Home / IAG / Determination 984845

Determination 984845

Insurer declined storm damage claim relying on exclusions for earth movement, faulty workmanship and pre-existing damage

FirmIAG
Decided2023-12-19
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant
Amount awarded—
Non-financial loss$5,400
Amount claimed—
SourceAFCA PDF

Summary

Complainants' home was damaged in a storm and the insurer first accepted then declined the claim relying on exclusions. AFCA found the storm was the proximate cause, no exclusion was proven, and ordered the claim accepted with a new scope of works, temporary accommodation and $5,400 non-financial loss.

The complainants established a claimable storm loss and the insurer's inconclusive expert reports did not prove an exclusion on the balance of probabilities, while its delays breached the Code timeframes.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimpay non financial lossreassess claimrepair or rectify

Related

All IAG determinations · Find similar determinations

Text of the determination

Determination Case number 984845 Financial firm Insurance Manufacturers of Australia Pty Ltd Determination | Case number: 984845 Page 1 of 8 Case number: 984845 15 December 2023 1 Determination overview 1.1 Complaint The complainants hold a home and contents insurance policy issued by the financial firm (the insurer). Following a storm event on 30 September 2021, the complainants lodged a claim for damage to the insurer property on 10 October 2021. The insurer initially accepted the claim and agreed to repair the property. However, after sending specialist contractors to the insured premises to assess the damage, the insurer overturned its decision. It declined the claim on the basis the damage to the insured premises was caused by excluded events, namely earth movement, incorrect installation processes and pre-existing damage. The complainants say there have been undue delays in the finalisation of the claim and wish the claim to be accepted and their home repaired. 1.2 Issues and key findings Have the complainants established a claimable loss? Yes. The panel is satisfied the available evidence from both parties is the proximate cause of the damage was the storm event. Is the insurer entitled to rely on an exclusion to deny the claim? No. The insurer has not persuaded the panel, on the balance of probabilities, an exclusion applies. Are the complainants entitled to non-financial loss? Yes. The complainants have established they have suffered additional stress and inconvenience as a result of the delays caused by the insurer. Why is the outcome fair? The information, on balance shows the complainants have established a claimable loss under the policy. The expert reports provided by the insurer on balance do not prove a valid exclusion as they are inconclusive in nature. It is fair for the insurer to accept and settle the claim as per the policy terms. It is also fair the insurer pays $5,400 in compensation towards the claim experience. 1.3 Determination This determination is in favour of the complainants. Within 14 days of the date the insurer is advised the complainants have accepted this determination, the insurer must:  appoint a relevantly qualified expert to prepare a scope of works to repair all the damage claimed including: Determination | Case number: 984845 Page 2 of 8 > provision for a project manager to coordinate the rectification works > provision for a hygienist to assess and conduct necessary mould remediation and > a 15% contingency for any unforeseen costs.  undertake to pay for all temporary accommodation costs available to the complainants under the policy  pay the complainants $5,400 in non-financial loss compensation and  make all reasonable endeavours to ensure the repairs are carried out and the claim concluded in a timely manner which reflects the insur er’s duty of good faith. Determination | Case number: 984845 Page 3 of 8 2 Reasons for determination 2.1 Have the complainants established a claimable loss? Yes. The panel is satisfied the available evidence from both parties is the proximate cause of the damage was the storm event. The complainants must establish a claimable loss When bringing a complaint to AFCA, a complainant is required initially to show it is more likely than not there is a claimable loss under the policy. This means demonstrating the loss or damage was caused by a risk that is covered under the policy. Once the complainant proves there is a claimable loss, the insurer is liable for the loss unless it shows an exclusion or limiting condition applies. The insurer has the responsibility to show it is more likely than not the exclusion or condition applies. The policy covers damage caused by storm, storm surge and rainwater run-off The parties relevantly agree:  the complainants were provided with the relevant policy documents or  a storm and rainfall event occurred on 30 September 2021 which caused damage to the property.  the product disclosure statement (PDS) describes the terms of the insurance policy  the policy covers damage caused by storm, storm surge and rainwater-runoff, including damage due to violent wind, cyclone, tornado, rain, thunderstorm, hail or snow, landslide and subsidence that follows immediately after the storm event. However, in part, the insurer says a one-off storm event did not cause all the damage or the damage is otherwise excluded as being pre-existing. The insurer commissioned several expert reports to determine proximate cause The insurer appointed its builder, Company R, to assess the damage. Company R attended the insured premises on 8 December 2021 and produced an undated report thereafter. The panel n otes from the report’s electronic file properties, this appears to have been created on 10 December 2021. We will refer to this report as the Company R report. The Company R report identified resultant damage to the stumps, concrete cracking throughout the property, drumming tiles around the pool area and cupping in the floorboards. However, the report was not definitive about the cause of the damage but did state the damage was consistent with flood and water damage from the storm event. Company R recommended an engineer attend to assess the stump footings and all the damage to the property. The engineer, Company C, attended the property and produced a report dated 17 March 2022 (the 2022 Company C Report). The report:  noted that during the storm event, water ponded beneath the property causing saturation of the sub floor soil  concluded it is likely the majority of the movement between the structural floor elements occurred due to the saturation of the soil caused by the storm event Determination | Case number: 984845 Page 4 of 8  provided several recommendations to reinstate the property to a pre-loss condition and the nature of remediation required  made several maintenance related recommendations to improve drainage and ventilation across the site to mitigate future possible losses  did not provide any plausible information to support the idea that a storm was not the proximate cause of the damage and  affirmed storm water entering the property was the direct source of the damage. Subsequently, the insurer engaged a flooring specialist, also from Company C, who attended the insured premises on 25 May 2023 and subsequently produced a report dated 10 July 2023 (the flooring report). The flooring report identified several problems with the installation of the floorboards which could have contributed to moisture retention in the floorboards. The flooring report suggested the high moisture content of the floor area was probably caused by improper ventilation and drainage. However, the flooring report remained inconclusive about the cause of the damage other than saturation of the floorboards due to water ingress related to the claimed storm event. The panel notes the flooring report was obtained nearly two years after the date of loss. The complainants say:  the insurer failed to provide any make safe or make reasonable attempts to extract water and dry the property  the damage had worsened as result of insurer’s failure to perform a make safe and  this has resulted in the subsequent high moisture readings in the flooring report. As the insurer has not provided any reasonable explanation with regards to any make safe completed at the insured premises, the panel accepts the complainants’ position in respect of the flooring report as being reasonably held and gives the flooring report little weight when determining the proximate cause of the damage. On balance the claimed damage was caused by the storm event Having considered all the available information, the panel accepts, on balance, the rainwater entering the property and saturation of the soil beneath after the storm event are the likely cause of the damage. The insurer has failed to satisfy the panel it is more likely than not the sustained damage would have nevertheless occurred in the absence of the storm event. As such, the complainants have established a claimable loss under the policy terms. 2.2 Is the insurer entitled to rely on an exclusion to deny the claim? No. The insurer has not persuaded the panel, on the balance of probabilities, an exclusion applies. The insurer must establish an exclusion applies Having established a claimable loss, the responsibility shifts to the insurer to establish a relevant exclusion applies to enable it to appropriately decline the claim. Determination | Case number: 984845 Page 5 of 8 The insurer relies on exclusions In its complaint response to AFCA dated 4 October 2023, the insurer advises the reasons for its position (with respect to the exclusions) are based on the following clauses on page 64 of the PDS: We do not cover […]  the settling, shrinkage or expansion in buildings, foundations, walls or pavements […] Maintaining and occupying your home We don’t cover loss, damage, injury or death arising from:  faulty design or workmanship  previous damage that has not been repaired  […]  you not maintaining your home in good repair and condition. This means your home must be watertight, structurally sound, secure and well maintained. The insurer relies on the Company C report and the flooring report when it advised the basis of its decision to decline was: As the reports on file identify the damages to be either due to earth movement, incorrect repair processes followed, pre-existing damages, we cannot be held liable to repair the damages to the complainants property. The panel is not persuaded by the insur er’s evidence The panel notes the majority of the expert reports obtained over the course of this claim accept the proximate cause of damage was the storm:  Company J report, dated 15 October 2021, attributed damage to common wear and tear structural movement and maintenance related issues  Company R report, dated 9 November 2021, attributed damage to shifting stumps consistent with flood water and water damage from a storm – advised an engineer was necessary to determine cause and  Company C engineer’s report , dated 17 March 2022, attributed damage to saturation of the soil from the storm event causing movement of structural floor elements. There was then a large period of time before the next set of expert reports:  Company C engineer’s report, dated 8 Februar y 2023, noted further damage in intervening period was to be expected as the soil dried Determination | Case number: 984845 Page 6 of 8  Company U report, dated 28 February 2023, attributed damage to non-compliant works at the time of construction, but specified ‘a causation of the damage has not been provided’ and advised an engineer was required  Company J report, dated 29 March 2023, says ‘damages that exist have been caused by the claimed storm event’ and  Company C flooring report, dated 10 July 2023, attributed damage to the floors to high levels of moisture content but could not attribute cause of damage to either the storm event or ongoing seepage. Specifically considering the exclusions relied on by the insurer, the panel is satisfied:  there is an insufficient basis to attribute the damage to any faulty design or workmanship  while there may have been pre-existing defects which have contributed to the loss, such as poor ventilation, on balance, the damage itself was caused by the storm and  subsequent issues exacerbated the damage due to the delays in properly assessing and resolving the claim. The insurer is required to accept the claim and re-assess the Scope of Works The panel does accept however the insurer is not liable for any improvement works which need to be undertaken in order to provide any further indemnity. Given the passage of time, as a matter of priority, the insurer must appoint a new contractor to provide an updated Scope of Works. The Scope of Works must include:  provision for a project manager to coordinate the rectification works  provision for a hygienist to assess and conduct necessary mould remediation and  a 15% contingency for any unforeseen costs. 2.3 Are the complainants entitled to non-financial loss? Yes. The complainants have established they have suffered additional stress and inconvenience as a result of the delays caused by the insurer. AFCA may award non-financial loss compensation AFCA may award, in certain circumstances, non-financial loss compensation up to a particular limit. For this complaint, the limit is $5,400. However, AFCA will only award compensation for non-financial loss where there has been an unusual amount of physical inconvenience, time taken to resolve a situation, or interference with the complainant’s expectation of enjoyment or peace of mind. In assessing whether to award compensation, AFCA expects the complainant to be moderately robust, bear the normal degree of inconvenience experienced when a problem occurs, and take reasonable steps to minimise the inconvenience suffered. The complainants are entitled to the maximum award Unfortunately for the complainants and their family, the claims and dispute process has been lengthy and has involved a number of issues including:  an apparent lack of make safe  miscommunications between the insurer and complainant  multiple experts coming to inconsistent conclusions over a relatively long two-year time period and  a breakdown in trust in the views and process of the insurer’s experts. Determination | Case number: 984845 Page 7 of 8 On some occasions, the experts only attended the premises for a few moments before presenting their findings. This was not acceptable conduct by those experts and therefore the panel has given their views little weight. The insurer at first engaged Company R builders and due to delays in obtaining the scope of works from Company R it engaged a second builder, Company U, who also could not complete the repairs. This resulted in the insurer engaging a third builder, Company J, who provided a scope of works for $254,038. At this point the insurer engaged a flooring specialist and obtained a flooring report twenty months later. The insurer finally denied the claim in July 2023 which is well after the 12 months of lodging the claim in October 2021 required for a claims decision in the General Insurance Code of Practice (the Code). The insurer has therefore breached the timeframes outlined within the Code. This conduct, by agents of the insurer, and the insurer’s own approach to the assessment of this claim, arriving at the conclusion it did on equivocal evidence, has caused significant undue delays in the resolution of this claim. The panel appreciates and sympathises with the stress and anxiety this would have caused the complainants’ family. The panel accepts the complainants were inconvenienced beyond that which would be expected when lodging a claim. The complainants have young children who have continued to live in the property since the event with worsening damage including mould. On this basis, the panel is satisfied the complainants are entitled to the maximum allowable award of $5,400 for non-financial loss compensation. 2.4 Why is the outcome fair? The information, on balance shows the complainants have established a claimable loss under the policy. The expert reports provided by the insurer on balance do not prove a valid exclusion as they are inconclusive in nature. It is fair for the insurer to accept and settle the claim as per the policy terms. It is also fair the insurer pays $5,400 in compensation towards the claim experience. Determination | Case number: 984845 Page 8 of 8 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided. While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. A panel determined this matter Due to the nature of this complaint, we referred it to a panel for determination. The panel includes:  an ombudsman  a member with significant experience in consumer and small business advocacy  a member with extensive experience in the general insurance industry. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.