Dispute over whether truck and concrete pump were a single insured item and the cash settlement amount for pump repairs after a fire

FirmChubb
Decided2024-02-02
ProductGeneral Insurance · Other general
OutcomeFor the complainant
Amount awarded$498,877
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

A fire destroyed a truck carrying a concrete pump; the insurer offered a cash settlement for the pump below the complainant's repair quote. AFCA found the truck and pump were separately insured and required the insurer to cash settle the truck at $148,500 and the pump per the complainant's quote, less excess.

The items were separately insured by the complainant's deliberate choice, and the insurer did not substantiate why the complainant's repair quote was unreasonable, so it must cash settle per that quote less excess.

Issues

Subjects and remedies

broker or intermediarybusiness interruptionsmall businesspay claim

Related

All Chubb determinations · Find similar determinations

Text of the determination

Determination Case number 980643 Financial firm Chubb Insurance Australia Limited Determination | Case number: 980643 Page 2 of 7 Case number: 980643 27 November 2023 1 Determination overview 1.1 Complaint The complainant is a small business which holds a Mobile Plant and Equipment Insurance policy issued by the financial firm (the insurer). The complainant is represented by its owner, Mr GN, his wife, Ms SN, and their solicitor, Mr RK. For convenience, I will refer to these parties c ollectively as ‘the complainant’ unless it is necessary to differentiate between them. On 11 April 2023, a fire broke out in a truck (the truck) being driven by Mr GN and carrying a concrete pump (the pump). A claim was lodged under the policy on the same day. On 26 April 2023, the insurer’s appointed assessor, Company A, inspected the truck and assessed it as a total loss. Company A liaised with concrete pump engineers, Company M, to assess any damage to the pump. On 6 May 2023, Company M determined the pump could be repaired, although this would take three months to complete. The complainant says the truck and pump should be considered a single unit, not separately insured, and together be deemed a total loss. It also says, as a small business, the time taken to resolve this claim is placing undue financial stress on the company. 1.2 Issues and key findings Should the truck and pump be considered a single item? No. The Certificate of Insurance lists the truck and the pump as separately insured items and the cor respondence between the complainant’s insurance broker and the insurer shows this was a deliberate choice by the complainant. Has the insurer properly assessed the claim? No. While the two pieces of equipment are properly considered as separate claims and all experts agree the pump can be repaired, only the complainant has provided an appropriate quote for the necessary repair work. The insurer is required to make payment in accordance with that quote. Why is the outcome fair? Given the insurer has not established why the complainant’s quote is unreasonable , the outcome is fair as it holds the parties to their respective obligations and rights under the insurance policy. 1.3 Determination This determination is in favour of the complainant. Within 21 days of the date the insurer is advised the complainant has accepted this determination, the insurer is required to cash settle:  the claim for the truck in the amount of $148,500 and  the claim for the pump in the amount of $350,376.80. Determination | Case number: 980643 Page 3 of 7 2 Reasons for determination 2.1 Should the truck and pump be considered a single item? No. The Certificate of Insurance lists the truck and the pump as separately insured items and the correspondence between the complainant’s insurance broker and the insurer shows this was a deliberate choice by the complainant. The truck and the pump are separately insured The complainant says the truck and pump should be considered a single unit. In summary, its reasons are:  the two are always hired together and the pump is not capable of deployment or use without the truck  the vehicle licensing registration considers the truck and pump to be a single unit and  the towing company used by the insurer after the fire treated the truck and pump as a single unit. However, the Policy Schedule for the period 2 May 2022 to 2 May 2023 (covering the insured event) shows the ‘Schedule of Machines Insured’ are:  DAF (Model TBA) Truck insured for $150,000 and  [Company T] 42m Boom Pump insured for $500,000. These are listed as separate insured items. The complainant requested separate itemisation in July 2018 The insurer has provided an email from the complainant’s insurance broker, Ms MR, dated 23 July 2018, which relevantly says: I have been talking to the above insured about their excess, and was wondering if we can split the truck/pump mid-term as the current excess is over $7,000. Split is: Truck $190,000 Pump $514,164 Prior to this request, the truck and pump were insured as a single item and I note the requested sums insured were not finalised. I am satisfied the Policy Schedule contains the correct amounts. The complainant now says it was not aware of the consequences of making this change and was not properly advised. This is a matter the complainant should take up with its insurance broker if it wishes to pursue that position. The insurer was entitled to expect any insurance advice was being adequately provided by Ms MR as the complainant’s broker. The truck and pump should be considered separately On the basis of the analysis above, I am satisfied the truck and pump should be separately assessed. However, this does not automatically mean the insurer’s assessment of the claim is correct. Determination | Case number: 980643 Page 4 of 7 2.2 Has the insurer properly assessed the claim? No. While the two pieces of equipment are properly considered as separate claims and all experts agree the pump can be repaired, only the complainant has provided an appropriate quote for the necessary repair work. The insurer is required to make payment in accordance with that quote. The truck is a total loss There is no dispute between the parties the truck is a total loss. The insurer has offered to settle the claim for the truck for the entire sum insured, less the excess, for a net payment of $148,500. The complainant says:  the pump was built specifically for the truck and won’t fit on any other chassis and  the truck cannot be replaced for the sum insured. In support of this position, the complainant has provided replacement values for the truck which exceed the sum insured. However, the complainant has received the benefit of advice from an insurance broker at least since July 2018 and has had sufficient opportunity each year to review the amount of coverage under the policy and the amounts its equipment was insured for. For whatever reason, during the relevant period of insurance, the complainant elected to insure the truck for $150,000 and pay premiums for this cover based, in part, on that sum insured. As a result, I am satisfied the insurer’s offer to settle the claim for the truck as a total loss and pay $148,500 is appropriate. The pump is repairable The complainant relies on advice from two repairers, Company T and Company P, to support its position the pump cannot be repaired, or at least cannot be repaired for the price the insurer asserts. On 24 May 2023, Company T relevantly advised: Regarding assessing fire damage possible repair of 42 metre boom. […] We would have to test to determine any heat damage to steel of boom and sub frame. Steel of boom turret structure is high tensile alloy steel from Sweden, specialized heat treatment is part of the properties that this type of steel gets it strength and fatigue resistance from.  Sub frame would have to be tested or replaced  Hydraulic cylinders of outriggers or boom sections would have to be inspected for damage and repaired or replaced  Hydraulic hoses replaced, and all fittings associated  replace slew motor and gear box. This also has the slew brake. all should be replaced for safety  Boom hydraulic Valve bank. Sent to HAWE for inspection or repair  Hydraulic oil replaced Determination | Case number: 980643 Page 5 of 7  Front out riggers have to be pulled of machine for complete and proper inspection.  all slew bolts replaced  slew ring inspected and repaired or replaced  PTO unit and oil pumps inspected for damage  all oil filter housings Having seen this type of damage before and the sad outcomes, I would suggest for safety reasons that the boom turret and front outriggers be replaced with new ones. This would require quotations for these items and freight cost and also lead times. Rear outriggers and boom section could be re used if not damaged from fire. We have seen repairs done to many booms over the years, and many short cuts taken. results have been people killed or injured as a result, at best booms collapsing resulting in more damage Notably, neither Company T nor Company P have not said the pump cannot be repaired, although I acknowledge Company T’s reasonable safety concerns about the need to properly assess if the metal had been affected by the fire. The insurer relies on an assessment made by Company A which sourced reports from Company G (a fire investigation specialist) and Company M (a pump engineer) to support its position the pump can be repaired by its repairer Company C. Given all the expert reports indicate the pump can be repaired if the appropriate tests are conducted, I am satisfied the pump has been appropriately assessed as being repairable. The insurer has offered to cash settle the claim for the pump On 8 September 2023, the insurer wrote to the complainant’s broker offering a settlement of $370,587.29 (excluding excess). This offer:  waived the $1,500 excess for the truck and  cash settled the pump repairs for $220,587.29. The complainant obtained a detailed quote for repairs Company P provided the complainant with quotes for:  the uninstall of the pump from the truck ($38,820 + GST)  the repair of the pump ($192,068 + GST) and  the installation of the pump on a replacement truck ($87,000 + GST) for a total of $317,888 + GST, or $355,376.80. The complainant says this quote is appropriate as:  it uses the scope of works provided by the insurer’s engineer  it covers all aspects of the repairs required to the pump  it covers most of the manufacturer’s recommendations about how the repairs should be carried out  the repairer is accessible as it is in the same city. Determination | Case number: 980643 Page 6 of 7 In addition, the complainant says it has had works done by the insurer’s repairer, Company C, in the past and have not had a good experience. Company A assessed the Company P quote and advised the insurer:  Company P overstated the cost to: > remove the pump - an estimated 200 hours of tradesman labour at $160 per hour > remount the pump as: ‒ this is a difficult cost to estimate without having a replacement cab chassis on which to base the quotation ‒ a more realistic figure for the fitting the pump to an alternate truck should be based on 250 hours of labour which amounts to $57,200 including GST ‒ the mounting brackets and components which are undamaged can be transferred from the existing cab chassis to the replacement truck  the repair quote was inconsistent with the Company M scope of works as there is no demonstrable need to replace the turret slew bearing at this time and further investigation is necessary and  freight costs of $11,000 incl. GST should not be included in estimates but should be paid on receipt of tax invoices. The Company A assessment of the quote is unsubstantiated Unfortunately, the Company A assessment of the Company P quote does not appear to be supported by any underpinning analysis. Company A has not:  provided reasons why the labour hours are overstated  demonstrated the mounting brackets are re-usable and: > have not been affected by heat or fire damaged > are able to be used on the replacement truck chassis  made any allowance for the cost of investigating and, in the context of a cash settlement, potentially replacing the turret slew bearing or  explained why the complainant should not include freight costs as the claim is to be cash settled. On this basis, I am satisfied, if the insurer wishes to cash settle the claim, it must meet the cost of the complainant’s quote from Company P as this is an actionable and reasonable quote for the repair to the pump. The insurer is entitled to deduct the amount of the excess ($5,000) however. 2.3 Why is the outcome fair? Given the insurer has not established why the complainant’s quote is unreasonable , the outcome is fair as it holds the parties to their respective obligations and rights under the insurance policy. Determination | Case number: 980643 Page 7 of 7 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided. While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.