Determination 978403

Quality of contractor repairs, sarking repair and compensation for claim handling

FirmIAG
Decided2024-04-08
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded—
Non-financial loss$4,000
Amount claimed—
SourceAFCA PDF

Summary

Complainants' storm damage claim was accepted but the contractor's repairs were deficient and incomplete after over two years. AFCA required the insurer to complete the rectification works and pay $4,000 non-financial loss, but rejected the demand to replace the sarking.

The insurer must complete agreed rectification and compensate for unusual inconvenience and delay under AFCA Rules D.3, but replacing sarking by demolishing brick walls was not fair or reasonable given the batts remedy.

Issues

Subjects and remedies

home or building damagenatural disasterpay non financial lossrepair or rectify

Related

All IAG determinations · Find similar determinations

Text of the determination

Determination Case number 978403 Financial firm Insurance Australia Limited Determination | Case number: 978403 Page 2 of 6 Case number: 978403 28 March 2024 1 Determination overview 1.1 Complaint The complainants hold a home insurance policy with the financial firm (insurer). On 27 February 2022, they lodged a claim for damage to the property following a storm. The insurer accepted the claim and authorised its contractor, BB, to complete the repairs. A dispute arose regarding the quality of the contractor’s work . The insurer appointed a second builder, PG, to assess BB’s work. It was agreed that some of the concerns raised by the complainants were valid and required rectification (rectification works). The complainants also say there are further outstanding repairs relating to the wall wrap/sarking (further repairs). In addition to the rectification works and further repairs, the complainants are also seeking compensation for the insurer’s handling of the claim. 1.2 Issues and key findings Has BB completed the repairs properly? No. The insurer is required to complete the rectification works in a timely manner. Are further repairs required in relation to the sarking? No. The insurer is not required to carry out any further repairs in relation to the sarking. While the damage to the sarking is unfortunate, the installation of the insulation batts has restored the walls to the pre-damage position as far as is reasonable practicable. Is compensation warranted in the circumstances? Yes. The insurer is required to pay $4,000 in non-financial loss compensation. Why is the outcome fair? The insurer has provided a reasonable solution for the damaged sarking. It would not be fair or reasonable in the circumstances to demolish the brick walls to replace the sarking. However, the insurer is yet to properly complete the repairs which it previously agreed to cover. Therefore, the insurer is required to pay compensation. 1.3 Determination This determination is partially in favour of the insurer. If the complainant accepts the determination, the insurer is required to:  complete the rectification works in a timely manner; and  pay the complainant $4,000 in compensation within 14 days of being advised of the complainant’s acceptance of the determination. Determination | Case number: 978403 Page 3 of 6 2 Reasons for determination 2.1 Has BB completed the repairs properly? No. The insurer is required to complete the rectification works in a timely manner. Insurer accepts that additional work is required after BB repairs The complainants say various further works are required at the property. They obtained their own building report to document these defects. The complainants also say the insurer agreed to address the remaining issues once they moved back in to the property, but this never occurred. The insurer obtained its own report from PG dated 23 February 2023 regarding the repairs completed by BB. PG says various rectification works are required which comprise new variations to the original scope of works, works that have not been properly completed by BB and defects in the work performed by BB. It states that the works completed by BB are largely acceptable but there is widespread evidence of minor deficiencies which should have been addressed before the complainants moved back into the property. There is currently no dispute regarding the rectification works. The complainant has agreed to the PG scope of works. Therefore, the insurer is required to complete the rectification works in a timely manner. Should the insurer fail to complete the rectification works or fail to do so in a timely manner, the complainants may lodge a new complainant with AFCA in relation to these issues. 2.2 Are further repairs required in relation to the sarking? No. The insurer is not required to carry out any further repairs in relation to the sarking. While the damage to the sarking is unfortunate, the installation of the insulation batts has restored the walls to the pre-damage position as far as is reasonable practicable. Parties disagree about repair of sarking In relation to the sarking, the insurer relies on the findings of PG who says:  the building is of brick masonry veneer construction with a wall cavity of approximately 40mm. Therefore, there is no need or a water barrier to the inside face. Further, it is likely the pliable membrane was fitted solely for its thermal capacity (to meet energy efficiency ratings) rather than to act as a water barrier;  the inner silver layer presents with delamination, but the outer blue polymer appears intact and undamaged. BB has advised that it mitigated the delaminated inner silver/aluminium lining by installing wall insulation batts, acting as a substitution to the compromised thermal inner layer of the pliable membrane, to the lower 1200 mm off finish floor level;  the weatherproofing of the building has not been compromised by the delamination of the pliable membrane. The thermal properties or insulation rating also has not been affected during the restoration and building repair process;  it does not recommend any further action by the insurer or the builder in relation to the pliable membrane; and  the building has been reinstated to a better thermal rating than it had prior to the storm event with regards to the lower 1200mm area. Determination | Case number: 978403 Page 4 of 6 The complainants say BB damaged the sarking in the process of completing the repairs. It then installed the insulation batts in order to mitigate the damage but did not replace the moisture barrier the membrane provided. That is, they say that the damage to the silver lining has compromised the outer blue sarking. Further, the complainants say they have lost the opportunity to have both sarking and insulation (batts or in some other form) in the future should they wish to increase the thermal efficiency and upgrade the insulation. In order to remedy the damage, they say the brick wall should be demolished and all sarking replaced. In support of its position, the complainants have provided an email from a technical advisor at an insulation manufacturer which says: If the membrane has delaminated and/or damaged, the performance of said product cannot guarantee for the intended purpose … Insurer not required to carry out further repairs in relation to sark ing I accept that during the repair process the silver sarking has been damaged. This was very unfortunate. However, I note that BB installed insulation batts to counteract the loss in thermal capacity. On balance, I am satisfied that there has been an adequate resolution of the damage to the silver lining by reason of the installation of the insulation batts. This is because:  there is no evidence that the outer blue sarking moisture barrier was damaged. The images provided suggest it is still intact;  there is insufficient evidence to establish that if the silver sarking is damaged that the blue outer sarking will be compromised. The onus is on the complainant to show a claimable loss in relation to the outer sarking. This onus has not been met;  any lost thermal capacity due to the damage to the inner silver sarking has been remedied by the installation of the batts;  I accept PG’s evidence that following the installation of the batts, the thermal capacity has in fact increased such that it is higher than what it was prior to the storm event or the damage;  the insurer is required to restore the complainant to as close as possible a position as they would have been in prior to the event. I consider this also applies where the repairs have caused damage to the property. The presence of damage due to repairs (rather than an insured event) does not increase the insurer’s o bligations; and  PG say it would be necessary to demolish the brick wall in order to fully replace the sarking. I do not consider this is fair or reasonable when, effectively, the insurer’s method has completely mitigated the damaged sarking. Therefore, I do not consider the insurer is required to carry out any further repairs in relation to the sarking. I am satisfied that the installation of the insulation batts is a reasonable and fair remedy for the damaged silver sarking. Accordingly, the insurer is not required to take any further action in relation to the sarking. 2.3 Is compensation warranted in the circumstances? Yes. The insurer is required to pay $4,000 in non-financial loss compensation. AFCA may award compensation in certain circumstances Under paragraph D.3 of the AFCA Rules, we may award compensation for non-financial loss (capped at $5,400) where the insurer’s actions have caused an un usual amount of: Determination | Case number: 978403 Page 5 of 6  physical inconvenience;  time taken to resolve the situation; or  interference with the complainant’s expectation of enjoyment or peace of mind. We take a conservative approach to compensation for non-financial loss. It is not awarded when a person suffers the normal degree of inconvenience when a problem occurs. Compensation is warranted in the circumstances The date of loss is 27 February 2022. The complainants lodged a claim that day. It is now over two years later and the damage which the insurer accepted cover for still has not been repaired in full. Further, some of the repairs carried out have not been properly completed and further damage has been caused to the property in the course of completing the repairs. The insurer has acknowledged the issues with its claims handling and offered the complainants $2,000 by way of non-financial loss compensation. I do not consider this is sufficient in the circumstances. This is because the insurer’s actions have caused a significant and higher than normal degree of inconvenience and stress. There has also been a significant delay in the completion of the repairs and it is still not known when all rectification works will be completed. Therefore, the insurer should pay the complainants $4,000 in non-financial loss compensation. 2.4 Why is the outcome fair? The insurer has provided a reasonable solution for the damaged sarking. It would not be fair or reasonable in the circumstances to demolish the brick walls to replace the sarking. However, the insurer is yet to properly complete the repairs which it previously agreed to cover. Therefore, the insurer is required to pay compensation. Determination | Case number: 978403 Page 6 of 6 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided. While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.