Dispute over scope of works and cost of repairs following a prior determination requiring the insurer to cover escape-of-water damage
Summary
Following an earlier AFCA determination requiring the insurer to cover a home escape-of-water claim, the parties disputed scope and cost of repairs. AFCA required a new scope of works and quote for all claimed damage, cash settlement with a 15% uplift, and temporary accommodation costs.
The earlier determination made the insurer liable for all the claimed damage, so it could not limit the scope of works without revisiting the merits.
Issues
- Claim amount dispute primary · upheld
“The insurer is required to prepare a scope of works and obtain an actionable quote for all the claimed damage”
- Poor claim handling secondary · upheld
“insurer sought soil testing after previous determination, inappropriate if done to limit its liability for the claimed damage”
- Repairs or contractors secondary · upheld
“insurer's scope covered only three rooms though the entire subfloor was affected; new scope of works required”
Subjects and remedies
home or building damagethird party authoritypay claimpay compensationreassess claim
Text of the determination
Determination
Case number 985112
Financial firm AAI Limited
Determination | Case number: 985112 Page 2 of 7
Case number: 985112 25 March 2024
1 Determination overview
1.1 Complaint
The complainant held a home insurance policy with the financial firm (insurer).
In 2020, he lodged a claim for damage to the property due to an escape of water from a
neighbouring property. The insurer declined the claim. The complainant lodged a complaint
with AFCA (number 834614). In 2022, a determination was issued in the complainant’s favour
(decision). Specifically, AFCA determined that the insurer should cover the claim in
accordance with the terms and conditions of the policy and the determination. A dispute has
now arisen about the scope of works necessary to repair the damage to an appropriate
standard, the reasonable cost of repairs and the insurer’s handling of the claim.
The complainant is represented by JG. Any reference to the complainant in this determination
is a reference to the complainant and/or JG.
1.2 Issues and key findings
Has the insurer complied with the decision?
No. The insurer is required to prepare a scope of works and obtain an actionable quote for all
the claimed damage (including but not limited to the movement and foundation damage to the
entire subfloor and resultant damage). The panel does not consider that the insurer is entitled
to reduce its liability to less than the claimed damage. To do so would involve revisiting the
merits of the claim and would be inconsistent with the previous determination.
Why is the outcome fair?
The outcome is fair because, in accordance with the previous determination, the insurer is
liable for all the claimed damage. Therefore, it is fair that the insurer covers this damage and
the complainant’s temporary accommodation costs while the repairs are completed .
1.3 Determination
This determination is in favour of the complainant.
Within 30 days of the complainant accepting this determination, the insurer is required to
obtain a new scope of works for all the claimed damage (including but not limited to the
movement and foundation damage to the entire subfloor and resultant damage) from MC.
Within 30 days of receiving the scope of works from MC, the insurer is to obtain an actionable
quote from PP. This should include an estimate of the time required to complete the works.
Within 14 days of receiving PP’s actionable quote, the insurer is required to cash settle the
complainant for:
the value of the quote plus a 15% uplift; and
temporary accommodation costs based on the estimated period and in accordance with
the terms and conditions of the policy.
Determination | Case number: 985112 Page 3 of 7
2 Reasons for determination
2.1 Has the insurer complied with the decision?
No. The insurer is required to prepare a scope of works and obtain an actionable quote for all
the claimed damage (including but not limited to the movement and foundation damage to the
entire subfloor and resultant damage). The panel does not consider that the insurer is entitled
to reduce its liability to less than the claimed damage. To do so would involve revisiting the
merits of the claim and would be inconsistent with the previous determination.
AFCA decision required insurer to cover the claim
The issues arising from the complainant’s claim have been before AFCA in October 2021.
The complainant sought cover for repair costs. He described the repairs as including
cracking, modification, foundation and structural repairs required in restumping, releveling,
relevant building work and replacement of damaged flooring, including fitting of skirting
boards and architraves, replacement of baseboards and domestic building insurance (claimed
damage). In relation to the claimed damage, in its letter dated 10 December 2021 to AFCA,
the complainant says:
[AFCA’s] general understanding of the complaint is correct. However … the
cracking to the plaster in the dwelling is of secondary concern, the primary
concern is the subsidence of the dwelling, and [the complainant] is seeking his
insurance cover the repair costs for the modification, foundation and structural
repairs required in restumping, releveling, relevant building work, replacement of
damaged flooring in the home and the costs of dealing with the complaint.
The above letter was provided to the insurer who then provided an additional response
stating that it ‘ does not agree that the cause of subsidence is excess flow of water under the
dwelling ’.
AFCA issued a determination on 22 May 2022 in favour of the complainant requiring the
insurer to cover the claim in accordance with the terms and conditions of the policy and the
provisions of the determination. The determination states:
Conclusion
Noting DB’ s concessio n that water from the neighbour’ s downpipes has
contributed to saturation of the soil, I accept that the complainant has met his
onus to establish a loss which is covered by the terms of the policy.
As stated, the onus now switches to the insurer to establish the application of the
exclusions upon which it seeks to rely to deny the complainant’ s claim.
Noting my concerns regarding the evidence presented by the insurer, I am not
satisfied that the insurer has met its onus to establish the application of the
exclusions upon which it seeks to deny the complainant ’ s claim.
Determination | Case number: 985112 Page 4 of 7
Based upon the exchanged material I am also satisfied that the complainant acted
with appropriate efficiency when he became aware of the damage.
The result is that the insurer is req uired to accept the complainant’ s claim, in
accordance with the terms and conditions of the policy.
The complainant confirms that he is seeking cover for repair costs, including
cracking, modification, foundation and structural repairs required in restumping,
releveling, relevant building work and replacement of damaged flooring, including
fitting of skirting boards and architraves, replacement of baseboards and domestic
building insurance.
The exchanged material does not include a complete scope of works or complete
quotation for repairs.
The insurer, within 30 days of acceptance of this determination by the
complainant, is to engage appropriately qualified representatives to prepare a
scope of works and quotation that complies with its obligations under the policy.
The quotation must be actionable by the complainant.
The insurer may either complete repairs or cash settle the claim.
If the insurer elects to cash settle the claim, it must add a 15% uplift to the
quotation to allow for contingencies. Interest is not payable upon the settlement
as the quotation will be current.
The panel notes that DB is the plumber engaged by the insurer. The report from the insurer’s
engineer, IL, was partly based on the DB report.
Parties disagree on the scope and cost of repairs
Following the determination, the insurer obtained geotechnical (HC) and structural
engineering (MC) reports. HC carried out an investigation and various soil testing ‘to
determine the issues that are causing distress of the building at the site’. HC noted that the
soil was class M and the site class P due to trees, fill and abnormal moisture conditions. It
stated that ‘the perched water table across the site is a result of poor site drainage on and
adjoining the site and high recent rainfall. The soil moisture levels all decrease significantly
with depth which suggests that the source of the water is from the surface of the site’.
MC then prepared a scope of works dated 29 July 2022 based on HC’s findings. The scope
covered the lounge, bathroom and north side pathway, including restumping the lounge and
bathroom (insurer SOW). MC acknowledged that there are pre-exiting issues that may be
exacerbating damage and deterioration to building elements that are not related to the event
and are excluded from the insurer SOW.
Base d on the insurer’s SOW, PP prepared a quote dated 12 September 2022 for the works
totalling $47,338.33. The insurer made an offer of $53,849.08, including a 15% uplift for
contingencies ($7,100.75) and less the $600 excess. The insurer has also offered the
Determination | Case number: 985112 Page 5 of 7
complainant $31,895.66 for temporary accommodation for 12 weeks while the repairs are
being carried out.
The complainant has provided a report from an engineer, TC, commenting on MC’s report. It
states that the insurer’s SOW includes restumping of three rooms only, however the entire
site beneath the dwelling is affected. The saturation of the soil has led to damage to the
dwelling in all areas. It recommends that the entire footing system should be rectified as part
of the scope of works.
The complainant further says the insurer’s cash settle ment offer is inadequate and has
provided a quotation for $435,490 from its builder, ER. The complainant’s quote is not
itemised. It does not specify the number of units or area to be covered, the unit price or the
cost of labour. It only provides the line items and a single figure for the total estimated cost of
repairs.
Insurer’s scope of works must include all claimed damage
The panel has reviewed the previous determination and the documents relating to the
previous determination.
The panel is satisfied that the scope of works should include all of the claimed damage. This
is consistent with the previous determination and the complaint documents. Having reviewed
the previous complaint, it is clear the damage claimed is focussed on the subsidence and
movement of the foundations. To limit the scope of works to less than the claimed damage, or
only part of the subfloor, would involve revisiting the merits of the previous determination and,
potentially, reducing the liability conferred on the insurer based on the previous determination.
The panel also notes the previous determination states that ‘soil testing at the property has
not been conducted’. The insurer has sought to carry out this testing after the previous
determination and in the context of the current complaint. However, the panel does not
consider this is appropriate in the circumstances if it is being done so in context of limiting its
liability for the claimed damage.
In any event, the panel is persuaded by TC’s comments regarding the rectification works
required. This is also consistent with and gives further weight to the previous determination.
Therefore, the insurer is liable for all of the claimed damage (including but not limited to the
movement and foundation damage to the entire subfloor and resultant damage).
Insurer should obtain a new quote for claimed damage
The panel is not persuaded by ER’s quote. This is because the quote only broadly lists the
type of work required to be done. It does not include specific details of the work required to be
completed, any measurements of areas, the number of units of any product, unit prices or the
labour costs. Rather, it simply gives a global figure for all works.
In the circumstances, the panel considers the insurer should obtain a new scope of works for
the claimed damage from MC and an actionable quotation from PP. In accordance with the
previous determination, the claim should then be cash settled with a 15% uplift to take into
account contingencies and the loss of a lifetime guarantee on repairs.
The insurer is also required to provide the complainant with temporary accommodation while
the works are being completed. To this end, the quote should include an estimate of time
likely to be required to complete the works. The insurer should then cash settle the
complainant for the estimated time period and in accordance with the terms and conditions of
the policy.
Determination | Case number: 985112 Page 6 of 7
2.2 Why is the outcome fair?
The outcome is fair because, in accordance with the previous determination, the insurer is
liable for all the claimed damage. Therefore, it is fair that the insurer covers this damage and
the complainant ’s temporary accommodation costs while the repairs are completed.
Determination | Case number: 985112 Page 7 of 7
3 Supporting information
3.1 The AFCA processes
AFCA’s approa ch is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
A panel determined this matter
Due to the nature of this complaint, we referred it to a panel for determination. The panel
includes:
an ombudsman
a member with significant experience in consumer and small business advocacy
a member with extensive experience in the insurance sector.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.