Water damage claim denied under gradual deterioration/wear and tear exclusion; loss of rent and compensation disputed
Text of the determination
Determination
Case number 977632
Financial firm QBE Insurance (Australia) Limited
Determination | Case number: 977632 Page 1 of 6
Case number: 977632 15 December 2023
1 Determination overview
1.1 Complaint
The complainant is a beneficiary under a residential strata plan insurance policy issued by the
financial firm ( insurer). The policy is issued to the owners’ corporation of a development in
which the complainant owns a unit (unit).
In March 2022, the complainant lodged a claim for water damage that had been occurring for
some time. She says investigations in October 2021 confirmed for the first time that water
was leaking from the unit’s bathroom. She accepts that failed waterproofing is the most likely
cause, and that a burst pipe identified during the investigations did not cause further damage.
The insurer has denied the claim. It says the damage commenced prior to it being on risk and
is due to excluded causes, including gradual deterioration, and wear and tear. However, it
accepts the claim could have been better managed and has offered $4,000 as compensation.
The complainant wants the insurer to accept the claim. She also seeks loss of rent (LOR),
including on the basis the insurer’s delays have caused the unit to remain uninhabitable for
longer than it should have been. Finally, she is dissatisfied w ith the insurer’s offer.
1.2 Issues and key findings
Is the insurer entitled to deny the claim?
Yes. The insurer has established that it is more likely than not the water damage commenced
prior to the policy incepting and is due to causes excluded under the policy terms. This also
means that the requirements for payment of LOR under the policy have not been met.
Is LOR payable outside the policy terms?
No. There were multiple cau ses for the delay experienced, many outside the insurer’s control.
I am therefore not satisfied that it would be reasonable to require the insurer to pay LOR
outside the policy terms.
Is the insurer to pay more in compensation than it offered?
No. To the extent the insurer contributed to the delays experienced and caused the
complainant stress and frustration, its offer represents fair compensation.
Why is the outcome fair?
The outcome is fair because the insurer has shown the claim is excluded, there were multiple
reasons for the delays experienced, and the insurer has offered fair compensation.
1.3 Determination
This determination is in favour of the insurer. Within 14 days of receiving written confirmation
the complainant accepts this determination, the insurer is to pay her $4,000. It is not required
to take any other action.
Determination | Case number: 977632 Page 2 of 6
2 Reasons for determination
2.1 Is the insurer entitled to deny the claim?
Yes. The insurer has established that it is more likely than not the water damage commenced
prior to the policy incepting and is due to causes excluded under the policy terms. This also
means that the requirements for payment of LOR under the policy have not been met.
Complainant is required to show a claimable loss under the policy
The complainant is required to show on the balance of probabilities (that it is more likely than
not), that she suffered a claimable loss under the policy. This means she must show the loss
was caused by a risk for which she is insured.
Subject to the terms and conditions set out in the product disclosure statement (PDS), the
policy covers the complainant’s unit against ‘Damage’ that occurs during the period of
insurance. The PDS defines Damage as:
any partial or total accidental physical loss of, or destruction of property from any
sudden and accidental cause not otherwise excluded by this Policy.
On 11 March 2022, the owner’s corporation’s insurance broker, EI, lodged with the insurer a
claim form signed by the complainant. The claim form included the following details:
Water has been building up in walls and the bath damaging the wall and
cupboards, on 10 March [2022] a pipe burst in the bathroom further adding to the
water damage. Damage in bedroom as well.
The date of loss was noted in the claim form as 10 March 2022.
The complainant subsequently confirmed that in early 2021, the bedroom wardrobe had been
removed as it would no longer adhere to the wall. That wall was very damp and would not
dry. In October 2021, the tenant (the complainant’s brother, JH) began strippin g out the
bathroom to find the cause of the dampness. He identified water coming out of the brickwork.
Once the complainant proves the existence of a claimable loss, the insurer is liable for the
loss unless it shows an exclusion or limiting condition applies. The insurer has the onus of
proving on the balance of probabilities the application of the exclusion or condition.
Complainant says claim should be accepted
The complainant says the water damage was accidental and arose during the period of
insurance running from 13 March 2021 to 13 March 2022.
She acknowledges that there has been water damage to the bedroom wall and wardrobe
since at least 2017 (and more likely dating back ten years or more), but says:
until October 2021, there was no basis on which to lodge a claim as the source of the
water was unknown despite attendances by various trades
in October 2021, JH ’s investigations indicated the water was coming from the bathroom.
According to the complainant, the only certainty is there was water discovered in the bricks in
the bathroom during the period of the insurance. She notes that the insurer’s trades have
Determination | Case number: 977632 Page 3 of 6
determined that the water was in the bricks due to the waterproofing failing, and this most
likely caused the damage the wardrobe in the adjacent bedroom.
The complainant submits that:
It is possible to speculate almost infinitely as to what has happened and when.
Such speculation is unhelpful and obfuscates the unavoidable fact, namely the
failed water proofing was identified during the period of insurance cover from [the
insurer] and the failed water proofing caused damage during the insurance period.
Further, the assessor / assessor’s contractor is unable to demonstrate
conclusively that the water proofing failed outside the period of the insurance
cover from [the insurer].
Insurer says claim is not covered
On 23 March 2022, loss adjuster AS inspected the unit. AS noted that the bedroom wall
dampness from prior to October 2021 was an ongoing issue. It said the burst pipe referred to
in the claim form was li kely the result of JH’s work in the bathroom. As the wardrobe had
been removed and the bathroom stripped out, the burst pipe did not cause any damage.
According to the insurer, difficulties were then experienced in arranging access to the unit for
its trades. As a result, the claim was in abeyance for an extended period.
On 18 January 2023, builder MJ inspected the unit on behalf of the insurer. In MJ’s opinion,
all the damage was the result of failed waterproofing. MJ also said the pipe leak in March
2022 had not caused any resultant damage as the bathroom had already been stripped out
and remained so.
On the same day, plumber DL performed pressure testing on the unit’s pipework. All
plumbing in the unit was confirmed as sound, with no leaks present.
The insurer submits that in the circumstances, the claim is not covered. It says on the
complainant’s own version of events, the damage has been occurring since prior to 2017. The
insurer notes the policy only incepted on 13 March 2017.
The insurer also relies on the following exclusion set out on page 19 of the PDS, which says
the policy does not cover Damage caused by or arising directly or indirectly from:
b. lack of maintenance, rust, oxidation, corrosion, mould, Wear and Tear, fading,
concrete or brick cancer, developing flaws, wet or dry rot, gradual corrosion or
gradual deterioration or, failure to maintain Your Insured Property in a reasonably
good state of repair. This includes when the damage to the Insured Property is
caused by light, air, sand, the climate (which includes wind or rain) or the passage
of time.
The PDS defines ‘Wear and Tear’ as ‘Damage or a reduction in value through age, ordinary
use or lack of maintenance.’
The insurer says that the damage claimed has occurred for an extended period as a result of
the waterproofing failing over time due to gradual deterioration, wear and tear.
Insurer is entitled to deny the claim
Based on the exchanged information, it is more likely than not that:
Determination | Case number: 977632 Page 4 of 6
the damage has been occurring since before 13 March 2017
the damage has continued to occur over an extended period due to gradual deterioration
and wear and tear.
I accept that the precise date on which the likely waterproofing failure occurred cannot be
identified. However, the longstanding and continuing nature of the damage indicates it is
probable the problem has developed gradually over many years.
I also accept that the complainant was not aware until October 2021 that the damage was
due to water escaping from the bathroom (likely the result of failed waterproofing). However,
the exclusion the insurer relies on applies regardless of whether an insured is aware of the
gradual deterioration etc or not.
The insurer has established that it is more likely than not the water damage commenced prior
to the policy incepting and is due to causes excluded under the policy terms. It is therefore
entitled to deny the claim.
LOR policy benefit is not payable
The PDS confirms on page 15 that the policy includes as a special benefit cover for LOR.
However, that cover is only triggered when (relevantly) the insured property is rendered unfit
to be occupied due to an admitted claim for Damage.
As I am satisfied that the insurer is entitled to deny the claim for the water damage, the
complainant is not entitled to payment of LOR under the special benefit.
2.2 Is LOR payable outside of the policy terms?
No. There were multiple causes for the delay experienced, many outside the insurer’s control .
I am therefore not satisfied that it would be reasonable to require the insurer to pay LOR
outside the policy terms.
Complainant seeks LOR due to claim delay
The complainant says that the insurer took too long to progress the claim, with the result that
the unit has remained unrepaired for longer than should have been the case. She says but for
the insurance claim being on foot, she would have attended to repairs long ago. The
complainant says the claim delay has resulted in LOR, which she estimates at $31,000.
She says:
I appreciate that the policy may contain a provision regarding loss of rent in
relation to insurable events. Beyond the policy, the insurer has obligations such
as to respond to claims within a reasonable timeframe. In situations where the
insurer engages in actions that may constitute mishandling, maladministration or
negligence, the insurer has obligations (outside the policy) to [pay] compensation
for losses as a result of the insurer's actions (or lack thereof).
The complainant notes that the claim was lodged on 11 March 2022, but she was not
provided with a claim decision until on or about 13 March 2023.
She concedes that she is not sure who caused or contributed to the delays. However, she
particularly identifies issues in her dealings with SC (an employee of EI), and MS (an
employee of AS).
Determination | Case number: 977632 Page 5 of 6
Insurer is not required to pay LOR
Based on the exchanged information, I am not satisfied that it would be reasonable to require
the insurer to pay LOR outside the policy terms.
I acknowledge that it took 12 months for the insurer to issue a claim decision. However, there
were multiple causes for the delay experienced. They include communication issues with EI
(which was the insurance broker, not a representative of the insurer), as well as problems
finding tim es mutually convenient to the insurer’s trades and JH for attendances at the unit.
As many of those causes were outside the control of the insurer, I am not satisfied that it
would be reasonable to require the insurer to pay LOR outside the policy terms.
2.3 Is the insurer to pay more in compensation than it offered?
No. To the extent the insurer contributed to the delays experienced and caused the
complainant stress and frustration, its offer represents fair compensation.
AFCA can award compensation for poor claim handling
Under the AFCA Rules, we may award compensation (capped at $5,400) for non-financial
loss where a complainant has suffered an unusual degree or extent of physical
inconvenience, time taken to resolve the situation or interference with their expectation of
enjoyment or peace of mind.
Insurer’s compensation offer is fair
I am satisfied that the insurer has contributed to some of the delay experienced. I also accept
that the delay has caused the complainant stress and frustration.
I find that the insurer’s offer to pay the complainant $4,000 represents fair compensation for
its contribution to the delay experienced.
The insurer is to pay that amount to the complainant if she accepts this determination.
2.4 Why is the outcome fair?
The outcome is fair because the insurer has shown the claim is excluded, there were multiple
reasons for the delays experienced, and the insurer has offered fair compensation.
Determination | Case number: 977632 Page 6 of 6
3 Supporting information
3.1 The AFCA process
AFCA’s approa ch is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. I have reviewed and considered
all the information the parties have provided.
While the parties have raised several issues in their submissions, I have restricted this
determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.