Home / Youi / Determination 998664

Determination 998664

Denial of intentional damage claim for collapsed boundary wall and damaged shed

FirmYoui
Decided2024-02-23
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The insurer declined a home insurance claim for a collapsed boundary wall and damaged shed, saying the neighbouring builder's excavation was negligent rather than intentional. AFCA found the damage was more likely intentional and required the insurer to accept the claim, including the earlier 2022 demolition damage, with a 50% share of the dividing fence cost.

The complainant showed on the balance of probabilities a claimable loss under the 'intentional damage' insured event, and the insurer relied on no exclusion.

Issues

Subjects and remedies

home or building damagethird party authoritypay claim

Related

All Youi determinations · Find similar determinations

Text of the determination

Determination Case number 998664 Financial firm Youi Pty Ltd Determination | Case number: 998664 Page 1 of 5 Case number: 998664 12 February 2024 1 Determination overview 1.1 Complaint The complainant holds home building insurance with the financial firm (insurer). On 15 June 2023, he lodged an intentional damage claim after his rear boundary wall collapsed and his shed was damaged due to excavation work by builder/developer HB next door. The insurer denied the claim. It says that the complainant has not established that HB intended to cause the damage. Rather, the damage was likely due to HB ’s neglige nce. The insurer accepts that HB ’s demolition of the wall’s top section in early 2022 was intentional and has offered to accept a separate claim for that damage. The complainant maintains that HB deliberately undermined the wall with the intention of causing it to collapse. He wants the insurer to accept all the damage claimed. 1.2 Issues and key findings Is the insurer entitled to deny the claim? No. On the exchanged information, the complainant has established it is more likely than not the damage was caused intentionally. The insurer has not relied on any policy exclusions. Why is the outcome fair? The complainant has established a claimable loss under the policy terms and the insurer has not relied on any exclusions. It is therefore fair to require the insurer to accept the claim. 1.3 Determination This determination is in favour of the complainant. If the complainant accepts this determination, the insurer is required to accept under the policy terms the claim for the wall’s collapse and the damage to the shed. The insurer is entitled to be paid the policy excess. The insurer is also to accept the damage to the wall due to the 2022 demolition of its top section. As that damage was from an intentional act that occurred in the prior policy period (29 October 2021 to 29 October 2022), a separate excess is payable. As the boundary wall was a dividing fence, the insurer is liable for 50% of its repair/replacement cost. If the insurer elects to pay a cash settlement, it must do so based on a current quote for the cost of claim related repairs actionable by a retail customer. It is also to pay a 15% uplift for contingencies and the loss of lifetime guarantee that applies to insurer approved repairs. Determination | Case number: 998664 Page 2 of 5 2 Reasons for determination The complainant is represented by family member JB. The complainant and JB are referred to in this determination as ‘the complainant’, unless context requ ires otherwise. 2.1 Is the insurer entitled to deny the claim? No. On the exchanged information, the complainant has established it is more likely than not the damage was caused intentionally. The insurer has not relied on any policy exclusions. Complainant is required to show a claimable loss under the policy The complainant is required to show on the balance of probabilities (that it is more likely than not), that he suffered a claimable loss under the policy. This means he must show the loss was caused by a risk for which he is insured. Subject to the terms and conditions set out in the product disclosure statement (PDS), the policy co vers damage to the complainant’s home caused by a listed insured event. One of those events is ‘intentional damage’. The PDS does not define ‘intentional’, so it’s usual and ordinary meaning is to be applied. By reference to the Macquarie Dictionary, I am satisfied the usual and ordinary meaning is: done with intention or on purpose: an intentional insult On 15 June 2023, the complainant lodged the claim. He told the insurer that earlier that day, his rear boundary brick wall had collapsed, and the heritage listed brick shed attached to and forming part of the wall had been damaged. He said HB had deliberately excavated next to the wall to cause it to fall. He also noted HB had wanted to get rid of the wall for years. Once the complainant proves the existence of a claimable loss, the insurer is liable for the loss unless it shows an exclusion or limiting condition applies. The i nsurer has the onus of proving on the balance of probabilities the application of the exclusion or condition. Insurer says complainant has not shown a claimable loss At the insurer’s request, builder AJ inspected the damage on 19 June 2023. AJ reported tha t: Upon my inspection of the property, I found that damage had been caused by clear action by the builder to the rear of the property, in which he has obviously undermined the brick wall of both the insured's owner's property and the neighbouring property surrounding, which has caused the brick wall to collapse. It was noted at the time of inspection that photos were shown demonstrating that the undermining had been dug up to 2m below the foundation in sand-based soil with the photos depicting a plumbing trench running below the wall foundations at a depth of approximately 2m. The builder to the rear of the property had staff working inside this trench on the day of the collapse and it must be noted that WorkSafe was notified of this issue. Determination | Case number: 998664 Page 3 of 5 The insurer ask ed AJ to confirm how it had reached its position. According to the insurer, AJ’s feedback indicated its position was largely based on information supplied by the complainant. The insurer says it is likely that the damage was caused by HB’s negligence, rath er than an intent to damage the wall and shed. It submits that:  the excavation works were for the purpose of installing plumbing, so completely unrelated to the wall  measures, whether adequate or not, were taken to brace the soil underneath the wall. This shows attempts were made to avoid undermining the wall  the complainant indicated underpinning of the wall was to be undertaken. Underpinning works are completed to support or strengthen a structure, not to undermine it  illegal demolition of a heritage structure is an offence carrying significant financial penalties  workers were present in the excavated area only three hours prior to the collapse. It is implausible that such a significant safety risk would be deliberately taken in the interests of removing the wall. The insurer submits that: It is not sufficient to show that the works were negligent. Intentional damage relies on there being a deliberate action with harm or wrongdoing to the insured property as the intended outcome. These facts do not support that the works conducted on 15 June 2023 were Intentional Damage. The insurer says the complainant has therefore not shown a claimable loss under the ‘intentional damage’ insured event. It has confirmed it does not rely on any exclusion. Complainant says damage was intentional The complainant says the damage that occurred on 15 June 2023 needs to be considered in the context of his longstanding dispute with HB concerning HB’s development project. The ongoing status of the wall has been an important part of that dispute. The complainant has provided a letter dated 2 March 2022 from lawyers AL to HB. AL’s clients (the complainant and other neighbours) had been told by HB that it intended demolishing and replacing the boundary wall. AL said that was not provided for under the relevant development certificate, and its clients did not consent to the proposed work. The complying development certificate (CDC) demolition plan signed by the private certifier on 15 March 2022 for the purpose of HB’s development specifically notes ‘rear wall old building not part of this CDC’ . That was a reference to the boundary wall, which was a wall from an old building that had otherwise been removed in the past. Despite AL’s letter , HB proceeded to remove a metre high section from the top of the wall. Photos provided by the complainant establish this had occurred by May 2022. On 14 December 2022, the complainant obtained an engineering report that confirmed the wall remained structurally sound. The complainant provided emails sent to and from his local council concerning HB’s activities. In an email sent to the council on the morning of 15 June 2023, JB said:  on 7 June 2023, she received a very threatening phone call from HB saying that if the wall falls over whilst he is underpinning it, there is nothing he can do about it  HB had begun excavating extremely close to the wall this morning. Determination | Case number: 998664 Page 4 of 5 The wall collapsed a few hours later. The complainant says that in the circumstances, it is clear HB works on 15 June 2023 were undertaken with the deliberate intention of causing the wall to collapse. He notes that is the conclusion reached by AJ, and that the insurer has not provided a supplementary report from AJ indicating its opinion was merely based on the complainant’s views . Insurer is not entitled to deny the claim Based on the exchanged information, I am satisfied that it is more likely than not damage to the wall and shed was caused intentionally. This is because:  I accept HB wanted to demolish the wall for a number of years  despite receiving AL’s letter stating the wall was not the subject of the CDC and the neighbours (including the complainant) did not consent to its demolition, HB removed the wall’s top section in around May 2022  HB’s comments made on 7 June 2023 to JB may reason ably be seen as an attempt to set up an excuse for what in fact occurred a week later – the wall’s collapse. At the very least, it was an acknowledgement that there was a risk the wall could collapse due to the work  despite that risk, HB dug a two metre trench immediately below the wall and shed  within hours of doing so the wall collapsed, and the shed was damaged  AJ’s report supports the complainant’s position. I have also taken into account the following information from the insurer’s claim notes:  an entr y dated 19 June 2023 noted ‘the damage to the wall and structures appears to be from wilful and deliberate actions by the adjoining builder, with a clear knowledge that the collapse and damage were the likely outcome’  on 25 July 2023, in response to the in surer’s query on the basis for its conclusions, AJ said it relied on discussions with the complainant and photographic evidence they had collected over the prior year  on 3 August 2023, in response to a request by the insurer for a supplementary report, AJ verbally advised that there was further evidence supporting the view that the damage had been deliberately caused. It maintained its opinion that was the case. The insurer is therefore not entitled to deny the claim. 2.2 Why is the outcome fair? The complainant has established a claimable loss under the policy terms and the insurer has not relied on any exclusions. It is therefore fair to require the insurer to accept the claim. Determination | Case number: 998664 Page 5 of 5 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fa irness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. I have reviewed and considered all the information the parties have provided. While the parties have raised several issues in their submissions, I have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.