Determination 985112

Dispute over scope of works and cost of repairs following a prior determination requiring the insurer to cover escape-of-water damage

FirmSuncorp Group
Decided2024-03-27
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant
Amount awarded—
Non-financial loss—
Amount claimed$435,490
SourceAFCA PDF

Summary

Following an earlier AFCA determination requiring the insurer to cover a home escape-of-water claim, the parties disputed scope and cost of repairs. AFCA required a new scope of works and quote for all claimed damage, cash settlement with a 15% uplift, and temporary accommodation costs.

The earlier determination made the insurer liable for all the claimed damage, so it could not limit the scope of works without revisiting the merits.

Issues

Subjects and remedies

home or building damagethird party authoritypay claimpay compensationreassess claim

Related

All Suncorp Group determinations · Find similar determinations

Text of the determination

Determination Case number 985112 Financial firm AAI Limited Determination | Case number: 985112 Page 2 of 7 Case number: 985112 25 March 2024 1 Determination overview 1.1 Complaint The complainant held a home insurance policy with the financial firm (insurer). In 2020, he lodged a claim for damage to the property due to an escape of water from a neighbouring property. The insurer declined the claim. The complainant lodged a complaint with AFCA (number 834614). In 2022, a determination was issued in the complainant’s favour (decision). Specifically, AFCA determined that the insurer should cover the claim in accordance with the terms and conditions of the policy and the determination. A dispute has now arisen about the scope of works necessary to repair the damage to an appropriate standard, the reasonable cost of repairs and the insurer’s handling of the claim. The complainant is represented by JG. Any reference to the complainant in this determination is a reference to the complainant and/or JG. 1.2 Issues and key findings Has the insurer complied with the decision? No. The insurer is required to prepare a scope of works and obtain an actionable quote for all the claimed damage (including but not limited to the movement and foundation damage to the entire subfloor and resultant damage). The panel does not consider that the insurer is entitled to reduce its liability to less than the claimed damage. To do so would involve revisiting the merits of the claim and would be inconsistent with the previous determination. Why is the outcome fair? The outcome is fair because, in accordance with the previous determination, the insurer is liable for all the claimed damage. Therefore, it is fair that the insurer covers this damage and the complainant’s temporary accommodation costs while the repairs are completed . 1.3 Determination This determination is in favour of the complainant. Within 30 days of the complainant accepting this determination, the insurer is required to obtain a new scope of works for all the claimed damage (including but not limited to the movement and foundation damage to the entire subfloor and resultant damage) from MC. Within 30 days of receiving the scope of works from MC, the insurer is to obtain an actionable quote from PP. This should include an estimate of the time required to complete the works. Within 14 days of receiving PP’s actionable quote, the insurer is required to cash settle the complainant for:  the value of the quote plus a 15% uplift; and  temporary accommodation costs based on the estimated period and in accordance with the terms and conditions of the policy. Determination | Case number: 985112 Page 3 of 7 2 Reasons for determination 2.1 Has the insurer complied with the decision? No. The insurer is required to prepare a scope of works and obtain an actionable quote for all the claimed damage (including but not limited to the movement and foundation damage to the entire subfloor and resultant damage). The panel does not consider that the insurer is entitled to reduce its liability to less than the claimed damage. To do so would involve revisiting the merits of the claim and would be inconsistent with the previous determination. AFCA decision required insurer to cover the claim The issues arising from the complainant’s claim have been before AFCA in October 2021. The complainant sought cover for repair costs. He described the repairs as including cracking, modification, foundation and structural repairs required in restumping, releveling, relevant building work and replacement of damaged flooring, including fitting of skirting boards and architraves, replacement of baseboards and domestic building insurance (claimed damage). In relation to the claimed damage, in its letter dated 10 December 2021 to AFCA, the complainant says: [AFCA’s] general understanding of the complaint is correct. However … the cracking to the plaster in the dwelling is of secondary concern, the primary concern is the subsidence of the dwelling, and [the complainant] is seeking his insurance cover the repair costs for the modification, foundation and structural repairs required in restumping, releveling, relevant building work, replacement of damaged flooring in the home and the costs of dealing with the complaint. The above letter was provided to the insurer who then provided an additional response stating that it ‘ does not agree that the cause of subsidence is excess flow of water under the dwelling ’. AFCA issued a determination on 22 May 2022 in favour of the complainant requiring the insurer to cover the claim in accordance with the terms and conditions of the policy and the provisions of the determination. The determination states: Conclusion Noting DB’ s concessio n that water from the neighbour’ s downpipes has contributed to saturation of the soil, I accept that the complainant has met his onus to establish a loss which is covered by the terms of the policy. As stated, the onus now switches to the insurer to establish the application of the exclusions upon which it seeks to rely to deny the complainant’ s claim. Noting my concerns regarding the evidence presented by the insurer, I am not satisfied that the insurer has met its onus to establish the application of the exclusions upon which it seeks to deny the complainant ’ s claim. Determination | Case number: 985112 Page 4 of 7 Based upon the exchanged material I am also satisfied that the complainant acted with appropriate efficiency when he became aware of the damage. The result is that the insurer is req uired to accept the complainant’ s claim, in accordance with the terms and conditions of the policy. The complainant confirms that he is seeking cover for repair costs, including cracking, modification, foundation and structural repairs required in restumping, releveling, relevant building work and replacement of damaged flooring, including fitting of skirting boards and architraves, replacement of baseboards and domestic building insurance. The exchanged material does not include a complete scope of works or complete quotation for repairs. The insurer, within 30 days of acceptance of this determination by the complainant, is to engage appropriately qualified representatives to prepare a scope of works and quotation that complies with its obligations under the policy. The quotation must be actionable by the complainant. The insurer may either complete repairs or cash settle the claim. If the insurer elects to cash settle the claim, it must add a 15% uplift to the quotation to allow for contingencies. Interest is not payable upon the settlement as the quotation will be current. The panel notes that DB is the plumber engaged by the insurer. The report from the insurer’s engineer, IL, was partly based on the DB report. Parties disagree on the scope and cost of repairs Following the determination, the insurer obtained geotechnical (HC) and structural engineering (MC) reports. HC carried out an investigation and various soil testing ‘to determine the issues that are causing distress of the building at the site’. HC noted that the soil was class M and the site class P due to trees, fill and abnormal moisture conditions. It stated that ‘the perched water table across the site is a result of poor site drainage on and adjoining the site and high recent rainfall. The soil moisture levels all decrease significantly with depth which suggests that the source of the water is from the surface of the site’. MC then prepared a scope of works dated 29 July 2022 based on HC’s findings. The scope covered the lounge, bathroom and north side pathway, including restumping the lounge and bathroom (insurer SOW). MC acknowledged that there are pre-exiting issues that may be exacerbating damage and deterioration to building elements that are not related to the event and are excluded from the insurer SOW. Base d on the insurer’s SOW, PP prepared a quote dated 12 September 2022 for the works totalling $47,338.33. The insurer made an offer of $53,849.08, including a 15% uplift for contingencies ($7,100.75) and less the $600 excess. The insurer has also offered the Determination | Case number: 985112 Page 5 of 7 complainant $31,895.66 for temporary accommodation for 12 weeks while the repairs are being carried out. The complainant has provided a report from an engineer, TC, commenting on MC’s report. It states that the insurer’s SOW includes restumping of three rooms only, however the entire site beneath the dwelling is affected. The saturation of the soil has led to damage to the dwelling in all areas. It recommends that the entire footing system should be rectified as part of the scope of works. The complainant further says the insurer’s cash settle ment offer is inadequate and has provided a quotation for $435,490 from its builder, ER. The complainant’s quote is not itemised. It does not specify the number of units or area to be covered, the unit price or the cost of labour. It only provides the line items and a single figure for the total estimated cost of repairs. Insurer’s scope of works must include all claimed damage The panel has reviewed the previous determination and the documents relating to the previous determination. The panel is satisfied that the scope of works should include all of the claimed damage. This is consistent with the previous determination and the complaint documents. Having reviewed the previous complaint, it is clear the damage claimed is focussed on the subsidence and movement of the foundations. To limit the scope of works to less than the claimed damage, or only part of the subfloor, would involve revisiting the merits of the previous determination and, potentially, reducing the liability conferred on the insurer based on the previous determination. The panel also notes the previous determination states that ‘soil testing at the property has not been conducted’. The insurer has sought to carry out this testing after the previous determination and in the context of the current complaint. However, the panel does not consider this is appropriate in the circumstances if it is being done so in context of limiting its liability for the claimed damage. In any event, the panel is persuaded by TC’s comments regarding the rectification works required. This is also consistent with and gives further weight to the previous determination. Therefore, the insurer is liable for all of the claimed damage (including but not limited to the movement and foundation damage to the entire subfloor and resultant damage). Insurer should obtain a new quote for claimed damage The panel is not persuaded by ER’s quote. This is because the quote only broadly lists the type of work required to be done. It does not include specific details of the work required to be completed, any measurements of areas, the number of units of any product, unit prices or the labour costs. Rather, it simply gives a global figure for all works. In the circumstances, the panel considers the insurer should obtain a new scope of works for the claimed damage from MC and an actionable quotation from PP. In accordance with the previous determination, the claim should then be cash settled with a 15% uplift to take into account contingencies and the loss of a lifetime guarantee on repairs. The insurer is also required to provide the complainant with temporary accommodation while the works are being completed. To this end, the quote should include an estimate of time likely to be required to complete the works. The insurer should then cash settle the complainant for the estimated time period and in accordance with the terms and conditions of the policy. Determination | Case number: 985112 Page 6 of 7 2.2 Why is the outcome fair? The outcome is fair because, in accordance with the previous determination, the insurer is liable for all the claimed damage. Therefore, it is fair that the insurer covers this damage and the complainant ’s temporary accommodation costs while the repairs are completed. Determination | Case number: 985112 Page 7 of 7 3 Supporting information 3.1 The AFCA processes AFCA’s approa ch is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided. While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. A panel determined this matter Due to the nature of this complaint, we referred it to a panel for determination. The panel includes:  an ombudsman  a member with significant experience in consumer and small business advocacy  a member with extensive experience in the insurance sector. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.