Insurer declined claim for further damage following vehicle impact repairs and lifetime guarantee; claims handling
Text of the determination
Determination
Case number 980490
Financial firm AAI Limited
Determination | Case number: 980490 Page 2 of 11
Case number: 980490 30 January 2024
1 Determination overview
1.1 Complaint
The complainant holds a building and contents policy of insurance underwritten by the
financial firm (insurer).
On 16 September 2017 a motor vehicle impacted with the front of the complainant‟s home
building. The insurer accepted the claim and undertook repairs. On 14 August 2020 the
complainant reported ongoing issues. She lodged a separate claim when there appeared to
be an escape of liquid event in the bathroom. On 19 January 2021 the complainant contacted
the insurer over other concerns with the works relating to the impact damage.
The insurer investigated before determining further works were in fact required, including the
installation of a waling plate and rectification of the prior failure to obtain a building permit for
the re-stumping works. The insurer however denies liability for the internal cracking, floor
level and shower base which it says was not related to the initial impact event or subsequent
repairs.
The complainant lodged a complaint with AFCA for review of this matter.
1.2 Issues and key findings
Was the insurer entitled to decline the claim for all further damage?
No. The evidence supports a conclusion that the cracked shower base and tile arose from the
original impact damage. The outstanding damage from the sub-floor and unapproved building
works have been rectified during this complaint. However, there is insufficient evidence to
establish the other claimed items were the result of the impact claim or the repairs undertaken
for that.
Did the insurer handle the claim appropriately?
No. The insurer failed to ensure the original claim repairs were completed properly. The
insurer also does not hold appropriately detailed records on the impact claim which might be
required in future to assist if any claims arise on the lifetime guarantee. Both of these issues
led to a claims handling delay and stress to the complainant, making it appropriate to award
$1,500 compensation for non-financial loss.
Why is the outcome fair?
It is fair that the insurer be liable for inadequate or substandard repairs which it carried out in
response to the initial impact claim, and that it compensate the complainant for avoidable
upset caused by its handling of the matter. It is also fair to expect that it would keep
appropriately detailed records of work it had undertaken, so as to minimise possible future
uncertainty about the scope of its lifetime guarantee.
1.3 Determination
This determination is partially in favour of the complainant.
Determination | Case number: 980490 Page 3 of 11
Within 30 days of receiving notice of the complainant‟s acceptance of this Determination, the
insurer is required to:
settle the complainant for the cracked shower base and tile identified in the original
assessor report based on the higher of two actionable market rate quotations for the repair
work to these items. The insurer should also provide a copy of these quotations to the
complainant to demonstrate the basis of its cash settlement.
pay $1,500 in compensation for non-financial loss to the complainant.
Determination | Case number: 980490 Page 4 of 11
2 Reasons for determination
2.1 Was the insurer entitled to decline the claim for all further
damage ?
No. The evidence supports a conclusion that the cracked shower base and tile arose from the
original impact damage. The outstanding damage from the sub-floor and unapproved building
works has been rectified during this complaint. However, there is insufficient evidence to
establish the other claimed items were the result of the impact claim or the repairs undertaken
for that.
Complainant has onus to establish a claimable loss under the policy
Under insurance law principles, the complainant is required to show, on the balance of
probabilities (that it is more likely than not), that she suffered a claimable loss under the
policy. This means she must show the loss was caused by a risk for which she is insured.
Once the complainant establishes the existence of a claimable loss, the insurer is liable for
the loss unless it shows an exclusion or limiting condition applies. The insurer has the onus of
proving, on the balance of probabilities, the application of the exclusion or condition.
The policy provides impact cover and a lifetime guarantee
The complainant submits there is outstanding damage arising from the 2017 impact claim
and/or the repairs which were required as a result of the impact. This includes outstanding
sub-floor repairs, internal cracking, floor levels and cracking to the shower base. There are
also submissions referring to a shower base and downpipes.
To be clear, this Determination deals only with any damage relating to the impact by the
vehicle and the lifetime guarantee applicable to those repairs. Any escape of liquid claim is
not the subject of this current complaint.
It is not disputed that the policy provides cover for damage arising from the vehicle impact
with the insured building. Further, there is no dispute that, under the policy, the insurer
provides the following lifetime guarantee on building repairs:
We guarantee the material used and standard of the workmanship to be free of
defects. If a defect arises in the lifetime of the building as a result of poor quality
workmanship or use of incorrect materials, then we will rectify the problem. It is a
condition of our guarantee that we reserve the right to decide who will undertake
the rectification work.
Accordingly, if the complainant can establish the property has outstanding damage arising
from the claimed impact event or from the insurer‟s repairs associated with it, then the policy
would respond.
Exclusions apply to the cover and to the lifetime guarantee
If the insurer can establish, on balance, that a policy exclusion is the cause of any currently
claimed loss, then the damage will not be covered. The insurer has relied on the exclusion of
earth movement:
Determination | Case number: 980490 Page 5 of 11
You are not covered under any section of your policy for damage, loss, cost or
legal liability that is caused by, arises from or involves:
…
Ground movement
erosion, vibration, subsidence, landslip, landslide, mudslide, collapse, shrinkage
or any other earth movement, …
Further, the lifetime guarantee only applies if there is a defect as a result of poor quality
workmanship or use of incorrect materials by the insurer‟s trades . That guarantee does not
apply if the defect or issues arise from an excluded cause.
There is no clear scope of works for the original repairs
The insurer has provided more than one scope of works as evidence of what work the original
builder completed to rectify the impact damage.
The first scope of works is included in a document entitled “Building Assessment – Scope of
Work‟ dated 21 September 2017. This document contain ed the following information:
There is no information in that scope referring to the replacement of a stump but there is
information that there was a need to replace approximately 6 joists to the front verandah
decking. There is also reference to the need to re-level a wall to the living room prior to
repairing and painting same. There is no information on the methodology which might be
used to re-level the wall.
A document entitled „ Builder Assessment report ‟ later indicates the following repairs were
conducted in October 2017:
Remove & replace impact damaged front timber verandah & steps to match
existing. (8m x 1.4m).
Remove & replace broken stump under house & re level floor within entrance &
lounge room to match existing.
Remove & replace front fence & gate to match existing.
Prepare, patch & paint 3 x interior walls within lounge room, approx 30 sqm.
Determination | Case number: 980490 Page 6 of 11
Prepare & seal verandah timbers & paint to match existing.
Prepare & paint front door jamb & 2 x weatherboard walls to match existing,
approx 20sqm.
Prepare & stain front fence to match existing, approx 1.4 x 1.6m.
Leave site neat & tidy on completion.
This scope of works includes the replacement of a broken stump under the home as well as
damaged timber to the verandah and re-levelling floor to match existing. There is no
information stating what methodology would be used for re-levelling the floor. Further, there
was no specific mention of the joists unless this is covered by the reference to damaged
timber. There are differences between the two scopes of work.
The available evidence shows that a „ jack and pack ‟ was carried out to the insured home.
Whilst the insurer states it has no records of any such works being conducted, the
complainant‟s evidence is that she did not arrange a jack and pack and that she witnessed
the builder‟s repairer brin ging in jacks.
It is possible that the jack was for the stump work. However, the use of multiple jacks and the
need to relevel a wall or floor may indicate it is more likely that a jack and pack was
conducted as part of the re-levelling works. This is because a jack and pack method is often
used for relevelling flooring or to permit re-stumping.
It is not clear, on the available evidence, exactly what work was carried out in response to the
original scope of works identified in 2017, how it was carried out or the extent to which it is
consistent with the original scope.
Additional repair work was later undertaken to the subfloor
The insurer conducted an internal dispute resolution (IDR) review of the claim and provided a
response dated 3 February 2022, as follows:
Internal cracks were not the result of the original impact or repairs “…but we will further
investigate the repairs our builder completed”
The engineering report received from KDC was that the damage arose from moisture
variation in the soil caused by tree roots and highly reactive clay soil rather than the impact
or repairs.
The BSG engineering report indicated the bearing length between the north end of the
joists and the floor beam was inadequate.
MCS engineering report provided an opinion that the ground surface levels and stormwater
drainage allowed stormwater to enter the subfloor causing long term settlement. Further,
there was no building permit obtained for the stump replacement undertaken as part of the
prior works.
The IL engineering report agreed with t he complainant‟s expert, BSG, that a new waling
plate was required to properly rectify the sub-floor.
The insurer would engage a further engineer to investigate the adequacy of the bearing
length between the north end of the joists and floor beam and adequacy of the stumps
(both the replaced stump and existing).
The insurer later undertook placement of the additional waling plate in line with both BSG and
IL recommendations. It appears that works were completed to ensure the replaced stump
would be permitted under the Victorian Building Act 1993 and the Building Regulations 2018 .
The latest BSG report from July 2023 also confirms that the subfloor rectifications are now
acceptable.
Determination | Case number: 980490 Page 7 of 11
The complainant states there is still unrepaired impact damage after subfloor repairs
The complainant has stated that there was internal cracking still resulting from the impact
damage.
The insurer notes the original complaint regarding unrepaired items included:
Shower base crack and movement
Front door jamming and floor levels
Internal cracks to the walls, ceiling and cornice
The complainant had also raised issues related to the downpipes in her submissions, which
she says were undone as part of the remedial works and not fixed until 2020. It is unclear why
the downpipes were removed as part of the impact claim and no scope of works includes this
work although the complainant provided plumbing invoices. In any event there is insufficient
evidence provided to establish the downpipes were damaged by the impact or formed part of
the repairs. It also was not included in the original complaint to the insurer.
The insurer is therefore not liable for issues relating to the downpipes.
The damage to the shower base is covered
The crack in the shower base was noted in the original assessor report.
Although BSG engineering has acknowledged the original assessor‟s statements may not
have been a definitive opinion, BSG states it does indicate the original assessor considered
the impact damage was sufficient to crack the shower base. BSG notes the lateral impact
from the vehicle into the sub floor could be responsible for the crack to the shower base and
tile viewed by the original assessor. BSG noted that it is reasonable to conclude the impact
also damaged pipework in the bathroom. However, this appears to have been dealt with
under another claim for escape of liquid.
The insurer‟s expert assessor noted the darkened colour of the cracks within the shower base
indicated long term cracking which are due to confirmed ground movement. However, this
2021 report was approximately 4 years after the original impact. Accordingly, it is not clear if
the assessor accounted for the age of the cracking in concluding it was long-term and due to
confirmed ground movement.
The insurer‟s engineer, KDC, noted the shower base cracking but did not provide a specific
finding on the possible influence of lateral force from the impact on the shower base. The
engineer simply found that the majority of the damage is due to tree roots without addressing
the shower base.
The insurer‟s engineer, IL, stated that when a vehicle impact is the cause of damage to a
structure, the damage is localised to the vicinity of impact, especially in relatively flexible
timber framed structure. IL noted the weatherboard wall and internal framing of the dwelling
has provided resistance to the horizontal force from vehicle impact. He does not provide
comment specifically addressing whether lateral force to the sub-floor (which sustained
damage) could have resulted in the crack to the shower base, given the fixed plumbing
attached to the shower base and the shower base‟s general position in the floor/subfloor.
It is difficult to reconcile these opinions as both IL and BSG appear to be appropriately
qualified engineers with different opinions as to whether the lateral force of the impact could
in fact create the crack to the shower base. The most contemporaneous assessment of the
impact damage to the time of the impact however supports the findings of BSG engineering.
Determination | Case number: 980490 Page 8 of 11
Given this, I prefer the evidence of BSG which particularly addressed the shower base crack
and the proximate cause of same. It follows that the shower base crack should be settled.
The policy permits settlement of a claim to be completed by way of the insurer undertaking
repairs or through cash settlement. Given the nature of this claim for unrepaired damage and
improperly completed repairs, it is appropriate for a cash settlement to be made to the
complainant based on the higher amount of two actionable market quotations.
An actionable market quotation is a market rate quotation from an appropriately qualified
professional based on the scope of works required to complete a repair. The appropriately
qualified professional should be prepared to complete the repairs for the same conditions and
cost stated in the quotation if engaged directly by the complainant outside the claim.
Front door jamming and floor levels are not the result of original impact claim
The evidence is that the front door was jamming and that the floor levels indicated settlement
towards the south side of the kitchen.
It is noted that the original impact damage did impact the verandah and the front door area.
The scope of works suggested the door was fixed due to a jamming issue. There is no expert
evidence showing that the repairs to the door jamming issue have failed.
KDC and MCS engineering considered the floor movement was likely due to differential
footing movement caused by moisture variation in the soil. The KDC engineering report notes
that there is variance to the floor levels. The front living room is less impacted according to
the floor levels taken. KDC said this was likely due to the re-building of this area after the
impact which would have effectively reset the floor level. The engineer also found the south
west corner downpipe boot had dropped away from the downpipe, which has been caused by
ground settlement, most likely from trees drying out the soil. This disconnection allowed
stormwater flow into the soil causing a temporary lift of the stumps relative to the settling of
nearby stumps.
In contrast, BSG noted that there were defective joist connections which were then repaired.
However, in relation to the ongoing movement, BSG notes the IL report dated September
2022 which concluded the difference in floor levels (settlement/heave) was not consistent with
vehicle impact. BSG states it generally agrees with this assertion, save as to the shower
base. BSG then goes on to note that the performance issues relating to excessive deflection
of floor framing may have been exacerbated by the jack and pack. However, the engineer
does not list it as a primary cause of any deflection in the floor levels and recommends
drainage around the home be managed. This would rule out the jack and pack being the
proximate cause of any floor level variations.
Based on the expert evidence presented, I am not persuaded that the front door and floor
level issues are the result of the original impact claim or the associated repairs.
The impact or repairs did not cause the current internal cracking
There is evidence that the cracks in the living room which were patched originally following
the collision have reappeared. There is also evidence of other internal cracking.
The majority of the expert evidence appears to support the position that the internal cracking
is the result of the differential floor movement caused by moisture variations in the founding
soils.
Determination | Case number: 980490 Page 9 of 11
The expert evidence from the complainant‟s engineer does not provide a basis to conclude
that the internal cracking was due to the additional subfloor repairs. As noted above in the
analysis of the floor levels, BSG did consider moisture was an issue for ongoing foundation
and floor movement. It is more likely than not that it is this foundation and floor movement that
has caused the internal cracking.
Internal cracking caused by differential foundation movement as a result of moisture
variations would not be damage resulting from the original impact or its repairs. That means
the insurer is not liable for that cracking.
2.2 Did the insurer handle the claim appropriately?
No. The insurer failed to ensure the original claim repairs were completed properly. The
insurer also does not hold appropriately detailed records on the impact claim which might be
required in future to assist if any claims arise on the lifetime guarantee. Both of these issues
led to a claims handling delay and stress to the complainant, making it appropriate to award
$1,500 for non-financial loss.
AFCA’s jurisdiction to award non -financial loss
Under our Rules, AFCA may award compensation for non-financial loss (capped at $5,400)
where there has been an unusual amount of:
physical inconvenience
time taken to resolve the situation
interference with a complainant‟s expectation of enjoyment or peace of mind.
AFCA takes a conservative approach to compensation and expects a complainant to bear a
normal degree of inconvenience during the course of a claim. However, we also take account
of a complainant‟s individual circumstances in assessing the impact on them of the insurer‟s
handling of the claim.
The complainant has raised concerns over the claims handling
The complainant has raised concerns over what she considers to be mismanagement of the
claim and a conspiracy of denial. The complainant has alleged the insurer‟s inability to access
records and reliance on its repairer or expert opinions was focused in a way to deny the
claim.
The complainant‟s use of the term „ conspiracy of denial ‟ suggests she feels that the insurer is
not attempting to administer the policy with the utmost good faith which is required by s 13 of
the Insurance Contracts Act 1984 , and is a serious allegation
The onus is on the complainant to establish that. A failure to meet the duty of utmost good
faith is not the same as, for example, inadequate record-keeping practices or differences in
expert opinions.
While I acknowledge the complainant‟s concerns, I am not satisfied, on the available
evidence, there has been a serious deliberate failure by the insurer to meet its obligations in
its handling of the matter (to the extent that represents a breach of its duty of utmost good
faith).
The complainant has established the claims handling was problematic
At the same time, however, I do accept there were the following issues with the claims
process:
Determination | Case number: 980490 Page 10 of 11
the record keeping of the scope of works approved and completed as a result of the
original impact damage was inconsistent and incomplete. This means that both the
complainant and the insurer had a lack of clarity over what portions of the home may be
subject to its lifetime guarantee.
the original repair works did include the replacement of a stump which required a building
permit to complete but which was not obtained by the insurer. If the municipal building
surveyor or other relevant building surveyor had become aware of this issue, it would have
been the complainant, as the building owner, who would have been subject to enforcement
action under the Building Act 1993 (Vic). This unintentionally exposed the complainant to
an unnecessary risk.
The original repair works were accepted by the insurer as being substandard in that the
sub-floor was not reinstated to a proper standard. The insurer has now completed those
works, but it should be noted that a proper assessment of the sub-floor during the original
repairs should have identified this issue.
I note that the complainant believes that the insurer has questioned her honesty in relation to
prior works completed – in particular the jack and pack. However, the insurer has specifically
stated that it was not suggesting the complainant was lying but rather they could not find the
relevant records. The insurer has not asserted that the complainant was dishonest and has
taken steps to address some of the outstanding issues after reviewing the complaint made.
The issues raised by the handling of the complaint are substantive and indicate the claims
handling fell below reasonable standards: for example, ensuring the repairs were completed
to an appropriate workmanlike standard and in accordance with legislative requirements.
The complainant should receive an award for non-financial loss
The complainant has provided a letter from her psychologist confirming the stress imposed by
the length and nature of the claims handling process.
I am satisfied in the circumstances that it would be appropriate to award non-financial loss for
the claims handling issues which created a delay in resolving the situation and clearly have
impacted the complainant‟s peace of mind and well-being.
I consider an award of $1,500 is appropriate to recognise the claims handling delays and
stress caused to the complainant.
2.3 Why is the outcome fair?
It is fair that the insurer be liable for inadequate or substandard repairs which it carried out in
response to the initial impact claim, and that it compensate the complainant for avoidable
upset caused by its handling of the matter. It is also fair to expect that it would keep
appropriately detailed records of work it had undertaken, so as to minimise possible future
uncertainty about the scope of its lifetime guarantee.
Determination | Case number: 980490 Page 11 of 11
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.