Insurer declined storm damage claim relying on exclusions for earth movement, faulty workmanship and pre-existing damage
Text of the determination
Determination
Case number 984845
Financial firm Insurance Manufacturers of Australia Pty Ltd
Determination | Case number: 984845 Page 1 of 8
Case number: 984845 15 December 2023
1 Determination overview
1.1 Complaint
The complainants hold a home and contents insurance policy issued by the financial firm (the
insurer). Following a storm event on 30 September 2021, the complainants lodged a claim for
damage to the insurer property on 10 October 2021.
The insurer initially accepted the claim and agreed to repair the property.
However, after sending specialist contractors to the insured premises to assess the damage,
the insurer overturned its decision. It declined the claim on the basis the damage to the
insured premises was caused by excluded events, namely earth movement, incorrect
installation processes and pre-existing damage.
The complainants say there have been undue delays in the finalisation of the claim and wish
the claim to be accepted and their home repaired.
1.2 Issues and key findings
Have the complainants established a claimable loss?
Yes. The panel is satisfied the available evidence from both parties is the proximate cause of
the damage was the storm event.
Is the insurer entitled to rely on an exclusion to deny the claim?
No. The insurer has not persuaded the panel, on the balance of probabilities, an exclusion
applies.
Are the complainants entitled to non-financial loss?
Yes. The complainants have established they have suffered additional stress and
inconvenience as a result of the delays caused by the insurer.
Why is the outcome fair?
The information, on balance shows the complainants have established a claimable loss under
the policy. The expert reports provided by the insurer on balance do not prove a valid
exclusion as they are inconclusive in nature. It is fair for the insurer to accept and settle the
claim as per the policy terms. It is also fair the insurer pays $5,400 in compensation towards
the claim experience.
1.3 Determination
This determination is in favour of the complainants.
Within 14 days of the date the insurer is advised the complainants have accepted this
determination, the insurer must:
appoint a relevantly qualified expert to prepare a scope of works to repair all the damage
claimed including:
Determination | Case number: 984845 Page 2 of 8
> provision for a project manager to coordinate the rectification works
> provision for a hygienist to assess and conduct necessary mould remediation and
> a 15% contingency for any unforeseen costs.
undertake to pay for all temporary accommodation costs available to the complainants
under the policy
pay the complainants $5,400 in non-financial loss compensation and
make all reasonable endeavours to ensure the repairs are carried out and the claim
concluded in a timely manner which reflects the insur er’s duty of good faith.
Determination | Case number: 984845 Page 3 of 8
2 Reasons for determination
2.1 Have the complainants established a claimable loss?
Yes. The panel is satisfied the available evidence from both parties is the proximate cause of
the damage was the storm event.
The complainants must establish a claimable loss
When bringing a complaint to AFCA, a complainant is required initially to show it is more likely
than not there is a claimable loss under the policy. This means demonstrating the loss or
damage was caused by a risk that is covered under the policy.
Once the complainant proves there is a claimable loss, the insurer is liable for the loss unless
it shows an exclusion or limiting condition applies. The insurer has the responsibility to show it
is more likely than not the exclusion or condition applies.
The policy covers damage caused by storm, storm surge and rainwater run-off
The parties relevantly agree:
the complainants were provided with the relevant policy documents or
a storm and rainfall event occurred on 30 September 2021 which caused damage to the
property.
the product disclosure statement (PDS) describes the terms of the insurance policy
the policy covers damage caused by storm, storm surge and rainwater-runoff, including
damage due to violent wind, cyclone, tornado, rain, thunderstorm, hail or snow, landslide
and subsidence that follows immediately after the storm event.
However, in part, the insurer says a one-off storm event did not cause all the damage or the
damage is otherwise excluded as being pre-existing.
The insurer commissioned several expert reports to determine proximate cause
The insurer appointed its builder, Company R, to assess the damage.
Company R attended the insured premises on 8 December 2021 and produced an undated
report thereafter. The panel n otes from the report’s electronic file properties, this appears to
have been created on 10 December 2021. We will refer to this report as the Company R
report.
The Company R report identified resultant damage to the stumps, concrete cracking
throughout the property, drumming tiles around the pool area and cupping in the floorboards.
However, the report was not definitive about the cause of the damage but did state the
damage was consistent with flood and water damage from the storm event. Company R
recommended an engineer attend to assess the stump footings and all the damage to the
property.
The engineer, Company C, attended the property and produced a report dated 17 March
2022 (the 2022 Company C Report). The report:
noted that during the storm event, water ponded beneath the property causing saturation
of the sub floor soil
concluded it is likely the majority of the movement between the structural floor elements
occurred due to the saturation of the soil caused by the storm event
Determination | Case number: 984845 Page 4 of 8
provided several recommendations to reinstate the property to a pre-loss condition and the
nature of remediation required
made several maintenance related recommendations to improve drainage and ventilation
across the site to mitigate future possible losses
did not provide any plausible information to support the idea that a storm was not the
proximate cause of the damage and
affirmed storm water entering the property was the direct source of the damage.
Subsequently, the insurer engaged a flooring specialist, also from Company C, who attended
the insured premises on 25 May 2023 and subsequently produced a report dated 10 July
2023 (the flooring report).
The flooring report identified several problems with the installation of the floorboards which
could have contributed to moisture retention in the floorboards. The flooring report suggested
the high moisture content of the floor area was probably caused by improper ventilation and
drainage. However, the flooring report remained inconclusive about the cause of the damage
other than saturation of the floorboards due to water ingress related to the claimed storm
event.
The panel notes the flooring report was obtained nearly two years after the date of loss. The
complainants say:
the insurer failed to provide any make safe or make reasonable attempts to extract water
and dry the property
the damage had worsened as result of insurer’s failure to perform a make safe and
this has resulted in the subsequent high moisture readings in the flooring report.
As the insurer has not provided any reasonable explanation with regards to any make safe
completed at the insured premises, the panel accepts the complainants’ position in respect of
the flooring report as being reasonably held and gives the flooring report little weight when
determining the proximate cause of the damage.
On balance the claimed damage was caused by the storm event
Having considered all the available information, the panel accepts, on balance, the rainwater
entering the property and saturation of the soil beneath after the storm event are the likely
cause of the damage.
The insurer has failed to satisfy the panel it is more likely than not the sustained damage
would have nevertheless occurred in the absence of the storm event.
As such, the complainants have established a claimable loss under the policy terms.
2.2 Is the insurer entitled to rely on an exclusion to deny the
claim?
No. The insurer has not persuaded the panel, on the balance of probabilities, an exclusion
applies.
The insurer must establish an exclusion applies
Having established a claimable loss, the responsibility shifts to the insurer to establish a
relevant exclusion applies to enable it to appropriately decline the claim.
Determination | Case number: 984845 Page 5 of 8
The insurer relies on exclusions
In its complaint response to AFCA dated 4 October 2023, the insurer advises the reasons for
its position (with respect to the exclusions) are based on the following clauses on page 64 of
the PDS:
We do not cover
[…]
the settling, shrinkage or expansion in buildings, foundations, walls or
pavements
[…] Maintaining and occupying your home
We don’t cover loss, damage, injury or death arising from:
faulty design or workmanship
previous damage that has not been repaired
[…]
you not maintaining your home in good repair and condition. This means
your home must be watertight, structurally sound, secure and well
maintained.
The insurer relies on the Company C report and the flooring report when it advised the basis
of its decision to decline was:
As the reports on file identify the damages to be either due to earth movement,
incorrect repair processes followed, pre-existing damages, we cannot be held
liable to repair the damages to the complainants property.
The panel is not persuaded by the insur er’s evidence
The panel notes the majority of the expert reports obtained over the course of this claim
accept the proximate cause of damage was the storm:
Company J report, dated 15 October 2021, attributed damage to common wear and tear
structural movement and maintenance related issues
Company R report, dated 9 November 2021, attributed damage to shifting stumps
consistent with flood water and water damage from a storm – advised an engineer was
necessary to determine cause and
Company C engineer’s report , dated 17 March 2022, attributed damage to saturation of
the soil from the storm event causing movement of structural floor elements.
There was then a large period of time before the next set of expert reports:
Company C engineer’s report, dated 8 Februar y 2023, noted further damage in intervening
period was to be expected as the soil dried
Determination | Case number: 984845 Page 6 of 8
Company U report, dated 28 February 2023, attributed damage to non-compliant works at
the time of construction, but specified ‘a causation of the damage has not been provided’
and advised an engineer was required
Company J report, dated 29 March 2023, says ‘damages that exist have been caused by
the claimed storm event’ and
Company C flooring report, dated 10 July 2023, attributed damage to the floors to high
levels of moisture content but could not attribute cause of damage to either the storm
event or ongoing seepage.
Specifically considering the exclusions relied on by the insurer, the panel is satisfied:
there is an insufficient basis to attribute the damage to any faulty design or workmanship
while there may have been pre-existing defects which have contributed to the loss, such
as poor ventilation, on balance, the damage itself was caused by the storm and
subsequent issues exacerbated the damage due to the delays in properly assessing and
resolving the claim.
The insurer is required to accept the claim and re-assess the Scope of Works
The panel does accept however the insurer is not liable for any improvement works which
need to be undertaken in order to provide any further indemnity.
Given the passage of time, as a matter of priority, the insurer must appoint a new contractor
to provide an updated Scope of Works. The Scope of Works must include:
provision for a project manager to coordinate the rectification works
provision for a hygienist to assess and conduct necessary mould remediation and
a 15% contingency for any unforeseen costs.
2.3 Are the complainants entitled to non-financial loss?
Yes. The complainants have established they have suffered additional stress and
inconvenience as a result of the delays caused by the insurer.
AFCA may award non-financial loss compensation
AFCA may award, in certain circumstances, non-financial loss compensation up to a
particular limit. For this complaint, the limit is $5,400.
However, AFCA will only award compensation for non-financial loss where there has been an
unusual amount of physical inconvenience, time taken to resolve a situation, or interference
with the complainant’s expectation of enjoyment or peace of mind.
In assessing whether to award compensation, AFCA expects the complainant to be
moderately robust, bear the normal degree of inconvenience experienced when a problem
occurs, and take reasonable steps to minimise the inconvenience suffered.
The complainants are entitled to the maximum award
Unfortunately for the complainants and their family, the claims and dispute process has been
lengthy and has involved a number of issues including:
an apparent lack of make safe
miscommunications between the insurer and complainant
multiple experts coming to inconsistent conclusions over a relatively long two-year time
period and
a breakdown in trust in the views and process of the insurer’s experts.
Determination | Case number: 984845 Page 7 of 8
On some occasions, the experts only attended the premises for a few moments before
presenting their findings. This was not acceptable conduct by those experts and therefore the
panel has given their views little weight.
The insurer at first engaged Company R builders and due to delays in obtaining the scope of
works from Company R it engaged a second builder, Company U, who also could not
complete the repairs. This resulted in the insurer engaging a third builder, Company J, who
provided a scope of works for $254,038.
At this point the insurer engaged a flooring specialist and obtained a flooring report twenty
months later. The insurer finally denied the claim in July 2023 which is well after the 12
months of lodging the claim in October 2021 required for a claims decision in the General
Insurance Code of Practice (the Code).
The insurer has therefore breached the timeframes outlined within the Code.
This conduct, by agents of the insurer, and the insurer’s own approach to the assessment of
this claim, arriving at the conclusion it did on equivocal evidence, has caused significant
undue delays in the resolution of this claim.
The panel appreciates and sympathises with the stress and anxiety this would have caused
the complainants’ family. The panel accepts the complainants were inconvenienced beyond
that which would be expected when lodging a claim. The complainants have young children
who have continued to live in the property since the event with worsening damage including
mould.
On this basis, the panel is satisfied the complainants are entitled to the maximum allowable
award of $5,400 for non-financial loss compensation.
2.4 Why is the outcome fair?
The information, on balance shows the complainants have established a claimable loss under
the policy. The expert reports provided by the insurer on balance do not prove a valid
exclusion as they are inconclusive in nature. It is fair for the insurer to accept and settle the
claim as per the policy terms. It is also fair the insurer pays $5,400 in compensation towards
the claim experience.
Determination | Case number: 984845 Page 8 of 8
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
A panel determined this matter
Due to the nature of this complaint, we referred it to a panel for determination. The panel
includes:
an ombudsman
a member with significant experience in consumer and small business advocacy
a member with extensive experience in the general insurance industry.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.