Insurer declined claims for engine damage and storm damage to boat, relying on poor maintenance, pre-existing damage and mechanical breakdown exclusions
Text of the determination
Determination
Case number 978480
Financial firm Zurich Australian Insurance Limited
Determination | Case number: 978480 Page 1 of 24
Case number: 978480 19 January 2024
1 Determination overview
1.1 Complaint
In July 2022, the complainant purchased a Custom Steel Cruiser craft (the boat) from a
broker in Mackay, QLD. On 21 July 2022, the complainant bought a Marine Premium
Pleasure Craft Insurance policy (the policy) issued by the financial firm (the insurer) to cover
the boat.
On 29 July 2022, while being transported from Mackay to Sydney, the boat sustained
damage. On 13 September 2022, the complainant lodged a claim under the policy for this
damage.
As details have evolved, the claim now relates to two events:
damage to the port side engine between 22 and 25 July 2022 and
storm damage said to have been sustained on or about 29 July 2022.
On 4 May 2023, the insurer declined the claims, predominantly on the basis of crew reports
that:
the engine damage occurred as a result of failure to maintain the engine properly and
the damage attributed to the storm was pre-existing.
The complainant disagrees. He relies on a pre-purchase inspection report and the statements
of the skipper, Mr AB, who inspected the boat and was transporting it to Sydney for the
complainant.
1.2 Issues and key findings
Is the insurer entitled to decline for misrepresentation?
No. While there is sufficient information to indicate the pre-purchase inspection report was
materially incorrect and misleading, this was not a misrepresentation by the complainant.
Has the complainant established a claimable loss?
Yes. I am satisfied the complainant has shown it is more likely than not there were two
claimable losses under the policy
Is the insurer entitled to decline for an exclusion?
Yes. The third-party witness statements are persuasive about the pre-existing state of the
boat, and the events which led to the claims being made. On the basis of these statements,
the insurer has established the exclusions for poor maintenance, pre-existing damage, and
failure to properly maintain the boat all apply.
Is the complainant entitled to non-financial loss?
No. There is insufficient evidence to show the insurer unduly delayed the resolution of the
claim, or caused the complainant an unusual amount of stress or inconvenience.
Determination | Case number: 978480 Page 2 of 24
Why is the outcome fair?
While I sympathise with the complainant‟s position, this was predominantly caused by trusting
an unsuitable person, Mr AB, to undertake a series of tasks which required more experience
and expertise than Mr AB could bring to the situation. This caused a series of breaches of the
insured‟s obligations under the policy and therefore it is fair in all the circumstances for the
insurer to deny the claim.
1.3 Determination
This determination is in favour of the insurer.
Determination | Case number: 978480 Page 3 of 24
2 Reasons for determination
2.1 Is the insurer entitled to decline for misrepresentation?
No. While there is sufficient information to indicate the pre-purchase inspection report was
materially incorrect and misleading, this was not a misrepresentation by the complainant.
The complaint involves third-party witnesses
It is important context for this complaint to note the complainant had not viewed the boat in
person prior to purchase, or indeed prior to it arriving in Sydney.
The complainant relied on a friend (and employee of his security business), Mr AB, to inspect
the boat and transport it from Mackay to Sydney on his behalf. The complainant paid Mr AB
to survey the boat, including performing an out of water inspection, and test drive the boat
with the previous owner before transporting the boat to Sydney.
Once purchased, Mr AB and the complainant arranged for a crew to assist Mr AB in
transporting the boat to Sydney. The crew initially comprised:
Mr AB, skipper
Mr CR, a second skipper and
Mr JK, a deckhand.
Following a dispute between Mr AB and Mr CR, the boat docked in Southport where Mr CR
was replaced by Mr GK as second skipper and Mr JK left without being replaced.
Accordingly, the transportation was in two stages – Mackay to Southport and Southport to
Sydney:
Mr AB, Mr CR and Mr JK can provide evidence of events between Mackay and Southport
and
Mr AB and Mr GK can provide evidence of events between Southport and Sydney.
The insurer conducted interviews with the complainant, Mr CR, Mr JK and Mr GK.
While there are some discrepancies in the ordering and timings of various events, a timeline
of relevant events taken from the interviews, as well as the Marine Incident Report completed
by Mr AB, has been included in section 3.2 of this determination.
The insurer says it is entitled to decline the claim for misrepresentation
For the purposes of obtaining insurance, Mr AB produced for the complainant an Inspection
Report and a Marine Craft Insurance Risk Evaluation report, dated 7 July 2022 (Mr AB‟s
report). The report provided an assessment that the vessel was in a sound and good
condition and was signed by Mr AB in the capacity of an „Authorised Marine Engineer‟.
However, in its claim decision letter dated 4 May 2023, the insurer relevantly says:
It is clear that the report of [Mr AB] (i.e., „ Marine Craft Risk Evaluation Report’ )
operated to misrepresent the true state of the vessel before cover was provided.
Had [the insurer] been made aware of the true state of repair of the vessel, it
would never have agreed to insure it. Accordingly, [the insurer] is entitled to
decline the claim.
Determination | Case number: 978480 Page 4 of 24
The complainant relied on Mr AB
In an email to the insurer, the complainant relevantly says:
As far as I am concerned the boat was checked and approved by [Mr AB]. While
the boat was out of the water, he checked the hull, integrity was fine, the rudder
and propeller and seals were fine, the water outlet for he (sic) motors were fine.
The owner and the Broker went for a two-hour sea trial with [Mr AB] and I have
the video to prove it with the running engines and the owner driving the boat.
Otherwise I would never have bought the boat. That was the whole idea of the out
of water inspection. Otherwise you would not give me insurance. You saw [Mr
AB] ‟ rep ort and you approved it. If you thought that [Mr AB] ‟ s report was not
acceptable why did you approve it and take my money for the insurance. If you
had not approved the insurance I would never have bought the boat indeed I
couldn‟t have bought the boat wit hout insurance.
[…] Do you think that [Mr AB] had a death wish that he would misrepresent the
true state of the vessel and if so give me proof. It was 1,000 nautical miles that
[Mr AB] had to travel to get to Sydney. If the boat was in disrepair it would not
have made it out of Mackay, and what could he gain from taking a boat that was
in disrepair 1,000 nautical miles. As far as I am concerned this is unsubstantiated
with proof. If so send me the proof that the boat was in disrepair.
[…] [Mr AB] and I have photos and you have them too of the vessel being
surveyed and checked and it was all good and the boat broker was there because
if there was a problem with the boat I would not have purchased it. That is the
purpose of a survey.
I paid [Mr AB] to check the motors, they were running fine, the owner of the boat
was there with us and the broker, that is why I bought the boat because it passed
all my tests. As a precaution, [Mr AB] advised me that we should change the oil
and filters and fan belts which he did. The boat was at Mackay for four days
getting serviced and tested, replacing water, filling up with diesel and after 4 days
they left with no problems.
Despite the above, i n his interview with the insurer‟s investigator, the complainant accepted
he trusted Mr AB was an Authorised Marine Engineer and had other relevant qualifications
but had not seen proof.
No evidence has been provided to AFCA of Mr AB holding this, or any other, marine
qualification.
The complainant summed up the current situation by relevantly saying:
[Mr AB]‟s left a trail of destruction everywhere and caused me to have a nervous
breakdown basically. […] But we‟ve known [Mr AB] for over 20 years, that‟s why
we trusted him with everything.
From the available evidence, I am satisfied the complainant trusted his friend, but it is more
likely than not Mr AB misrepresented his qualifications to the complainant and the insurer.
Determination | Case number: 978480 Page 5 of 24
Mr AB’s inspection report is lacking in detail
As a result of this finding, Mr AB‟s 7-page inspection report, dated 7 July 2022, must be given
appropriate weight as the assessment of an unqualified person.
The report provides a brief written description of:
Hull and Exterior Fittings
Cabin and Interior Fittings
Mechanical Systems
Electrical Systems and
Electronic and Navigational Systems
and provided a risk evaluation free of any concerns about the boat, aside from:
a query against the Auxiliary Steering
noting there were no gas bottles, gas detector or flares
a need for the manual bilge pump to be installed and
labelling needed on the two electrical bilge pumps.
To support this assessment, the report contains 15 unlabelled colour photographs of which:
four photographs (one out of focus) are taken of the exterior of the boat while in the water
three are taken (while in a hardstand) of the boat‟s rudder, one of the two propellers and
the boat‟s hull from the bow
two are of the tender boat which does not form part of this complaint and
the remaining six pictures appear to be of:
> the rudder and propeller of either an inboard, or v-drive engine – presumably of the
tender boat
> two close ups of engines – presumably of the boat
> a close up of part of a hull – presumably of the boat, but perhaps of the tender boat
> a close up of what appears to be the anchor winch of the boat and
> a close up of what appears to be the bow of the boat, poorly painted and partly
obscured by chains and rope.
Unfortunately, due to their lack of detail and clarity, the photographs provide little evidentiary
support for demonstrating the systems which have subsequently been claimed for were in
good working order prior to the boat leaving Mackay.
Mr AB’s report is inconsistent with other evidence
In addition, there is clear evidence which has been provided to AFCA to demonstrate Mr AB‟s
inspection was inadequate.
Firstly, Mr AB‟s written assessment relevantly reported the hull was „in immaculate condition‟
and there was no rust on the rudder. However, the photographs he inserted into the report
show rust and marine build up on the rudder, propeller and hull.
Secondly, Mr AB ‟s report went on to say:
I inspected the hull above and below the waterline whilst the vessel was in the
hardstand and found no corrosion or damage. The structural integrity of the
vessel remains intact.
I examined all watertight fittings, hatches and seals and found them to be in good
order. The reserve buoyancy remains intact.
Determination | Case number: 978480 Page 6 of 24
[…] The electrical systems are all in operational condition with a large supply of
12 v DC battery storage power and 240 v AC from the alternators and generator.
Despite Mr AB‟s inspection , in the subsequent Loss Adjuster and Marine Surveyor report,
dated 26 September 2022, the Marine Surveyor observed:
an aft section of the main cabin ceiling was missing, exposing electrical wiring
the flybridge was an incomplete add on of alloy construction
the helm was not affixed to the superstructure in an acceptable manner and
the engine room wiring, and installation of the charger, inverter and other components was
not installed in a professional manner.
These issues have not been raised as having been caused by either event giving rise to the
claim and I accept therefore these were pre-existing issues on the boat which were
overlooked by Mr AB.
Thirdly , Mr AB did not check the boat‟s registration. While he included a „HIN/Registration/Sail
No‟ in the report, this does not relate to any official registration in either QLD or NSW. I am
satisfied this was a basic, online check which should have been completed during a
competent inspection.
The Loss Adjuster and Marine S urveyor contacted the boat‟s previous owner who confirmed
the boat was not registered in QLD and believed this was acceptable as the boat was being
transferred to NSW. However, a failure to register the boat is a breach of the relevant
legislation of both states for putting the boat on the water.
As an aside, I accept the boat has now been registered in NSW under a different number on
2 August 2022 after arriving in Sydney.
Fourthly, the complainant says Mr AB inspected the service records and checked with the
broker and previous owner the vessel had been regularly serviced. However, the complainant
has not provided supporting information, such as service records, indicating the vessel was
regularly serviced and maintained in accordance with the manufacturer‟s recommendations.
I infer this is either because such records do not exist or would not assist the complainant‟s
position.
Fifthly, Mr AB‟s inspection report is inconsistent with the evidence provided by Mr CR and Mr
JK in their interviews with the insurer‟s investigator.
Mr CR relevantly says, prior to leaving Mackay:
the auto pilot and radar did not work
there were issues with the steering
the portside motor did not always register on the tachometer, but otherwise both motors
appeared to work ok
a spotlight on the front of the boat did not work and
the navigation system did not work.
Mr JK relevantly says, prior to leaving Mackay:
the horn did not work
the front spotlights did not work
lights and navigation lights did not work
radar did not work
there were steering issues and the boat would not steer in a straight line
speedometers, gauges and oil pressure gauge did not work
Determination | Case number: 978480 Page 7 of 24
coordinator bilge pumps did not work and
wiper blades did not work on the cockpit.
The complainant challenges these accounts and says these assessments are based on
assumptions made by unqualified people and their unsubstantiated statements, and that Mr
CR, in particular, is lying. I will deal with this argument in section 2.3 below.
Finally, Mr AB‟s Marine Incident Report, dated 8 August 2022, relevantly says:
on or about 22 July 2022 (the first day and 2 days after the test drive), the anchor winch
failed and blew a seal on the bottom of the hydraulic line and the anchor well needed to be
pumped out
on or about 25 July 2022, in Southport, there was a need to inspect the boat for imminent
danger or failures of any mechanical systems
on 27 July 2022:
> the port engine started shattering and making extreme rattling noises, causing loss of
steering and
> despite the engine oil being full, there were excessive oil leakages from the engine‟s
gaskets and salt water backwashed into the exhaust manifold, swamping the glow
plugs.
All of these issues pre-date the storm on or about 29 July 2022 and Mr AB makes no
reference to any incident which could have caused these problems. Accordingly, it is more
likely than not, any issues with the anchor winch, port engine, oil leakages or exhaust
manifold should have been identifi able, and identified, in Mr AB‟s pre -purchase report.
Mr AB’s report misrepresented the boat’s condition
On the basis of the above inconsistencies and issues, I am satisfied the report prepared on 7
July 2022 by Mr AB misrepresented, either by design or negligence due to his lack of
qualifications, the condition of the boat prior to the insurance being purchased.
The complainant was the applicant for insurance
Despite these issues with Mr AB‟s report, it was not Mr AB who applied for the insurance – it
was the complainant.
Section 20B of the Insurance Contracts Act 1984 (the Act) relevantly says:
The insured's duty to take reasonable care not to make a misrepresentation
(1) Subject to this Act, an insured has a duty to take reasonable care not to
make a misrepresentation to the insurer before the relevant contract of
insurance is entered into.
(2) Whether or not an insured has taken reasonable care not to make a
misrepresentation is to be determined with regard to all the relevant
circumstances.
(3) Without limiting subsection (2), the following matters may be taken into
account in determining whether an insured has taken reasonable care
not to make a misrepresentation:
Determination | Case number: 978480 Page 8 of 24
(a) […]
(e) whether or not an agent was acting for the insured;
(f) […]
(4) Any particular characteristics or circumstances of the insured of which
the insurer was aware, or ought reasonably to have been aware, are to
be taken into account in determining whether an insured has taken
reasonable care not to make a misrepresentation.
(5) The insured is not to be taken to have made a misrepresentation merely
because the insured:
(a) failed to answer a question; or
(b) gave an obviously incomplete or irrelevant answer to a question.
(6) To avoid doubt, a misrepresentation made fraudulently is made in breach
of the duty to take reasonable care not to make a misrepresentation.
The complainant has known Mr AB for 20 years and it is clear he trusted him. In the context
of their friendship, I am satisfied it was reasonable for the complainant to believe Mr AB held
the qualifications he claimed to have without the need to ask for proof.
The complainant relied on Mr AB‟s representations to hire him to conduct the relevant
inspections and transport the boat for him. I am satisfied this amounted to the complainant
taking reasonable care to ensure the boat was properly checked prior to purchase.
I am satisfied while Mr AB likely made a misrepresentation to the complainant, the
complainant‟s belief in the veracity of his statements made to the insurer in the insurance
application was reasonable in the circumstances.
The insurer cannot rely on the misrepresentation to deny the claim
As a result, I am not satisfied the insurer has established the complainant, as the insured,
made a misrepresentation as defined in the Act.
It is therefore not entitled to decline the claim on this basis.
2.2 Has the complainant established a claimable loss?
Yes. I am satisfied the complainant has shown it is more likely than not there were two
claimable losses under the policy.
Determination | Case number: 978480 Page 9 of 24
The complainant must establish a claimable loss
When bringing a complaint to AFCA, the complainant is required initially to show it is more
likely than not there is a claimable loss under the policy. This means demonstrating the loss
or damage was caused by a risk that is covered under the policy.
Once the complainant proves there is a claimable loss, the insurer is liable for the loss unless
it shows an exclusion or limiting condition applies. The insurer has the responsibility to show it
is more likely than not the exclusion or condition applies.
The complainant claimed for storm damage
In the claim form provided to the insurer, the complainant relevantly provided the following
information:
the type of claim was „Storm‟, with the date of occurrence being 29 July 2022
details of the claim were provided through Mr AB‟s Marine Incident Report
the complainant had no relationship with Mr AB, he was just delivering the boat
the severe storm weather had caused Mr AB to suffer severe anxiety, trauma related
injuries and PTSD
the sole witness was Mr AB
the claimed loss was for:
> anchor winch
> 2 x CAT engines one is seized and the other not operating rattling and noisy
> generator not working
> bilge pumps not working, cause of excessive oil in bilges
> radar and navigation systems had been switched off and were inoperable due to storm
damage
> hydraulic steering inoperable because of rudder damage
> solar panels missing off top of vessel and
> other items subsequently not pursued.
The terms and conditions are set out in the Product Disclosure Statement
The policy is made up of a certificate of insurance and product disclosure statement (PDS),
which form the terms of the vessel‟s cover. There is no dispute the complainant received
these documents. The insurer is therefore entitled to rely on the terms of the policy in
assessing the subject claim.
The policy documents provide cover for accidental loss or damage to the vessel during the
period of insurance.
Relevantly clauses from the PDS are set out in section 3.3 of this determination.
The complainant has established a claimable loss for the engine
In its Claims Outcome letter, dated 4 May 2023, the insurer accepts damage occurred to the
port engine on 27 July 2022.
From Mr AB‟s Marine Incident Report, it is clear on the complainant‟s own evidence the
damage to the anchor winch, port engine and hydraulic steering pre-dated the storm on 29
July 2022.
As a result, the complainant would need to establish these damages arose from an insured
Occurrence, as defined in the policy. The PDS defines „Occurrence‟ as:
Determination | Case number: 978480 Page 10 of 24
a sudden, unexpected and accidental event to which this insurance applies which
happens within the Period of Insurance. An Occurrence caused by the same,
repeated general harmful condition that results in an Occurrence within the Period
of Insurance, unless an excluded cause of Loss, is considered to be one (1)
Occurrence.
With respect to the anchor motor, the complainant has not raised any further evidence of
what caused this to fail. However, I am satisfied the failure of the anchor winch was „sudden,
une xpected and accidental‟.
With respect to the port engine, the complainant says:
the motor seized, and this is usually due to starvation of water
a grounding of the boat would have blocked the inlet water to the engine and
underwater pictures show evidence of a grounding.
While Mr AB‟s Marine Incident Report makes no mention of a grounding, the interviews with
Mr CR and Mr JK both attest that Mr AB ran the boat aground on a mudbank near Morton
Bay, prior to reaching Southport. On this basis, I am satisfied a grounding did occur and this
meets the definition of an „Occurrence‟.
The complainant has therefore established a claimable loss for the claim for the anchor motor
and engine.
The complainant has established a claimable loss for the storm
The insurer‟s Claims Outcome letter also accepts:
a storm occurred on or about 29 July 2022 and
the tender battery, tender fuel tank, cushions, outboard motor cover and solar panels were
lost or damaged in the storm.
I am satisfied a storm meets the definition of „Occurrence‟ and damage occurred during the
storm.
The complainant has therefore established a claimable loss for the claim for the storm.
2.3 Is the insurer entitled to decline for an exclusion?
Yes. The third-party witness statements are persuasive about the pre-existing state of the
boat, and the events which led to the claim being made. On the basis of these statements,
the insurer has established the exclusions for poor maintenance, pre-existing damage, and
failure to properly maintain the boat all apply.
The insurer must establish relevant exclusions apply
Given my findings in section 2.2 above, the insurer now has the responsibility to show it is
more likely than not one or more exclusions or conditions apply to limit its liability.
The insurer says the engine damage was caused by poor maintenance
In its Claims Outcome letter, the insurer relevantly says:
1. The evidence gathered from [Mr GK] ‟s statement concludes that damage
sustained to the portside engine resulted wholly from a failure by [Mr AB] to put
Determination | Case number: 978480 Page 11 of 24
correct amounts of oil in the engine. [Mr GK] notes in his transcript of interview
that when [Mr AB] changed the oil, the amounts he put in was “16L short.”
[…]
3. The forecasted claim that damage was sustained as a result of the vessel‟s
grounding on a mudbank is not substantiated given that both [Mr CR] and [Mr JK]
will say that the engine operated soundly following the grounding. Had the engine
failed due to water starvation following the grounding […] the engine would have
showed signs of failure before arriving in Southport.
[…]
5. This leads to the conclusion that the only cause for portside engine failure
would be the failure to provide sufficient engine oil – a failure to maintain the boat
in good order and repair.
The grounding did not cause the engine failure
The complainant, on the basis of Mr AB‟s account, says the port engine failed due to water
starvation caused by a grounding on the Mackay to Southport leg of the journey.
Mr AB‟s Marine Incident Report says the boat left Mackay at 12:46pm on 22 July and arrived
in Southport on 25 July at 8:30am. During this time, Mr CR and Mr JK formed the crew with
Mr AB.
None of the crew provide a date or time for the grounding, although both Mr CR and Mr JK
agree it was at night, somewhere after 23 July 2022. However:
Mr CR says Mr AB ran the boat aground on a sandbank at the south end of Moreton Bay,
just short of Southport but
Mr JK says the boat was grounded in the G S Strait.
Despite this discrepancy, both Mr CR and Mr JK say, following the grounding on the
sandbank, both motors continued to work properly and there were no issues on the remainder
of the trip to Southport. Mr CR puts the grounding at approximately 3 hours prior to arriving in
Southport, whereas on Mr JK‟s account it would have been much longer.
The complainant says:
In response to the claim that the engine operated soundly following the grounding,
if you have any knowledge of engines and how they operate, and I am a retired ex
motor mechanic, then you would know that the engine can still operate for a
limited amount of time because the vent was only partly closed, as you can see
by the photo that I supplied from the diver that I paid to investigate which showed
a big chunk out of the rudder. I presume that [Mr GK] and [Mr JK] are qualified
engineers to make this assumption.
The engine only failed the next day after they left Southport. Fifteen minutes after
they left Southport, the engine failed and they were towed back in and I had a
phone call from [Mr AB] that the engine had failed. If they did not decide to stop at
Southport the engine would have seized out at sea.
Determination | Case number: 978480 Page 12 of 24
As a preliminary issue, the underwater photograph taken by the diver and relied on by the
complainant is inconclusive of damage being caused by the grounding. This is because:
while the photograph shows a chip out of the edge of a metallic blade, it is not clear what
the blade is (either a propeller or rudder)
the chip could have been pre-existing as:
> Mr AB‟s photograph of the rudder in the inspection report:
‒ is insufficiently detailed to exclude pre-existing damage and
‒ is not the same rudder as in the underwater photographs as it is affixed to the hull,
rather than a propeller and
> Mr AB‟s inspection report only shows a picture of one off the propellers, not both.
Even if I were to accept the rudder was damaged in the grounding, according to the timeline
in section 3.2, it is more likely than not the engine seized on 27 July 2022 on the first attempt
by Mr AB and Mr GK to leave Southport.
This is two days after the grounding, likely around 5am on 25 July 2022. According to Mr AB‟s
Marine Incident Report dated 8 August 2022:
there is no mention of the grounding or any issue with the engines prior to docking with the
fuel barge at 8:30am on 25 July 2022
after refuelling, Mr AB started the engines and took the boat to its visitor‟s berth for an
inspection „for imminent danger or failures to any mechanical systems‟
on 27 July 2022, Mr AB decided to put more fuel in the boat and it was while heading to
the fuelling dock the issues with the port-side engine started and
on inspection of the port engine by Mr AB at some time after 1:40pm on 27 July 2022, Mr
AB noted:
There were excessive oil leakages from the engines‟ gaskets and salt water
backwashed into the exhaust manifold, which swamped the glow plugs. I believe
that the engine had seized, therefore the engine could not be started or deemed
to be safe. At this point the steering system of the vessel had seized as it is
operated by the port engine.
There is no evidence from Mr AB the engine had seized due to water starvation arising from
the grounding as asserted by the complainant.
The engine seized due to a lack of oil
However, at this point, Mr CR and Mr JK had been replaced on the crew by Mr GK. Mr GK
relevantly told the insurer‟s investigator:
Q 49 Now when you took the vessel over did both motors work?
A When I drove the vessel off the wharf both motors were running [Mr AB]
had assured me that all the oils and everything were right I had spent several
hours the day before when I arrived up there and he was just giving me a tour re-
tensioning all the belts and everything on the engines because both engines were
just covered in black dust because [Mr AB] had fitted new belts to everything in
Mackay and hadn‟t tensioned it properly. I probably got 50 to 100 metres off the
wharf heading for the fuel wharf at Southport and lost steering and well there was
Determination | Case number: 978480 Page 13 of 24
some rather expensive Maxi Yachts and everything floating around the Southport
rush was all under process, we were lucky not to run into anything and the lost
steering turned out to be that the actual port motor had seized.
Q 50 What caused it to seize do you know?
A Yes, I asked [Mr AB] how the oils were and he told me he checked
everything and I well you know he‟s the engineer, well as far as I knew he was the
owner at this stage, because he told me he‟d boug ht it [the complainant] had lent
him the money and well I, I am up there as a bloody, basically as an assistant so
I‟m not going to take over and start running the engine room and everything and I
really kicked myself for not looking because the reason the engine failed it was 16
litres short of oil.
Q 51 How do you know that?
A Because I put 16 litres in it.
The complainant relevantly queries:
how Mr GK has identified the oil in the post side engine was 16L short and that this caused
the engine to seize when:
> he is not a qualified marine engineer and
> he was not present when Mr AB added the engine oil in Mackay and
why the evidence of Mr GK can be relied on when he should have checked the condition of
the boat when he came on board.
Taking these objections in turn, I note:
Mr GK identified the post engine was 16L short of oil as:
> he added 16L of oil to it
> the interview transcripts show Mr GK is a boat repairer with a boat licence, a deckhand,
a coxswain and holds a Boating Masters 5 certification. I am satisfied he is qualified to
provide an opinion of the cause of the engine failure
> Mr GK does not say Mr AB added insufficient oil in Mackay – merely that the engine
was 16L short despite Mr AB allegedly checking the oil levels and
Mr GK, like the complainant, accepted the representations of Mr AB that he was suitably
qualified and had checked the engines as the boat‟s engineer.
On the basis of the available evidence, I am satisfied it is more likely than not the engine
failed due to a lack of oil. This is more likely than not to have been due to the excessive oil
leakages from the engines‟ gaskets reported by Mr AB in his Marine Incident Report.
The insurer says poor maintenance is excluded
The insurer says the PDS is clear:
You must maintain Your Boat, Trailer, Equipment and Accessories in a good state
of Repair and condition. Any Loss or Damage caused by poor maintenance is not
covered under the Policy. You must also make reasonable efforts to protect Your
Boat, Trailer, Equipment and Accessories from any Loss or Damage. (P. 15)
Determination | Case number: 978480 Page 14 of 24
[…] It shall be the duty of every Insured Person to exercise due diligence to
maintain all insured property in seaworthy condition and reasonably fit in all
respects for the intended use of such insured property (P. 36)
and the complainant, via his representative Mr AB, failed to do so. It has denied the claim for
the engine damage on this basis.
I am satisfied, whether or not the cause of the shortage of oil was a failure to add sufficient
oil, a failure to identify the rate of the consumption of oil correctly, or a failure to address the
excessive oil leaks, this amounts to „poor maintenance‟ and a failure to „maintain all insured
property in a seaworthy condition‟ as contemplated by the policy wording in the P DS.
The insurer is therefore entitled to rely on this exclusion to deny the claim for the port engine.
The insurer says mechanical breakdown is excluded
In addition, the insurer also relies on the exclusion in the policy which says cover will not be
provided for „Mechanical Breakdown‟ (see section 3.3 of this determination), being damage to
the boat‟s motors unless an exception applies.
According to the available evidence:
the motors were reconditioned in 2013 and are therefore more than 5 years old and
no service records have been provided
therefore, I am satisfied the exception to the exclusion does not apply and the insurer is
entitled to rely on the exclusion as an additional basis to deny this claim.
The witness reports describe the storm and damage differently
In his Marine Incident Report, Mr AB relevantly describes the night of the storm as follows:
On 29 July 2022 we hit another extreme heavy storm, time of the storm was
15:07. Coordinates South 31.01°, East 153.04°. The swells and the winds were
raising the vessel to the point of tip over. Two swells came in and swamped our
bow which the freaky wave raised as high as the flybridge, approximately 7.5m
swells, raised over the top which swamped all the batteries and solar panels, fuel
tanks that were a part of the tender boat. The outboard lid at this point had come
off the engine and the engine was swamped, full of salt water inside. The hot
water system was submerged, and we had no hot water. At this point the
generator stopped operating. The bilge pumps of the vessel stopped operating.
The windscreen wiper ceased to work. The radar and navigation system switched
off. We managed to turn on the GPS, but the radar had failed, and we were in the
middle of nowhere in the middle of a storm unable to stop. If we had stopped the
vessel, the vessel would have capsized, and we would have had to deploy the life
raft for our crew safety.
At this point I made a decision to steer the vessel to starboard and aim for
Korogoro Track, Hat5 Head, NSW 2440 […] I was so traumatized that I had to
make some serious navigational decisions, using compass and chart, as the radar
system had failed. I did not sleep for four days, I was extremely hallucinating and
going through panic attacks. The afternoon after the storm passed, I made the
decision to up anchor and start proceeding towards Port Macquarie.
Determination | Case number: 978480 Page 15 of 24
[…] We made it to Sydney Harbour on Sunday 31 August 2022 and we logged off
Marine Rescue at 17:15.
I assessed all damages at this point […] I discovered at this point that all solar
panels, winch batteries, outboard cover, tender were damaged due to the storm
we experienced two days prior to arriving in Sydney Harbour.
Mr GK relevantly says:
Q 75 And with all the storm damage, what are the circumstances of that
you just got hit by a rogue or a big wave?
A What I was saying with the boat being burying it‟s bow into the sea it
went, it didn‟t get hit with a rogue wave it dived it‟s nose into a wave that was less
than one metre high and quite honestly my opinion for the batteries and
everything going over the side in that occasion was that none of it was ever
secured properly.
Q 76 It should have withstood that if it had been properly maintained and
secured?
A Oh yeah well it wasn‟t enough to, it, the boat lurched fairly hard a lot of
stuff came off went flying off the roof but there was a lot of materials up there and
stuff that were just stored there and weren‟t, weren‟t properly latched down, well
I‟d commented to [Mr AB] about it before we left Southport, and he said no, n o, it‟s
all fine it‟s all covered this way nothing‟s moved, and but well, it wasn‟t a violent
enough lurch to have thrown people off their feet or anything like that. It was just
well quite simply the boat just had a very bad rolling motion.
[…]
Q 89 The storm damage you believe that happened?
A The only thing that was damaged by the storm was the battery pack for
the lifting of the dinghy onto the roof, and a few things that went overboard with it
which I don‟t even know what they were.
[…]
Q 99 Were you concerned at any stage for your safety due to the
condition of the boat?
A No. No. No if there had been any concerns at all about the actual safety
to the point that it could suddenly sink or anything like that I wouldn‟t have taken it
to Sydney, simple as.
Q 100 Was it a difficult trip back to Sydney?
Determination | Case number: 978480 Page 16 of 24
A It was a difficult trip back to Sydney in that [Mr AB] was just kept going to
pieces and basically wanted off the whole way, other than that it would‟ve just
been a challenging trip back, it was an interesting trip it would have been it was,
there was no absolutely the only threat to my safety was when [Mr AB] was on the
helm and doing silly things. Although to be totally prudent the reason I anchored
up at Point Corrogera and didn‟t go back to the Manning River at Southport
Rocks, oh not the Manning, the Macleay River I should say, the only reason I
didn‟t go back to the Macleay and tie up at Jerseyville Trawler Wharf was that with
all the issues that had happened by that stage no compass, no bilge pumps
working, the generator not working and everything else, I was basically under the
point that the minute I returned to a port I couldn‟t legally or morally take it back
out again, there was too many problems.
The insurer says some of the claimed storm damage was pre-existing
Turning to the second claim for damage as a result of the storm on 29 July 2022, as noted
above, the complainant has claimed for:
the anchor winch
2 x CAT engines one is seized and the other not operating rattling and noisy
generator not working
bilge pumps not working, cause of excessive oil in bilges
radar and navigation systems had been switched off and were inoperable due to storm
damage
hydraulic steering inoperable because of rudder damage and
solar panels missing off top of vessel.
Relying on the interviews with Mr CR and Mr JK (as set out above in section 2.1), the insurer
has denied the claims for the anchor winch, generator, bilge pumps, radar, navigation
systems and hydraulic steering as being pre-existing damage which was not caused by an
Occurrence while the policy was in effect.
As noted above, the complainant says the evidence from Mr CR and Mr JK should not be
accepted due to the ill-will between them and Mr AB, and due to their lack of qualifications.
The AFCA approach to conflicting evidence is clear
The AFCA Operational Guidelines to Rule A.14.3 detail how AFCA will treat conflicting
evidence. The Operational Guideline relevantly says:
We have an obligation to conduct our enquiries and resolve complaints in a way
that draws out the facts and is fair to the parties. Particularly where there is
conflicting information provided by the parties, we may need to consider the
weight to give to various information provided to us, whether assertions or
documentary material. This also depends on the reliability of the information.
The reliability of information depends on the nature and source of the information
and how it was obtained. Generally, in the absence of any other compelling
factors:
Information from an independent source is more reliable than information
from a party that has an interest in the outcome of the complaint.
Determination | Case number: 978480 Page 17 of 24
Opinion by an expert with specialised knowledge, or experience, is more
reliable than opinion by a less-qualified expert.
Information that has controls over its creation and maintenance is more
reliable than information without these.
Contemporaneous notes are more reliable than an oral recollection.
Originals are more reliable than copies.
Information from one source that is consistent with information from
another source is more reliable.
In this context, I am satisfied:
Mr CR and Mr JK have no interest in the outcome of the complaint
Mr CR and Mr JK are more qualified than Mr AB as:
> Mr CR has 30 years‟ experience in transporting vessels around Australia and has
recreational boating licence
> Mr JK hold a qualification as a coxswain and is qualified to drive commercial vessels up
to 12 metres and
> there are significant doubts about Mr AB‟s qualifications, if any, as set out above.
Mr CR and Mr JK voluntarily provided their statements to the insurer‟s investigator through
interview, whereas Mr AB has been uncooperative and
the information provided by Mr CR and Mr JK is broadly consistent with each other, and
with the interview provided by Mr GK.
The insurer may deny part of the claim on the basis of pre -existing damage
On the available evidence, I am satisfied the claim for the anchor winch, generator, bilge
pumps, radar, navigation systems and hydraulic steering as being pre-existing damage which
was not caused by the storm, or by any other Occurrence while the policy was in effect.
The insurer may also deny the claim for the solar panels
The insurer points to Mr GK‟s account that the batteries and other items which were washed
overboard during the storm were not secured properly as a breach of the obligation in the
policy to make reasonable efforts to protect the Boat, Trailer, Equipment and Accessories
from any Loss or Damage.
Mr AB‟s account does not demonstrate the claimed items were properly secured and Mr GK‟s
account is clear that the items were not secured enough to be able to withstand a minor wave
which was not violent enough to have thrown people from their feet.
On the basis of Mr GK‟s evidence, I am satisfied it is more likely than not the claimed items
were not properly secured and therefore the insurer is entitled to deny the claim for the solar
panels and other lost items.
2.4 Is the complainant entitled to non-financial loss?
No. There is insufficient evidence to show the insurer unduly delayed the resolution of the
claim, or caused the complainant an unusual amount of stress or inconvenience.
AFCA may award non-financial loss compensation
AFCA may award, in certain circumstances, non-financial loss compensation up to a
particular limit. For this complaint, the limit is $5,400.
Determination | Case number: 978480 Page 18 of 24
However, AFCA will only award compensation for non-financial loss where there has been an
unusual amount of physical inconvenience, time taken to resolve a situation, or interference
with the complainant‟s expectation of enjoyment or peace of mind.
In assessing whether to award compensation, AFCA expects the complainant to be
moderately robust, bear the normal degree of inconvenience experienced when a problem
occurs, and take reasonable steps to minimise the inconvenience suffered.
The claim took 8 months to reach a decision
The complainant says it took the insurer 9 and a half months to deny the claim. The claim
was lodged on 13 September 2022 and the claim outcome letter was dated 4 May 2023 – a
period of 8 months.
Under the General Insurance Code of Practice (the Code), an insurer normally has 4 months
to make a claim decision, unless paragraph 78 applies. This paragraph relevantly says:
78. In circumstances where:
a. […];
b. your claim is fraudulent, or we reasonably suspect it is fraudulent;
c. you do not respond to our reasonable inquiries or to our requests for
documents or information about your claim;
d. we have difficulty communicating with you about your claim due to
circumstances beyond our control; or
e. […];
then within 12 months of receiving your claim we will tell you our decision in
writing. If we cannot make a decision within 12 months, we will tell you in writing
about our Complaints process.
The insurer says there were delays throughout the claim in respect to the investigations
process and in interviewing the delivery crew. The complainant‟s broker was informed that the
crew were unavailable to be interviewed until mid-January 2023.
In particular, Mr AB declined to be interviewed and it took some time for Mr GK to be located
to be interviewed as he was travelling for work.
I accept these issues fall within the circumstances described by paragraph 78 and therefore
the time taken by the insurer was not a breach of the Code.
The complainant says he suffered stress and ill health
The complainant says the claims process has left him with an unmovable boat, mental health
and lots of financial problems.
The claim notes show the complainant advised the insurer that the claims process has had an
adverse effect on his health and is taking anti-depressants. The insurer accepted the
complainant was experiencing these circumstances and identified him as a vulnerable
person.
Determination | Case number: 978480 Page 19 of 24
There is insufficient evidence to show the insurer caused the issues
However, the complainant has not provided any evidence supporting his claim that the mental
and financial problems he experienced were caused by the unreasonable conduct of the
insurer.
While, I am satisfied it is more likely than not the complainant did suffer some form of financial
hardship and mental health issues, these were more directly caused by the actions of Mr AB,
as described above, and not the insurer.
In these circumstances, I am not satisfied it is appropriate to award non-financial loss
compensation.
2.5 Why is the outcome fair?
While I sympathise with the complainant‟s position, this was predominantly caused by trusting
an unsuitable person, Mr AB, to undertake a series of tasks which required more experience
and expertise than Mr AB could bring to the situation. This caused a series of breaches of the
insured‟s obligations under the policy and therefore it is fair in all the circumstances for the
insurer to deny the claim.
Determination | Case number: 978480 Page 20 of 24
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.
3.2 Chronology
Timeline of relevant events
Events are taken from the interviews conducted by the insurance investigator and the Marine
Incident Report completed by Mr AB. Attribution is given in parentheses after each entry.
Date Event
2 7 June 2022 The complainant put a $ 6,500 deposit on the boat (COM)
7 July 2022 Mr AB completes the Marine Craft Insurance Risk Evaluation (AB)
Determination | Case number: 978480 Page 21 of 24
18 July 2022 Mr AB, Mr CR and Mr JK arrive at Mackay Marina (AB)
19 July 2022 Mr AB orders new filters, motor oil, coolant, diesel filters and engine
treatment lubrication to service engines and begins three - days of
servicing and make ready (AB)
20 July 2022 Mr AB and Mr CR take the boat for a test drive (AB)
22 July 2022 Mr AB, Mr CR and Mr JK leave Mackay on the boat (AB)
25 July 2022 The boat arrives in Southport (AB)
26 July 2022 The complainant bought the boat (COM)
Mr GK arrives in Southport (GK)
27 July 2022 Mr AB tells the complainant they would leave the following day due to
the wind (COM)
The boat is ground ed between Mackay and Southport (COM)
Dispute between Mr AB and Mr CR and Mr JK about the grounding
(COM)
The boat docks at Southport to disembark Mr CR and Mr JK a nd
refuel (COM)
Mr GK embarks on the boat and sets off with Mr AB, but the steering
failed within 50 - 100m of the wharf due to the port engine seizing (GK)
Mr AB and Mr GK adjust the motors to operate the boat on a single
motor (GK)
Mr AB refuelled and en r oute to the fuelling dock, experienced
steering issues and portside engine problems (AB)
28 July 2022 Mr GK embarks at Southport and the boat sets off, but the port engine
fails 10 - 15 min out of Sou thport Marina, requiring the boat to be towed
back to port (COM)
The boat leaves Southport (AB)
The boat is caught in a severe storm and shelters in a cover overnight
behind Hat Head Point (GK)
29 July 2022 T he boat is caught in a severe storm and shelters in a cove (COM)
The boat is cau ght in an extreme storm at 15:07 and makes for the
Hat Head Point cove. (AB)
Determination | Case number: 978480 Page 22 of 24
30 July 2022 Mr AB notifies the complainant of the extreme weather and need to
anchor in the cove at 6:45am . (AB)
31 July 2022 The boat arrives in Sydney at 17:15 (AB)
1 August 2022 The boat arrives in Sydney (GK)
The boat arrives in Sydney (COM)
3.3 Relevant policy terms
Part IA – Your Obligations
KEEP INSURED PROPERTY IN GOOD CONDITION AND
REPAIR AND ALWAYS PROTECT THEM
You must maintain Your Boat, Trailer, Equipment and Accessories in a good state
of Repair and condition.
Any Loss or Damage caused by poor maintenance is not covered under the
Policy. You must also make reasonable efforts to protect Your Boat, Trailer,
Equipment and Accessories from any Loss or Damage.
If You make a claim and knew about something that could cause Loss or Damage
to Your property and You did not make reasonable efforts to avoid it before the
Loss, or Damage occurred, then Your claim may not be paid. If You do suffer
Loss or Damage You must also make reasonable efforts to prevent any further
Loss or Damage.
Part III – Property Coverage
A. INSURING AGREEMENT
This Policy covers You against risks of direct Physical Loss or Damage to Your
Boat, its Contents, and Personal Effects while on board Your Boat caused by an
Occurrence. This coverage is subject to the Geographic Limits and all Policy
terms, Policy conditions, Policy exclusions and written endorsements.
[…] Partial Damage to Your Boat
If Your Boat is partially damaged, We will pay the Reasonable Costs to Repair
Your Boat to as near as possible to its Market Value, appearance, and condition
immediately prior to the Occurrence, with materials of like kind and quality. The
Determination | Case number: 978480 Page 23 of 24
most We will pay is Your Boat‟s Sum Insured. We will not pay for any
improvement or betterment to Your Boat.
For a covered Loss to Your Motors, if Your Motors are five years of age or less,
We will pay the Reasonable Costs to Repair or replace Your Motors without
deductions for depreciation up to the Market Value of Your Motors.
When We pay a partial Loss, We reserve the right to keep the remains, or the
proceeds of sale, of any parts removed from Your Boat in connection with the
Repair of a partial Loss, if any, up to the amount of such payment.
B. GENERAL CONDITIONS
We will not be liable to pay any claim under this insurance unless You and any
Insured Person comply with all the requirements in the following conditions.
[…] • Due Diligence
It shall be the duty of every Insured Person to exercise due diligence to maintain
all insured property in seaworthy condition and reasonably fit in all respects for
the intended use of such insured property.
F. PROPERTY EXCLUSIONS
These exclusions apply to PART III – PROPERTY COVERAGE.
There shall be no coverage under PART III – PROPERTY COVERAGE for any
coverage specified in PART III for Loss or Damage, claim or expense attributable
to or resulting directly or indirectly, in whole or in part or in combination with any
other cause or causes from or in respect of:
[…] • Mechanical Breakdown
Any Ph ysical Loss or Damage to Your Boat‟s Motors in connection with
Mechanical Breakdown. However this exclusion does not apply if all of the
following apply:
1. Your Motors have been manufactured within the last 5 years;
2. Your Motors have been regularly serviced and maintained in accordance with
the manufacturer‟s recommendations, and You can provide copies of records of
that service;
3. Your Motors are not covered under the manufacturer‟s original warranty or any
extended warranty; and
Determination | Case number: 978480 Page 24 of 24
4. The Physical Loss or Damage did not result from the failure of maintenance
items such as seals, gaskets and filters
Any claim that We accept for Mechanical Breakdown will be subject to an Excess
of 10% of the total Motor claim or the Excess named in this Policy, whichever is
greater. […]
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.