Settlement amount for make-safe temporary fence and fence repair after storm damage, plus compensation claimed

FirmAuto & General
Decided2024-02-26
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded$5,182
Non-financial loss$2,500
Amount claimed$317,982
SourceAFCA PDF

Summary

A home insurer initially declined a storm-damaged fence claim then accepted it and offered settlement. AFCA found the offer largely fair but required an updated scope and quote including concrete work, with a 15% uplift if cash settled.

The policy lets the insurer choose how to settle, the insurer's make-safe quote was reasonable and the complainant's claimed costs were excessive, but the repair scope omitted damaged concrete.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimpay non financial lossreassess claim

Related

All Auto & General determinations · Find similar determinations

Text of the determination

Determination Case number 981161 Financial firm Auto & General Services Pty Ltd Determination | Case number: 981161 Page 1 of 8 Case number: 981161 5 February 2024 1 Determination overview 1.1 Complaint The complainant holds a home insurance policy with the financial firm (insurer). On 12 November 2022 she lodged a claim after her rear brick boundary fence fell during strong winds on or around 29 October 2022. The insurer initially declined cover for the fence, but later accepted liability. It is willing to either cash settle (based on its builder’s quote) or authorise its repairer to commence repairs. It also offers to pay $5,181.53 for the reasonable cost to make the site safe; as well as $2,500 as compensation for non-financial loss. The complainant wants payment of $56,725 for the make-safe/temporary fence, $136,566 to repair the damage from the fallen fence, and other compensation totalling $123,691.45. 1.2 Issues and key findings Is the insurer’s proposed settlement fair? The insurer’s settlement offer for the make-safe/temporary fence, based on its repairer’s quote, is fair in the circumstances. The evidence does not establish that the considerably higher cost claimed by the complainant was warranted or necessary. The insurer has the choice as to how it will settle the claim and what repairer it uses. Its offer to either repair or cash settle the damaged fence is also fair, although the scope of work and quote needs to be updated and increased, as set out in section 2.1 below. An increase in the insurer’s offer of $2,500 compensation for non-financial loss is not warranted. Nor is the complainant entitled to compensation for other consequential losses. Why is the outcome fair? The outcome is fair because the evidence shows the insurer’s position is reas onable and addresses its liability under the policy. It would not be fair to require the insurer to pay more in the circumstances. 1.3 Determination This determination is substantially in favour of the insurer. The insurer is required to settle the claim, as it has offered to do, by paying $5,181.53 for make safe/temporary fence and $2,500 in non-financial loss compensation. It is also required to obtain a new scope of works and actionable quote for repair of the damaged fence, which must also include the repair/replacement of concrete between the fence and pool. If the insurer elects to cash settle the repairs, an uplift of 15% is to be added to the actionable quote it is required to obtain and use as the basis for the cash settlement. Determination | Case number: 981161 Page 2 of 8 2 Reasons for determination 2.1 Is the insurer ’ s proposed settlement fair? Make-safe/temporary fence No evidence of make safe delays by insurer Both parties agree prompt action was required to make the property safe after the brick fence collapsed. The complainant has a young child and the fence forms a boundary between the complainant’s yard and a construction site next door. The panel reviewed the complainant’s make -safe submissions but was not convinced it shows there were delays by the insurer or its trades in taking action to make the site safe. The claim was lodged over the phone on Friday 12 November 2021. During the call, the insurer said it would arrange for a builder (JP) to attend within a week to make the site safe and, if required, erect a temporary fence. The evidence shows JP attempted to call the complainant several times between 15 and 25 November 2021. When JP finally reached the complainant on 25 November 2021, they arranged to attend on 30 November 2021. However, when they arrived as arranged, JP found a temporary fence had already been installed. The panel considers the available information shows the insurer and JP made reasonable attempts to meet their accepted obligations to make the site safe within the agreed timeframe of 7 days from the date of claim lodgement. Insurer’s temporary fence settlement offer is fair The complainant has provided an invoice for $56,725 from her builder (RM) showing they attended on Monday 15 November 2021 (one business day after the claim was lodged) to install a temporary fence. A further invoice for $63,175 from RM dated 24 November 2021 appears to refer to the same work but notes partial payment by the complainant of $30,000 which ‘ covers the temporary fencing requested and acknowledges that we have agreed to a repayment plan for further works as quoted’. RM’s scope of works refers to the temporary fence needing to be acoustic and 3 metres high for privacy, due to the commercial building next door which was under construction at the time of the quote being issued. The quote also states the timber will be capped for longevity. Neither RM nor the complainant has explained why a temporary make-safe fence would need to be built to these specifications. The panel considers the cost and scope of works is excessive and unnecessary for a temporary fence to secure the site on an interim basis only. The insurer is willing to contribute $5,181.53 towards the cost of the temporary fence, which is the amount its builder JP quoted and would have charged had it been given the opportunity to do the work. The panel considers JP ’s scope of works and quote is reasonable. The panel notes the complainant has said the insurer promised to pay $30,000 for the temporary fencing. However, there is no evidence to support that and the insurer does not agree that is the case. Determination | Case number: 981161 Page 3 of 8 The insurer ’ s offer to reimburse the complainant $5,183.00 for the temporary fence is fair and reasonable in the circumstances. Complainant should have checked with insurer before arranging make-safe It is also worth noting that, under the terms of the policy, the complainant is required to ‘a sk [the insurer] before arranging repairs or paying anyone to help, unless necessary to prevent further loss’. (There is no dispute that the complainant had received the policy documents.) That is a reasonable requirement to ensure there are no misunderstandings about what needs to be done, by whom and when. By proceeding with the make-safe without having first referred to the insurer, the complainant appears to have incurred avoidable additional costs for which the insurer should not be liable. Damaged fence Policy allows insurer to choose how to settle the claim The policy outlines how the insurer will settle a claim. It gives the insurer the right to settle by either:  repairing the damage  replacing the damaged item  paying the value of the repair work to the complainant as a cash settlement. It further states that when a claim is accepted, the insurer may choose the repairer and enter into a contract with them to carry out the work. The complainant wants the damaged fence component of the claim to be settled based on a $136,566 quote for fence replacement supplied by RM (and dated March 2022). The panel notes that the quote is not itemised. The complainant has not explained why she is not prepared to accept that the work be completed by the insurer’s repairer. The insurer is willing to authorise JP to do the repairs but has also offered, as an alternative, to cash settle the claim by paying the complainant $30,560.54, which is what it would cost for JP to do the repairs, plus a 10% contingency (totalling $33,616.59). The panel considers the insurer’s offer of those alternative forms of settlement is fair and reasonable in the circumstances. Insurer’s scope of works is incomplete However, the panel is not satisfied the cash settlement amount proposed by the insurer is adequate to fully discharge the insurer’s liability for fence repairs. JP ’ s assessment report of 30 November 2021 says the concrete between the retaining wall and swimming pool was also damaged when the brick fence fell over. However, the concreting has not been included in its quote. The insurer therefore needs to arrange for an amended and updated quote, which includes that additional identified damage. JP’s original quote is dated June 2023, which means it is already out of date in any case. There is also nothing to show that it is a quote which would be actionable by the complainant as a retail customer. That means, if the claim is to be cash settled, the new quote to be obtained by the insurer must be based on JP’s scope of works but with the inclusion of the further concreting work. Determination | Case number: 981161 Page 4 of 8 Importantly, the quote must also be one which is actionable by the complainant (that is, it must reasonably reflect the cost to the complainant of having the claim-related repairs completed by a repairer who would be willing and able to do the work for her). To be clear, that does not mean it must equate to RM’s quote, which the panel considers, on balance, is excessive (and which includes, for example, an allowance for hiring a tree surgeon to develop a repair plan for affected trees near the fence, when the policy excludes cover for plants, trees and soil). In arriving at the final cash settlement figure for the fence, the insurer is also required to add an uplift of 15% to the quoted amount. That is to allow for contingencies and the transfer of risk to the complainant. For completeness, the panel notes it would generally be the case that the cost of a boundary fence would be shared by the neighbouring parties. No information has been provided by the complainant as to any discussions or arrangements which might be in place with the neighbouring property owner regarding possible sharing of costs. In the circumstances, the panel considers the insurer’s offer to cover the full quoted cost of fence repairs/replacement is fair. Compensation for non-financial loss and other losses No further compensation is warranted Under the AFCA Rules, we can award up to $5,400 compensation for non-financial loss. We will only award this type of compensation if a complainant suffers an unusual degree of physical inconvenience, time taken to resolve the matter, or unreasonable interference with their peace of mind because the insurer mishandled your claim. We take a conservative approach to awarding non-financial loss. A certain level of inconvenience is to be expected for any claim. The information provided indicates the insurer made reasonable attempts to make the site safe after being first notified of the claim. However, the panel considers it took longer than might reasonably be expected for the insurer to make a decision about its liability for the fence – even though that was during a period of catastrophic weather events resulting in higher than usual claim numbers. While that might explain the delay, it does not relieve the insurer of its liability to deal with claims in a timely and effective fashion, and in accordance with the General Insurance Code of Practice. The insurer caused a further delay when it then denied the claim incorrectly, though this was later reversed. It took over a year (June 2023) to accept the claim and only after the complainant disputed the insurer’s original decision to decline it. The insurer acknowledges its service fell short of its usual standards. It has offered $2,500 in compensation for non-financial loss. The complainant is seeking a total of $123,691.45 compensation. She arrived at that amount based on time spent and inconvenience suffered, loss of income, a refund of three years ’ premiums, health expenses incurred and a family holiday taken to recover from the stress of the claim. The panel acknowledges the length of time taken by the insurer to deal with and reach a fair decision on the claim. It also appreciates this has caused the complainant and her family considerable and understandable upset and inconvenience. However, the panel is satisfied Determination | Case number: 981161 Page 5 of 8 that the insurer’s offer of $2,500 compensation for non -financial loss is reasonable in the circumstances. It is also relevant to note that the policy does not cover ‘consequential or indir ect loss, inconvenience or expense…’. Nor is the panel satisfied the complainant has established any other basis upon which the additional claimed expenses should be covered (including any refund of premiums paid, since the complainant has continued to have the benefit of cover). Determination | Case number: 981161 Page 6 of 8 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided. While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. A panel determined this matter Due to the nature of this complaint, we referred it to a panel for determination. The panel includes:  an ombudsman  a member with significant experience in consumer and small business advocacy  a member with extensive experience in the insurance industry. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established. Determination | Case number: 981161 Page 7 of 8 3.2 Relevant policy information Product Disclosure Statement Page 19 How we settle your claim If we agree to pay a claim for loss, theft, or damage to your home, contents, or personal effects, we will pay up to the limits stated in your policy documents. Following discussion with you, we will choose to do one of three things:  repair the damaged property to the same standard, specification, or quality as it was when it was new  replace the damaged property where available, or with the nearest equivalent property available in Australia  pay you the reasonable amount it would cost to repair or replace the property. We are allowed to choose the repairer or supplier that is used and may enter into building contracts with them on your behalf. If we choose to repair or rebuild your property, we will ensure the repaired or rebuilt parts of your home comply with current building regulations and laws. Page 27 You are not covered for […] Loss or damage to your contents. You can buy Contents Insurance to have alongside your Home Insurance. See page 28 for information about what Contents Insurance covers. Your Home Insurance does not cover the following things: [...]  garden beds, hedges, lawns, plants, shrubs, trees, and soil … 3.3 Expert reports Record Key points Insurer ’s expert ( JP ) Builders report 30 November 2021  Fallen fence impacted concrete near the pool & retaining wall .  Engineer will be required to determine scope and repair method . Insurer’s expert (JP) New fence scope and quote 23 June 2023  Repair cost $30, 560. 64 .  Does not include repairs to damage d concrete . Complainant’s expert (RM ) New fence scope and quote 23 March 2022  Repair cost $136,566.00 .  Does not include engineer inspection .  Does not include warranty insurance . Determination | Case number: 981161 Page 8 of 8 Record Key points Complainant’s expert (RM ) Temp fence scope and quote 15 November 2021  Cost $56, 725.00 .  Fence to be acoustic because new commercial building being built next door .  Fence to be 3m high for privacy .  Fence will be capped for longevity .

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.