Determination 977844

Adequacy of cash settlement after earlier AFCA determination for escape of liquid damage, and compliance with that determination

FirmSuncorp Group
Decided2024-02-23
ProductGeneral Insurance · Home building and contents
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed$200,000
SourceAFCA PDF

Summary

After an earlier AFCA determination, the insurer paid a cash settlement of $61,698.09 for escape of liquid damage. The complainant said it was inadequate and sought over $200,000; AFCA found the insurer complied and the settlement was fair, requiring no further payment.

The cash settlement was calculated per the previous determination from an actionable quote plus 20% contingency, and later higher quotes covered non-claim-related work and were prepared years later.

Issues

Subjects and remedies

home or building damageno remedy

Related

All Suncorp Group determinations · Find similar determinations

Text of the determination

Determination Case number 977844 Financial firm AAI Limited Determination | Case number: 977844 Page 1 of 6 Case number: 977844 23 February 2024 1 Determination overview 1.1 Complaint The complainant ’s wife holds home building insurance with the financial firm (insurer). On 19 June 2018, the complainant lodged a claim on her behalf for movement damage caused by escape of liquid (EOL). As he was dissatisfied with the insurer’s claim response, he lodged a complaint with AFCA - case number 667423. On 11 May 2021, AFCA issued a determination in that case that was substantially in favour of the complainant (previous determination). The previous determination set out the process by which a cash settlement was to be calculated and paid. The complainant accepted the previous determination. On 3 August 2021, the insurer paid $61,698.09 as a cash settlement. The complainant says that amount the insurer paid is insufficient because he has been unable to find a builder prepared to undertake the repairs for that amount. He also says the insurer has failed to comply with the previous determination. The complainant seeks over $200,000 in total from the insurer. 1.2 Issues and key findings Has the insurer complied with the previous determination? Yes. The insurer has established that it complied with the obligations and requirements imposed upon it by the previous determination. Was the cash settlement paid fair and reasonable? Yes. The complainant has not shown the insurer ’s cash settl ement payment amount was miscalculated or was otherwise inadequate to cover the cost to repair the damage AFCA found was a direct result of the claimed EOL event. Why is this outcome fair? The cash settlement was calculated in accordance with the previous determination and reflected the reasonable cost of claim related repairs at the time it was paid. Therefore, it would not be fair to require the insurer to pay the complainant an additional amount. 1.3 Determination This determination is in favour of the insurer. The insurer is not required to pay an additional amount to the complainant. Determination | Case number: 977844 Page 2 of 6 2 Reasons for determination 2.1 Has the insurer complied with the previous determination? Yes. The insurer has established that it complied with the obligations and requirements imposed upon it by the previous determination. Previous determination outcome On 11 May 2021, AFCA issued the previous determination, pursuant to which the EOL claim was to be resolved in the following manner:  the insurer engages IL, or another independent engineer if IL is not available, to complete a scope of works to repair the NW [north western] damage IL concluded was caused by the leak  if an independent engineer is engaged, it should be one agreed to by the parties. This can be done by the insurer providing a list of three engineers that the complainant can choose one from. Alternatively, the complainant can provide three choices for the insurer to choose one – the engineer’s costs are to be borne by the insurer  once the engineer completes the scope of works, each party can obtain at least one, and no more than two, actionable quotes based on that scope of works. To clarify, an actionable quote is one where the builder is prepared to do the works for the complainant  if only one actionable quote is obtained, then the insurer is to cash settle the claim based on that quote plus a 20% contingency. If more than one actionable quote is obtained, then the insurer is to cash settle based on the average of those quotations with a 20% contingency. The contingency is to address the likely variances that may arise in a complicated job like this and the fact the risks of the works are passing to the complainant. Any amount payable by the insurer is limited by the relevant sum insured. No interest is payable given payment should be based on current rates. If the parties are unable to agree on the final quantum, the complainant can lodge a complaint to AFCA for a decision on this point. On 20 May 2021, the complainant accepted the previous determination, meaning it became binding on the insurer. Insurer says it has complied with the previous determination The insurer says it appointed engineer IL to provide a scope of works (SOW) in accordance with the previous determination. On 8 June 2021, IL reinspected the home. On 9 June 2021, it provided its SOW. On 23 June 2021, builder AB provided a quote totalling $51,831.74 for the claim related repairs, based on IL’s SOW. IL’s SOW and AB’s quote were provided to the complainant on 24 June 2021. The insurer’s claim notes make it clear that the complainant received those documents. Determination | Case number: 977844 Page 3 of 6 On 3 August 2021, the insurer called the complainant as it had not received from him an alternative quote based on IL’s SOW . The insurer advised the complainant that, in accordance with the previous determination, it would pay a cash settlement based on AB’s quote payment plus a 20% contingency uplift. The insurer sent a confirmatory letter that day. On 5 August 2021, the insurer paid the complainant $61,698.09 ($51,831.74 plus 20% less the $500 policy excess). In an email dated 17 August 2023, AB confirmed that its June 2021 quote ‘would have been relevant and actionable at the time’. AB acknowledged that the only potential fluctu ation would have been to costs for engineer’s plans and permits. The insurer says that is standard, the fluctuation could be up or down, and AB had quoted average rates for those items. The insurer says it has therefore complied with the previous determination. Complainant says insurer has not complied with previous determination On 9 August 2021, the complainant telephoned the insurer and expressed his dissatisfaction with the settlement amount. The insurer’s claim notes show it advised the complainant that if he provided his own builder’s quote, it would reconsider the settlement amount payable. On 13 September 2021 the complainant’s lawyer IR contacted the insurer and advised that the complainant would be obtaining an actionable quote. A second email was received from IR on 21 September 2021 advising the complainant was unable to provide a quote due to COVID-19 restrictions. On 15 December 2022, IR emailed to the insurer a quote dated 30 November 2022 for $203,821 from builder FB. The complainant submits that in the circumstances, the insurer has not complied with the previous determination. The basis for that submission appears to be that the insurer has not paid a higher cash settlement based on the information IR provided on 15 December 2022. Insurer has complied with previous determination Based on the exchanged information, the panel is satisfied that the insurer has complied with the previous determination. This is because the insurer:  engaged IL to prepare a SOW to repair the EOL related damage to the north western corner of the home  obtained a quote from AB for the claim related repairs based on IL’s SOW. AB has confirmed its quote was actionable as at 23 June 2021  promptly provided the complainant with a copy of IL’s SOW and AB’s quote  gave the complainant a reasonable opportunity (over a month) to obtain an actionable builder’s quote based on IL’s SOW  paid a cash settlement based on AB’s quote plus a 20% contingency uplift. The panel acknowledges that AB’s allowances for engineer’s plans and permi ts were somewhat contingent. However, that was dealt with in the previous determination by the application of the 20% uplift. The panel also accepts COVID-19 restrictions were in place in September 2021. However, the previous determination made clear that the quotes to be obtained were to be based on IL’s SOW . The complainant has not explained why a physical inspection was required to obtain a quote based off an already completed SOW. In any event, the compl ainant’s main concern is the cash settlement payment ’s adequacy . Determination | Case number: 977844 Page 4 of 6 2.2 Was the cash settlement paid fair and reasonable? Yes. The complainant has not shown the insurer’s cash settlement payment amount was miscalculated or was otherwise inadequate to cover the cost to repair the damage AFCA found were a direct result of the claimed EOL event. Complainant says cash settlement amount is inadequate On 15 December 2022, IR sent the insurer FB’s quote dated 30 November 2022 for $203,821. The insurer advised the complainant it was unable to accept FB’s quote. The insurer noted that the quote was based off a new SOW which the complainant had obtained independently and not based off IL’s SOW as per the previous determination. On 27 September 2023, the complainant submitted a copy of IL’s SOW dated 9 June 20 21 marked up with costings. The complainant said the costings had been provided by FB. The total was $230,940 - $152,170 for structural works and $78,770 for remedial works. The complainant says he has been unable to find a builder prepared to undertake the repairs for the cash settlement the insurer paid. He says that the costings FB has provided establish the cash settlement payment was inadequate. Insurer says the cash settlement payment is adequate The insurer says that notwithstanding that it paid the cash settlement in accordance with the previous determination, and that FB’s 30 November 2022 quote was not based on IL’s SOW, it arranged for further investigations to be undertaken. On 9 February 2023, plumber LV attended the home and performed leak detection testing and inspected the drains by CCTV. LV concluded that there were issues with leaks and water pooling on surfaces, all of which were long term and due to lack of maintenance. The insurer also obtained a report dated 9 February 2023 from HC, geotechnical consultant. HC concluded: In my opinion based on the boreholes and testing completed that there are leaking services and / or poor site drainage at the site. The moisture that has been encountered is from the current leaking services and poor site drainage not the previous leak reportedly from 5 years ago. According to the insurer, the reports from LV and HC show that the ongoing issues with the home are not claim related. In relation to the copy of IL’s SOW said to have been marked up with FB’s costings, the insurer says the costing is not an actionable quote because no business name, letterhead or ABN has been provided. There is also insufficient breakdown provided to enable assessment of whether reasonable industry rates have been applied. The insurer relies on AB’s email dated 17 August 2023 in submitting that the cash settlement it paid on 5 August 2021 reflected the reasonable cost of claim related repairs at the time. Determination | Case number: 977844 Page 5 of 6 Cash settlement payment was fair and reasonable A cash settlement must be based on a reasonable quote for claim-related repairs, actionable by a retail customer. An uplift is then to be applied to the quoted amount to allow for contingencies and the loss of the lifetime guarantee that applies to insurer approved repairs. In the previous determination, AFCA required the insurer to obtain from IL or another independent engineer a SOW for claim related repairs to the north western corner of the home. Following reinspection of the home, IL provided its SOW on 9 June 2021. On 23 June 2021, AB provided a quote based on IL’s SOW. AB has confirmed that the quote ‘would have been relevant and actionable at the time’. The panel is not persuaded that the complainant has shown AB’s quote had been miscalculated or was otherwise inadequate as at mid-2021. This is because:  the insurer has provided expert reports showing while the home continues to have issues, these are not claim related, but are due to lack of maintenance  FB’s quote dated 30 November 2022 was prepared 16 months after the cash settlement was paid and was based on a current SOW that went beyond claim related damage  the costings the complainant submitted on 27 September 2023 cannot be relied upon for the reasons the insurer has outlined. The panel also notes the costings have been prepared more than two years after the cash settlement was paid. Accordingly, the panel is satisfied that the cash settlement the insurer paid on 5 August 2021 was fair and reasonable. 2.3 Why is the outcome fair? The cash settlement was calculated in accordance with the previous determination and reflected the reasonable cost of claim related repairs at the time it was paid. Therefore, it would not be fair to require the insurer to pay the complainant an additional amount. Determination | Case number: 977844 Page 6 of 6 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all the information the parties have provided. While the parties have raised several issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. A panel determined this matter Due to the nature of this complaint, we referred it to a panel for determination. The panel includes:  an ombudsman  a member with significant experience in consumer and small business advocacy  a member with extensive experience in the insurance industry. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.