Claim for storm damage to roof declined on faulty workmanship and defective design exclusions; emergency make safe costs and cladding damage declined without explanation
Summary
A strata beneficiary claimed for storm damage to a roof; the insurer declined citing faulty workmanship and design defects. AFCA upheld the decline for the roof but required the insurer to pay $1,980 for emergency tarping and $315 for cladding damage.
The proximate cause of roof damage was excluded faulty workmanship and defective design, and section 46 did not apply, but emergency works were covered by the policy and the decline of those items was unexplained.
Issues
- Claim denial primary · not upheld
“The insurer is entitled to rely upon the terms and conditions of the policy and exclude liability for damage to the roof.”
- Claim amount dispute secondary · upheld
“insurer should pay emergency tarping ($1,980) and cladding damage ($315); no clear explanation why these items were declined”
- Product terms interpretation secondary · not upheld
“Section 46 does not assist the complainant; exclusion does not operate by reference to a condition existing when the contract was entered into.”
Subjects and remedies
home or building damagenatural disasterpay claim
Text of the determination
Determination
Case number 980326
Financial firm QBE Insurance (Australia) Limited
Determination | Case number: 980326 Page 1 of 8
Case number: 980326 23 January 2024
1 Determination overview
1.1 Complaint
The complainant is a beneficiary under a commercial strata insurance policy with the financial
firm (insurer) and lodged a claim for damage to a roof caused following a storm on or around
18 February 2023.
The insurer declined the claim and says the dominant cause of the damage is a combination
of defects, faulty workmanship and defective design/materials. The insurer says the loss is
excluded from the policy, so it is entitled to decline the claim in full.
The complainant disagrees and says the roof was adequately constructed and compliant. The
complainant maintains the storm event on 18 February 2023 was the sole cause of damage.
1.2 Issues and key findings
Is the insurer entitled to refuse the claim for damage to the roof?
Yes. The information shows the proximate cause of damage to the roof was a combination of
defects, faulty workmanship and defective design/materials.
Is the insurer obligated to cover additional items?
Yes. It is fair the insurer reimburses the complainant for the emergency make safe and
damage to the cladding as outlined in their documents. The insurer provided no clear
explanation why these items were declined, and the policy covers emergency works.
Why is the outcome fair?
The outcome is fair as the policy does not cover loss or damage that is directly or indirectly
caused by faulty workmanship and design defects.
1.3 Determination
This determination is substantially in favour of the insurer. Within 14 days of notification of the
complainant accepting this determination the insurer is to:
cash settle the complainant the costs incurred to tarp the building ($1,980) and to repair
the damage to the cladding when the initial tarping occurred ($315).
The insurer is otherwise entitled to rely upon the terms and conditions of the policy to deny
liability with respect to the damage to the roof.
Determination | Case number: 980326 Page 2 of 8
2 Reasons for determination
2.1 Is the insurer entitled to refuse the claim for damage to the
roof?
Yes. The information shows the proximate cause of damage to the roof was a combination of
defects, faulty workmanship and defective design/materials
Complainant has the onus to establish a claim falls within the terms of the
policy
It is established insurance law that an insured has the onus to establish on the balance of
probabilities (that is, more likely than not) that the loss or damage claim falls within the terms
of the policy. This is commonly called a prima facie claim.
The complainant’s policy is a commercial strata insurance plan that provides cover for
damage sustained to the insured property during the period of insurance subject to various
terms and conditions.
Damage is defined under the policy to mean any partial or total accidental physical loss of or
destruction of property from any sudden and accidental cause not otherwise excluded by this
policy.
The complainant lodged a claim for significant storm damage sustained to the roof of unit 5
resulting in water damage internally following a storm on 18 February 2023. There is no
dispute the unit suffered significant damage. The panel accepts such damage was sudden
and accidental.
The insurer relies on exclusions within the policy to deny liability with respect to the damage
to the roof structures. The insurer says that the proximate cause, that is the dominant or
effective cause of damage was from a combination of defects, faulty workmanship and
defective design/materials.
The onus is on the insurer to establish, that most likely the loss or damage was caused or
arose directly or indirectly as a result of an excluded event.
Expert reports indicate faulty workmanship
The insurer appointed a loss adjuster (SD) and SD appointed builders (AB) to attend to make
safe at the premises. The make safe was done on or around 3 March 2023 by tarping the
roof. A further inspection of the roof was done by AB on or around 21 March 2023 and
additional sand bags were added to hold down the tarp.
An engineer (SCE) was appointed to attend the property to determine the cause of roof
damage.
SCE noted the following, in its report of 23 March 2023:
there was a point of failure observed to have initiated at the fixing between the kliplock roof
sheet bracket and the insulated panel
the screw fixing had been fixed into the insulated panel, however not in to the metal roof
purlin
the National Construction Code (NCC) 2016 provide reference to the relevant Australia
Standard (AS) code for roof construction:
Determination | Case number: 980326 Page 3 of 8
> the applicable AS is AS152.1- 1992 Design and Installation of Sheet roof and Wall
Cladding
> this section refers to concealed fastener systems, such as kliplock bracket systems
require fixings to be installed in accordance with manufacture specifications
> the standard also provides a ‘note’ which states that it is essential that correct
cladding/fastener systems are used otherwise resistance to wind forces may be
reduced
referring to the suppliers/manufacturer’s specifications, fasteners installed into metal
should have at least one thread protruding past the metal purlin support
the length of the screw should be increased to accommodate insulation
this provision for an increased fixing length to ensure fixity between the metal roof sheeting
and roof supports has not been followed
straw insulation has no structural capacity in withdrawal and cannot be utilised for metal
roof fixing support
the kliplock roof sheeting fixings penetrated the straw insulated panel only with an
insufficient length to penetrate the roof framing/purlins contrary to the AS and
manufacturers specifications
regarding the recorded wind speed on the day of the incident:
> the recorded information from the Bureau of Meteorology (BoM) shows the maximum
wind speed was 65 km/h
> 65 km/h per the Beauf ort Wind Scale is referred to as ‘gale’ winds and described as
‘twigs break off trees; progress generally impeded’
> the wind speed at the date of loss is insufficient to have caused roof sheeting failure,
unless other issues were present.
The complainant provided details from their local council to show the building was approved
for building. They say this means the construction and materials used were compliant at the
time. However, this information only confirms council approved the build, not that it met the
building standards referred to in the SCE report. Building application from the council is not
considered persuasive because it does not confirm structural adequacy/compliance after the
build was completed.
Regarding the wind speed, the panel acknowledges the solar panels were damaged in the
wind event. However, there is no alternative information submitted to show the wind speeds
were above 65km/h. The news article refers to wind speeds up to 105 km/h. The location was
some 114km away from the insured property.
The complainant submitted information (from GC) which, they say, shows the roof was
structurally sound for solar panels to be installed. However, this is an installation engineering
compliance certificate, and only assumes the roof sheets are compliant. There is no
information in this certificate to show the what inspections were done to conclude that the roof
was structurally adequate and compliant with AS 1170.2:2011 (noting this AS was likely the
incorrect AS because, by the complainant’s ow n admission, the building was constructed well
before 2011).
The panel acknowledges the complainant sent in an email showing that their broker attended
the site (prior to the policy being renewed in May 2020) to conduct an inspection. The panel
has reviewed this email and notes that the email includes no details showing that anyone
inspected the roof or that there were images taken to show the condition of the roof in May
2020. The panel does not consider this email to be persuasive.
Determination | Case number: 980326 Page 4 of 8
SCE was asked to comment on the additional information submitted by the complainant and it
did so in its report, dated 17 August 2023. Of relevance, SCE noted:
there was no certificate of compliance showing the building met the relevant building codes
the structural certification provided by GC is contingent upon the assumption that the roof
sheeting was kliplock700 or kliplock406
the roof sheeting was not installed to those specifications, meaning the structural
certificate is not applicable
further, the kliplock roof sheets are concealed, so GC would not have been able to confirm
if the sheets were fixed down to the steel purlins.
severe thunderstorms and damaging winds were not experienced on the date of loss. The
wind gust did not exceed the 1:500 recurrence interval for the solar panel installation, and
therefore, had a compliant roof structure been constructed, the roof sheeting uplift and the
dislodgment of the solar panels would not have occurred
the proximate cause of the roof sheeting uplift is consistent with defective workmanship,
namely, insufficient fixing of the sheeting to the steel purlins contrary to the manufacturer’s
specification applicable at the time of the roof sheeting installation in 1964
The panel notes there was discussion around whether the roof sheets were replaced in 2016
based on NEARMAP aerial imagery. The broker advised the roof sheets were only painted at
this time, and no replacement was made. This aspect of the claim was not considered in
detail because it would not change the outcome of the complaint. The panel considers the
information SCE persuasive enough to decline the claim for the roof.
Section 46 of the Act does not assist the complainant
The complainant says they were not aware of the defects in construction of the roof structure.
Since they were unaware of the defects, the insurer is unable to rely on the policy exclusion.
The complainant appears to rely on section 46 of the Insurance Contracts Act 1984 (the Act).
Section 46 of the Act is extracted at section 3.3 of this determination.
The insurer says by reason of the regulations made under the Act, section 46 does not apply
to the policy which was a broad form policy. It also says that even if section 46 did apply, it
does not assist the complainant.
It is accepted insurance law that insurers can exclude cover for particular events irrespective
of when they occur. Such an exclusion does not fall within section 46 because it could not be
said the exclusion was made by reference to a condition of a thing at the time the contract
was entered into.
The panel acknowledges that the complainant did not know of the construction issues with
the roof structure until the storm event. However, the panel accepts that section 46 does not
assist the complainant. This is because the exclusion relied upon by the insurer does not
operate by reference to a condition existing at the time the contract was entered into.
Insurer not required to cover roof damage
The panel considers the reports from SCE to be detailed and persuasive. SCE considered the
proximate cause of damage to the roof area is due to faulty workmanship and defective
design. The complainant has not provided any information in the contrary to refute this
position.
Determination | Case number: 980326 Page 5 of 8
In the absence of any further information the panel accepts the findings of SCE. The insurer
is entitled to rely upon the terms and conditions of the policy and exclude liability for damage
to the roof.
2.2 Is the insurer obligated to cover additional items?
Yes. The panel considers it fair the insurer reimburses the complainant for the emergency
make safe and damage to the cladding as outlined in their documents. The insurer provided
no clear explanation why these items were declined, and the policy covers emergency works .
Solar panels do not form part of the commercial strata policy
The complainant is seeking coverage to the solar panels. The insurer advised that cover
under the policy only formed part of the building. On 23 March 2023, the insurer sent out its
decline letter which advised the following:
[the insurer] through confirmation of Annual General meeting minutes or bylaws to confirm
if the solar panels on the roof of unit 5 and the cold storage room installed in unit 5 was
agreed to formed part of the Owners Corporations property once built/installed.
In response the Strata Manager confirmed
“Unit 5 is Cubic Space, meaning that all the repairs and main tenance costs and any
additions to this lot are the responsibility of the individual lot owner and are not covered by
the Owners Corporation.”
There is no information from the Strata Manager to confirm that the solar panels form part of
the building insurance. Further, the policy does not cover ‘Lot Owner’s Contents and other
personal property is theirs’.
Regrettably, the complainants are not entitled to have the solar panels (repair, installation or
replacement) covered by this policy.
Insurer is required to cover emergency tarp and damage to cladding
The complainant submitted invoices outlining what they would like covered in addition to the
roof damage and solar panels. These items were:
emergency response to tarp the roof to prevent further damage to stock ($1,980)
damage cladding caused by make safe hired by the insurer to do tarping ($315).
The policy, on page 18, outlines the following:
Policy 1 – Insured Property
[…]
2. Emergency and temporary protection costs
Reas onable cost of temporary protection and safety or emergency repairs in pursuance of
Your duty to minimise insured loss and avoid further losses.
We will not pay more than $7,500 for this Addit ional Benefit […]
Determination | Case number: 980326 Page 6 of 8
The invoices refer to this as ‘emergency works’ and ‘extra work’. The insurer has not offered
any explanation why these items should not be covered.
The panel considers that since the works noted in the invoices refers to make safe and
emergency works, the insurer should pay these invoices within 30 days.
2.3 Why is the outcome fair?
The outcome is fair as the policy does not cover loss or damage that is directly or indirectly
caused by faulty workmanship and design defects.
While the panel accepts water entered the property during a storm on or about 18 February
2023 there is no information to support a finding that the storm was the dominant or effective
cause of the roof damage. The available information establishes that most likely the
proximate cause of the damage to the roof was faulty workmanship and design defects to the
roof which is excluded from cover under the terms of the policy.
As loss or damage caused directly or indirectly because of these events it is excluded under
the terms of the policy, it is fair that the insurer is entitled to rely upon the terms and
conditions of the policy to refuse payment of the claim.
Determination | Case number: 980326 Page 7 of 8
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all the information the parties have provided.
While the parties have raised several issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
A panel determined this matter
Due to the nature of this complaint, we referred it to a panel for determination. The panel
includes:
an ombudsman
a member with significant experience in consumer and small business advocacy
a member with extensive experience in the insurance industry.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.
3.2 Insurance Contracts Act 1984
Section 46
Pre-existing defect or imperfection
Determination | Case number: 980326 Page 8 of 8
(1) This section applies where a claim under a contract of insurance
(other than a contract of insurance that is included in a class of contracts
declared by the regulations to be a class of contracts in relation to which
this section does not apply) is made in respect of a loss that occurred as
a result, in whole or in part, of a defect or imperfection in a thing
(2) Where, at the time when the contract was entered into, the insured was
not aware of, and a reasonable person in the circumstances could not be
expected to have been aware of, the defect or imperfection, the insurer
may not rely on a provision included in the contract that has the effect of
limiting or excluding the insurer's liability under the contract by reference
to the condition, at a time before the contract was entered into, of the
thing.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.