Home / Suncorp Group / Determination 990524

Determination 990524

Storm damage claim: driveway cash settlement amount, declined garage slab and timber floor damage, and delay

FirmSuncorp Group
Decided2024-04-29
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded—
Non-financial loss$2,500
Amount claimed—
SourceAFCA PDF

Summary

Homeowners claimed for storm damage to their driveway, garage slab and timber floor. AFCA found the insurer entitled to cash-settle the driveway but required it to assess the complainants' quote and work out a fair settlement, upheld the decline of the garage and floor damage, and awarded $2,500 for delay.

The insurer cannot repair the driveway without stabilising soil (not covered) so may cash-settle, but its quotes were unreliable; the garage and floor damage was not caused by a single storm event; delay warranted non-financial loss compensation.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimpay non financial lossreassess claim

Related

All Suncorp Group determinations · Find similar determinations

Text of the determination

Determination Case number 990524 Financial firm AAI Limited Determination | Case number: 990524 Page 1 of 11 Case number: 990524 25 March 2024 1 Determination overview 1.1 Complaint The complainants hold a home insurance policy with the financial firm (the insurer). They lodged a claim after a series of heavy storms in early 2022. They say the storms caused:  the partial collapse of the driveway  cracking to the garage slab  movement and squeaking in part of the house ’s timber floor. The insurer says it will pay $243,254.22 to repair the driveway. It says it will not pay to repair the garage slab or the house floor. The complainants want the insurer to cover all of the claimed damage. They also want the insurer to repair the damage instead of paying the cost of repairs. 1.2 Issues and key findings Is the insurer entitled to cash-settle the claim? Yes. The insurer cannot repair the driveway without stabilising the soil. The policy does not cover the cost of stabilising the soil. The insurer must obtain further information to determine a fair cash-settlement amount. Is the insurer required to cover the disputed damage? No. The insurer is not required to cover the damage to the garage and house. The available information indicates this damage was not caused by the storms. Are the complainants entitled to other compensation? Yes. The insurer has delayed the resolution of the claim, leaving the complainants with no safe way to access their home. The insurer should pay the complainants $2,500 in compensation for non-financial loss. Why is the outcome fair? The insurer has agreed to pay the cost of repairing the driveway. The available information is insufficient to determine this cost. The fairest outcome is to require the parties to obtain further information to determine the cost of repairing the driveway. 1.3 Determination This determination is mostly in favour of the insurer. The insurer must pay a cash settlement based on the cost of repairing the driveway (excluding the cost of stabilising the soil). The parties must work together to determine a fair settlement sum as set out in section 2.1 of this determination. The insurer must pay the complainants $2,500 in compensation for non-financial loss. Determination | Case number: 990524 Page 2 of 11 2 Reasons for determination 2.1 Is the insurer entitled to cash-settle the claim? Yes. The insurer cannot repair the driveway without stabilising the soil. The policy does not cover the cost of stabilising the soil. The insurer must obtain further information to determine a fair cash-settlement amount. Policy covers damage caused by storm (or series of storms) The cover provided by the policy is set out in the product disclosure statement. Relevant policy terms are quoted in section 3.2 of this determination. The policy covers damage caused by ‘insured events’ , including ‘flood’ and ‘storm’. The policy says it only covers damage caused by ‘a single event’. For example, it covers damage caused by ‘a single storm event’ but does not cover damage caused by ‘rain over time’. The policy says: ‘A series of incidents attributable to one source of originating cause is deemed to be the one incident.’ The insured property is in New South Wales, which was subjected to a series of heavy storms from late February 2022 to early March 2022. Under the policy, these storms can be treated as a single insured event. Complainants claimed for damage to driveway The complainants lodged the claim on 4 March 2022. They said the recent rain had damaged their driveway. The home buildings are set high above the road. The driveway’s upper portion has a wide area for cars to turn around and park. The driveway’s lower portion is a steep, narrow slope connecting the parking area to the road. Photographs show the ground collapsed under the east side of the parking area. Part of the driveway slab broke off, and part of it was left hanging in mid-air. Experts disagreed on cause of damage The insurer appointed a builder (KBA), who inspected the home on 10 May 2022. KBA said the damage to the driveway was caused by ‘the recent floods’. The insurer appointed an engineer (CRD), who inspected the home on 2 June 2022. CRD said: ‘ the collapse of the driveway can be attributed to single event, that is, the March 2022 storm events ’. KBA provided a quote to ‘ replace the northern portion of the concrete driveway ’. The quote was dated 15 September 2022 and totalled $361,679.23 (including 35% builder’s margin and 10% GST). The insurer noted: ‘ This appears high for the works required. ’. Because of the high quote, the insurer assigned an internal building coordinator to review the claim. On 19 December 2022, the insurer’s building coordinator inspected the home with a new engineer (FMG) and KBA. FMG inspected the home, but made no relevant comments about the driveway. The building coordinator and KBA noted the driveway had subsided since the initial collapse, despite temporary propping. Determination | Case number: 990524 Page 3 of 11 The insurer appointed a geotechnical engineer (AGS), who inspected the property on 16 March 2023. AGS provided recommendations for reinstating the driveway, but said these recommendations were ‘ only preliminary ’. They said the site was ‘ potentially unstable and dangerous ’, and should be investigated further before any construction. The insurer appointed another engineer (MCS), who inspected the home on 12 May 2023. MCS said the driveway failed during a storm, but the storm was not the proximate (dominant) cause of damage. MCS said the cause of damage was ‘ uncontrolled fill in the area which has resulted in embankment failure on a number of occ asions within the past 10 years’ . Insurer agreed to cover driveway damage After receiving MCS’ report, the insurer said the damage to the driveway was not covered under the policy. However, it had previously told the complainants the damage would be covered. The insurer decided to settle this aspect of the claim by paying the cost of repairing the driveway, but not the cost of repairing the ground supporting the driveway. The insurer has agreed to cover the damage to the driveway. Therefore, the panel does not need to determine whether the policy covers this damage. Insurer has offered cash settlement for driveway damage The insurer obtained quotes from a builder (RCC) for the following amounts (including 16- 17% builder’s margin, 20% ‘event margin’, and 10% GST) :  $192,578.88 to repair of the upper portion of the driveway (quote dated 2 July 2023)  $34,032.06 to construct a temporary driveway (quote dated 19 June 2023)  $16,643.28 to remove the temporary driveway (quote dated 19 June 2023). These amounts total $243,254.22. The insurer offered to pay this amount to settle the claim for driveway damage. The insurer also offered to assess any quote provided by the complainant. Insurer cannot repair driveway without stabilising soil The policy says the insurer will appoint a builder to repair insured damage, unless this is not possible. The insurer says it cannot appoint a builder to complete the repairs because the ground at the site is unstable. AGS said the slope was ‘ potentially unstable and dangerous ’. MCS’ report included aerial photos of the site from 2011 (before the buildings were constructed) to 2023. The photos showed there was a landslide on the east side of the driveway in 2016 (before the driveway was sealed). The complainants told the insurer’s investigator the driveway was damaged in 2021. The damage was similar to the damage that occurred in 2022 (though nowhere near as severe). They lodged a claim for this damage with their previous insurer, but the claim was denied. They paid to repair the driveway, adding a curb and gutter. The ground under the driveway collapsed again in March 2022. It has continued to collapse since then, despite propping. The available information indicates the ground at the site is unstable. The insurer could not reasonably appoint a builder to repair the driveway without stabilising the soil. Determination | Case number: 990524 Page 4 of 11 Insurer not liable for cost of stabilising soil The policy covers ‘buildings’. The policy’s definition of ‘buildings’ excludes ‘ loose or compacted soil ’. The policy covers some kinds of damage caused by soil movement, but it does not cover damage to the soil itself. The policy does not cover the costs of stabilising the soil on the site, or reinstating soil that has collapsed. The insurer cannot appoint a builder to repair the driveway unless the soil is stabilised, which the insurer is not responsible for. In these circumstances, the policy entitles the insurer to cash-settle the claim. The panel believes it is fair for the insurer to cash-settle the claim. Insurer must assess complainant’s quote The policy says, if the insurer cannot appoint a builder to repair insured damage, it will settle the claim as follows:  the complainants will appoint a builder to provide a scope of works and quote  the insurer will assess the scope of works and quote  if the quote is reasonable, the insurer will pay the amount of the quote. If the quote is not reasonable, the insurer may adjust the quote and pay the amount of the adjusted quote. The complainants have provided a quote dated 14 August 2023 to reinstate the driveway for $732,918.15 (ex GST). They say this does not include installing and removing a temporary driveway, which will be required to access the property during construction. The insurer has not assessed the complainants’ quote. The complainants say they sent it to the insurer, but it is not clear whether the insurer received it. AFCA provided a copy of the quote to the insurer on 19 February 2024. The insurer must assess the complainants’ quote in accordance with the policy. If the insurer determines the quote is not reasonable, it may adjust the quote and pay the amount of the adjusted quote. If the quote includes the costs of stabilising or reinstating soil, the insurer may adjust the quote to remove those costs. Insurer must consider all policy entitlements After assessing the complainants’ quote, the insurer must calculate a fair settlem ent sum, and give the complainants a written explanation of its calculation. The policy provides cover for the costs of:  repairing the driveway on a ‘new for old’ basis (but not to a better standard than when it was new)  any temporary work required to make the site safe  making the driveway comply with relevant building regulations (but only if it complied with the relevant building regulations in force when it was built)  temporary accommodation (which the complainants say they will need if a temporary driveway is not constructed)  professionals, such as architects or surveyors, reasonably necessary to complete repairs (bearing in mind the experts’ advice that the repairs should be designed with input from a geotechnical engineer). The insurer’s settlemen t must account for the above entitlements. However, the settlement does not need to include the costs of stabilising soil or reinstating collapsed soil. Determination | Case number: 990524 Page 5 of 11 Insurer may need further information to determine cost of repairs The insurer’s building coordinator said a geotechnical engineer would be required to determine the correct repair method for the driveway. A geotechnical engineer (AGS) made preliminary recommendations, but said further investigation was required to determine the correct repair method. After this, MCS inspected the property, but did not prepare a scope of works, and did not set out a method for repairing the driveway. Since then, no other engineers have provided opinions. For the above reasons, the insurer may need to obtain further engineering reports to determine the correct repair method for the driveway, and the cost of repairs. Insurer must consider whether upper portion could be repaired in isolation The insurer says it will pay to repair the upper portion of the driveway, but not the lower portion. The available information does not show the lower portion was damaged by an insured event. However, it is not clear whether it would be practicable to repair the upper portion in isolation. The insurer’s building coordinator says it is possib le to repair the upper portion without repairing the lower portion. He says RCC confirmed this. However, RCC has not confirmed this in writing. AGS said: ‘The concrete driveway slab should be reconstructed…’ AGS did not suggest reconstructing only part of the driveway slab. MCS recommended repairing the driveway ‘by incorporating both repair of the damaged running surface (on the lower portion) as well as rectification of the poor quality of fill (which damaged the upper portion)’. MCS did not say whether it would be possible to repair the upper portion in isolation. In determining the correct repair method for the driveway, and the cost of repairs, the insurer must consider whether it would be possible to repair the upper portion in isolation. If the insurer maintains that it will only pay to repair the upper portion, it must provide expert evidence confirming this repair method is practicable (or would be, if the soil supporting the driveway was stable). Parties must work together to determine settlement The insurer may ask the complainants to provide information, or access to the property, to help it decide how to settle the claim. The complainants must comply with the insurer’s reasonable requests. The parties must work together to determine how to settle the claim. If the parties cannot agree on a fair claim settlement, the complainant may lodge another AFCA complaint. 2.2 Is the insurer required to cover the disputed damage? No. The insurer is not required to cover the damage to the garage and house. The available information indicates this damage was not caused by the storms. Insurer not required to cover garage slab The complainants say the rainfall caused cracking in the garage slab. Determination | Case number: 990524 Page 6 of 11 CRD (on 2 June 2022) inspected the garage, but did not record any cracking to the slab. KBA (on 4 November 2022) took photos showing cracks in the garage slab. They said the cracks formed because the slab had no control joints. FMG (on 19 December 2022) said the cracks formed because of:  typical drying shrinkage of the concrete  a lack of movement joints in the slab  ground movement caused by water entering the soil. This water was not solely due to the heavy rain in early 2022 (though it would have contributed). The cracks would have formed, and gradually worsened over time, regardless of whether the heavy rain occurred in early 2022. MCS (on 12 May 2023) said the cracks formed because of a lack of control joints. They noted the garage footings were designed for class M soil, but it was actually built on class P soil. They said the cracks were not caused by the heavy rain in early 2022. None of the experts who inspected the home said the garage slab cracks were caused by a single storm, or a single series of related storms. The available information does not show the garage slab was damaged by an insured event. The insurer is not required to cover this damage. Insurer not required to cover timber floor The complainants say parts of their timber floor move and squeak when stepped on. The insurer appointed a timber flooring expert (AFT), who inspected the home on 20 December 2022. AFT said the movement and squeaking could be due to a skewed or misaligned fixing, or movement of the home. They did not say whether any such movement might have been caused by an insured event. FMG (on 7 March 2023) said the squeaking was due to:  misaligned fixing of the particleboard to the joist, which they observed in the subfloor  long-term movement of the footings. Heavy rain would have exacerbated the movement, as footing movement is affected by weather. However, the movement was occurring before 2022. The available information indicates the timber floor was damaged by building movement. The heavy rain in early 2022 would have contributed to this movement. However, this was a continuation of movement that was already occurring, and would have continued without those storms. No movement can be attributed specifically to the rainfall in early 2022. The policy only covers damage caused by a single incident, or a series of related incidents. Based on the available information, the damage to the timber floor cannot be attributed to a single storm, or a single series of related storms. The insurer is not required to cover this damage. 2.3 Are the complainants entitled to other compensation? Yes. The insurer has delayed the resolution of the claim, leaving the complainants with no safe way to access their home. The insurer must pay the complainants $2,500 in compensation for non-financial loss. Determination | Case number: 990524 Page 7 of 11 AFCA can award compensation for non-financial loss Under the AFCA Rules, we can award up to $5,400 compensation for non-financial loss if a complainant suffered an unusual degree of stress, inconvenience, or delay because an insurer mishandled a claim. We do not award compensation for the usual amount of inconvenience involved in making a claim. We do not award compensation for delays caused by the complainant, or other factors outside the insurer’s control. Insurer caused delay The com plainants’ driveway was damaged in March 2022. Almost two years later, it has not been repaired. The main factor delaying the claim was the time taken by the insurer to obtain expert reports. Obtaining those reports was necessary, and there is no information showing the insurer could have done it more quickly. On 19 December 2022, the insurer said it would need engineering advice to determine the correct repair method for the driveway. However, the insurer did not obtain this advice. The last inspection was by MCS on 12 May 2023. The insurer asked MCS to prepare a scope of works to repair claim-related damage. MCS concluded none of the damage was claim- related, so it did not prepare a scope of works. The insurer decided to pay the cost of repairing the driveway, despite MCS’ advice. However, it did not ask MCS or any other engineer to determine the correct repair method. From 6 July 2023, the insurer offered to cash-settle the claim for driveway damage based on RCC’s quotes. However, these quotes were prepare d without the necessary engineering advice, so they were not a reliable estimate of the cost of repairs. The insurer may need to obtain further engineering reports to determine the cost of repairing the driveway. This will delay the resolution of the claim. Delay caused stress and inconvenience for complainants On 21 April 2023, the insurer said the complainants should not use their driveway because it was unsafe. The insurer said it was considering arranging an alternative driveway or temporary accommodation. Neither of these have been arranged. The complainants say they are still using the driveway because there is no other safe way to access the home. The delay in resolving the claim has caused the complainants stress and inconvenience. The insurer should pay the complainants compensation for non-financial loss in the sum of $2,500. 2.4 Why is the outcome fair? The insurer has agreed to pay the cost of repairing the driveway. The available information is insufficient to determine this cost. The fairest outcome is to require the parties to obtain further information to determine the cost of repairing the driveway. Determination | Case number: 990524 Page 8 of 11 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided. While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. A panel determined this matter Due to the nature of this complaint, we referred it to a panel for determination. The panel includes:  an ombudsman  a member with extensive experience in consumer and small business advocacy  a member with extensive experience in insurance. One complainant represented both complainants In this determination, statements by one complainant are treated as if they were made jointly by both complainants. 3.2 Relevant policy terms Product Disclosure Statement – Home Building Insurance What we cover – the basics (pages 17 – 22) What we cover as the building We cover The building that you own or are responsible for and use primarily for domestic purposes and described as ‘The building’ on your certificate of insurance (if it shows a description of ‘The building’) including the following at the ins ured address: …  sealed driveways or sealed roads (limits apply );  outdoor walls, gates, fences (limits apply) and ret aining walls which are located within the boundaries of the ins ured address; … Determination | Case number: 990524 Page 9 of 11 What we don’t cover as the building We don’t cover Building does not include: …  loose or compacted soil, sand, lawn, grass, artificial grass, gravel (including on roads, driveways and tracks), pebbles, rocks or granular rubber; … Things we don’t cover (pages 23 – 36) Things we don’t cover Loss or damage to, or caused by, connected with or arising from, or liability caused by, connected with or arising from: Ground movement erosion, vibration, subsidence, landslip, landslide, mudslide, collapse, shrinkage or any other eart h movement, but we will cover landslide or subsidence that is specifically covered under the following insured events:  ‘Flood’ (but only if you have cover for insured event ‘Flood’) page 39;  ‘Storm’ page 41;  ‘Storm surge’ page 42;  ‘Earthquake and Tsunami’ page 45;  ‘Escape of liquid’ page 47;  ‘Explosion’ page 50. Wear, tear and gradual deterioration any part of the buildin g that has wear, tear, rust, fading, rising damp, corrosion, rot, action of light, atmospheric or climatic conditions or gradual det erioration such as, but not limited to:  tiles and their adhesive or grouting breaking down;  weat hering of roof tiles or roof ridge capping;  gradual weathering and breakdown of bricks, mortar or concrete. What we cover – the details (pages 37 – 52) What you are covered for - Insured Events Loss or damage to the building We cover We cover loss or damage to your building at the insured address caused by an insured event in the period of insurance. The insured events we cover are set out on pages 39 to 52. We don’t cover We don’t cover anything in section 3 ‘Things we don’t cover’ on pages 23 to 36. There are also things that we don’t cover set out in sections 4 to 6 on pages 37 to 70. … Determination | Case number: 990524 Page 10 of 11 ! We do not insure wear, tear or gradual deterioration. For full details, see page 30. ! When making a claim you must be able to prove that an incident covered by your policy took place. An incident means a single event, accident or occurrence which you did not intend or expect to happen (e.g. it means a single storm event, it does not mean rain over time). Flood We cover Loss or damage caused by a flood. We don’t cover …  loss or damage caus ed by erosion, vibration, subsidence, landslip, landslide, mudslide, collapse, shrinkage or any other earth movement, but we will cover damage to the building caused by a landslide or subsidence proved to have occurred within 72 hours of , and directly because of, flood and not because of erosion, structural fault or design fault. Storm We cover Loss or damage caused by a storm. We don’t cover …  loss or damage caus ed by erosion, vibration, subsidence, landslip, landslide, mudslide, collapse, shrinkage or any other earth movement, but we will cover loss or damage to the building caused by a landslide or subsidence proved to have occurred within 72 hours of, and directly because of, a storm and not because of erosion, structural fault or design fault; … Making a claim (pages 71 – 86) How we settle building claims We will aim to use a member of our supplier network to repair or rebuild the damage to the building. Sometimes, this is not always possible e.g. if there is pre - existing damage. This will determine how the building claim will be settled. When a member from our supplier network can complete the repair or rebuild When your claim for loss o r damage to the building is covered, we will engage a builder from our supplier net work to prepare a scope of works and provide a quote on the cost to repair or rebuild the building on a ‘new for old’ basis. Once the scope of works and quote is provided to us, we will arrange for it to be assessed. This will involve reviewing the quote to make sure that the quote is appropriat e and reasonable for the scope of works. This includes a consideration of the appropriateness of materials, repair method, labour and mat erial costs and overall cost. … Determination | Case number: 990524 Page 11 of 11 When a member of our supplier network is unable to complete the repair or rebuild and you have a building sum insured When your claim for loss or damage to the building is covered and a member of our supplier network is unable to complete the repair or rebuild, we will ask you to engage a builder to provide a scope of works and provide a quot e on the cost to repair or rebuild the building on a ‘new for old’ basis. Once the scope of works and quote is provided to us, we will arrange for it to be assessed. This will involve reviewing the quote to determine it is appropriate and reasonable for the scope of works. This includes a consideration of the appropriateness of materials, repair method, labour and material costs and overall cost effectiveness. If the quote is appropriate and reasonable for the scope of works, we will then pay you the assessed amount. If it is not, the quote may be adjusted. This may include, adjusting the scope of works or the quote. We will then pay you the adjusted amount of the quote. If we pay you for the repair or rebuild, the Lifetime guarantee on building repairs does not apply, see page 84. … ‘New for old’ means:  rebuild or repair with new items or new materials that are reasonably or readily available at the time of replacement or repair from Australian suppliers;  rebuild or repair regardless of age, with no allowance for depreciation. … ‘New for old’ does not:  include paying the extra cost of replacing or purchasing an extended warranty on any item;  mean of a better standard, specification or quality than when new. Words with special meanings (pages 103 – 107) Some words in this policy have a special meaning. It is important to read this section because it can impact how your policy is interpreted. Incident means a single event, accident or occurrence which you did not intend or expect to happen. A series of incidents attributable to one source of originating cause is deemed to be the one incident.