Dispute over whether truck and concrete pump were a single insured item and the cash settlement amount for pump repairs after a fire
Text of the determination
Determination
Case number 980643
Financial firm Chubb Insurance Australia Limited
Determination | Case number: 980643 Page 2 of 7
Case number: 980643 27 November 2023
1 Determination overview
1.1 Complaint
The complainant is a small business which holds a Mobile Plant and Equipment Insurance
policy issued by the financial firm (the insurer). The complainant is represented by its owner,
Mr GN, his wife, Ms SN, and their solicitor, Mr RK. For convenience, I will refer to these
parties c ollectively as ‘the complainant’ unless it is necessary to differentiate between them.
On 11 April 2023, a fire broke out in a truck (the truck) being driven by Mr GN and carrying a
concrete pump (the pump). A claim was lodged under the policy on the same day.
On 26 April 2023, the insurer’s appointed assessor, Company A, inspected the truck and
assessed it as a total loss. Company A liaised with concrete pump engineers, Company M, to
assess any damage to the pump. On 6 May 2023, Company M determined the pump could
be repaired, although this would take three months to complete.
The complainant says the truck and pump should be considered a single unit, not separately
insured, and together be deemed a total loss. It also says, as a small business, the time taken
to resolve this claim is placing undue financial stress on the company.
1.2 Issues and key findings
Should the truck and pump be considered a single item?
No. The Certificate of Insurance lists the truck and the pump as separately insured items and
the cor respondence between the complainant’s insurance broker and the insurer shows this
was a deliberate choice by the complainant.
Has the insurer properly assessed the claim?
No. While the two pieces of equipment are properly considered as separate claims and all
experts agree the pump can be repaired, only the complainant has provided an appropriate
quote for the necessary repair work. The insurer is required to make payment in accordance
with that quote.
Why is the outcome fair?
Given the insurer has not established why the complainant’s quote is unreasonable , the
outcome is fair as it holds the parties to their respective obligations and rights under the
insurance policy.
1.3 Determination
This determination is in favour of the complainant.
Within 21 days of the date the insurer is advised the complainant has accepted this
determination, the insurer is required to cash settle:
the claim for the truck in the amount of $148,500 and
the claim for the pump in the amount of $350,376.80.
Determination | Case number: 980643 Page 3 of 7
2 Reasons for determination
2.1 Should the truck and pump be considered a single item?
No. The Certificate of Insurance lists the truck and the pump as separately insured items and
the correspondence between the complainant’s insurance broker and the insurer shows this
was a deliberate choice by the complainant.
The truck and the pump are separately insured
The complainant says the truck and pump should be considered a single unit. In summary, its
reasons are:
the two are always hired together and the pump is not capable of deployment or use
without the truck
the vehicle licensing registration considers the truck and pump to be a single unit and
the towing company used by the insurer after the fire treated the truck and pump as a
single unit.
However, the Policy Schedule for the period 2 May 2022 to 2 May 2023 (covering the insured
event) shows the ‘Schedule of Machines Insured’ are:
DAF (Model TBA) Truck insured for $150,000 and
[Company T] 42m Boom Pump insured for $500,000.
These are listed as separate insured items.
The complainant requested separate itemisation in July 2018
The insurer has provided an email from the complainant’s insurance broker, Ms MR, dated 23
July 2018, which relevantly says:
I have been talking to the above insured about their excess, and was wondering if
we can split the truck/pump mid-term as the current excess is over $7,000.
Split is:
Truck $190,000
Pump $514,164
Prior to this request, the truck and pump were insured as a single item and I note the
requested sums insured were not finalised. I am satisfied the Policy Schedule contains the
correct amounts.
The complainant now says it was not aware of the consequences of making this change and
was not properly advised. This is a matter the complainant should take up with its insurance
broker if it wishes to pursue that position. The insurer was entitled to expect any insurance
advice was being adequately provided by Ms MR as the complainant’s broker.
The truck and pump should be considered separately
On the basis of the analysis above, I am satisfied the truck and pump should be separately
assessed. However, this does not automatically mean the insurer’s assessment of the claim
is correct.
Determination | Case number: 980643 Page 4 of 7
2.2 Has the insurer properly assessed the claim?
No. While the two pieces of equipment are properly considered as separate claims and all
experts agree the pump can be repaired, only the complainant has provided an appropriate
quote for the necessary repair work. The insurer is required to make payment in accordance
with that quote.
The truck is a total loss
There is no dispute between the parties the truck is a total loss.
The insurer has offered to settle the claim for the truck for the entire sum insured, less the
excess, for a net payment of $148,500.
The complainant says:
the pump was built specifically for the truck and won’t fit on any other chassis and
the truck cannot be replaced for the sum insured.
In support of this position, the complainant has provided replacement values for the truck
which exceed the sum insured.
However, the complainant has received the benefit of advice from an insurance broker at
least since July 2018 and has had sufficient opportunity each year to review the amount of
coverage under the policy and the amounts its equipment was insured for.
For whatever reason, during the relevant period of insurance, the complainant elected to
insure the truck for $150,000 and pay premiums for this cover based, in part, on that sum
insured.
As a result, I am satisfied the insurer’s offer to settle the claim for the truck as a total loss and
pay $148,500 is appropriate.
The pump is repairable
The complainant relies on advice from two repairers, Company T and Company P, to support
its position the pump cannot be repaired, or at least cannot be repaired for the price the
insurer asserts. On 24 May 2023, Company T relevantly advised:
Regarding assessing fire damage possible repair of 42 metre boom.
[…] We would have to test to determine any heat damage to steel of boom and
sub frame. Steel of boom turret structure is high tensile alloy steel from Sweden,
specialized heat treatment is part of the properties that this type of steel gets it
strength and fatigue resistance from.
Sub frame would have to be tested or replaced
Hydraulic cylinders of outriggers or boom sections would have to be
inspected for damage and repaired or replaced
Hydraulic hoses replaced, and all fittings associated
replace slew motor and gear box. This also has the slew brake. all should
be replaced for safety
Boom hydraulic Valve bank. Sent to HAWE for inspection or repair
Hydraulic oil replaced
Determination | Case number: 980643 Page 5 of 7
Front out riggers have to be pulled of machine for complete and proper
inspection.
all slew bolts replaced
slew ring inspected and repaired or replaced
PTO unit and oil pumps inspected for damage
all oil filter housings
Having seen this type of damage before and the sad outcomes, I would suggest
for safety reasons that the boom turret and front outriggers be replaced with new
ones.
This would require quotations for these items and freight cost and also lead times.
Rear outriggers and boom section could be re used if not damaged from fire.
We have seen repairs done to many booms over the years, and many short cuts
taken. results have been people killed or injured as a result, at best booms
collapsing resulting in more damage
Notably, neither Company T nor Company P have not said the pump cannot be repaired,
although I acknowledge Company T’s reasonable safety concerns about the need to properly
assess if the metal had been affected by the fire.
The insurer relies on an assessment made by Company A which sourced reports from
Company G (a fire investigation specialist) and Company M (a pump engineer) to support its
position the pump can be repaired by its repairer Company C.
Given all the expert reports indicate the pump can be repaired if the appropriate tests are
conducted, I am satisfied the pump has been appropriately assessed as being repairable.
The insurer has offered to cash settle the claim for the pump
On 8 September 2023, the insurer wrote to the complainant’s broker offering a settlement of
$370,587.29 (excluding excess). This offer:
waived the $1,500 excess for the truck and
cash settled the pump repairs for $220,587.29.
The complainant obtained a detailed quote for repairs
Company P provided the complainant with quotes for:
the uninstall of the pump from the truck ($38,820 + GST)
the repair of the pump ($192,068 + GST) and
the installation of the pump on a replacement truck ($87,000 + GST)
for a total of $317,888 + GST, or $355,376.80.
The complainant says this quote is appropriate as:
it uses the scope of works provided by the insurer’s engineer
it covers all aspects of the repairs required to the pump
it covers most of the manufacturer’s recommendations about how the repairs should be
carried out
the repairer is accessible as it is in the same city.
Determination | Case number: 980643 Page 6 of 7
In addition, the complainant says it has had works done by the insurer’s repairer, Company C,
in the past and have not had a good experience.
Company A assessed the Company P quote and advised the insurer:
Company P overstated the cost to:
> remove the pump - an estimated 200 hours of tradesman labour at $160 per hour
> remount the pump as:
‒ this is a difficult cost to estimate without having a replacement cab chassis on which
to base the quotation
‒ a more realistic figure for the fitting the pump to an alternate truck should be based
on 250 hours of labour which amounts to $57,200 including GST
‒ the mounting brackets and components which are undamaged can be transferred
from the existing cab chassis to the replacement truck
the repair quote was inconsistent with the Company M scope of works as there is no
demonstrable need to replace the turret slew bearing at this time and further investigation
is necessary and
freight costs of $11,000 incl. GST should not be included in estimates but should be paid
on receipt of tax invoices.
The Company A assessment of the quote is unsubstantiated
Unfortunately, the Company A assessment of the Company P quote does not appear to be
supported by any underpinning analysis. Company A has not:
provided reasons why the labour hours are overstated
demonstrated the mounting brackets are re-usable and:
> have not been affected by heat or fire damaged
> are able to be used on the replacement truck chassis
made any allowance for the cost of investigating and, in the context of a cash settlement,
potentially replacing the turret slew bearing or
explained why the complainant should not include freight costs as the claim is to be cash
settled.
On this basis, I am satisfied, if the insurer wishes to cash settle the claim, it must meet the
cost of the complainant’s quote from Company P as this is an actionable and reasonable
quote for the repair to the pump.
The insurer is entitled to deduct the amount of the excess ($5,000) however.
2.3 Why is the outcome fair?
Given the insurer has not established why the complainant’s quote is unreasonable , the
outcome is fair as it holds the parties to their respective obligations and rights under the
insurance policy.
Determination | Case number: 980643 Page 7 of 7
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.