Text of the determination
Determination
Case number 976435
Financial firm AAI Limited
Determination | Case number: 976435 Page 1 of 8
Case number: 976435 29 November 2023
1 Determination overview
1.1 Complaint
The complainant holds a home and contents insurance policy underwritten by the financial
firm (insurer). He lodged a claim for storm damage which occurred on 28 February 2023.
The insurer accepted some damage was storm related and has offered a cash settlement for
the repair costs. However, it says much of the damage was due to ground movement and
other factors excluded by the policy. The insurer also says as the complainant repaired the
pergola, rear room and decking prior to assessment, it was prejudiced from properly
assessing this damage. The insurer says it is not liable for the cost to repair those areas.
The complainant disagrees with the decision. He believes the insurer should cover all the
claimed damage. He also seeks reimbursement for professional costs incurred.
1.2 Issues and key findings
Is the insurer entitled to limit the covered damage?
Yes. The exchanged information shows, on balance, most of the damage was caused by
long-term foundation movement and other excluded issues. The insurer offered to pay a cash
settlement for the internal water damage and this is fair. The insurer must also include a 25%
contingencies uplift with this payment.
Is the insurer liable for any other expenses?
No. The complainant has not shown the repaired damage was caused by circumstances
covered under the terms of the policy. Also, by repairing this damage without authority from
the insurer, the complainant prejudiced the insurer’s ability to fairly consider the loss. The
complainant has also not shown his son’s hospitalisation was caused by the insurer’s work .
The insurer is not liable for the professional fees incurred by the complainant.
Why is the outcome fair?
The damage was mostly consistent with the age of the property and long-term movement
issues which the policy does not cover. The insurer’s offer fairly represents the extent to
which the storm caused damage.
1.3 Determination
This determination is in favour of the insurer.
The insurer is required to pay $6,200.19 for the repairs, if it has not already done so. It must
also include a contingencies uplift of 25% on this amount. The insurer is not required to take
any further action in relation to the claim or the complaint.
Determination | Case number: 976435 Page 2 of 8
2 Reasons for determination
2.1 Is the insurer entitled to limit the covered damage?
Yes. The exchanged information shows, on balance, most of the damage was caused by
long-term foundation movement and other excluded issues. The insurer offered to pay a cash
settlement for the internal water damage and this is fair. The insurer must also include a 25%
contingencies uplift with this payment.
Complainant seeks cover for damage to home due to storm event
The complainant ’s home is a single storey home, estimated to be 50-70 years old. It is a
timber-framed fibro building, constructed on timber beam and pier flooring. The complainant
purchased it in February 2020 and says he immediately replaced the kitchen, laundry and
bathroom as well as painting the home.
He claims for storm damage to the pergola, an adjoining room, kitchen, laundry, doors, floors,
cracks in the walls and ceilings, the concrete driveway and the foundations.
Onus on complainant to establish claimable loss
The complainant has the onus of establishing he suffered a loss from an event covered by the
policy. If a claimable loss is established, the insurer then has the onus of establishing the
application of any exclusion or condition it relies on to deny or reduce its liability.
For both the complainant and the insurer, the onus of proof is the balance of probabilities
(that is, it is more likely than not).
If the complainant can establish he suffered a claimable loss, the onus shifts to the insurer to
show, on balance:
it is entitled to rely on an exclusion under the policy, or
it is otherwise entitled to decline the claim.
Policy covers storm damage subject to terms, conditions and exclusions
The terms of the policy include the Certificate of Insurance and the Product Disclosure
Statement (PDS). There is no dispute the insurer sent these documents to the complainant.
The policy covers damage caused by one of the listed ‘insured events ’ . It does not provide
cover for all damage. Amongst these events is cover for ‘storm’. This is defined as:
a storm, cyclone or severe atmospheric disturbance. It can be accompanied by
strong winds, rain, lightning, hail, snow or dust.
The insurer offers additional cover for accidental damage, but the complainant did not select
this option. The policy specifically excludes cover for damage caused by earth movement
(unless it is an immediate consequence of storm, flood, earthquake or explosion).
There is no dispute a storm occurred, however the insurer does not accept it was the cause
of most of the claimed damage at the home. To the extent the storm caused some of this
damage, the insurer agreed to pay $6,200.19 to cover this damage.
Determination | Case number: 976435 Page 3 of 8
Various experts inspected and disagreed over the causes of damage
Both parties arranged for experts to inspect and report on the damage.
The complainant retained builder (NM) who considered all the observed damage was due to
the storm event. NM estimated a cost of $71,135 to repair this damage.
The insurer appointed builder SB, which found evidence of water staining and structural
movement. It recommended a ‘structural specialist’ review the damage.
A separate roof report from SB identified rusting and corrosion of metal roof sheets. It
described the roof as being in ‘average’ condition. Water entered the home through two
whirlybirds, a satellite dish and the TV antenna.
The insurer arranged for engineer TC to attend the site. TC found:
driveway cracks were due to ‘shrinkage restraint cracking’ and not the storm
stepped cracking through the bricks, cracking to the kitchen tiles, benchtop and the
plasterboard was from soil heave, due to an ‘extended wet period’ and ground movement
bathroom and laundry damage were due to a roof leak
the gaps in the floorboards are not due to rainfall and remain within tolerance levels
footings are not affected by the rainfall – the issues are maintenance related.
SB agreed with TC’s findings and further noted online images predating the loss showed the
exterior stepped cracking was evident back then. It considers the soil heaving issue has been
ongoing for some time. I agree the online images show evidence of stepped cracking dating
back until at least 2018. This predates the complainant’s ownershi p of the home.
Dissatisfied with the insurer’s view s, the complainant retained engineer ST, which found:
some of the existing footings were subjected to an ‘uplift pressure from the saturated
foundation material supporting them’
this was due to the storms which affected the area and caused ‘wide diagonal cracks’ in
the driveway, destabilised the steel post supporting the pergola and caused cracks to the
walls and ceilings.
TC acknowledged there was a high amount of rainfall. However, it says the infrastructure
should have been sufficient to deal with this. It does not accept ground movement from the
storm caused damage. Any ground movement occurred over a long period of time.
The insurer then engaged engineer SW to inspect the property. SW observed:
the home was built on reactive clay soils, which swell upon wetting and shrink upon drying
rainfall data confirms 206.2mm fell between 22 and 28 February 2022 and a further
375.4mm fell between 2 and 8 March 2022
whilst rainfall on any particular day was not extraordinary, it was significant over the period
a floor level survey found a differential of 74mm across the home
the piers under the home showed evidence of prior movement predating the event
this movement was due to soil moisture variations affecting the reactive soil
no single defined event in February 2022 caused the loss
movement of the concrete driveway was due to several factors, including the absence of
proper control joints, drying shrinkage and foundation movement
the front patio tiles were damaged by a combination of ground movement, inadequate
design and the absence of appropriate movement joints.
In response, the complainant retained another engineer, NS, which found:
rain in February 2022 ‘seemingly exacerbated’ the pre -existing damage at the home
Determination | Case number: 976435 Page 4 of 8
it agrees with SW that the movement of the piers is due to the ‘variations in the moisture
content of the foundational soil’, but considers the storm contributed to this
concrete damage to the driveway and the patio tiles was due to ‘ soil moisture variations’
the damage at the property was due to ‘a range of causes’, including sustained heavy rain,
land subsidence, moisture settlement
‘significant probability, greater than 50%’ the damage was caused by the storms.
After reviewing the NS report, SW responded again. NS says the presence of prior repair
work indicates the foundations were ‘historically susceptible to movement’. The observed
damage is symptomatic of an ongoing issue rather than a one-off event. Packing under the
piers included the use of a car jack. This packing is more than 20mm in some areas, which is
indicative of ‘a significant degree of settlement and adjustment’. NS did not address this.
SW also reported that the presence of pre- existing damage challenged NS’s conclusions that
the storms were a significant factor in the damage. In SW’s view, the storms merely served to
highlight the issues with historical structural instability at the home. SW maintained drying
shrinkage was the main cause of the concrete cracks. This also was a factor with the patio
cracks, as well as tile expansion due to ‘environmental factors’. SW concluded:
The damages observed … are multifaceted and result from a combination of
factors that have been at play over time. These factors have exerted stresses and
influences on the different components of the structure, leading to the damages
now observable.
It is crucial to appreciate that the property has undergone a series of structural
and material changes and adjustments over its lifetime. The damages observed
are not sudden or recent developments but are the culmination of long-standing
issues and the property’s response to environmental and structural changes over
time.
SW maintains a storm was not the cause of the damage to the home.
Long-term ground movement is the proximate cause of damage
Based on a review of the various reports, the insurer’s assessor recommended that it covers
the water entry damage through the roof only. The assessor considered none of the other
damage claimable. The insurer initially offered to pay $4,161.85. It later increased this offer to
$6,200.19. The complainant believes this offer is unreasonable.
I accept there was no single cause of the damage to the home. Several contributing factors
were identified by the various experts. I acknowledge the series of storms through February
and March of 2022 likely contributed to the damage, however I do not accept these were the
proximate cause of the damage.
Damage can have more than one cause. The proximate cause is not necessarily the first or
last or the sole cause of the loss. It is the effective, dominant or operative cause of the loss.
Based on the exchanged material, I consider the home was susceptible to movement
primarily due to the reactive clay foundation soils. This is shown in the long-term movement
issues affecting the piers and photos showing the damage to the concrete at the rear.
The differential movement identified by SW in the home is indicative of a long-term problem.
Determination | Case number: 976435 Page 5 of 8
I acknowledge there were other contributing factors to this damage, including construction
issues for the concrete and tiling and the considerable amount of water from the storm. I
consider these were less important in terms of the cause of damage.
Whilst I acknowledge the storms contributed, I found the views of SW particularly compelling
regarding the proximate cause. SW undertook a floor survey showing the extent of differential
movement through the home. I accept this did not happen due to the storm. I further accept
this was indicative of a larger soil movement problem which developed over time.
This made the home susceptible to the impact of the storms in early 2022. I am not satisfied
any of the structural issues identified at the home were proximately caused by the storms.
I further accept the insurer is not liable for the damaged concrete, the patio tiles, the piers, the
roof, the floors or any other claimed damage from the event. The damage to the concrete,
tiles and piers was all due to the long-term movement of the property. I acknowledge that
construction issues may have influenced this damage as well as the storm.
Policy excludes damage caused by long-term ground movement
The insurer does not cover loss or damage to, caused by, connected with or arising from:
erosion, vibration, subsidence, landslip, landslide, mudslide, collapse, shrinkage
or any other earth movement, but we will cover landslide or subsidence that is
specifically covered under the following insured events:
• ‘Storm’
Under the storm event, the insurer does not cover:
loss or damage caused by erosion, vibration, subsidence, landslip, landslide,
mudslide, collapse, shrinkage or any other earth movement, but we will cover loss
or damage caused by a landslide or subsidence proved to have occurred within
72 hours of, and directly because of, a storm and not because of erosion,
structural fault or design fault
There is no dispute earth movement is present at the home. There is no persuasive evidence
this occurred within 72 hours of the event. To be fair to the complainant, the insurer was not
able to inspect the home within this timeframe and it would arguably be unfair for it to rely on
this condition. However, I am not persuaded the movement was proximately caused by the
storm. Therefore, I accept the insurer is not liable for it.
As there is no dispute water got into the home and caused internal damage, I accept this can
be attributed to the storm events. The insurer agreed to cover this damage.
Insurer to pay cash settlement with contingencies uplift for covered damage
I accept the quote the insurer relied upon to settle the claim was sufficient to address the
internal damage to the walls, doors and ceilings. I also accept the insurer is not liable for any
other damage. The floors and the cracking damage were due to long-term movement issues.
The insurer may use the quote as a basis for settlement. Noting the roof has issues which
require attention, I am satisfied it is not practical for the insurer to attend to the repairs.
Therefore, a cash settlement is a fair way to resolve the claim.
Determination | Case number: 976435 Page 6 of 8
The insurer must include a 25% contingencies uplift with the settlement. This is to cater for
the transfer of risk to the complainant to complete the work and to compensate him for the
loss of the lifetime guarantee.
2.2 Is the insurer liable for any other expenses?
No. The complainant has not shown the repaired damage was caused by circumstances
covered under the terms of the policy. Also, by repairing this damage without authority from
the insurer, the complainant prejudiced the insurer’s ability to fairly consider the loss. The
complainant h as also not shown his son’s hospitalisation was caused by the insurer’s work.
The insurer is not liable for the professional fees incurred by the complainant.
Complainant retained experts to conduct early repair work
The complainant undertook repairs to the pergola, rear room and the decking before these
areas were inspected by the insurer. No post-loss or pre-repair photos of this damage were
provided. It is not possible to determine the extent of damage caused to these areas by the
storm event.
Carpenter BA charged $13,880 on 20 March 2022 to reconstruct and replace the subfloor
foundations of the decking ‘caused by floodwaters’. BA also removed and replaced some
water-damaged walls. Fencer TT repaired the rear pergola and adjoining room for $7,150.
Tiler AM replaced some damaged tiles for $1,100.
The complainant says he was informed by the insurer he could proceed with repairs if they
were under $10,000. An email from the insurer dated 27 March 2022 confirms the insurer
authorised the complainant to obtain repair quotes up to $11,000. These would then be
subject to review. No authority to undertake repairs was given.
Complainant’s decision to conduct early repairs prejudiced the insurer
The complainant says the early repairs were necessary as rain was coming into the home.
To the extent the home sustained damage which required immediate attention, I accept it
would not be unreasonable for the complainant to make the home safe. The insurer was not
able to immediately inspect the damage and there was a delay of several weeks before the
home was inspected.
However, there is no persuasive evidence the home was in immediate danger or that the
repairs were necessary due to the storm. To be covered under the policy, the complainant
must show the damage was caused by the storm. I accept most of the damage was not.
When making a claim, the PDS tells an insured person under ‘What you must not do’ :
• do not carry out or authorise repairs without our consent unless you cannot
contact us and need to make emergency repairs to protect the home or
contents or it is necessary for health and safety reasons;
…
If you do not comply
If you do not comply with ‘What you must do’ and ‘What you must not do’ we can
reduce or refuse to pay your claim and/or recover from you any costs and/or any
monies we have paid and/or cancel your policy.
Determination | Case number: 976435 Page 7 of 8
Whilst I accept the complainant may have misread the insurer’s instructions or considered the
repairs necessary, I am not sa tisfied these costs are covered. The complainant’s experts
provided no specific details about the cause of the claimed damage and provided no photos.
The insurer says its ability to properly assess the damage was prejudiced because an
assessment of these areas was not possible due to the completion of the repairs. I accept
the insurer was prejudiced as it was unable to properly determine if the loss was covered.
It is incumbent upon the complainant to show the claimed damage was caused by events
covered under the terms of the policy. I acknowledge there was likely damage present. I also
acknowledge it is possible a storm contributed to this damage. However, I cannot be satisfied
the storm caused the damage.
Accordingly, I am satisfied the complainant’s actions prejudiced the insurer’s ability to
determine the cause of the loss. Noting most of the other claimed damage is not covered, I
accept it is likely that some, if not all, of the repaired damage was not caused by the storm
either. In these circumstances, I am satisfied the prejudice incurred by the insurer not being
able to inspect the damage extends to the payment for these costs.
This means I accept the insurer is not liable for the repaired damage.
No persuasive evidence mould treatment caused compla inant’s son to get sick
The insurer did some mould remediation work at the property through FE and PE. The
complainant said the cleaning products used made him and his son sick.
FE treated the mould and confirmed readings returned to normal. It reports mould infestation
affected the complainant’s son and he was taken to hospital. Whilst the complainant blames
FE’s treatment for this, FE notes the cleaning agent used was ‘non - hazardous’.
The complainant provided documents to show his son was treated for an asthma attack and
breathing problems. There is no persuasive evidence the treatment used by FE caused or
exacerbated this condition (or to what extent). I am not satisfied the insurer is liable for this.
Insurer not required to cover the complainant’s incu rred professional costs
The complainant incurred costs to retain experts which provided opinions about the cause of
the claimed damage. None of these opinions were persuasive in terms of paying the claim. I
am satisfied the insurer is not liable for these expenses.
2.3 Why is the outcome fair?
The damage was mostly consistent with the age of the property and long-term movement
issues which the policy does not cover. The insurer’s offer fairly represents the extent to
which the storm caused damage.
Determination | Case number: 976435 Page 8 of 8
3 Supporting information
3.1 The AFCA processes
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.