Incorrect roof sheeting installed by insurer's repairer; cash settlement and non-financial loss
Text of the determination
Determination
Case number 988630
Financial firm HDI Global Specialty SE
Determination | Case number: 988630 Page 1 of 8
Case number: 988630 15 December 2023
1 Determination overview
1.1 Complaint
Mr and Mrs R operated a farming partnership (together described in this Determination as the
complainant) which held a farm policy with the financial firm (insurer).
The complainant made a claim regarding the complainant‟s house property (described in the
policy as an owner-occupied dwelling) in rural New South Wales which was insured under the
policy. The claim related to hail damage to the roof of the dwelling which occurred on 7
September 2018 and its subsequent repair by the insurer‟s repairer .
The insurer‟s rep airer, EP, conducted repairs to the roof. The insurer does not dispute that
EP installed incorrect roof sheeting materials.
The complainant was not satisfied with the incorrect sheeting and the quality of other repairs.
Since 2019 the parties have exchanged offers and counter-offers to resolve the claim for
repairs. However, the claim has not been resolved.
1.2 Issues and key findings
Has the insurer correctly assessed the claim in relation to the repair work?
No. The installation of the incorrect sheeting and the need for minor repairs did not comply
with the policy. After many years of failed attempts to resolve the dispute satisfactorily, a cash
settlement is appropriate which is inclusive of a 20% uplift for the transfer of risk and the loss
of the warranty.
Is the complainant entitled to compensation for non-financial loss?
Yes. The complainant is entitled to $2,000 compensation for non-financial loss.
Why is the outcome fair?
The outcome is fair as the insurer is required to comply with the terms of the policy and
provides the opportunity for finality and closure after four years. The complainant is also
entitled to an amount of non-financial loss compensation in the circumstances.
1.3 Determination
The determination is substantially in favour of the complainant. Within 21 days of the insurer
receiving written notice of the complainant‟s ac ceptance of this determination, the insurer is to
pay to the complainant:
$40,000 as a cash settlement for the incorrect roof sheeting and minor roof repairs
$2,000 for non-financial loss.
Determination | Case number: 988630 Page 2 of 8
2 Reasons for determination
There has been a full exchange of all material information relied on for the purposes of this
determination and each party has had the opportunity to address all issues.
This complaint has been determined based on what is fair in all the circumstances, having
regard to the relevant law, good industry practice, codes of practice and previous decisions
where applicable.
While the parties have raised numerous issues in their submissions and this complex and
complicated dispute has spanned over five years, for the purposes of this determination,
commentary has been restricted to those issues considered directly relevant to the outcome
only.
2.1 Has the insurer correctly assessed the claim in relation to
the repair work?
No. The installation of the incorrect sheeting and the need for minor repairs did not comply
with the policy. After many years of failed attempts to resolve the dispute satisfactorily, a cash
settlement is appropriate which is inclusive of a 20% uplift for the transfer of risk and the loss
of the warranty.
Complainant has the initial onus to establish a valid claim
The initial onus is with the complainant to establish on the balance of probabilities (that is
more likely than not) that the loss or damage claimed falls within the insuring provision of the
policy. This is known as a valid (or prima facie ) claim.
Once the complainant has established a valid claim, the onus shifts to the insurer to establish,
on balance, the application of a policy exclusion or that it is otherwise entitled to decline or
limit the claim under the policy.
The partnership was insured and authorised to make the complaint
There is no dispute that the complainant received the Certificate of Insurance (COI) and
Product Disclosure Statement (PDS) (together the policy).
Cover was on a replacement sum insured basis for the dwelling
The insuring clause in the policy provided that the insurer was required to:
pay the costs actually incurred to rebuild or repair the damaged portion of the dwelling „ as
nearly as practicable to the same condition and extent that it was when new ‟
to use „ house materials and construction methods ‟ which were commonly used at the time.
The insurer was also bound by the provisions of the General Code of Conduct where it
selected and directly authorised a repairer it „ will accept responsibility for the quality of [the
repairer ‟s] work and the materials ‟ the repairer used .
No dispute that the dwelling was damaged by hail
There is no dispute that the roof of the dwelling was damaged by hail on 7 July 2018.
Authorised by the insurer, the insurer‟s representative , EP, sought to repair the damage to the
roof with the approval of the complainant in October 2018.
Determination | Case number: 988630 Page 3 of 8
The complainant and the insurer’s repaire r entered into a SOW Contract
The complainant entered into a contract with EP in a Statement of Works dated 26 October
2018 ( EP Statement of Works Contract ). The EP Statement of Works Contract stated:
EP would organise the repairs
EP enclosed a copy of the Scope of Works ( SOW )
upon completion of all repair works, EP would provide a „ Completion Certificate ‟
The SOW stated:
MAIN ROOF
Metal Roofing
Colorbond - Remove and replace hail damaged roof sheeting to match existing
incl flashings and cappings – Material 590/m2 Labour 590/m2
The SOW contained terms and conditions between the complainant and EP:
clause 1.7 of the EP Statement of Works Contract stated under the heading “Damages
and sub- standard workmanship” - if at the end of the job the complainant was dissatisfied
with any aspect of the service, the complainant must inform EP as soon as possible
the complainant must allow EP to effect a remedy using EP‟s own tradespersons and
under no circumstances will it be held liable for the costs of reparations by third parties that
it has not expressly agreed to in writing.
On 26 October 2018 EP sent the EP Scope of Works Contract and a blank Completion
Certificate to the complainant. The complainant signed the EP Statement of Works Contract
and EP sought to undertake the repairs. Based on the information, a Certificate of
Completion has not been signed by the complainant at any stage.
The replacement roof sheeting was the incorrect thickness
EP commenced the repair works on the complainant‟s home and o n 4 December 2018 the
complainant wrote to the comp lainant‟s broker, IH:
the complainant requested an independent assessment of the works be undertaken due to
concerns about the dwelling‟s aesthetics due to the repair and rough sheet-trimming on
two valleys
the complainant stated tha t he would „also like to confirm the guage (sic, gauge) of the
corrugate has been replaced like-for- like‟
The complainant‟s broker, IH, forwarded the complainant‟s concerns to the insurer on 4
December 2018.
On 12 September 2019 EP:
offered a settlement „to reimburse [the complainant] for the difference in material gauge‟
stated it had „ no way of knowing that the materials were in fact 0.48BMT prior to installing
however we do acknowledge that there is a difference in the material costs installed. There
is no difference in material performance or warranties however as an attempt to resolve we
are willing to offer $9,345.60‟
On 19 December 2019 the complainant ‟s broker, IH, made a counter-offer of $59,261.40
based on a quote by the complainant‟s carpenter, ML, and stated:
there was significant visible warping of the lighter sheets
the lighter sheets are less durable and more easily damaged by traffic on the roof when
cleaning and maintaining infrastructure located on the roof (e.g. aerials, hot water system)
which significantly reduces the life span of the roof
Determination | Case number: 988630 Page 4 of 8
The complainant‟s carpenter‟s quotation for $59,261.40 was dated 28 November 2019 and
stated:
> remove and replace the roof „as the wrong gauge roofing iron has been installed ‟
> remove the current .42mm roofing iron and replace using the .48mm sheeting that was
previously on the roof
> replace all flashings and capping - 598M2 of roofing
> remove and replace the roofing insulation blanket and the existing roofing battens due
to this now being the third roof that will be installed using these battens the „ likelihood of
the battens maintaining structural integrity is low
> replace the metal roofing battens and the insulated roofing blanket - 598m2 of roofing
Complainant and insurer did not resolve the dispute and new issues arose
From March 2020 the complainant and the insurer communicated in numerous attempts to
resolve the dispute and new issues arose, including:
on 18 April 2020 the complai nant‟s broker, IH, advised P, the insurer‟s representative, that
the complainant agreed to the roof replacement but did not want EP to do the work
on 19 April 2020 P replied to IH that the complainant could either accept the difference
between the gauge of the sheets as offered by EP or, accept that EP „will reinstall the
roofing gauge to the requested size‟
between 19 April 2020 and 30 June 2020 the complainant‟s broker, IH, and the P
communicated about whether it was reasonable for the complainant to refuse to allow the
builder to rectify the work by reinstalling the roofing gauge to the requested size, namely
0.48 BMT
f rom 1 December 2020 further discussions occurred (including an issue in relation to „hail
denting/ da mage to wall‟ and solar panels)
on 9 February 2021 P advised IH that another roofing contractor would not be appointed,
the insurer stood by the decision for EP to rectify the roof sheeting and that:
> the solar installation costs were not covered by the policy
> the bruising to the wall was a separate issue which the complainant was requested to
provide a quote for consideration by the insurer
On 19 March 2021 IH advised P that there was „ agreement in principle ‟ by the complainant for
EP to proceed. However, issues arose as to pre-work and progress inspections and the
selection of an assessor.
The complainant was sent a cash settlement offer on 22 June 2021 by EP which had been
signed by EP and stated that it was to be signed and returned by the complainant by 2 July
2021. From 22 September 2021 to 13 January 2022 further communications occurred
regarding the proposed resolution and repairs to be conducted by EP between IH and P. The
complainant handwrote amendments on the offer and dated it 8 August 2022, crossed out
sections of text and a paragraph of the Settlement Deed and added additional words. EP did
not accept the complainant‟s Settlement document with the complainant‟s alterations.
The sheeting was incorrect
The complainant relied on the insurer ‟s acknowledgement that the sheeting was incorrect.
The complainant‟s carpenter‟s quotation for $59,261.40 dated 28 November 2019 stated that
„ the wrong gauge roofing iron has been installed ‟ and that the roofing insulation blanket and
the existing roofing battens needed to be removed and replaced.
Further, the complainant said:
0.48 BMT is a stronger product which:
> enhanced the structural strength of building
Determination | Case number: 988630 Page 5 of 8
> is used on properties in exposed, high-wind areas
> is used where foot traffic is required to maintain buildings
the dwelling had each of these three features
the complainant paid a premium price for a builder to use premium products in the
construction of the building
> one of the premium products was the heavier 0.48 BMT roofing material
the repair of the premium material with a lesser quality product thereby reduced the value
of the dwelling
The insurer said:
there were no ongoing issues with the 0.42 BMT roof as there were no leaks or signs of
other damage
there was no difference in the longevity or performance of a 0.48 BMT compared to 0.42
BMT
The insurer did not suggest that the insulation blanket and roofing battens did not need to be
replaced.
No valid claim for consequential loss
The complainant sought compensation for the alleged loss in the value of the home due to
the incorrect sheeting having been installed by EP. The complainant did not put forward any
evidence or expert report which established that the value of the dwelling was reduced. In
any event, the policy provided a general exclusion that the insurer did not „provide any cover
for consequential loss or liability under any section of this policy ‟ . The complainant has not
established a valid claim in relation to the diminution in the value of the home.
Cash settlement fair and appropriate for valid claim for defective sheeting and
minor repairs
There was no dispute that the incorrect sheeting was installed by EP.
U nder the terms of the policy the insurer was required „ to rebuild or repair the damaged
portion of [the dwelling] as nearly as practicable to the same condition and extent that it was
when new ‟ and that it „ will use house materials and construction methods, which are
commonly used at the time of Loss ‟. The repair needed to be „as nearly as practicable to the
same condition and extent that [the roof] was when new‟. The use of the correct sheeting
thickness (rather than an incorrect thickness) would have enabled the repair to be as nearly
as practicable to the same condition and the extent that the roof was when new. Put another
way, the use of the correct sheeting would have repaired the roof to the same condition and
extent that it was when new. EP did not do so by repairing the roof with the incorrect
sheeting. Whilst the expression „as nearly as practicable‟ might, in some situations, enable
an insurer to repair with materials which were nearly the same but not exactly the same,
depending on practicability, this was not the case here. The sheeting was of a specific type
and thickness and the repair could, and should, have been conducted with the same (i.e.
similar or identical) sheeting.
Further, the insurer was also obliged under the policy to use house materials and construction
methods which are commonly used at the time of the complainant‟s loss. The use of the
correct sheeting thickness (rather than the incorrect thickness) would have complied with the
insurer‟s obligation to use house materials which were commonly used at the time. The
insurer accepted that the correct thickness sheeting was commonly used at the time – there
was no dispute about that and the cost to the repairer of the correct sheeting was part of the
Determination | Case number: 988630 Page 6 of 8
negotiations which attempted to resolve the claim. The correct thickness sheeting would
have enabled the insurer to comply with its obligation under the policy.
Further, the Code provided that the insurer accepted „ responsibility for the quality of [the
repairer‟s] work and the materials they use ‟ . The complainant was not satisfied with the
quality of EP‟s work and the materials EP used. The complainant sought their repair and
replacement. The insurer was respons ible for the quality of EP‟s work and the materials it
used – in the repair authorised by the insurer, EP did not perform the work to the quality
required (it installed incorrect sheeting) and the materials used were incorrect.
These conclusions are reinforced by the terms of the EP Statement of Works Contract which
required the repairs to ‟ match existing incl flashings and capping ‟ . The installation of the
incorrect sheeting by EP did not match the existing sheeting on the complainant‟s dwelling .
The complainant has established a valid claim in relation to the incorrect sheeting.
EP offered to replace the sheeting. Under the terms of the EP Statement of Works Contract,
the complainant was required to allow EP to effect a remedy using its own tradespersons. In
the circumstances, the complainant should have allowed EP to effect a remedy (i.e. replace
the sheeting with the correct sheeting) using its own tradespersons and at its cost. The
complainant said that the relationship had broken down but this was a position which the
complainant adopted in the period from 18 April 2020 to 19 March 2021. From 19 March
2021 until 31 March 2023 (the latter date being when the complainant requested a cash
settlement and closure) the complainant was prepared to accept the replacement of the
sheeting and that it be done by EP. From 19 March 2021 the complainant wanted an
independent assessor and the insurer did agree to this. However, matters were further
complicated as the parties could not agree on the terms of the resolution (including minor
repairs additional to the replacement of the incorrect sheeting).
EP installed incorrect sheeting and there are also some other repairs which cannot be agreed
- the complainant says that they included the „repair bulging of roofing on western side‟ and
the „repair mis - aligned sheets on western roof‟ . On the information (including the
photographs), the complainant has established a valid claim also for the minor repairs. The
minor repairs would be resolved if the incorrect sheeting was removed and replaced by the
proper installation of correct sheeting.
In the circumstances, including the length of time that the parties have been in dispute, it is
fair to resolve the dispute by a cash settlement in full and final settlement of the incorrect
sheeting and other minor repairs. It is in the best interests of the parties that the claim is
resolved by cash settlement instead of the insurer (or EP) attending to some or all of the
repairs. When an insurer settles a claim by paying the cost of repairs, it transfers this risk to
the insured. The insured may find it more difficult and expensive to arrange repairs because
an insured does not have the insurer‟s knowledge and bargaining power.
AFCA considers that if an insurer cash settles a claim, it should consider paying an allowance
for the transfer of the risk. Based on the available information, there is a risk that the
replacement of the incorrect sheeting may also require the removal and replacement of the
roofing insulation blanket and the existing roofing battens (as stated in C‟s quotation). In the
circumstances, including the complainant‟s remote location, a reasonable allowance for the
transfer of risk is 20%.
Determination | Case number: 988630 Page 7 of 8
In the circumstances, it is fair and appropriate and in accordance with the policy that the
insurer pay $40,000 as a cash settlement in full and final settlement for the installation of the
incorrect sheeting and for the minor repairs (inclusive of a 20% uplift for the transfer of risk
and the complainant‟s loss of the warranty requiring the insurer to accept responsibility for the
quality of its repairer‟s work and the materials used).
2.2 Is the complainant entitled compensation for non-
financial loss?
Yes. The complainant is entitled to $2,000 compensation for non-financial loss.
AFCA can award compensation for non-financial loss
Under AFCA‟s Rules, it can award up to $5,400 compensation for non-financial loss. This
must relate to poor claims handling or other actions of the insurer which cause an unusual
degree of stress, delay, or inconvenience. AFCA takes a conservative approach to
compensation for non-financial loss. We expect complainants to be moderately robust, and
we will not award compensation for the ordinary degree of inconvenience in volved in making
a claim.
Insurer must pay compensation of $2,000
Based on the information available, I am satisfied that the complainant did experience an
unusual degree of stress and inconvenience which included the repairs (including faults in the
repairs and the incorrect sheeting being used by EP), delays in EP acknowledging that it had
used incorrect sheeting material and the protracted negotiations which have not resolved
satisfactorily the dispute. Based on the information, there were delays from 2018 by both the
complainant and the insurer (and its representatives). In the circumstances and applying
AFCA‟s conservative approach, it is fair that the insurer pay non-financial loss compensation
in the amount $2,000.
2.3 Why is the outcome fair?
The outcome is fair as the insurer is required to comply with the terms of the policy and
provides the opportunity for finality and closure after four years. The complainant is also
entitled to an amount of non-financial loss compensation in the circumstances.
Determination | Case number: 988630 Page 8 of 8
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. I have reviewed and considered
all the information the parties have provided.
While the parties have raised several issues in their submissions, this determination is
restricted to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information. If there are conflicting recollections and these are evenly weighted, we may find
that a claim cannot be established.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.