Insurer declined the claim for a rotted structural beam under the wear, tear and gradual deterioration exclusion
Text of the determination
Determination
Case number 978702
Financial firm AAI Limited (insurer)
Determination | Case number: 978702 Page 1 of 15
Case number: 978702 25 October 2023
1 Determination overview
1.1 Complaint
The complainant has owned the insured property with her husband since April 2018. Since
April 2020, the complainant has held a Building and Contents Insurance policy in respect of
the property, issued by the insurer. On 26 February 2022, the property experienced a severe
storm, and the complainant made a claim for water damage to the internal ceilings of a
bedroom and adjacent hallway.
The complainant says, despite the claim being accepted and repairs commenced, on the
second day of repairs, the builders stopped work due to finding a rotten wooden support
beam beneath the main deck above the bedroom. The insurer cash-paid the balance of the
repair works quote.
The complainant says she now understands the insurer was not able to rely on the exclusion
for pre-existing conditions as there was no way the complainant or her family could
reasonably have been aware of the issue causing damage to the support beam. She seeks to
have the claim accepted and all the water damage repaired.
The insurer says it is entitled to deny the claim on two grounds:
the damage to the support beam was not caused by a single insured event and
the proximate cause of the damage was wear, tear and gradual deterioration of the
balcony waterproofing, thereby falling within a general exclusion.
In this complaint, submis sions have been made on the complainant‟s behalf by her husband
and a solicitor. For convenience and brevity, I shall refer to all three of these people as „the
complainant‟ unless it is necessary to differentiate between them.
1.2 Issues and key findings
Has the complainant established a claimable loss?
Yes. The claim for the damage to the internal ceilings was accepted, and I am not satisfied
the insurer has established the damage to the structural beam was not caused by an
„Incident‟ as defined by the policy.
Is the insurer entitled to rely on an exclusion?
Yes. The insurer is permitted to rely on the exclusion for wear, tear and gradual deterioration.
Why is the outcome fair?
The policy applies to insured events which fall within its terms. I am satisfied the insurer has
established an exclusion applies. I am also satisfied the insurer has not contributed to either
any non- financial loss or to the complainant‟s professional costs.
1.3 Determination
This determination is in favour of the insurer.
Determination | Case number: 978702 Page 2 of 15
2 Reasons for determination
2.1 Has the complainant established a claimable loss?
Yes. The claim for the damage to the internal ceilings was accepted, and I am not satisfied
the insurer has established the damage to the structural beam was not caused by an
„Incident‟ as defined by the policy.
The complainant must establish a claimable loss
When bringing a complaint to AFCA, the complainant is required initially to show it is more
likely than not there is a claimable loss under the policy. This means demonstrating the loss
or damage was caused by a risk that is covered under the policy.
The terms of the insurance policy are set out in the Product Disclosure Statement (PDS)
dated 18 September 2020. Relevant clauses of this PDS are set out in section 3.2 of this
determination.
The claim was initially accepted
The claim was initially accepted by the insurer on the basis of a builder‟s report from
Company A, the insurer‟s appointed builder. This report relevantly said:
Upon inspection of the property, roof, ceiling cavity and being advised by the
insureds of the damage occurred in the event there is evidence of water entering
via the roof/tiled verandah above. This was stated by the insureds that this
damage to the bedroom ceiling lining has occurred before.
At the above roof/verandah there are a few issues to be sealed to mitigate this
from occurring again. Under the overhang of the verandah tile to the compressed
sheeting there ‟ s never been any sealed applied this is poor workmanship and
over the years this has allowed water to enter compensate the membrane and
now leak. Where the 2 flashing fold over each other on the box gutter need to be
sealed. Some places have gaps wide enough to fit your finger up i don‟t believe
this is allowing water to enter but needs to be sealed due to splashing may occur
and damages appear.
The box gutter width is shallow and when heavy rain occurs there is a lot of
splashing under the Colourbond roof sheeting to the box gutter flashing there is
gaps this needs to have foam infills installed between the flashing and the
underside of the Colourbond roof sheeting. There are a few issues that one are
allowing water to enter if these are areas are sealed up than in my professional
opinion the water ingress is mitigated and we can warrant our repairs on the
below ceiling linings.
In response, the insurer says is accepted the complainant‟s claim was for damage caused by
the claimed storm event to the internal ceilings.
Once repair work was commenced at the property, Company A removed the ceilings in the
affected areas and discovered a rotted structural beam. Company A traced the water ingress
Determination | Case number: 978702 Page 3 of 15
to deteriorated waterproofing on the balcony and missing sealant on the underside of the
tiles.
The insurer denied the claim for the structural beam
The insurer says the policy only responds to single insured events and the complainants have
not shown the timber support beam had become rotten as a result of the storm, and not
gradually over a period of time,
The insurer relies on the assessment reports of:
Company A‟s builder‟s assessment report, dated 14 March 2022
its own Assessment Report, dated 23 June 2022 and
a leak detection report provided by the complainant from Company ALD, dated 8 August
2022.
The 14 March 2022 report from Company A predates the discovery of the rotten structural
beam, but relevantly says:
the proximate cause of the damage to the internal ceilings was the storm
there were maintenance issues which needed to occur prior to works being carried out
including:
> seal the tile overhang to compressed sheeting on verandah to stop water ingress
> sealant to be applied to where the two flashings overhang each other
> foam infills to be installed in box gutter return and underside of Colourbond sheeting.
The 23 June 2022 report was based on an assessment conducted with Company A and the
complainants. It relevantly says:
The insured would also like consideration for repairs to the balcony and the
waterproofing of it to make it safe again, the insured felt that the damages are
caused by storms over a period of time and should be considered as part of the
claim. The assessor has advised the insured that the insurance covers for
individual events and does exclude gradual wear tear and deterioration from the
weathering elements. The insured understood this.
The builder gave some advise (sic) about what needs to be done that was a
cheaper option then removing all the tiles as the insured‟s builder had suggested.
Assessor tested balcony tiles and could not locate any drummy tiles close to the
area that was known to leak. As noted the handrail had movement and that was
affecting tiles and cracks have formed over the years.
Maintenance and building defects
Insured is to have tile overhang to compress sheeting on the verandah sealed to
stop water ingress.
Sealant to where the two flashings overhang each other and foam infills to box
gutter return and underside of the colour bond sheeting.
Timber rot was discovered on main beam that limits the warranty of work.
The 8 August 2022 report from Company ALD relevantly says:
spray testing was carried out on the balcony and found water escaping through gaps along
the edge between tile flashing, through to ceiling below and
photographs show the rotten structural beam is directly below this observed leak.
Determination | Case number: 978702 Page 4 of 15
In its Notice of Response, dated 30 May 2023, notably the insurer‟s only substantive
submission as it has not otherwise responded to the complainant‟s submissions, the insurer
relevantly says:
Both reports were consistent in their findings that the balcony waterproofing and
rotting to the structural beam has occurred over an extended period of time, and
whilst the Customer may have only become aware of the failure and rot after the
storm event, the proximate cause of damage to the balcony is not due to a single
event. Instead, the damage is due to wear, tear and gradual deterioration which in
turn caused extended and ongoing rot and decay to the structural beam due to
water ingress. It is therefore the Insurers view that the Customer has not met their
onus in establishing a valid claim to which the policy must respond for the
damage to the balcony and structural beam as it has not been caused by a single
event or incident.
The complainant contests this analysis
On the issue of establishing a valid claim, the complainant‟s solicitor relevantly says:
the insurer accepted a valid claim had been made and indeed cash settled that valid claim,
in part
the insurer purported to deny part of that claim, namely the damage to the structural beam,
on the basis of wear, tear and gradual deterioration and
alternatively, the insurer incorrectly applied its definition of „Incident‟ as:
> the policy says an „Incident‟ can be a series of occurrences which were not expected to
happen, attributable to one source of originating cause
> the insurer‟s reports demonstrate the originating cause of the damage was the water
ingress from the balcony, being a single source attributable to a series of storms over
time
The insurer has not engaged with this argument, simply noting the damage occurred over
time and therefore has not been shown to be attributable to a single event.
The complainant has established a claimable loss
As the insurer has not contested the complainants‟ position, despite the opportunity to do so, I
am satisfied any submission it may have made would not have assisted its position.
I am therefore satisfied the complainant has established a valid claim and a claimable loss in
respect of the structural beam.
Whether the insurer is entitled to deny the claim now rests on whether it can appropriately
rely on any exclusions in the policy.
2.2 Is the insurer entitled to rely on an exclusion?
Yes. The insurer is permitted to rely on the exclusion for wear, tear and gradual deterioration.
The insurer must establish it may validly rely on an exclusion
Once the complainant proves there is a claimable loss, the insurer is liable for the loss unless
it shows an exclusion or limiting condition applies. The insurer has the responsibility to show it
is more likely than not the exclusion or condition applies.
Determination | Case number: 978702 Page 5 of 15
The insurer relies on the exclusion for wear, tear and gradual deterioration
In its Notice of Response, the insurer relevantly says:
The Insurer submits that their decision to decline coverage for the damages to the
balcony and structural beam is correct based on the information to hand. The
Insurer has undertaken a detailed assessment of the property to determine the
cause of damage to the balcony and structural beam and determined that the
damages to the balcony and beam was due to water ingress via the tiled balcony
over an extended period of time and not the result of a single insured event. The
cause of this damage is wear, tear, gradual deterioration and rot which is also
expressly excluded by the policy.
[…] Further, the policy provided is subject to the terms, conditions, limits and
exclusions as set out in the PDS. In this instance, the policy also generally
excludes loss or damage caused by or arising from wear, tear and gradual
deterioration (Attachment 3):
Page 30
Things we don’t cover
Loss or damage to, or caused by, connected with or arising from, or
liability caused by, connected with or arising from:
Wear, tear and gradual deterioration
any part of the building that has wear, tear, rust, fading, rising damp,
corrosion, rot, action of light, atmospheric or climatic conditions or
gradual deterioration such as, but not limited to:
• tiles and their adhesive or grouting breaking down;
• wea thering of roof tiles or roof ridge capping;
• gradual weathering and breakdown of bricks, mortar or concrete
The exclusion is broadly drafted. From the facts of this complaint, it is clear there was
damage to the structural beam caused by rot. This meets the definition in the exclusion.
The complainant argues section 46 of the Insurance Contracts Act 1984 applies
However, the complainant says the insurer cannot rely on this exclusion, due to the operation
of section 46 of the Insurance Contracts Act 1984 (the IC Act). Relevant wording in the IC Act
is set out in section 3.3 of this determination.
The complainant says:
Determination | Case number: 978702 Page 6 of 15
the exclusion for wear, tear and gradual deterioration has the effect of limiting or excluding
the insurer‟s liability by reference to the condition of the beam and balcony waterproofing
at the time the policy was entered into
the claim is being made in respect of a loss occurring, in part, as a result of a defect or
imperfection in the roof and waterproofing
the complainant was not aware, and a reasonable person could not have been aware, of
the defect or imperfection causing the water ingress and
therefore section 46 of the IC Act therefore operates to prevent the insurer from relying on
this exclusion.
The insurer says section 46 does not assist the complainant as:
The Insurer submits that it is not reliant on a provision included in the contract that
has the effect of limiting or excluding its liability by reference to the condition or
„defect‟.
[…] [Company A] found that the damage to th e property was from water ingress
from the Customers balcony due to a lack of sealant applied to the tiled overhang
which has then caused the breakdown or wear and tear of the waterproofing
membrane, allowing water to damage the structural beam causing the rot. This
damage has manifested over an extended period of time and accordingly, the
Insurer submits that the claimed damage cannot be attributed to a single event. It
is on this basis and the application of the wear, tear and gradual deterioration
exclusion that the claim is determined not to be one for acceptance.
In order for section 46 to support the Customer, an insured event must first be
established, and the Insurer is then reliant on a „defect‟ exclusion to defeat the
claim. This is not the case in this situation.
The Insurer submits that it does not rely on any defect whether it is missing
sealant, foam infills or incorrectly folded and sealed flashing to exclude its liability
under the contract. Rather the Insurer maintains that the claimed damage was not
caused by any single insured event or incident to which the policy responds, and
that the Customer has therefore not established a valid claim.
For the reasons set out in section 2.1 of this determination above, I am satisfied the
complainant ha s established a valid claim. I am also not satisfied by the insurer‟s position it is
simultaneously relying on the exclusion in some respects, but not in others.
Accordingly, I am satisfied there is a valid claim and the insurer is, at least in part, relyi ng on
an exclusion. This enlivens consideration of section 46 but does not mean it operates the way
the complainant suggests.
The courts have considered section 46
In Nelson v Hollard Insurance Company Pty Ltd [2010] NSWSC 199, the court considered
whether section 46 would prevent an insurer from relying on an exclusion clause relating to
inherent defects, structural faults, faulty workmanship and faulty design.
The court relied on the earlier decision in Asteron Life Ltd v Zeiderman [2004] NSWCA 47
which held:
Determination | Case number: 978702 Page 7 of 15
An insurer is entitled to exclude cover for particular events, irrespective of when
they occur, and an exclusionary provision of that character does not fall within the
statutory preclusion in either section 46 or section 47 of the Act because it could
not be said that a limitation or exclusion was made “by reference to” a condition of
a thing or sickness or disability at the time the contract was entered into.
In essence, the court held an insurer is able to limit its liability where an exclusion clause
does not operate by reference to an event at a time before the contract was entered into.
Section 46 does not apply in the present circumstances
Referring to an AFCA preliminary assessment, the complainant‟s solicitor says:
The assessor‟s interpretatio n of section 46 of the Insurance Contracts Act 1984 is
incorrect in failing to give any effect to the words “ has the effect of ” in section 46.
This section operates in respect of a clause which has “ the effect of limiting or
excluding the insurer’s liability under the contract by reference to the condition, at
a time before the contract was entered into, of the thing .” ( our emphasis ) A
clause need not directly refer to the condition of the thing at the time the contract
was entered into in order to fall within the section – it is sufficient if this clause has
the effect of excluding this damage by reason of the fact that it must have existed
at the time the contract was entered into. The exclusion relied on by the Insurer
has this effect.
While I agree that a direct reference is unnecessary, in the present policy, the exclusion is
relevantly for:
Loss or damage to, or caused by, connected with or arising from […] any part of
the building that has wear, tear, rust, fading, rising damp, corrosion, rot, action of
light, atmospheric or climatic conditions or gradual deterioration.
This is not referable to any event which pre-dated April 2020 when the policy was first issued.
As a result, due to the Asteron case, I am satisfied section 46 does not operate to prevent the
insurer from relying on the exclusion to deny this aspect of the claim.
The complainant raised section 54
For the sake of completeness, while the complainant‟s solicitor does not press this issue, in
the initial complaint, the complainants raised the issue of section 54 of the IC Act as being
potentially relevant.
The complainant suggested:
In accordance with section 54(1), as the pre-existing defects in the home neither
caused nor contributed to the loss, [the insurer] is only entitled to reduce their
claim by the amount which represents the actual prejudice it has suffered due to
the alleged failure to maintain their home in good condition.
Determination | Case number: 978702 Page 8 of 15
As no part of our loss was caused by our act (by virtue of the operation of section
46), section 54(3) prohibits [the insurer] from refusing payment of our claim based
on the alleged failure by us to keep our home in good condition.
Respectfully, this is not how section 54 works.
Simply put, section 54 says an insurer may not refuse to pay a claim in whole or in part solely
as a result of:
some act of the insured or some other person
which occurred after the contract was entered into
unless the act could reasonably be regarded as being capable of causing or contributing to
an insured loss.
I accept the complainant was not, and a reasonable person in the circumstances could not
have been, aware of the issues which allowed the water ingress.
However, on the available evidence, I am satisfied:
the pre-existing defects have caused and contributed to the loss being claimed
the insurer is not alleging the complainant did not keep the home in good condition
there was no identifiable act of the complainant or any other person which is being relied
on by the insurer and
even if the failure to maintain the degraded waterproofing and prevent the water ingress
could be deemed to be an act after the commencement of the policy, it could reasonably
be regarded the water ingress was capable of causing or contributing to an insured loss.
Accordingly, I am not satisfied section 54 applies.
The insurer is entitled to rely on the exclusion
As a result of the above analysis, I am satisfied the insurer may appropriately rely on the
exclusion for wear, tear and gradual deterioration to deny the claim for the structural beam.
2.3 Why is the outcome fair?
The policy applies to insured events which fall within its terms. I am satisfied the insurer has
established an exclusion applies. I am also satisfied the insurer has not contributed to eith er
any non- financial loss or to the complainant‟s professional costs.
AFCA may award non-financial loss compensation
AFCA may award, in certain circumstances, non-financial loss compensation up to a
particular limit. For this complaint, the limit is $5,400.
However, AFCA will only award compensation for non-financial loss where there has been an
unusual amount of physical inconvenience, time taken to resolve a situation, or interference
with the complainant‟s expectation of enjoyment or peace of mind.
In assessing whether to award compensation, AFCA expects the complainant to be
moderately robust, bear the normal degree of inconvenience experienced when a problem
occurs, and take reasonable steps to minimise the inconvenience suffered.
The complainant seeks non-financial loss compensation
The complainant says AFCA should take into account alleged breaches of the General
Insurance Code of Practice and award non-financial loss as a result.
Determination | Case number: 978702 Page 9 of 15
Specifically, the complainant says non-financial loss is justified on the basis of delay in
providing written reasons for declining part of the claim and informing the Complainant as to
the complaints process:
the claim was lodged with the Insurer on 28 February 2022.
an assessor‟s report dated 23 June 2022 was provided t o the Complainant by the Insurer
on or about 5 July 2022 and
it was not until 15 February 2023 the Insurer wrote to the Complainant giving reasons for
the Insurer‟s decision and outlining the complaints process.
There is no evidence of the impact of the delays on the complainants
Merely that there were delays in providing the reports is insufficient to give rise to a claim for
non-financial loss. At no point has the complainant or her representatives indicated they have
suffered more than the normal level of inconvenience experienced when a claim is lodged
and partly denied.
On the available evidence, I am satisfied the complainants knew the position they were in and
the basis for the insurer‟s position at all material times. I am not satisfied the failure to provide
written reports confirming the verbal advice caused any unusual amount of interference with
the complainant‟s expectation of enjoyment or peace of mind.
There is no basis for the award of professional costs
Further, while AFCA Rule D.5.1 allows me to make an award for professional costs incurred
in pursuing a complaint (as requested by the complainant), I am not satisfied this is
appropriate either.
As relevantly stated in the AFCA Operational Guidelines:
We provide a free service for Complainants. It is not usually necessary for either
party to be legally represented.
[…] If the Complainant chooses to be represented, they will usually have to cover
their legal fees themselves. Lawyers acting for Complainants should make this
clear to the Complainant.
Although there is no automatic right to legal costs, we can decide that the
Financial Firm should contribute to the Complainant‟s legal costs (but not in a
Superannuation Complaint). […] These costs are, however, usually capped at a
total of $5,000 per complaint, regardless of the number of claims or issues raised
in it or the types of costs incurred.
When considering whether to require the Financial Firm to make a costs
contribution, we take into account the complexity of the complaint and whether the
Complainant needed to incur the costs to understand or establish their claim.
I am not satisfied the complainant required legal assistance to present this complaint at
AFCA. The basis for the claim was straightforward and turned on the wording of the exclusion
clause relied on by the insurer.
Determination | Case number: 978702 Page 10 of 15
The complainant‟s legal advisers introduced the potential application of sections 46 and 54 for
the IC Act, thereby complicating the issues in dispute. For the reasons above, these
submissions were not useful to the complainant.
In the circumstances, I am satisfied it would not be fair to require the insurer to pay the
complainant‟s legal costs.
Determination | Case number: 978702 Page 11 of 15
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.
3.2 Relevant policy terms
Your responsibilities (PDS, Page 11)
[…] • keep the building structurally sound, watertight, secure and well maintained
(e.g. remove mould, fix any holes in floors, walls, ceilings, fix loose, missing or
rusted steps, gutters, flooring);
• y ou must fix any inherent defect, faulty design, structural defect, structural fault
and/or faulty/poor workmanship at the building as soon as possible after you
identify it or are told about it;
[…] • ensure that the building is kept in good condition (e.g . there are no blocked
gutters, the roof is not rusted, the building is not infested with vermin and there is
no termite damage);
Determination | Case number: 978702 Page 12 of 15
[…] Not meeting your responsibilities
Your policy may not provide cover if you have not met your responsibilities and it
may lead us to reduce or refuse to pay your claim and/or cancel your policy.
What we don’t cover (PDS, Page 25 -30)
Loss or damage to, or caused by, connected with or arising from, or liability
caused by, connected with or arising from:
Building not in good condition
any part of the building not being in good condition, such as, but not limited to:
• the roof leaks when it rains;
• there are blocked gutters;
• there are areas of the roof that are rusted through;
• there is wood rot, termite or ant damage to the b uilding;
• there are holes in floors, walls, ceilings or any other parts of the building or unit
(e.g. external wall cladding, internal plaster, floorboards); […]
Wear, tear and gradual deterioration
any part of the building that has wear, tear, rust, fading, rising damp, corrosion,
rot, action of light, atmospheric or climatic conditions or gradual deterioration such
as, but not limited to:
• tiles and their adhesive or grouting breaking down;
• weathering of roof tiles or roof ridge capping;
• gradual weathering and breakdown of bricks, mortar or concrete.
What you are covered for – Insured Events
Storm
We cover Loss or damage caused by a storm.
We don‟t cover • loss or damage caused by flood;
Determination | Case number: 978702 Page 13 of 15
• loss or damage to the building caused by actions or movem ents
of the sea or storm surge;
• loss or damage caused by erosion, vibration, subsidence,
landslip, landslide, mudslide, collapse, shrinkage or any other
earth movement, but we will cover loss or damage to the building
caused by a landslide or subsidence proved to have occurred
within 72 hours of, and directly because of, a storm and not
because of erosion, structural fault or design fault;
• loss or damage to retaining walls, sea walls, revetments, garden
borders and free standing outdoor walls;
• result ant cracking to sealed paths, sealed roads and sealed
driveways, but we will cover them if they are washed away by the
storm;
• loss or damage to a sporting surface or court including a tennis
court, squash court or multi-court surface;
• loss or damage to boat jetties, pontoons, mooring poles and
their attachments and accessories, including if they are washed
away by the storm;
• damage to external paintwork of the building, if that is the only
building damage caused by the storm;
• loss or damage to gates , fences or wall fences that would be
considered by a reasonable person to be in an obvious state of
disrepair before the loss or damage occurred.
Words with special meanings (PDS, Page 103 onwards)
Incident
means a single event, accident or occurrence which you did not intend or expect
to happen. A series of incidents attributable to one source of originating cause is
deemed to be the one incident.
[…]
Storm
means a single weather event being, a cyclone or severe atmospheric
disturbance. It can be accompanied by strong winds, rain, lightning, hail, snow or
dust.
Determination | Case number: 978702 Page 14 of 15
3.3 Relevant law
Insurance Contracts Act 1984 – Section 46
Pre ‑ existing defect or imperfection
(1) This section applies where a claim under a contract of insurance (other than a
contract of insurance that is included in a class of contracts declared by the
regulations to be a class of contracts in relation to which this section does not
apply) is made in respect of a loss that occurred as a result, in whole or in part, of
a defect or imperfection in a thing.
(2) Where, at the time when the contract was entered into, the insured was not
aware of, and a reasonable person in the circumstances could not be expected to
have been aware of, the defect or imperfection, the insurer may not rely on a
provision included in the contract that has the effect of limiting or excluding the
insurer‟s liability under the contract by reference to the condition, at a time before
the contract was entered into, of the thing.
Insurance Contracts Act 1984 – Section 54
Insurer may not refuse to pay claims in certain circumstances
(1) Subject to this section, where the effect of a contract of insurance would, but
for this section, be that the insurer may refuse to pay a claim, either in whole or in
part, by reason of some act of the insured or of some other person, being an act
that occurred after the contract was entered into but not being an act in respect of
which subsection (2) applies, the insurer may not refuse to pay the claim by
reason only of that act but the in surer‟s liability in respect of the claim is reduced
by the amount that fairly represents the extent to which the insurer‟s interests
were prejudiced as a result of that act.
(2) Subject to the succeeding provisions of this section, where the act could
reasonably be regarded as being capable of causing or contributing to a loss in
respect of which insurance cover is provided by the contract, the insurer may
refuse to pay the claim.
(3) Where the insured proves that no part of the loss that gave rise to the claim
was caused by the act, the insurer may not refuse to pay the claim by reason only
of the act.
(4) Where the insured proves that some part of the loss that gave rise to the
claim was not caused by the act, the insurer may not refuse to pay the claim, so
far as it concerns that part of the loss, by reason only of the act.
(5) Where:
Determination | Case number: 978702 Page 15 of 15
(a) the act was necessary to protect the safety of a person or to
preserve property; or
(b) it was not reasonably possible for the insured or other person not to
do the act;
the insurer may not refuse to pay the claim by reason only of the act.
(6) A reference in this section to an act includes a reference to:
(a) an omission; and
(b) an act or omission that has the effect of altering the state or condition
of the subject ‑ matter of the contract or of allowing the state or condition
of that subject ‑ matter to alter.