The complainant claimed for flood damage to her home; the insurer accepted part and declined cracking damage as pre-existing or due to foundation movement. AFCA required the insurer to cover fresh internal cracks by repair or cash settlement plus 15% contingency, but upheld the decline for external and pre-existing damage.
Expert evidence showed external and slab cracking was pre-existing foundation movement, but the insurer failed to prove fresh internal wall and ceiling cracks were excluded, given 36 hours of inundation.
Issues
- Claim denial primary · upheld
“Insurer has not been successful in showing an entitlement to decline cover for fresh internal cracks to walls, cornices and ceilings; external and pre-existing damage decline fair.”
- Inadequate claim investigation secondary · upheld
“T has not provided any information to support or explain this; cause of dropping sheets unknown, no evidence shown to be excluded.”
Subjects and remedies
home or building damagenatural disasterpay claimrepair or rectify
Text of the determination
Determination
Case number 989092
Financial firm Allianz Australia Insurance Limited
Determination | Case number: 989092 Page 1 of 5
Case number: 989092 14 March 2024
1 Determination overview
1.1 Complaint
The complainant holds a home building insurance policy with the financial firm (insurer). The
complainant lodged a claim for damage to her property following a flood event in February
2022. The insurer has partially accepted the claim offering the cash settlement of
$151,488.84 for damage it has assessed to be due to the flood event.
The insurer has declined to cover internal and external cracking damage it says it not related
to or caused by the flood event. The insurer says this is pre-existing damage and/or due to
circumstances excluded under the policy.
The complainant says the cracks have developed in her property because of the flood and
requests the insurer to pay for the cost to repair this damage.
1.2 Issues and key findings
Is the insurer ’s assessment of its liability under the policy reasonable?
No. The available information shows some of the internal cracking damage to the walls and
ceilings is fresh and most likely due to the flood event. However, it is fair that the insurer be
entitled to decline cover for the external walls, cracks to the concrete slabs, cracks to the
patio flooring/tiles and areas which have been shown to have been previously patched by the
complainant since purchasing the home.
Why is the outcome fair?
The outcome is fair because it is based on the information provided by the parties and the
policy. It is fair to accept, in addition to the damage already accepted under the claim, the
insurer is to cover the cost to repair the non-structural fresh internal cracking damage. It is
also fair that the insurer be allowed to decline cover for what has been shown to be pre-
existing damage and due to ongoing foundation movement.
1.3 Determination
This determination is partially in favour of the complainant. Within 14 days of receiving notice
of the compla inant’s acceptance of this determination, the insurer is to:
arrange for a suitably qualified builder to provide an actionable repair quote for the damage
in the form of internal cracks to the walls, cornices and ceiling stress
the insurer at its discretion can either arrange for the repairs to be completed or
alternatively cash settle the complainant for the cost of these repairs
if cash settled, the settlement is to be increased by a further 15% to allow for
contingencies.
Determination | Case number: 989092 Page 2 of 5
2 Reasons for Determination
2.1 Is the insurer ’s assessment of its liability fair?
No. The available information shows some but not all the cracking damage to the internal
walls and ceiling is fresh and most likely due to the flood event. However, it is fair that the
insurer be entitled to decline cover for the external cracking, cracks to the concrete slabs,
cracks to the patio flooring/tiles and areas which have been shown to have been previously
patched by the complainant since purchasing the home.
No dispute the complainant has established damage that triggers cover
There is no dispute the insured property has suffered significant damage due to a flood event
in February 2022. The insurer has accepted the claim and offered (cash settled) the
complainant $151,488.84 towards damage it accepts to be consistent with the flooding event.
The insurer has declined to cover for certain internal and external areas of cracking damage
as well as sagging ceilings on the basis this is not damage caused by the flood event. The
insurer says the excluded damage is not due to the flood. Rather, that it is old damage, and
which has occurred over a long period of time due to foundation movement, which is
excluded under the policy.
Complainant says flood caused the cracks
The complainant accepts the house did present with some movement damage before the
flood event in February 2022, and that her home was not perfect. However, she says there
are cracks that have appeared since the flood event, and the insurer should be required to
cover all this damage.
The complainant relies on her appointed engineering consultants ‘F’ who after completing an
assessment has provided a report dated 17 April 2022. Th complainant points out that F says:
Protracted floods events would be expected to cause soil saturation and softening
at depth and this would be likely to exacerbate footing and slab settlements and
house damages.
Information from appointed consultants is reasonably consistent
I acknowledge the complainant’s position and reference to the report from F. Ho wever, having
reviewed this report in its entirety, I am not satisfied it supports a view that all the external and
internal cracking damage claimed is due to the flood event. Rather, I am of the view most of
the information in this report supports the ins urer’s position. I note F says:
it is highly likely that there has been long term consolidation of loose material under the
footings predominantly at the east and south sides and this has caused the settlements
and damages. It is also likely that the settlements and damages are ongoing
it is likely that the house settlements had been occurring from when the house was being
constructed and have been ongoing ever since
t he house has severe differential settlements and damages, some of which are ongoing,
and underpinning is required.
The insurer appointed building consultants ‘J’ to inspect the insured building and determine
the cause and extent of the damage. J has provided a report dated 4 May 2022 which notes
Determination | Case number: 989092 Page 3 of 5
that there is damage consistent with the flood event as well as some water ingress damage
due to maintenance related issues. J recommended the appointment of an engineer to
determine the cause and extent of damage caused by the flood event.
The insurer appointed engineering consultants ‘T’ who vis ited the insured property on 4 May
2022 (external inspection) and 17 October 2022 (internal inspection). T has provided two
reports dated 18 May 2022 and 19 January 2023. With respect to its assessment of the
external areas of the home, T says:
the site is located on the Brisbane River flood plain and as such the founding soils are
alluvial, reactive and of poor quality
the Brisbane City Council Flood Awareness Map indicates the site was flooded in the
January 1974 and January 2011 floods
there is a considerable body of evidence from the observations made during the
inspection, that the movement damage to the external areas has occurred some time ago
with evidence of previous repairs/patching
the head over the sliding glass door (observation 8) has been constructed in this position
which indicates the movement had occurred prior to the enclosure of the original patio area
i n T’s opinion that the visible damage resulting from building movement is not due to the
flood event in February 2022. Rather, that the evidence suggests the movement has
occurred in the past as many of the cracks have been previously filled and patched.
With respect to the internal damage in dispute, T says:
the level survey results for the internal areas show that the house has pre-existing fall from
the front of the house to the rear, in particular the southeast corner of the house
there are cracks in the floor slab which have paint in the crack areas, indicating the cracks
were pre-existent to the last renovation
cracks in gyprock ceilings were evident and were generally located in the areas where
gyprock commonly cracks
most of the defects in the ceilings and cornice are due to the material movement created
by the shrinkage and expansion of the gyprock ceilings, and the detailing of the expansion
joints installed
the cause of the dropping sheets at the expansion joint is not known
the visible internal damage is not structural, has resulted from movement in the gyprock
ceilings and has not been caused by the flood event in February 2022.
Complainant accepts the insured building did have pre-existing damage
I note the complainant says she purchased the property in 2014, at which time she was
informed the property was in a flood plain, so she made sure to have flood cover.
The complainant in her communications with the insurer and AFCA concedes that the insured
building was not in perfect condition before the February 2022 flood event. Also, that prior to
the flood event the insured building did present with movement damage, some of which has
been patched in the past.
However, the complainant says some of the cracks noted to the insured building have
appeared after and due to the flood event, and therefore, should be covered by the insurer.
Insurer has shown external cracking damage is not covered under the policy
The insurer says all the excluded cracks have occurred because of soil movement over time,
material expansion and gradual deterioration which the policy excludes.
Determination | Case number: 989092 Page 4 of 5
I accept the insurer has provided reasonably compelling information in support of the view
that all the external cracking to the brickwork, concrete slabs, patio tiles etc is not the result of
the flood event.
It is most likely this damage pre-existed the flood event with clear evidence of previous repair
attempts. It is possible that the flooding event has exacerbated and/or re-opened the cracks,
but I am satisfied the damage was already present and not covered under the policy.
Insurer to increase cover under the claim to include fresh internal cracks
I accept there exists damage within the home that has also been shown to most likely have
been present prior to the flood event in 2022, this being cracking damage to the floor slab and
the pre-existing fall (floor level issues) from the front to rear of the house. This damage is
consistent with long term foundational movement and not the flood event.
In saying that, I am not satisfied there is persuasive information to decline cover for the more
recent and fresh internal cracking and distress to the ceilings, cornices and walls within the
home. I note T says these cracks are in locations were gyprock commonly cracks, however, T
has not provided any information to support and/or explain this. This comment alone, in my
opinion, it not enough to show this damage to fall within the policy exclusions.
I note T acknowledges the cause of the dropping sheets at the expansion joints is unknown
and does not provide any evidence to show the cause to be excluded under the policy.
Merely saying this damage is not due to the flood event, in the absence of any persuasive
supporting information, is not adequate to establish this damage is excluded under the policy.
There is no dispute the floodwaters remained within the insured building for around 36 hours.
I accept it is reasonable to accept this is a significant period of inundation and that this will
have caused and/or contributed to the fresh cracks noted to the walls and ceilings above the
water inundation level.
Having considered the available information, I am satisfied the internal cracks to the walls,
cornices and ceiling distress (including the garage ceiling) appears to be fresh and recent
damage. I am satisfied, in the absence of compelling information to the contrary, it is fair to
accept this damage is due to the flood event, and the insurer has not been successful in
showing an entitlement to decline cover for this damage.
Insurer to increase level of indemnity offered under the claim
In line with the above, within 14 days of receiving notice of the complainant’s acceptance of
this determination, the insurer is to:
arrange for a suitably qualified builder to provide an actionable repair quote for the damage
in the form of internal cracks to the walls, cornices and ceiling stress
the insurer at its discretion can either arrange for the repairs to be completed or
alternatively cash settle the complainant for the cost of these repairs
if cash settled, the settlement is to be increased by a further 15% to allow for
contingencies.
2.2 Why is the outcome fair?
The outcome is fair because it is based on the information provided by the parties and the
policy. It is fair to accept, in addition to the damage already accepted under the claim, the
insurer is to cover the cost to repair the non-structural fresh internal cracking damage. It is
Determination | Case number: 989092 Page 5 of 5
also fair that the insurer be allowed to decline cover for what has been shown to be pre-
existing damage as well as that assessed to be due to ongoing foundation movement.
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all the information the parties have provided.
While the parties have raised several issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.