Determination 986903

Defective and incomplete storm damage repairs, additional damage to carpet, and claim delays

FirmIAG
Decided2024-03-25
ProductGeneral Insurance · Landlord
OutcomeFor the complainant
Amount awarded$3,900
Non-financial loss$1,400
Amount claimed—
SourceAFCA PDF

Summary

The complainant's third AFCA complaint concerned substandard and incomplete storm damage repairs and damage to her carpet caused by the insurer's trades. AFCA required a cash settlement based on her builder's quote plus 15%, $3,900 with interest for carpet, and $1,400 non-financial loss.

The insurer failed to repair to an acceptable standard despite ample opportunity and the relationship had broken down, so a cash settlement and compensation for poor claim handling were fair.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimpay compensationpay interestpay non financial lossrepair or rectify

Related

All IAG determinations · Find similar determinations

Text of the determination

Determination Case number 986903 Financial firm Insurance Australia Limited Determination | Case number: 986903 Page 2 of 8 Case number: 986903 23 February 2024 1 Determination overview 1.1 Complaint The complainant holds home building insurance with the financial firm (insurer). In July 2020, she lodged a claim for storm damage to the insured property, sustained earlier that year. The claim has already been the subject of two complaints to AFCA because of the complainant’s dissatisfaction with the insurer’s timeliness . Both complaints were resolved on the basis the insurer agreed to progress its assessment and complete repairs. This third complaint to AFCA relates to the complainant’ s concerns that the insurer has not completed all claim-related repairs, poorly completed the repairs it has undertaken, and has caused additional damage during the repair process. 1.2 Issues and key findings Is the insurer liable for additional damage? Yes. Based on the exchanged information, the complainant has established that the internal repair work is substandard. Further, I am satisfied that the insurer’s trades damaged the carpet. However, I am not satisfied that the insurer should replace the living room ceiling. Should the insurer pay a cash settlement? Yes. The insurer has had sufficient opportunity to undertake repairs and has failed to do so to an acceptable standard. Further, the relationship between the parties has broken down. Is more information needed to cash settle the claim? Yes. The complainant’s builder is to prepare a retail quote for rectifying the internal repair items referred to in section 2.3 below. The insurer is to pay the quote plus a 15% uplift. Is non-financial loss compensation payable? Yes. The insurer’s delays and poor claim handling have caused the complainant stress and inconvenience. It is to pay her $1,400 in compensation. Why is the outcome fair? As the insurer has failed to properly repair claim related damage and has caused further damage to the home, it is fair that a cash settlement is paid based on a quote from the complainant’s builder . It is fair that the insurer pays compensation for stress, it caused. 1.3 Determination This determination is substantially in favour of the complainant. Upon receiving written notice that the complainant accepts this determination, the insurer is to pay the complainant:  a cash settlement pursuant to the process set out in section 2.3 below  within 21 days of receiving the notice, $3,900 for carpet replacement plus interest, and  within 21 days of receiving the notice, $1,400 in non-financial loss compensation. Determination | Case number: 986903 Page 3 of 8 2 Reasons for determination 2.1 Is the insurer liable for additional damage? Yes. Based on the exchanged information, the complainant has established that the internal repa ir work is substandard. Further, I am satisfied that the insurer’s trades damaged the carpet. However, I am not satisfied that the insurer should replace the living room ceiling. Internal repair work is substandard T he complainant’s home is insured under a landlord’s residential property insurance policy. She previously rented the home out but has lived in it since at least 2020. The policy’s terms and conditions are set out in the certificate of insurance (COI) and the product disclosure statement (PDS). The insurer has accepted the complainant’s storm damage claim and arranged for various repairs to be undertaken externally and internally. Most recently, the internal repairs were undertaken by builder RZ pursuant to a scope of works (SOW) dated 6 July 2022. The complainant says RZ ’s repairs are unacceptable. She has provided a report dated 14 July 2023 by JB, building consultant. JB inspected the home and reviewed repairs based on RZ ’s SOW dated 30 November 2021. That SOW is the same as the 6 July 2022 SOW, except the latter includes two more laundry items and one more dining room item. JB concluded that RZ ’s workmanship was substandard, and did not meet the requirements set out in the SOW. JB listed the relevant items in the SOW. The laundry, kitchen, dining room, lounge room, bathroom, hall, bedrooms one and two, and balcony were all affected. The insurer provided RZ with JB’s report. In an email dated 5 October 2023, RZ said:  ‘The repairs on this claim have been inspected by a TA and found that all the rep airs that we completed are good’  the issues JB had identified were pre-existing, RZ had identified those issues before repairs were undertaken, but it was nevertheless told to proceed. RZ’s reference to a TA inspection appears to relate to an inspection undertaken by the insurer’s employed technical assessor on 13 March 2023. The insurer has provided the assessor’s file note dated 13 March 2023. In it, the assessor recorded that overall paintworks appeared to have a fair and reasonable finish. However, he conceded better preparation could have been undertaken before final coats were applied, and accepted RZ’s repairs to the veranda ceiling were poor. I am on balance satisfied that the co mplainant has shown that RZ’s in ternal repairs are substandard because:  JB’s report is the only expert report submitted to AFCA that comments on the internal repairs. It contains photos of the areas of concern and is overall persuasive  I do not find RZ’s b rief comments compelling. As the trade that completed the impugned repairs, RZ cannot be regarded as independent  the assessor’s views are set out in a file note, not a report, and predate JB’s inspection. It is reasonable to assume that issues with RZ’s re pairs would become more apparent over time. Further, the assessor acknowledges there were issues with the RZ’s work. Determination | Case number: 986903 Page 4 of 8 Insurer’s trades damaged carpet The complainant says that the insurer’s trades damaged her carpets. She has provided photos of the damag e. She says that due to the insurer’s delays, she proceeded to replace the carpets. She has provided an invoice dated 23 March 2023 from carpet supplier CC, showing that she paid $3,900. On 19 June 2023, the insurer informed the complainant that, while her policy did not include contents cover, it was willing to consider paying the carpet replacement cost upon receiving the relevant invoice. In its submission to AFCA dated 3 October 2023, the insurer advised it was still waiting for the invoice. It also said the staining shown in the photos was relatively light. The insurer submitted the carpet could have been steam cleaned. The insurer has not disputed that its trades damaged the carpets. Having examined the available photos, I do not agree with the insurer that the staining was relatively light. I also note that some of the weave had been pulled up. I do not accept that steam cleaning would have been sufficient. I am satisfied that it is reasonable to require the insurer to reimburse the complainant the $3,900 she paid for the carpet’s replacement. It is also to pay interest pursuant to section 57 of the Insurance Contracts Act, 1984 (Cth) on that amount from 23 March 2023 to the date the reimbursement is paid. The complainant also says the insurer’s removalist FR damaged two pictures, a lamp, two antique candlesticks and a fridge. Further, that she paid $113 to have her home cleaned after the insurer’s trades left a mess. On 19 June 2023, the insurer said it was willing to consider covering the damage and costs upon the complainant providing further information in support. I co nsider the insurer’s requests reasonable. There is nothing before me to show that the complainant has provided the insurer with the information it requested. As she has had ample opportunity to do so, the insurer is not required to pay for the damage or reimburse the cleaning costs. For the sake of completeness, I note there is some suggestion that FR has in any event reimbursed the complainant for the damaged items, and that the insurer may have already reimbursed the $113 in cleaning costs. Insurer not liable to replace living room ceiling The complainant says RZ drilled 15 to 20 small holes in her decorative living (lounge) room ceiling for no reason. She also says that as the insurer did not replace her roof until April 2022, continuing water ingress has resulted in that ceiling bowing. She has provided photos in support. The complainant says that the insurer agreed to replace the ceiling, and that agreement formed part of the resolution of her second complaint to AFCA. She says that is reflected by RZ’s SOW, which referred to re-fitting the ceiling. The insurer says RZ repaired the holes in the living room ceiling and otherwise attended to the required repairs to that room. It refers to its technical assessor’s file note dated 13 March 2023, in which he said the home was about 90 years old and that the ceiling showed evidence of historical movement only. Determination | Case number: 986903 Page 5 of 8 The insurer notes JB’s report does not say the ceiling should be replaced. The insurer denies that the living room ceiling requires replacement due to the claim event or the actions of its trades. It also denies that it agreed to replace the ceiling. RZ’s SOWs both note as a repair item ‘re - fix and set ceiling ready for painting’. In relation to that item, JB concluded ‘ At the time of the inspection, the ceiling appears to be bowed, which indicates that re-fixing the ceil ing has not been conducted’. I am satisfied that the insurer is required to rectify that item. However, that does not mean that it is required to replace the ceiling. Based on the exchanged information, I am not satisfied that the insurer agreed to replace the living room ceiling. There is nothing that confirms the ceiling’s replacement formed part of the resolution of the complainant’s second AFCA complaint. In the circumstances, the insurer is not required to replace the living room ceiling. 2.2 Should the insurer pay a cash settlement? Yes. The insurer has had sufficient opportunity to undertake repairs and has failed to do so to an acceptable standard. Further, the relationship between the parties has broken down. Insurer is to pay a cash settlement rather than attend to repairs The PDS provides that a claim may be settled through the insurer attending to claim-related repairs or by paying the complainant the repair costs (paying a cash settlement). The insurer initially chose to attend to repairs. As would be apparent from the information set out above, it has failed to do so to an acceptable standard in the three and half years since the claim was notified. It is also apparent that the relationship between the parties has significantly deteriorated to the point where ongoing interactions between them will likely result in further disputes. The complainant no longer wants the insurer’s trades to undertake repair work. RZ has told the insurer it is unwilling to continue to be involved. I am satisfied that it is therefore appropriate to require the insurer to pay a cash settlement. 2.3 Is more information needed to cash settle the claim? Yes. The complainant’s builder is to prepare a retail quote for rectifying the internal repair items referred to in this section 2.3. The insurer is to pay the quote plus a 15% uplift. Information is needed to enable cash settlement A cash settlement must be based on a reasonable quote for claim-related repairs, actionable by a retail customer. An uplift is then to be applied to the quoted amount to allow for contingencies and the loss of the lifetime guarantee that applies to insurer approved repairs. I am satisfied that JB’s report dated 14 July 2023 sets out the claim-related repairs to be rectified, subject to it considering whether the following are also to be included:  the additional repair items referred to in RZ’s SOW dated 6 July 2022 , being: > 12. laundry – extra allowance to prepare/repair wall > 13. laundry – remove and replace water damaged section of ceiling lining Determination | Case number: 986903 Page 6 of 8 > 18. dining – allowance to remove and replace water damaged section of plasterboard ceiling  the damage to the false ceiling in the linen closest, which occurred in October 2023. Once JB has considered those items, it is to prepare a retail quote for the current cost of the rectification repairs. Once that quote is available, it is to be provided to the insurer. The insurer is to pay the quoted amount plus a 15% contingencies uplift. The insurer has previously paid temporary accommodation (TA) costs. It is reasonable that it has done so. It is possible that the complainant will need TA during the repair rectification process. In preparing its quote, JB is to provide an estimate of how long the home will likely be unliveable during the repairs. The insurer is to pay the complainant a TA cash settlement for that period, based on the weekly TA amount it last paid for the complainant, plus a 15% contingencies uplift. In the event that JB charges a fee for preparation of its quote, it is reasonable that the insurer reimburses the complainant that fee upon provision of proof of payment (and subject to a maximum cap of $5,000 pursuant to the AFCA Rules). The COI confirms that the building sum insured is $534,300. However, as the cash settlement payments are due to the insurer’s previous inadequate repair work, the payments are not to erode the building sum insured or any other policy limit. 2.4 Is non-financial loss compensation payable? Yes. The i nsurer’s delays and poor claim handling have caused the complainant stress and inconvenience. It is to pay her $1,400 in compensation. AFCA can award compensation for poor claim handling Under the AFCA Rules, we may award compensation (capped at $5,400) for non-financial loss where a complainant has suffered an unusual degree or extent of physical inconvenience, time taken to resolve the situation or interference with their expectation of enjoyment or peace of mind. Insurer has caused stress and inconvenience The complainant says that the insurer’s lengthy delays and poor claim handling have caused her major stress and inconvenience and have compromised her mental health. The insurer has acknowledged that it should have handled the claim better. It has previously paid the complainant a total of $4,000 in compensation. While the insurer’s previous payments are acknowledged, it has continued to mismanage the claim to the point where the complainant has been forced to approach AFCA for a third time. I accept tha t the complainant’s claim experience has been extremely distressing for an unreasonably long time. It is reasonable to require the insurer to pay the complainant a further $1,400 in non-financial loss compensation (taking the total compensation amount to $5,400). Determination | Case number: 986903 Page 7 of 8 2.5 Why is the outcome fair? As the insurer has failed to properly repair claim related damage and has caused further damage to the home, it is fair that a cash settlement is paid based on a quote from the complainant’s builder. It is fair that the ins urer pays compensation for stress, it caused. Determination | Case number: 986903 Page 8 of 8 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. I have reviewed and considered all the information the parties have provided. While the parties have raised several issues in their submissions, I have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.