Dispute over liability for further roof damage allegedly caused by make-safe works and storm, plus delays in claim handling
Text of the determination
Determination
Case number 975413
Financial firm Allianz Australia General Insurance Limited
Determination | Case number: 975413 Page 1 of 8
Case number: 975413 3 November 2023
1 Determination overview
1.1 Complaint
The complainant holds a home and contents insurance policy with the financial firm (insurer).
On 11 March 2022, the complainant lodged a claim with the insurer following a storm event.
The insurer accepted the cost of repairing internal water damage because of the storm event,
however the complainant was informed that he would need to address roof maintenance and
flashing issues prior to the works proceeding.
The complainant says that make- safe works carried out by the insurer’s assessor were
unprofessional and caused further damage to the roof.
The complainant has also raised issues about delays during the claims process.
1.2 Issues and key findings
Is the insurer liable for any further damage?
The insurer is not liable for any further damage other than the accepted internal damage.
There is no persuasive evidence that damage to the entrance roof was caused during the
make-safe works, or by the storm event. There are pre-existing maintenance items and non-
compliant roof flashings which are the responsibility of the complainant as the homeowner.
Is the complainant entitled to compensation?
No. On balance, I do not consider the insurer has acted inappropriately in its handling of the
claim to warrant an award of compensation.
Why is the outcome fair?
The insurer’s obligations are limited by the terms of the policy. In this instance, it would not be
fair to require the insurer to cover the claimed loss. This is because it falls outside the scope
of cover.
1.3 Determination
This determination is in favour of the insurer.
The insurer is not liable for any further damage other than the accepted internal damage.
Determination | Case number: 975413 Page 2 of 8
2 Reasons for determination
2.1 Is the insurer liable for any further damage?
The insurer is not liable for any further damage other than the accepted internal damage.
There is no persuasive evidence that damage to the entrance roof was caused during the
make-safe works, or by the storm event. There are pre-existing maintenance items and non-
compliant roof flashings which are the responsibility of the complainant as the homeowner.
Complainant has onus to establish a valid claim
It is established insurance law that the complainant carries the initial onus to show that the
terms and conditions of the relevant insurance policy cover the loss. This is known as a valid
claim.
Once the complainant establishes a valid claim, the onus then shifts to the insurer to
demonstrate the loss is not covered, either by way of one of the policy exclusions or on some
other basis.
Policy covers insured events
The complainant’s home and contents policy is an ‘insured events’ policy. This means that
not all loss and damage is automatically covered. Rather, only loss or damage caused by one
or more of the insured events and subject to the exclusions, is covered. One of the insured
events under the policy is ‘storm’.
On 11 March 2022, the complainant lodged a claim with the insurer after he noticed water
leaking on the ceiling near the entrance of the property and below the balcony due to a storm.
The date of loss was recorded as 1 March 2022.
The insurer accepted the cost of repairing internal water damage because of the storm event,
however the complainant was informed that he would need to address roof maintenance and
flashing issues prior to the accepted works proceeding. In the meantime, make-safe works
were undertaken to the property by the insurer’s assessors (AJ) .
A dispute has arisen regarding the make-safe works, which the complainant says caused
damage to his roof.
Multiple make-safe works conducted
The exchanged material indicates that multiple make-safe works were conducted by AJ to
prevent water ingress.
The first make-safe was conducted by AJ on or about 21 April 2022, where it was confirmed
that water was entering through cracks of render and windows. The relevant areas were
sealed with silicone.
The second make-safe was conducted on or about 10 May 2022, where it was confirmed
there was water ingress to the ceiling. Cracks were found in the render on the roof leaking
into the blue board. The area was sealed with silicone.
Additional trades attended on or about 2 June 2022, at which time they applied plywood to a
hole in the gyprock ceiling, silicone to areas of the Colorbond roof, and a tarp and sandbags
to the roof area.
Determination | Case number: 975413 Page 3 of 8
Maintenance and installation issues identified in May 2022
An inspection was also carried out by a roofer (NR) engaged by AJ in or about May 2022. A
roof report dated 20 May 2022 identified the following issues:
the flashings installed on the front entrance roof have not been installed appropriately.
There are visible gaps between the flashings which are not covered and can deteriorate
the adjacent wall in the near future,
the flashings installed have not been pressure sealed to the wall which can allow water
ingress during deluge rain,
silicone sealant has been applied between the gaps of the flashing and roof sheets which
causes condensation during weather change and water pooling,
the sealant applied on the gap between the top balcony roof and the wall is deteriorating
and can further damage the roof join onto the wall,
the ridge capping tiles on the rear roof and top main roof have developed cracks on the
pointing at multiple locations,
roof tiles have also developed cracks at multiple locations.
The report stated that most of the issues identified on the roof are maintenance related, and
the incorrectly installed flashing on the front entrance roof is related to poor quality
installation. The report recommended several action items to be completed by the
complainant to rectify these issues, including the installation of new flashings to the front
entrance roof.
Complainant says damage caused during make-safe works
On or about 15 September 2022, the complainant raised concerns with the insurer about the
make-safe works completed by AJ. The complainant provided photographs and says the
make-safe team came out multiple times but failed to stop the water leaking from the ceiling.
The complainant says on each occasion AJ tried to apply silicone in different spots. According
to a roofing specialist he consulted, the silicone would block the water from flowing out in
some places.
At the last visit in June 2022, AJ put a tarp on the metal roof and used silicone to seal the tarp
to the metal roof, together with a bag of weight to apply pressure. The weight caused a dent
on the metal roof. According to his roofer, removing the silicone would cause further damage
to the metal roof. The installation of the tarp was prior to receipt of any reports from AJ
regarding maintenance issues.
The complainant further says that at the time of the make-safe, the tradesperson told him that
the insurer would remove the tarp and fix the damages once an assessment had been done.
Had he known this would not occur, he would not have allowed the tarp to be installed. He
says the tarp blew away the following day and he was left with silicone damage.
The complainant has queried whether the entrance roof flashing was a contributing factor for
the water ingress. He says he had works done by his roofer and there has been no water
ingress since. However, he now has no option but to replace the silicone on the roof flashing.
The complainant says he paid his roofer in cash and does not have any invoices or details of
the work completed.
The complainant maintains the silicone used by AJ damaged the roof. He is seeking
replacement of the metal roof area, or alternatively, that the silicone be removed without
causing further damage to the roof.
Determination | Case number: 975413 Page 4 of 8
Insurer says make-safe works did not cause further damage
In response to the complainant’s concerns, NR conducted a further inspection at the property
in December 2022.
NR provided a report dated 22 December 2022 which stated that the damages are due to
poor quality and non-compliant installation of apron flashing. NR indicated the apron flashing
installed on the roof is non-compliant as there is no dry pan provided for the flashing. Further,
the apron flashing is completely sealed with the silicone to the sheets, which will create
condensation in the ceiling space causing water ingress. The complainant says this was
caused by the make-safe team.
NR also confirmed that the make-safe work had not caused further damage:
From the time we first inspected the roof to inspecting it now the structural
integrity and water ingress issues are the same. The make safes have not
worsened the water ingress or the roof. In saying this the make safes have left big
lines of silicon which has made it look worse off. So, whilst the make safes did not
cause more damage, they have made it look worse. This silicone was used in
attempts to prevent further damages.
AJ has since confirmed that it cannot remove the silicone due to manufacturer’s
recommendations. Attempting to do so would expedite corrosion and risk electrolysis. AJ also
highlighted that there have been previous attempts to repair the area prior to its attendance.
The insurer is not liable for any further damage
I have carefully considered the information provided by the parties, together with the policy
wording.
There appears to be some confusion by the complainant as to what silicone was applied by
AJ during the make-safe works. Whilst silicone may have been applied by AJ in other areas
of the property, it is clear from the exchanged material that in respect of the entrance roof,
silicone was only applied to the surface of the flashing to secure the tarp. The silicone applied
between the gaps of the flashing and the roof sheets which was not pressure sealed was pre-
existing, and not carried out by AJ.
The exchanged material provided by the insurer is consistent in confirming that the cause of
the water ingress on the front entrance roof is due to non-compliant roof flashing and
maintenance issues. The condition of the roof compromised its integrity and made it unable to
resist weather events that might otherwise have had no effect.
In the absence of any persuasive information to the contrary, I do not accept that further
damage has occurred to the entrance roof by the application of silicone during the make-safe
works. The make-safe works were a temporary measure in mitigating further loss, and I am
satisfied that the existing flashings required replacement. Further, there is no evidence to
show that the flashing was damaged by the storm event.
It is unclear if the maintenance works to the roof have been completed by the complainant to
date. In any event, the se repairs are the complainant’s responsibility in keeping the property
watertight and well-maintained. They are outside the scope of cover provided under the
policy.
The insurer is not liable for any further damage other than the accepted internal damage.
Determination | Case number: 975413 Page 5 of 8
Cash settlement for accepted internal damages is fair and reasonable
The exchanged material indicates that the insurer is willing to carry out the internal accepted
repairs, should the complainant address all necessary maintenance issues to the roof.
The insurer has also offered a cash settlement to finalise the claim. The total settlement offer
is $7,588.37, being $7,353.06, plus a 10% contingency, less the applicable $500 excess. I
note AFCA’s preliminary assessment increased the contingency to 20%, which the insurer
said it was happy to accept.
In the circumstances, I consider the proposed cash settlement offer to be fair and reasonable.
2.2 Is the complainant entitled to compensation?
No. On balance, I do not consider the insurer has acted inappropriately in its handling of the
claim to warrant an award of compensation.
AFCA may award compensation in certain circumstances
Under our Rules, AFCA may award compensation for non-financial loss (capped at $5,400)
where there has been an unusual amount of:
physical inconvenience
time taken to resolve the situation
interference with the complainant’s expectation of enjoyment or peace of mind.
AFCA takes a conservative approach to compensation and expects a complainant to bear a
normal degree of inconvenience during the course of the claim
Complainant dissatisfied with delays
The complainant says there were delays with the insurer’s complaint process. He says it took
three months for someone to attend his property after he initially raised the complaint, and
after numerous follow-ups, a further two months to receive the insurer’s report.
The insurer acknowledged that instances of communication could have been better, and it did
take several months to address the complainant’s concerns about the make -safe works. The
insurer offered $500 as a goodwill gesture in addition to the accepted internal damages, and
to avoid the complaint progressing to a determination. The complainant did not accept the
offer and it was withdrawn by the insurer.
The complainant is not entitled to compensation
Whilst there have been some communication issues by the insurer, as stated above, there is
no evidence that the complainant has fully addressed the maintenance issues associated with
the roof. I consider this has contributed to delays in bringing finality to the claim, particularly
when the insurer has been prepared to carry out the accepted internal works on the basis the
maintenance issues were rectified.
On balance, I do not consider the insurer ‘s conduct caused an unusual degree of
inconvenience, interference or delay to the complainant to warrant an award of
compensation.
Determination | Case number: 975413 Page 6 of 8
2.3 Why is the outcome fair?
The insurer’s obli gations are limited by the terms of the policy. In this instance, it would not be
fair to require the insurer to cover the claimed loss. This is because it falls outside the scope
of cover.
Determination | Case number: 975413 Page 7 of 8
3 Supporting information
3.1 The AFCA process
AFCA’s approach is ba sed on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.
3.2 Relevant policy terms
General exclusions (pages 15 to 16 of PDS)
What types of loss and damage are excluded.
Your policy does not cover loss or damage from the following situations.
Any loss or damage to the extent that it is caused by or arises from:
• defects in design, structure, materials, workmanship or construction at the
insured site… , which you knew about or should have reasonably known about at
the time of the loss or damage arising,
• failure to take reasonable steps to keep the insured property watertight, well
maintained, structurally sound and secure, for example:
Determination | Case number: 975413 Page 8 of 8
– a storm can highlight defects rather than cause them, and
– damage due to lack of maintenance is not covered.
Insured events (pages 20 to 29 of PDS)
Depending on whether you have Building cover or Contents cover, we will insure
your building and/or contents against loss or damage caused by the following
events if they occur during your period of insurance.
…
Storm
Covered.
Loss or damage caused by storm, including cyclone, hail, wind, snow or rain.
…
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.