Insurer declined claim for cracking and movement damage after a 2020 storm and was not bound by a mistaken scope of works
Text of the determination
Determination
Case number 983063
Financial firm AAI Limited
Determination | Case number: 983063 Page 1 of 7
Case number: 983063 29 February 2024
1 Determination overview
1.1 Complaint
The complainant had a building and contents insurance policy (policy) with the financial firm
(insurer). Following a storm in 2020, the complainant claimed for cracking and movement
damage and a bowed garage ceiling. AFCA determination 849755 required the insurer to
cover storm damage to the garage ceiling but did not make a determination regarding other
damage.
Following a further dispute, in 2022 the insurer agreed to repair the damage using its builder.
On 12 July 2022, the insurer sent the repair contract to the complainant. It mistakenly
included a scope of work (SOW) greater than required by AFCA determination 849755.
The complainant says that the house cracks were caused by the 2020 storm and should be
covered by the insurer. He also says that the insurer should be bound by the mistaken SOW.
The insurer says the cracks were not caused by storm and it is not required to do perform all
repairs in the wrong SOW that was quickly corrected.
1.2 Issues and key findings
Is the insurer entitled to deny the movement damage?
Yes. Based on the available information the complainant has not established the movement
damage was caused by storm or other insured event within the terms of the policy. The
insurer can deny the claim on this basis.
Is insurer bound by mistaken SOW sent?
No. The insurer is not bound by the mistaken SOW. That is because the mistake was
quickly corrected and did not cause loss to the complainant.
Is non-financial loss compensation payable?
No. The available information shows that the insurer handled the claim and resulting
complaint within reasonable timeframes and in line with good industry practice. In the
circumstances, I am not satisfied compensation for non-financial loss is warranted.
Why is the outcome fair?
As the damage was not caused by an event listed in the policy, it is fair that the insurer is
entitled to deny liability. It is also fair that the insurer not be bound by, or otherwise provide
remedy for, a mistake in circumstances where the available information does not show it
resulted in any loss.
1.3 Determination
This determination is in favour of the insurer.
The insurer is not required to take any further action in relation to the claim or this complaint.
Determination | Case number: 983063 Page 2 of 7
2 Reasons for determination
2.1 Is the insurer entitled to deny the movement damage?
Yes. Based on the available information the complainant has not established the movement
damage was caused by storm or other insured event within the terms of the policy. The
insurer can deny the claim on this basis.
Onus on complainant to establish a claimable loss
When making a claim, an insured party has the onus of establishing they suffered a loss for
which their insurance policy provides cover. The insured party must establish this on the
balance of probabilities (i.e. that it is more likely than not).
The complainant held a building and contents insurance policy with the insurer. The policy
was an ‘insured events’ policy. This means that not all loss and damage is automatically
covered. Rather, only loss or damage caused by one or more of the insured events and not
subject to exclusions, is covered . One of the insured events is ‘storm’.
If a claimable loss is established, the insurer has the onus of establishing, on the balance of
probabilities, the application of any exclusion it relies on to reduce its liability.
Insurer ’s experts say damage is not consistent with storm damage
The insurer engaged forensic engineer, CR, to inspect the property as part of its assessment
of the claim.
CR provided a report dated 1 May 2023 (CR1). CR says:
internal cracking to walls, cornices and architraves has been caused by long-term
differential footing movement due to normal seasonal moisture changes in reactive soil
waterproofing in the front and rear balconies has failed, causing water ingress to the
floorspace and damage to framework and balcony linings
some dilapidated grout and sealant was observed on the rear balcony
some differential footing movement has affected the rear balcony causing the cladding to
crack
the ceiling cracking has been contributed to by haphazard installation of the ceiling linings.
In particular, the back-blocks did not extend the full width between adjacent roof trusses.
Properly installed, they are meant to reinforce the joints and prevent cracking along the
joints
none of the damage is related to a one-off event and is all of long-term consequence.
The insurer has provided a CR’s supplementary report (CR2), dated 7 September 2023. That
report restates CR’s earlier findings and says:
damage to cornices and architrave junctions has been contributed to by normal thermal
expansion and contraction of differing building materials since construction
damage to the balcony exterior consisted of water staining and mould to ceiling linings and
detachment of cladding. Inspection of a section of the balcony framework found decay/rot
to sections of the timber members.
the extent of timer decay/rot indicates it has been occurring for several years, including
prior to the loss date
the time between the reported damage (9 October 2020) and engineer’s investigation (1
March 2023) does not affect its findings. The differential footing movement has been
occurring since the initial construction date.
Determination | Case number: 983063 Page 3 of 7
The insurer has provided a CR’s suppl ementary report 2 (CR3), dated 19 October 2023. CR3
says:
CR’s comment about ‘haphazard’ construction relates to poor and non -compliant
installation of the ceiling linings which have cracked along the ceiling joints. These lacked
additional strengthening of those joints in accordance with AS2589 in force at the time of
construction
the observed crack to the rear balcony’s cladding is in line with the edge of a brick pier.
This is consistent with it being caused by vertical movement of a brick pier, shrinking and
swelling in clay soil
failure of the waterproof membrane in both balconies is indicated by the timber decay in
framework. This shows that water is entering balcony floorspace. This has also led to
water stains and mould seen on the ceiling linings of both balconies. The level of timber
decay indicates water ingress for in excess of several years.
The insurer has also provided BB’s assessment report dated 30 October 2020. This report
was obtained in relation to the 2020 claim and considered in AFCA determination 849755 in
relation to the garage ceiling damage. Insofar a s BB’s report comments on the matters
relevant to this determination, it says:
the complainant advised they had noticed some cracks and marks on the ceilings
throughout the house and balcony
BB noted numerous areas of cracking within the house. It believed that this was due to the
general movement of the house and was n’t related to any specific event.
Relying on CR’s reports, the insurer says the damage was not caused by stor m or other
single event. Rather, it says, the damage was caused by:
ground movement
wear, tear and gradual deterioration (tiles and adhesive, grout breaking down, weathering
of roof tiles or roof ridge capping, gradual weathering and breakdown of bricks, mortar or
concrete).
The policy excludes damage from those causes.
Complainant says damage should be covered as storm damage
The complainant has not provided a report regarding the cause of the damage but makes
several comments saying the insurer is wrong to decline his claim, including:
there is no dispute the storm occurred
he reported cracking throughout rooms in the property when he lodged the initial claim on
15 October 2020
he does not accept the insurer has shown the cause of damage was wear and tear over
many years
the storm caused damage to the balcony, laundry ceiling, lounge room, rear kitchen
ceiling, ceiling on lounge room upstairs, bathroom upstairs ceiling & bedroom ceiling
the insurer’s reports should have been completed in 2020 when the claim was first made,
not May 2023. He questions the accuracy of the CR reports given the time that has
passed since the storm. He says it is not reasonable to rely on reports written so long after
he reported the damage
the insurer has alleged haphazard construction in the property but failed to provide
supporting evidence
CR’s reports are vague and do not address the root cause, exact cause of damage or the
exact location of the property so cannot be relied upon
CR2 contains an incorrect date of inspection
CR3’s rainfall data is unreliable as it is from suburb BN, not the complainant’s suburb.
Determination | Case number: 983063 Page 4 of 7
Relying on CR’s report s, the insurer says the damage was not caused by storm or other
single event. Rather, it says, the damage was caused by:
ground movement
wear, tear and gradual deterioration (tiles and adhesive, grout breaking down, weathering
of roof tiles or roof ridge capping, gradual weathering and breakdown of bricks, mortar or
concrete).
Insurer is entitled to deny movement damage
As stated above, the onus rests with the complainant to establish, on the balance of
probabilities, that the damage to his property was caused by an insured event, in this case, a
storm.
I acknowledge that the complainant says he first noticed the cracking damage to the property
after the storm. The insurer’s claim notes show that the complainant told the insurer of
cracking throughout rooms in the property, garage and balcony when he made the claim in
2020. However, it does not mean the storm was the dominant or effective cause of the loss.
I am persuaded by CR’s reports and accept their conclusions that the damage was not
caused by storm but by natural differential movement due to climatic changes in reactive
founding soils, substandard building and failed waterproofing. That is because:
CR inspected the building
writers of the CR reports are suitably qualified
the reports are logical, evidence-based and provide extracts from Geological Survey of
Victoria and Australian Standard 2870 as to the soil classification in the area of the
property
the report contains photographs supporting its conclusions.
While BB’s report was written shortly after the claim was made, I have not given it weight in
relation to the cause of the damage. That is because BB’s report is focu sed on the cause of
damage to the garage ceiling and contains no analysis of cracking in other parts of the house.
In any event, it does not assist the complainant’s claim.
I do not accept the complainant’s argument that CR’s reports should not be relied upon
because they are vague, do not address the root cause of the damage, or the correct exact
location of the property. As stated above, I am satisfied that CR is suitably qualified and the
reports are sufficiently detailed in their information and findings to be relied upon.
The complainant has said that CR2 should be given no weight because it contains an error.
The error was in relation to the date of CR’s inspection. I do not accept the complainant’s
argument. The insurer has explained that CR inspected the property once on 22 March 2023.
No other errors have been shown in CR’s information or findings that would cast doubt on the
value of the report.
The complainant has said the rainfall data in CR3 should be disregarded because it is not
from his suburb. The complainant has not nominated a closer rainfall station. Accordingly, I
am satisfied CR used the an appropriately close rain station.
Insurer entitled to deny the claim
I am not satisfied the complainant has established the loss is covered by the policy. He has
not proven of the balance of probabilities that the proximate cause of the damage was the
storm or any other insured event. Rather, it is more likely than not that the damage was
Determination | Case number: 983063 Page 5 of 7
caused by factors that are not covered by the policy. Therefore, the insurer is entitled to deny
the claim for the damage.
2.2 Is insurer bound by mistaken SOW sent?
No. The insurer is not bound by the mistaken SOW. That is because the mistake was
quickly corrected and did not cause loss to the complainant.
Incorrect SOW sent to complainant
In arranging for repairs to the garage ceiling, on 12 July 2022, the repairer’s contract and
SOW was sent to the complainant for signing. The contract mistakenly contained a SOW for
repairs to: kitchen/living; laundry; landing/stairs; bathroom; garage; & balcony ceiling.
On 12 August 2022, the insurer contacted the complainant and advised the SOW sent on 12
July 2022 was a mistake. It said the repairs were limited to the garage ceiling.
The complainant says that, having sent him that SOW, the insurer should be required to do all
repairs in it. He points to other correspondence between him and the insurer where, he says,
the insurer confirmed all works in the mistaken SOW would be done. The complainant says
that t he insurer’s failure to do the repairs in the mistaken SOW caused him financial loss
because:
repair costs have increased since the claim was lodged
he was unable to sell the property at a high market price as he was waiting on the insurer’s
repairs.
Mistake did not cause loss to the complainant
I am satisfied the insurer’s mistake does not compel it to undertake the work in the mistaken
SOW. That is because:
the SOW of 12 July 2023 was sent by mistake and was corrected shortly after. This is
confirm ed by the insurer’s claim notes
the complainant had no reasonable basis to believe the insurer would repair more than the
garage ceiling. That is because the repairs related to AFCA determination 849755 which
required the insurer to repair the garage ceiling. It did not address other cracking damage
in the property
The insurer had confirmed the repairs were limited to the garage ceiling. By email dated
11 July 2022 12.36pm , the insurer had told the complainant ‘As discussed on the phone
today, [insurer] will cover the cost of repairs under your insurance claim as determined by
AFCA’ .
By 12 August 2023 the insurer had corrected the mistake. I am not persuaded that the
the repair costs or market value of the property significantly changed in the time between
the error and its correction
The complainant’s claimed loss relates to the insurer not attending to the repairs. As
stated above, I am satisfied the insurer was not required to do so. The complainant has
not shown any loss related to the mistaken SOW.
2.3 Is non-financial loss compensation payable?
No. The available information shows that the insurer handled the claim and resulting
complaint within reasonable timeframes and in line with good industry practice. In the
circumstances, I am not satisfied compensation for non-financial loss is warranted.
Determination | Case number: 983063 Page 6 of 7
AFCA can award compensation for non-financial loss
Under our Rules, AFCA can award up to $5,400 compensation for non-financial loss. This
must relate to poor claims handling or other actions of the insurer which cause an unusual
degree of stress, delay, or inconvenience.
We expect complainants to be moderately robust, and we will not award compensation for the
ordinary degree of inconvenience involved in making a claim.
Compensation for non-financial loss not warranted
Having considered all the available information, I do not consider the complainant has
suffered an unusual degree of stress, delay and/or inconvenience in the matters dealt with in
this determination. Accordingly, I am not satisfied compensation for non-financial loss is
warranted.
2.4 Why is the outcome fair?
As the damage was not caused by an event listed in the policy, it is fair that the insurer is
entitled to deny liability. It is also fair that the insurer not be bound by, or otherwise provide
remedy for, a mistake in circumstances where the available information does not show it
resulted in any loss.
Determination | Case number: 983063 Page 7 of 7
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.