Determination 976810

Partial denial of storm damage claim for roof and internal damage, with delays

FirmHollard
Decided2023-11-24
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant
Amount awarded—
Non-financial loss$10,800
Amount claimed—
SourceAFCA PDF

Summary

Insurer partially denied a storm damage claim for roof damage, saying undersized trusses caused it. AFCA found the storm was the proximate cause, and required the insurer to cover roof and internal repairs, temporary accommodation, $5,400 non-financial loss to each complainant and the expert report cost with interest.

The storm was the proximate cause of the roof damage, the insurer's denial lacked probative evidence, and its avoidable delays caused further internal damage and loss.

Issues

Subjects and remedies

health or medicalhome or building damagemental healthnatural disasterpay claimpay compensationpay interestpay non financial lossreassess claimrepair or rectify

Related

All Hollard determinations · Find similar determinations

Text of the determination

Determination Case number 976810 Financial firm Hollard Insurance Partners Limited Determination | Case number: 976810 Page 1 of 12 Case number: 976810 13 November 2023 1 Determination overview 1.1 Complaint The complainants hold a home and contents insurance policy with the financial firm (insurer) and lodged a claim for damage following a severe storm on 29 October 2021. The insurer initially accepted the claim but subsequently reversed its decision and partially declined that part of the claim related to roof damage. The insurer now says the roof damage was due to undersized trusses in the roof space. The complainant disagrees and wants the insurer to accept the claim for all storm-related damage to the roof and associated internal damage caused by ongoing water ingress. 1.2 Issues and key findings Is the insurer entitled to decline the repairs to the roof? No. The available evidence shows the roof damage was caused by the October 2021 storm. Is the insurer liable for the internal damage? Yes. The available evidence shows further internal damage caused by rain water ingress has occurred because of, amongst other things, avoidable delays. Is the insurer required to cover ongoing temporary accommodation? Yes. The insurer is required to fund ongoing temporary accommodation. Are the complainants entitled to non-financial loss? Yes. The insurer is required to pay $5,400 non-financial compensation to each complainant. Are the complainants entitled to the cost of an expert report? Yes. The insurer should reimburse to the complainants the cost of an expert report, together with interest on this sum. The expert report helped establish the cause of damage. Why is the outcome fair? The available evidence does not support the ins urer’s decision to partially deny the claim, with subsequent delays causing additional internal damage, rendering the home unfit for habitation. The mismanagement of the claim and avoidable delays have also had a significant adverse impact on the physical and psychological well-being of both complainants. 1.3 Determination This determination is in favour of the complainants. The complaint should be resolved in accordance with section 2.6, below. Determination | Case number: 976810 Page 2 of 12 2 Reasons for determination 2.1 Is the insurer entitled to decline the repairs to the roof? Complainant has onus to establish a valid claim It is established insurance law that the complainant first has the onus to establish the claimed loss is a result of an event covered under the policy. This must be established on the balance of probabilities, meaning that it is more likely than not. If the complainant is able to establish a valid claim, the onus shifts to the insurer to show, on the balance of probabilities, it is entitled to rely on an exclusion under the policy or is otherwise entitled to decline the claim. The policy c overs loss or damage caused by an insured event, being the incidents listed in the Product Disclosure Statement ( PDS) and the Certificate of Insurance . These incident s include “ storm ” (see page 34 of the PDS) . Page 3 of the PDS defines a “storm” as: - Storm:-  violent wind (including cyclone);  rain, hail or snow of unusual volume, force or duration. The claim On 29 October 2021 a violent storm lasting approximately six hours struck the region around Scotsburn, in country Victoria. The storm caused substantial damage to the complainants’ property, including damage to the roof, the rear porch and a bedroom. Trees felled by the storm also damaged a boundary fence. The insu rer arranged for CS, builders, to inspect the complainants’ home on 15 November 2021 and perform make- safe works. CS’s report written pursuant to that inspection is thorough and logical. It also contains a comprehensive scope of works (SOW) concerning the necessary storm-related repairs. CS concluded that all damage, apart from the damage to the rear porch, was caused by the storm. (CS concluded the damage to the rear porch came about because of pre-existing maintenance issues related to guttering above the porch that was in poor condition). In regard to the roof, CS found:- Our inspection of the external roof identified that sections of the ridge capping had been dislodged due to high winds. Further damage has occurred to the various roof tiles which were cracked due to impact from debris. Additional damage to the roof rafters which are now bowed and split has been caused by uplift and movement from the solar hotwater system on the roof above due to the winds. VT, leak detector and roof plumber, also inspect ed the complainants’ home on 29 November 2021. In regard to the roof, VT noted that storm-related damage was causing water ingress into the ceiling cavity during further rain events. VT concluded:- In my professional opinion water ingress is due to resultant damage to roof caused by strong winds during storm…. Determination | Case number: 976810 Page 3 of 12 Resulting damages:-  6 metres of ridge capping tiles dislodged  All cement pointing affected by storm  Roof tiles under hot water service broken  Roof trusses under hot wat service damaged  1 roof tile cracked due to fallen ridge capping (replaced with new tile). Clearly, following inspections by CS and VT, the complainants had established a valid claim for storm damage to their property, including to the roof of their home. Insurer caused substantial avoidable delays The clear evidence of a valid claim as of late November 2021 is set out above. Moreover, on 24 December 2021 CS advised the insurer as follows:- Hi Claims, I am just following up on this claim, as there is still water ingress from the damaged roof that we cannot stop until the repairs are carried out. However, despite the reports of CS and VT, and despite advice from CS that water ingress into the complainants’ home was continuing, the insurer did not communicate its acceptance of the claim for the storm-related damage (apart from the damage to the rear porch) until 24 January 2022. Subsequently, matters did not progress well, and further delays ensued. In the absence of any progress regarding the necessary repairs, especially the remedial works required to the roof, on 29 June 2022 the complainants advised the insurer that their home was “ no longer liveable ”. They enquired whether temporary accommodation was available. The insurer then arranged for SD, design consultants and engineers, to inspect the complainants’ home on 9 August 2022. SD’s report is comprehensive and logical and is supported by many helpful photographs. SD’s inspection included entering the roof cavity and sighting widespread tile movement, allowing sunlight through the gaps. SD noted the location of such tile damage correlated with the internal ceiling damage. SD concluded the damage was caused by the storm of October 2021:- Damage sustained to the roof cladding has allowed moisture and wind gusts into the roof cavity damaging the interior ceilings. Despite SD’s report, very little progress was made. Then, on 8 September 2022, CS commenced work on the roof. However, it immediately advised the insurer that the damage was more significant than first thought. The insu rer’s claim notes reveal the following: - ….. CS called and advised that the roof needs a full repair and there is no point repairing a part of it when the whole needs replacement….. the roof is not in good condition and it is unsafe for the insured to reside in that property until repairs are done. I have advised (CS) to let the insureds know we can organise temporary accommodation until the repairs are done. CS also advised the insurer at that time (or shortly afterwards) it could not warrant any works it performed on the roof as the trusses were undersized. Determination | Case number: 976810 Page 4 of 12 Unfortunately, this information was not conveyed to the complainants until they called the insurer on 5 October 2022. Subsequently, despite the complainants paying the excess applicable to their policy, and despite their repeated requests for updates and further information, very little substantive progress was made in relation to the roof repairs. Then, on 20 February 2023, the complainants again telephoned the insurer. The insurer’s claim note pertaining to that call includes the following:- (Complainant) called to advise he hasn’t heard from anyone since xmas. (Complainant) advised there is mould growing in the house, the ceiling will fall down soon. A further claim note provided by the insurer indicates that, four days later (that is, 24 February 2022), an internal review of the claim was foreshadowed. However, nothing of substance appears to have eventuated. Claim notes dated 31 March 2023 then reveal that:-  At 11.46 am CS again contacted the insurer to advise that the roof of the complainants’ home was sagging due to the age of the roof and wear and tear. CS apparently reported that the storm of October 2021 may have exacerbated “ it a little ” but the main cause is roof-age. CS also reported tha t the property is “ nearly inhabitable ” (I am not certain what the term, “ nearly inhabitable ” means in this context)  At 11.53 am one of the complainants again contacted the insurer to advise that the sagging of the roof had, “ become much worse…. due to exte rnal roof being exposed from DOL, during rainfall, water enters the roof cavity and is making the insulation wet causing the ceiling to sag…. it is much worse and getting lower by the day ”. During this conversation the complainant also advised she was very concerned for her own safety and that of her family, as she thought the roof would collapse. The complainant again enquired about temporary accommodation. Funding for this was approved by the insurer. One of the complainants then called the insurer again on 11 April 2023 and was advised, amongst other things, a decision about whether the insurer would fully or partially accept the damage to roof was “ still pending ” . More than two weeks later, on 28 April 2023, the insurer advised the complainants that:-  regarding the roof trusses, given they are undersized the insurer would, “not consider upgrades under the policy” and  “an assessor” had “been appointed”. Little substantive progress followed. Then, on 3 May 2023 one of the complainants advised the insurer that, “ this has taken a toll on her and her husband’s mental health ” . Finally, on about 4 May 2023, the insurer advised the complainants that their claim had been partially denied. The insurer advised:- ….. the “sag to the roof” was also not accepted as th e proximate cause of the damages are the undersized trusses and not as a result of a one-off storm event. Additional evidence about the roof obtained by both parties Both parties then obtained further evidence regarding the roof following the insurer ’s par tial denial of the claim. Determination | Case number: 976810 Page 5 of 12 The complainants engaged BC, engineer, who inspected their home on 15 June 2023 and provided a report dated 21 June 2023. BC’s conclusions are based upon, amongst other things, the observations he made during the inspection and a full structural design review of the roof framing (the structural design is set out on page 2 of his report). BC noted:-  There was evidence of strengthening works on the internal roof structure that appeared no more than 10 years old, thus proving the roof structure had been maintained  The nature of the failure of several roof trusses was consistent with wind uplift which would be partially due to internal pressure in the roof cavity after tiles were dislodged  The main cause of damage to the roof would likely be uplift on the roof structure  Damage to two trusses under the hot water service is due to localised wind pressures on the hot water service which has exerted additional load on to the trusses. In sum, BC concluded:- ….. the damage to the roof trusses….. is due to the localized pressures during wind gusts on 29 October 2021. The damage has resulted in the failure of several trusses leading to deflection in the roof structure. This movement, in conjunction with some displaced tiles has resulted in water infiltration and subsequent mould growth. The residence has areas that are unsafe and is not habitable in its present state. The insurer then arranged for HR, building restorers, to inspect the complainants’ home on 18 August 2023 and prepare a report dated 30 August 2023. HR concluded the mould damage, which affected the entire property, was caused by an, “ ongoing roof leak since 2021, which was caused by storm damage/heavy winds ”. Finally, FM, engineers, inspected the complainants’ home o n 15 September 2023 for the insurer. FM’s report made pursuant to that inspection includes the following conclusions: -  There may have been some nail plate failure on one or more of the roof trusses prior the storm  Absent this pre-existing problem, failure of the roof trusses would not be expected in the recorded wind conditions  Nevertheless, the storm was a contributing factor in the failure of the roof. In particular, the localised wind pressure increases would have exacerbated the pressures acting on the roof  Moreover, the localised damage and dislodgement of roof tiles would have allowed additional localised pressures to have occurred. Significantly, FM was of the opinion that, had the size of the roof trusses been a major contributing factor to the failure of the roof, one would have expected the body of the truss members to have failed in the storm, and not just the nail plates and connections. Proximate cause of damage and “sagging” ceiling damage was the storm Damage can have more than one cause. For instance, in this matter the complainants say the damage to the roof and ceilings of their home was caused by the storm, whilst the insurer maintains that the damage to the roof was the result of undersized roof trusses. Determination | Case number: 976810 Page 6 of 12 In deciding whether the policy responds, it is necessary to identify the proximate cause of damage. The proximate cause is not necessarily the first or the last or the sole cause of the loss. It is the effective or dominant or operative cause of the loss. If there are several causes of a loss operating contemporaneously, each must be examined for the qualities of reality, predominance and efficiency as the active, efficient cause that sets a relevant chain of events in action. If one cause would have caused the harm in any case, and the other would not have done so in the absence of the first, the first is the proximate cause. I have considered all available evidence. I am of the opinion the proximate cause of the structural damage to the roof was the storm. This is because of the following factors:-  The reports of CS and VT are discussed above. As mentioned, both CS and VT concluded the roof damage was storm related. (I do note a subsequent short report from CS dated 31 March 2023, but that report makes no mention of roof trusses)  Aside from part of the overall analysis of FM which, I note, is based upon observations of the roof made almost two years after the storm of October 2021, the evidence of all experts overwhelmingly supports the complainants’ submission that the storm was the cause of the roof failure and subsequent internal damage  The storm was severe. Bureau of Meteorology (BOM) data indicate a peak wind gust speed of 100 km/h during the storm. Moreover, media reports state Victoria’s State Emergency Service received more than 950 calls for help following the storm, and the BOM issued a near state-wide severe weather warning for damaging winds (see SD ’s report dated 9 August 2022, page 6)  No evidence has been supplied by the insurer to prove the trusses were undersize. CS apparently reported that information to the insurer on about 8 September 2022, but did not supply any documentary evidence to support the assertion. Moreover, in its report SD makes no mention of “undersized” roof trusses. In addition, FM concluded the size of the trusses was not a contributing factor to the failure of the roof. In short, there is no probative evidence whatsoever that the size of the roof trusses played any significant causal role in the failure of the roof  The complainants ’ home was constructed in about 1982 and there is evidence the roof had been maintained. Moreover, the insurer has presented no evidence of roof failure prior to the storm of October 2021  The complainants say they first noticed damage to the roof tiles immediately following the storm and then noted internal damage a few weeks later. They also reported to FM there was, “….. significant crashing and noise as a result of wind during the storm dated 29 October 2021 ”. The insurer has presented no evidence to impugn the credit of the complainants. I therefore have no reason to doubt their honesty and credibility  BC appears to have conducted the most comprehensive inspection and analysis of the internal roof structure. I note that other experts were somewhat limited in their internal inspection of the roof due to safety concerns. BC concluded that no other causal factors, apart from the storm of October 2021, played a role in the roof failure. In sum, the insurer has provided no probative evidence to support its decision to partially deny the claim because of undersized roof trusses. It follows that the insurer must accept the claim for the roof damage and should settle the claim as set out under section 2.6, below. Determination | Case number: 976810 Page 7 of 12 2.2 Is the insurer liable for the internal damage? Insurer caused significant delays The storm-damaged roof subsequently allowed substantial and repeated rain water ingress into the complainants’ home over the following months. I have no doubt the internal damage caused by this water ingress is, therefore, also storm-related. However, to appreciate the degree to which the internal structure of the house was subject to water ingress and, therefore, to understand the extent of toxic mould damage now present in the complainants’ home, a review of the claim delays caused by the insurer i s warranted. The evidence in this matter, including the claim notes supplied by the insurer, reveal the following timeline of events:- 31 October 2021 Claim lodged (date of loss is 29 October 2021) 15 November 2021 CS attends and reports roof damage is storm-related 29 November 2021 VT reports roof damage is storm-related 24 December 2021 CS reports ongoing water ingress until roof repairs are done 24 January 2022 Insurer accepts the claim 29 June 2022 Complainants advise insurer their home is “ no longer liveable ”. They enquire whether temporary accommodation is available 9 August 2022 SD reports damage is storm related 8 September 2022 CS begins roof repairs. Finds damage is worse than expected. CS says home is uninhabitable. Repairs cease. CS also tells insurer roof trusses are undersize, but insurer seeks no documentary independent evidence to substantiate this claim 20 February 2023 Complainants call insurer and advise they has not heard from anyone associated with the insurer since Christmas 2022. Also tell the insurer mould is growing in the house and the ceiling will fall down soon 31 March 2023 Complainants tell insurer of additional water damage and raise safety concerns. Insurer funds alternative accommodation 11 April 2023 Insurer tells complainants decision to accept or deny roof damage is still pending 4 May 2023 Partial denial of claim regarding roof damage communicated to complainants. Determination | Case number: 976810 Page 8 of 12 The timeline shows significant delays. Whilst I acknowledge this claim occurred during several weather catastrophes, this does not excuse the insurer ’ s responsibility to assess claims in a timely manner. The delays are excessive, particularly given the insurer was first notified the complainants ’ home was uninhabitable in late June 2022. I n short, the insurer’s management of this claim has been of a very poor standard indeed. Erroneous denial of roof damage created delays The insurer declined the structural roof damage on the basis the damage was caused by undersized roof trusses, not the storm. As mentioned, the insurer has not provided any reports to support its position. The contact notes indicate it relied on a conversation between CS and the insurer ’ s claims area in this regard. Significantly, in its report dated 15 November 2021, CS concludes all roof damage can be attributed to the storm event on 29 October 2021. This included structural damage to the rafters/trusses. At the time of making the decision to deny the structural roof damage the insurer had reports from an engineer, SD, and a roof plumber, VT, stating the damage was caused by the storm. The insurer has not explained why it placed so much reliance on CS’s verbal report on about 8 September 2022 and rejected the opinions of a roof plumber and engineer, both of whom, on the face of it, appear relatively more qualified to report on roof damage. Moreover, the insurer has not revealed why it chose not to seek additional expert (and documentary) evidence about the size of the roof trusses in a timely manner. In all the circumstances, the decision by the insurer to decline the claim, insofar as it relates to the structural roof damage, was patently incorrect. Quite simply, that denial was not (and still is not) supported by any probative evidence. Moreover, it caused significant, avoidable delays which have not only resulted in additional substantial internal damage to the complainants’ home, but also caused a great deal of stress, anxiety and psychologic al upset for both complainants. Further internal damage and mould due in part to erroneous denial by insurer Contact notes show CS notified the insurer on 24 December 2021 that water ingress would not stop until the roof was repaired. Moreover, both parties now agree the internal damage worsened after CS stopped working on the roof in September 2022. The insurer appointed HR to report on mould growth inside the house. A technician attended on 18 August 2023 and reported microbial growth on surfaces, cabinetry and contents throughout the house. HR recommended the appointment of a hygienist to report further on the extent of the mould growth and the remediation required. The insurer did not appoint a hygienist. It maintains its position that the mould has been caused by the damage to the roof, the liability for which has been declined. I note that SD ’s report recorded mould growth in August 2022 . SD’s report and HR ’s report are 12 months apart. Taken together, they show a significant increase in mould infestation during that 12-month period. It is therefore reasonable to assume that, had the insurer not delayed repairs when it erroneously declined the structural damage to the roof, remedial works would have been undertaken sooner and the internal damage thereby likely minimised. Determination | Case number: 976810 Page 9 of 12 It follows that the insurer is required to accept the claim insofar as it relates to all internal damage caused by repeated rain water ingress following the storm of October 2021 (see section 2.6, below). Moreover, the quantum of such claim and the works necessary to remediate the internal damage is not limited by the terms and conditions of the policy as it stems from avoidable delays and claim mismanagement on the part of the insurer. 2.3 Is the insurer required to fund ongoing temporary accommodation? Alternative accommodation to continue The policy covers reasonable temporary accommodation for a period of 12 months if the home is rendered uninhabitable due to an insured event. A large part of this benefit has been exhausted because of avoidable delays, claim mismanagement and the erroneous decision by the insurer to decline the claim regarding storm-damage to the roof. It follows that the insurer is required to fund ongoing alternative accommodation until remedial works have been completed and the complainants and their son are able to return to their property. Moreover, the total quantum of this benefit is not limited by the policy terms and conditions as the need for it stems from avoidable delays and claim mismanagement on the part of the insurer. Alternative accommodation to allow for son and pets The complainants ’ son is a student and he resided in the family home until it became uninhabitable. The complainant has also explained they have dogs that remain at the damaged property and they travel to feed them. In all the circumstances, it is fair and reasonable that any ongoing temporary accommodation should include arrangements to accommodate the complainants ’ son and their pets. Similarly, the insurer should also fund all necessary storage costs required for the contents of the complainants ’ home until repairs and remediation works are completed. 2.4 Are the complainants entitled to non-financial loss? Both complainants have suffered physically and psychologically Under the AFCA rules, non-financial loss compensation (capped at $5,400) may be awarded in circumstances where a complainant has suffered an unusual degree or extent of physical inconvenience, time taken to resolve the situation or interference with their expectation of enjoyment or peace of mind. AFCA takes a conservative approach to compensation for non-financial loss. It is not awarded when a person suffers the normal degree of inconvenience when a problem occurs. Moreover, non-financial loss is not intended to be a punishment for any wrongdoing on the part of the insurer. I accept the complainants in this matter has suffered an unusual degree of physical inconvenience and interference with their expectation of enjoyment and peace of mind. Indeed, each complainant has suffered both physically and psychologically during the processing of this claim. Determination | Case number: 976810 Page 10 of 12 For instance, there were significant delays in processing the claim. I am of the opinion these delays were mostly avoidable and well beyond what would normally be expected, even during a period of high claims volume. As explained, significant delays originated from an unsupported denial of the structural roof damage. Consequently, the complainants have been compelled to watch as the damage to their home gradually worsened. They now face the possibility of the home being unrepairable. In addition, the insurer was first made aware the home was uninhabitable June 2022. However, alternative accommodation was not arranged until March 2023 when the complainants expressed serious concern for their safety. In all the circumstances, I am of the opinion the insurer must pay to each complainant the maximum non-financial loss compensation available under the AFCA Rules. This means the insurer must pay the sum of $5,400 to each complainant. 2.5 Are the complainants entitled to the cost of an expert report? The complainants paid for BC to inspect their property and report following the insurer’s partial denial of their claim. BC’s report was instrumental in establishing the proximate cause of the damage to the roof and its consequent failure. Accordingly, the insurer is required to reimburse the complainants for the cost of the report. In addition, the insurer must pay interest to the complainants on the cost of BC’s report in accordance with section 57 of the Insurance Contract Act (1984) (the Act). 2.6 Claim should be resolved in this way Avoidable delays and claim mismanagement mean time is of the essence Within 14 days of receiving notice the complainants accept this determination, the insurer must:-  engage an engineer, roofing specialist, expert builder, or other suitably qualified expert, together with a mould restoration expert, to draw up a SOW regarding the necessary repairs and associated works to the roof of the premises and the internal structures and fixtures of the complainants’ home that have been storm damaged and/or rain water-damaged; and  cover the cost of ongoing temporary accommodation for the complainants, their son and their dogs, together with all necessary storage costs, until all repair, restoration and remediation works are completed and the complainants can return to their property; and  pay the sum of $5,400 in non-financial loss compensation to each complainant; and  reimburse to the complainants the cost of the BC report and pay interest on that sum from the date the report was paid for by the complainants to the date of settlement in accordance with section 57 of the Act. The insurer must also provide to the complainants an explanation, and breakdown, of how the interest has been calculated. Within a further 14 day period of receipt of the SOW, the insurer is to obtain at least one actionable quotation based upon the SOW, either by way of a tender process or otherwise. Determination | Case number: 976810 Page 11 of 12 All repairs and remedial works included in the SOW and quotation(s) must also comply with all current and applicable Commonwealth and Victorian building-related, safety-related and health-related laws, regulations and codes. Within a further seven days of receipt of the associated quotation(s), the insurer must elect to either:  commence the necessary repairs and associated works as soon as possible, or  offer a cash settlement to the complainants comprising a sum equal to the total of the preferred actionable quotation, plus a 20% contingency on top of this to factor in the risk of the works passing to the complainants and the likely possibility that further works may be required. Finally, given the poor claims management and avoidable delays which have already occurred, and the deleterious effect these delays and mismanagement have had upon the complainants, I emphasize to the insurer that time is of the essence. 2.7 Why is this a fair outcome? The outcome is fair in all the circumstances because:-  The proximate cause of the damage was the storm of October 2021  The insurer erroneously denied part of the claim  Internal damage to the complainant’s home (in particular, mould damage) was caused by ongoing rain water ingress following the original storm-related damage  Avoidable delays have resulted in additional internal damage, thereby rendering the complainants’ home uninhabitable. It follows the insurer should pay the costs of ongoing temporary accommodation and storage costs  Poor management of the claim by the insurer has had a significant and deleterious impact, both physically and psychologically, on both complainants. It follows that an award of non-financial loss compensation is fair, reasonable and appropriate  Throughout this complaint AFCA’s approach has remained objective, consistent with the facts and based upon the law. Determination | Case number: 976810 Page 12 of 12 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to: the legal principles applicable industry codes or guidance good industry practice previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all the information the parties have provided. While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider: available documents the recollections of the parties all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.