Home / QBE / Determination 985372
Determination 985372
Partial decline of storm damage claim, inadequate cash settlement scope and delay
Summary
Farm owners' storm damage claim was partly accepted, but the cash settlement was based on non-actionable quotes and an incomplete scope. AFCA required a fresh independent scope and quote, cash settlement with a 20% uplift, payment for curtains and blinds, and $4,500 non-financial loss.
The insurer bore the onus of justifying limits on cover and had not shown it fulfilled policy obligations, and its unreasonable delays warranted non-financial loss compensation under AFCA Rule D.3.3.
Issues
- Claim amount dispute primary · upheld“cash settlement is based on an incomplete scope of works; insurer's quotes not actionable”
- Claim denial secondary · upheld“not satisfied the policy excludes the cost of replanting the tree”
- Poor claim handling secondary · upheld“insurer's poor management of the claim caused unreasonable stress, anxiety”
- Delay secondary · upheld“unreasonable delays by the insurer in assessing and bringing the claim to conclusion”
- Repairs or contractors secondary · upheld“consultant J's failure to adequately remediate the mould”
Subjects and remedies
health or medicalhome or building damagenatural disastersmall businesspay claimpay compensationpay non financial lossreassess claim
Related
Text of the determination
Determination
Determination
Case number 985372
Financial firm QBE Insurance (Australia) Limited
Determination | Case number: 985372 Page 2 of 10
Case number: 985372 15 March 2024
1 Determination overview
1.1 Complaint
The complainants hold a farm insurance policy with the financial firm (the insurer). On 7
March 2022, the complainants lodged a claim for damage sustained to their property on 26
and 27 February 2022 from a severe weather event.
The insurer has accepted the claim. However, the insurer has declined cover for damage it
says is not due to the significant weather event. It says the excluded damage is maintenance
related, pre-existing and/or due to wear, tear and gradual deterioration.
1.2 Issues and key findings
Has the insurer fulfilled its obligations under the policy?
No. The available information does not show it is most likely that the insurer has fulfilled its
policy obligations with respect to the complainants’ claim. The insurer is to settle the claim a s
set out under section 2.1 below.
Are the complainants entitled to non-financial loss compensation (NFL)?
Yes. The insurer is to pay the complainants $4,500 in NFL in line with the AFCA Rules.
Why is the outcome fair?
The outcome is fair as it is based on the information from the parties, the relevant policy
provisions and what is considered reasonable in the circumstances. It is fair that the insurer
also be required to pay the complainants NFL given their poor experience under the claim.
1.3 Determination
This determination is mostly in favour of the complainants. The insurer is to:
ensure ‘RB’ finalises its assessment of the insured building, inclusive of the areas noted
above, and provide an independent report of its opinions, scope of works and associated
repair quote within 21 days of receiving notice of the complainants’ acceptance of this
determination
cash settle the claim based on RB’s repair quote. The cash settlement is to be increased
by 20% to allow for contingencies and loss of the policy ’s lifetime guarantee on repairs
benefit. This is to be paid within 14 days of receiving the final scope of works and repair
quote
cover the cost to replant the tree up to $10,000 less the expenses incurred in removing the
palm tree
cover the cost to repair/replace the pipes between downpipes and the water tanks
based on the quote from ‘C’, pays the complainants $17,938 plus a further 20%
contingency for the curtains and blinds and pays the complainants $4,500 in NFL (these
Determination | Case number: 985372 Page 3 of 10
are to be paid within 14 days of receiving notice of the complainants’ acceptance of this
determination).
2 Reasons for determination
2.1 Has the insurer fulfilled its obligations under the policy?
No. The available information does not show that the insurer has fulfilled its policy obligations
with respect to the complainants’ claim.
The policy covers the insured property against accidental loss or damage
The insurer provided the complainants with the relevant policy documentation including the
product disclosure statement (PDS) and certificate of insurance (COI). The panel accepts the
insurer is entitled to rely on the policy provisions to assess its liability under the claim.
The policy covers the insured property against accidental loss or damage. Cover under the
policy is subject to the conditions, limitations and exclusions specified in the PDS. The policy
defines accidental damage as:
An incident that is unforeseen and unintended and that causes loss or damage.
This includes a series of accidents arising out of the one event.
The complainants have shown damage that triggers cover under the policy
The complainants are first required to show, it is more likely than not, that the loss or damage
claimed triggers cover under the policy. Only if the complainants can do this, will the duty shift
to the insurer to show, on balance, it is entitled to decline cover in line with the policy wording
or otherwise.
There is no dispute that the insured property (building and contents) have suffered significant
damage because of severe weather in February 2022. The panel accepts that this incident
meets the policy definition of ‘accidental’, and therefore, the resultant loss or damage triggers
cover under the policy.
Given this, the onus rests with the insurer to show, on the balance the probabilities, an
entitlement to limit or decline cover for the claimed loss or damage in line with the policy
provisions or otherwise.
The insurer has partially accepted the claim
The panel notes at the time this complaint was brought to AFCA, there were various items of
loss or damage in dispute between the parties. However, since this time, the parties have
been successful in resolving several of these disputed items.
In the interest of brevity, the panel has limited its consideration to only those items/matters
that remain in contention between the parties. The panel has considered all the information
provided by the parties, however, reference has been limited to that information found
relevant in providing this determination to the parties.
Determination | Case number: 985372 Page 4 of 10
Complainants dispute adequacy of the insurer’s proposed cash settlement
The complainants are dissatisfie d with the insurer’s assessment of its liability, including its
settlement offers and proposed repairs. The complainants are not opposed to the insurer’s
settling its liability by way of a cash settlement. However, they say the cash settlement is
based on an incomplete scope of works. The complainants have proposed a number of
issues they want resolved in addition to what the insurer has already agreed to cover:
the insurer must appoint either ‘ LM ’ or another suitably qualified, independent third party to
review the case materials, provide their own independent assessment and quotation for
repairs of all damages, including:
> ceiling cavity - include provision to repair separation of plasterboard and metal ceiling
battens in the ensuite area as noted in the ‘ R F’ report
> estimate/provision for full refurbishment of laundry/bathroom area following full strip out
(including any repairs to concrete slab that are insured event related)
> repainting all internal walls and ceilings
> provision for repair of paved walkway east side near shed/gate for gas bottle access
> external house cladding - provision for repair works of new cracks emerging in various
locations
> palm tree – remove and replant
> roof repair – insurer arrange for a fresh assessment of the roof to determine if there
exists any damage caused by the claimed weather event in February 2022
> water tanks - confirm replacement/repair of movement damaged 90mm rainwater
feeder pipes from downpipes to water tanks
> provision for timber retaining walls
the insurer must cover the cost of temporary accommodation relating to the time it will take
to complete repairs to the insured building and accepted under the claim, estimated at 3-4
months
the insurer must provide reimbursement of temporary accommodation expenses incurred
as result of subsequent weather events over the more recent Christmas and New Year
period severe weather events
the insurer must make immediate payment for curtains and blinds based on a quote from
C the insurer has had in its possession since 15 September 2023 in the amount of
$17,938; and
the insurer must provide cover for the contents items which were damaged by the severe
weather over the more recent Christmas and New Year period.
The panel is satisfied the that the loss or damage as well as temporary accommodation costs
relating to the more recent Christmas/New Year period, do not fall within the scope of the
claim subject of this complaint. This loss or damage arises from an event or events
independent of the February 2022 weather event and as such will need to be considered
under a separate claim(s).
These items need to be considered under a new claim and IDR complaint, before meeting the
requirements of the AFCA Rules. Given this, these items/issues cannot be considered under
this complaint. However, the panel considers the other items/issues outlined above do fall
under the claim subject of this complaint.
Building repairs scope of works, quote and appointment of further consultants
Determination | Case number: 985372 Page 5 of 10
The panel notes, to date, the insurer has not been successful in appointing a building
consultant that is prepared to undertake the repairs accepted under the claim. It has been
over two years since the claim was lodged.
The panel notes th e insurer’s claim settlement offer is based on repair quotes from building
consultants ‘T’. T has confirmed it is not able to warrant and therefore complete the works.
This means T’s repair quotes are not actionable and cannot be relied on to settle the insurer’s
liability.
The panel is satisfied that the insurer to settle the claim by way of a cash settlement, this
needs to be based on a fair, complete and actionable quote from a suitably licensed and
qualified consultant. The panel is not satisfied the insurer has been successful in fulfilling its
obligations in this regard.
The insurer says it has appointed suitably qualified and licensed building consultant RB in
January 2024 to provide independent repair quotes. These have not been provided to AFCA
and the insurer has not advised if the quotes have been finalised, and if not, when they are
expected.
The complainants have not provided their own independent expert reports, although have
raised their own thoughts and concerns regarding the proposed scope of works to be
accepted under the claim.
In addition to the items already accepted by the insurer for this claim, the complainants are
also seeking cover for:
ceiling cavity - include provision to repair separation of plasterboard and metal ceiling
battens in the ensuite area
repainting internal walls and ceilings due to water ingress damage and subsequent mould
contamination
estimate/provision for full refurbishment of laundry/bathroom area following full strip out
(including any repairs to concrete slab that are insured event related)
provision for repair of paved walkway east side near shed/gate for gas bottle access
external house cladding - provision for repair works of new cracks emerging in various
locations
the insurer to appoint a roofing consultant to complete fresh assessment to determine
whether there is any damage consistent with being due to the February 2022 significant
weather event.
The insurer is required to direct RB to inspect, assess and provide its independent opinion as
to whether the additional items that the complainant’s have raised were damaged by the
February 2022 event. If so, they should be included in RB’s final scope of works and
associated repair quote which will form the basis for the insurer’s final cash settlement offer to
the complainants.
Should RB, like the insurer’s previously appointed consultants, fail to provide a complete and
actionable repair quote, then the insurer is to appoint LM to the claim. The insurer must then
accept and settle the claim based on LM’s a ssessment and associated repair quote. This
panel is satisfied that the insurer has had adequate time to establish its liability under the
claim and will have failed to do so.
Temporary accommodation
Determination | Case number: 985372 Page 6 of 10
With respect to the temporary accommodation that will be required whilst the damage
accepted under the claim is being repaired, the panel notes there is reference to this
estimated as being a period of up to three to fourth months.
The panel is satisfied that the insurer is obliged to provide cover for the reasonable time
period it assesses to be fair and allows the complainants to arrange suitable temporary
accommodation while the repair work is being completed. This is to be assessed once the
final scope of works and actionable repair quote is received from RB. Alternatively, if RB fails
to provide the above, this time period is to be assessed on the scope of works and quote from
LM.
Palm tree
The available information shows the insurer has accepted to cover the cost of the removal of
the palm tree. However, the insurer is not accepting the cost to replant the palm tree, which
the complainants are seeking cover for under the policy.
The panel is not satisfied the policy excludes the cost of replanting the tree in the
circumstances relevant to the claim. However, it does note that the policy (accidental cover),
limits cover under the additional benefit for ‘Trees, shrubs and plants’, to $10,000 during any
one period of cover.
Given this, the panel is satisfied it is fair that the insurer be required to cover the cost to
replant the tree up to $10,000 less the expenses incurred in removing the palm tree. Should
the cost to remove the palm tree exceed $10,000, the insurer will not be required to make any
further payments towards replanting of the palm tree.
Water tanks
The available information shows the insurer has now accepted to cover the cost to replace
the two damaged water tanks. However, the information is unclear as to whether the insurer’s
acceptance includes replacement/repair of damaged 90mm rainwater feeder pipes from the
down pipes to the water tanks.
The panel is satisfied it is fair that the insurer includes the repair/replacement of the pipes in
the costs to replace the water tanks.
Curtains and blinds
The available information shows the insurer believes the complainants are required to source
a quote for the damaged curtains/blinds. However, the complainants say there has been a
quote, sourced by the insurer, on the claim since September 2023, and the claim should be
settled based on this quote.
The panel notes the information includes a quote for the damaged curtains/blinds from C
dated 15 September 2023, in the amount of $17,938 addressed to the insurer’s loss adjusters
‘S’. The insurer has not provid ed any comment or information to show that this quote is
unreasonable, excessive or incorrect.
In the absence of any compelling information to the contrary, the panel is satisfied it is fair
that the insurer pays the complainants $17,938 plus a further 20% contingency payment
given the time lapsed. This payment is to be made within 14 days of receiving notice of the
complainants’ acceptance of this determination.
Determination | Case number: 985372 Page 7 of 10
Insurer to increase its liability under the claim
In line with the matters considered above, the panel is satisfied it is fair that the insurer:
arrange for RB to complete its assessment, including the areas noted above, and provide
an independent report with its scope of works and associated repair quote with 21 days of
receiving notice of the complainants’ acceptance of this determination
cash settle the claim based on RB ’s opinion and repair quotes. The cash settlement is to
be increased by a further 20% to allow for contingencies and loss of the policy lifetime
guarantee on repairs benefit. This is to be paid within 14 days of receiving the final scope
of works and repair quote
covers the cost to replant the tree up to $10,000 less the expenses incurred in removing
the palm tree
includes the repair/replacement of the pipes in the costs to replace the water tanks
pays the complainants $17,938 plus a further 20% contingency payment given the time
lapsed for the cost of replacing curtains and carpet in accordance with C’s quote. This
payment is to be made within 14 days of receiving notice of the complainants’ acceptance
of this determination.
2.2 Are the complainants entitled to NFL?
Yes. The insurer is to pay the complainants $4,500 in NFL in line with the AFCA Rules.
AFCA Rules allow an award of NFL in certain circumstances
The AFCA Rule D 3.3 allows for an award of up to $5,400 for non-financial loss
compensation, if the insurer caused the complainant to suffer an unusual degree or extent of
inconvenience, delay or interference. AFCA takes a conservative approach when considering
any award of compensation.
Insurer is to pay the complainants $4,500 in NFL
The complainants have expressed dissatisfaction with the handling of the claim. In particular,
the complainants are dissatisfied with the time taken and the progress of the claim.
In this instance and considering AFCA’s approach to compensation, the panel is satisfied the
insurer’s poor management of the claim has caused the complainants to experience
unreasonable levels of stress, anxiety, physical inconvenience and delays.
The available information shows there have been unreasonable delays by the insurer caused
in assessing and bringing the claim to conclusion. These include instances of delays in
appointing consultants to complete assessments and further delays caused by these
consultants not being suitable to provide services under the claim.
The panel acknowledges the claim relates to a significant event and that this would
reasonably impact on the insurer’s overall ability to manage the claim. However, in the
panel’s opinion, most of t he delays experienced by the complainants were avoidable and not
the result of delays associated with managing a high number of claims caused by the
significant weather event.
The panel notes the complainants and their children were forced to live with mould
contamination for an extended period of time. This was due to the insurer’s appointed
consultants’ J’s failure to adequately remediate the mould and the insurer’s delays in
Determination | Case number: 985372 Page 8 of 10
addressing this issue. This has caused the family to experience medical issues requiring
treatment.
Given the above, and other failures not specifically referred to in this determination, the panel
is satisfied it is reasonable that the insurer be required to pay the complainants $4,500 in
NFL. This is to be paid within 14 days of re ceiving notice of the complainants’ acceptance of
this determination.
2.3 Why is the outcome fair?
The outcome is fair as it is based on the information from the parties, the relevant policy
provisions and what is considered reasonable in the circumstances. It is fair that the insurer
also be required to pay the complainants NFL given their poor experience under the claim
and the significant additional stress and emotional distress this caused the complainants .
3 Supporting information
3.1 AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all the information the parties have provided.
While the parties have raised several issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
A panel determined this matter
Due to the nature of this complaint, we referred it to a panel for determination. The panel
includes:
an ombudsman
a member with significant experience in consumer and small business advocacy
a member with extensive experience in general insurance.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
Determination | Case number: 985372 Page 9 of 10
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.
3.2 Relevant policy wording
Accidental damage
If you have selected accidental damage cover:
You are insured against accidental loss or damage to your home, contents, or
both at the address during the period of insurance. This includes cover for any of
the Insured events (to the extent described or excluded in those insured events).
Your Policy Schedule will show if you have selected accidental damage cover for
your home, contents, or both.
...
Additional benefits – Applicable to Subsection 1 Home and Contents
The following additional benefits apply. For any additional benefits to be payable,
you must suffer or incur the relevant loss, liability or damage during the period of
insurance.
We pay additional benefits 1 to 22 as part of the sums insured for your home or
contents, depending on the type of cover you have chosen. ...
12. Trees, shrubs and plants
If you occupy the home insured by this Policy as your primary residence:
We pay for loss or damage to trees, shrubs or plants caused directly by any
insured event except for Insured event 3. storm, rainwater or wind or tempest,
hail, tornado, cyclone or hurricane, freeze or weight of snow.
If you have accidental damage cover:
We will pay up to $10,000 in total during any one period of insurance. ...
Determination | Case number: 985372 Page 10 of 10
We do not insure:
(a) grass or lawn; or
(b) any event that is not sudden, accidental and unforeseen.
We only repair or replace trees, plants or shrubs, that are so damaged that they
die, are permanently disfigured or not recovered after being stolen.
3.3 AFCA Rules
D.3.3 An AFCA Decision Maker may decide that the Financial Firm is to compensate
the Complainant for non-financial loss:
a) for a complaint relating to an individual’s privacy rights - injury has occurred to
the Complainant’s feelings or humiliation has been suffered by the Complainant;
or
b) for other complaints – an unusual degree or extent of physical inconvenience,
time taken to resolve the situation or interference with the Complainant’s
expectation of enjoyment or peace of mind has occurred.