Storm damage to east balcony declined as wear, tear and gradual deterioration; cash settlement of accepted internal and pool pump damage
Text of the determination
Determination
Case number 974338
Financial firm AAI Limited
Determination | Case number: 974338 Page 1 of 7
Case number: 974338 27 February 2024
1 Determination overview
1.1 Complaint
The complainant has building and contents insurance with the financial firm (insurer).
He lodged a claim for damage to his property during a storm event on 26 February 2022. The
insurer accepted the claim for a pool pump and internal damages due to stormwater ingress.
It declined cover for damage to the east balcony. It says the balcony damage is due to
gradual deterioration and a lack of maintenance, and was not caused by a single storm event.
The complainant wants the insurer to repair or replace the balcony. He also seeks an updated
settlement for the accepted damages.
1.2 Issues and key findings
Is the insurer required to cover the damage to the balcony?
No. The insurer is not required to cover the damage to the balcony. This is because:
the information provided shows the balcony damage occurred over a long period of time
the proximate cause of damage to the balcony is wear and tear
the damage is not due to an insured event and is excluded.
Is it fair to cash settle the complainant?
Yes. It is fair for the insurer to cash settle the complainant as it cannot guarantee the internal
repairs due to the water ingress through the balcony, which is not covered under the claim.
Why is the outcome fair?
The insurer is entitled to rely on its expert material and the terms of the policy. The available
information does not show the balcony damage was caused by the storm and instead shows
it was caused by wear and tear which is excluded by the policy. It would not be fair to require
the insurer to cover this damage, or complete the internal repairs.
1.3 Determination
This determination is in favour of the insurer.
The insurer is entitled to decline cover for the balcony.
The insurer is to pay the complainant interest on the amounts already settled (being
$12,011.84 for the internal repairs and $2,756.11 for the pool pump) from 30 days after the
date of each quote until the date payment was made, at the rate determined under section 57
of the Insurance Contracts Act 1984 (Cth).
Determination | Case number: 974338 Page 2 of 7
2 Reasons for determination
2.1 Is the insurer required to cover the damage to the balcony?
No. The insurer is not required to cover the damage to the balcony. This is because:
the information provided shows the balcony damage occurred over a long period of time
the proximate cause of damage to the balcony is wear and tear
the damage is not due to an insured event and is excluded.
Complainant must show a loss of the type covered by the policy
When making a claim the complainant carries the initial onus to show a loss of a type covered
by the policy. The complainant must show this on the balance of probabilities (that is, more
likely than not).
Once the complainant has shown a loss covered under the policy, the onus transfers to the
insurer to show it can rely on a condition, limitation, or exclusion in the policy to limit its
liability or to deny the claim.
The complainant’s policy provides cover for specified insured events , including damage
caused by a storm. The full terms and conditions of cover are set out in the product disclosure
statement (PDS) and certificate of insurance. Relevant terms are included in section 3.2 of
this determination.
There is no dispute there was a significant storm event. The insurer has accepted internal
damage to the property as a result of the storm but says the damage to the balcony was not
from a single storm event.
The insurer says the damage is from rain ingress through the tiles on the balcony over an
extended period of time, and the proximate cause of damage is extended and ongoing rot
and decay. It says the complainant has not shown the damage was caused by the claimed
storm event. Additionally, the insurer says the general exclusion for damage caused by wear,
tear and gradual deterioration applies.
Experts agree there is long-term deterioration to the balcony structure
The insurer’s builder (AB) inspected the property on 8 March 2022. AB said there was rotting,
rusting, and moulding to the balcony as a result of rain ingress over an extended period of
time.
The insurer’s assessor inspected the property on 27 May 2022 and noted tiles on top of t he
balcony had begun to pop in sections due to grout breakdown, which it said was the likely
cause of water ingress in the balcony causing the damage. Photographs provided with this
report show deterioration to areas of grouting.
The insurer appointed an engineer (EC) to report on the cause and extent of the damage to
the rear balcony. EC inspected the property on 27 June 2022 and provided its report on 14
July 2022. EC said the balcony was significantly decayed and deteriorated, leaving it
unstable. It said there had been gradual water ingress over a long period due to poor
waterproofing, the design of the balcony, and the balustrade fixings penetrating the balcony
floor and waterproofing.
Determination | Case number: 974338 Page 3 of 7
Photographs provided show significant rot and deterioration to the structural timber beam at
the front of the balcony.
I nsurer’s engineer’s opinion is preferred
The complainant provided a report from his engineer (FC) dated 3 March 2023. The
complainant says FC’s opinion should be preferred as the EC would be motivated to
recommend a claim denial, while FC is independent.
FC generally agreed with EC’s findings, including that there was deterioration to the timber
framing over the past 12-13 years and that the waterproofing was inadequate.
However, FC considered the storm was the cause of the failure because the balcony failed
during the storm. FC then said the storm caused a build-up of water on the floor of the
balcony causing the framing to be loaded above its limit, leading to the damages. This
conclusion is inconsistent with FC’s prior acknowledgement that the timber structure had
deteriorated over many years.
EC noted FC did not detail the specifics of how this overload would occur. EC said the
balcony was required to be designed to withstand a live load of at least 2kPa, which would
require more than 200mm of water per square metre of balcony area, which EC said was not
considered possible on an open balcony area. The photographs provided show gaps across
the base of the balustrade which would allow water to escape to the ground below.
EC maintained the storm would not have overwhelmed the balcony without it being in a
deteriorated state. On balance, I am persuaded by EC’s opinion, sup ported by the other
experts and images of the significant deterioration to the balcony beam, which is consistent
with long term deterioration.
Other submissions do not assist the complainant
The complainant says the front balcony is nearly identical to the damaged rear balcony and
has not failed. He says they were both constructed and certified in 2012 and maintained in
the same way. He says if the rear balcony failed due to gradual deterioration the front balcony
should also have failed. I am not persuaded by this argument.
Photographs show the affected rear balcony is on the waterfront, which FC noted was very
exposed to the prevailing weather conditions. This means the balconies were subject to
different weathering over time, with the front balcony being more sheltered at the other side of
the home.
The complainant provided an email from the certifier in September 2012 which said there
were no issues with the structural integrity of the balconies on completion. The email also
said the complainant needed to ensure the timber was sealed against water entry, which has
been shown to be an issue in this case.
Proximate cause of the balcony damage is wear, tear, and gradual deterioration
The proximate cause of a loss is the dominant, effective, or operative cause. It does not have
to be the first, the last, or the sole cause of the damage. It is a question of fact that depends
on the circumstances of each case, and a common-sense evaluation of the evidence.
I am not persuaded b y FC’s opinion that the balcony failed during the storm so this was the
cause of the damage. Rather, it appears the storm loosened some of the fascia tiles (later
removed in the make safe) to reveal long-term structural damage.
Determination | Case number: 974338 Page 4 of 7
I am not satisfied, on balance, the storm was the dominant cause of damage to the balcony.
Instead, I am satisfied the proximate cause of the damage to the balcony is wear, tear, and
gradual deterioration which is excluded by the policy.
As the proximate cause of the damage to the balcony has not been shown to be an insured
event (and is excluded), the insurer is entitled to decline this part of the claim.
2.2 Is it fair to cash settle the complainant?
Yes. It is fair for the insurer to cash settle the complainant as it cannot guarantee the internal
repairs due to the water ingress through the balcony, which is not covered under the claim.
Fair to cash settle the accepted damages
The insurer proposes to cash settle the complainant for the accepted repairs. It says its
builder cannot warrant the internal repairs as the internal water ingress occurred through the
balcony which is not covered under the claim. The policy allows the insurer to cash settle the
complainant in these circumstances
I accept it is reasonable for the insurer to cash settle the claim. This will allow the complainant
to complete the internal repairs once the water ingress through the balcony has been
addressed.
While the policy provides for a cash settlement to be based on quotes provided by the
complainant, the complainant has been unable to source quotes for the repairs. In the
absence of any alternative scope of works and costings, I accept the quotes and scope of
works provided by the insurer are reasonable.
Settlement with uplift and excess waiver is reasonable
The insurer’s builder provided a quote totalling $10,009.87 for the internal repairs on 25 May
2023. The insurer also relies on a quote from 19 July 2022 for replacing the pool pump,
totalling $2,756.11.
The parties agree the insurer has paid the complainant $12,011.84 for the internal repairs,
(being $10,009.87 plus a 20% uplift) and $2,756.11 to replace the pool pump.
The complainant notes the insurer’s quotes are out of date and wants it to source updated
quotes, including for the balcony. The insurer provided a quote for the balcony repair to assist
the complainant as a guide when sourcing his own quotes for the balcony replacement. The
insurer is not required to provide the complainant with an updated quote for this purpose.
The insurer provided a 20% uplift on the quote for the internal repairs and waived the $5,000
excess. It also agreed to cover the cost of the tiles removed in the make safe, which was
included in the quote for the internal repairs. I accept the uplift of 20% was appropriate for the
internal repairs to allow for any contingencies and the transfer of risk.
Considering the age of the quotes, the insurer should also pay interest on the settlement
amounts from 30 days after the date of each quote until the date payment was made at the
rate determined under section 57 of the Insurance Contracts Act 1984 (Cth), to allow for any
increase in costs since the quotes were completed.
Determination | Case number: 974338 Page 5 of 7
2.3 Why is the outcome fair?
The outcome is fair as the insurer is entitled to rely on its expert material and the terms of the
policy. The available information does not show the balcony damage was caused by the
storm and instead shows it was caused by wear and tear which is excluded by the policy. It
would not be fair to require the insurer to cover this damage, or complete the internal repairs.
Determination | Case number: 974338 Page 6 of 7
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.
3.2 Relevant policy terms
What you are covered for – Insured events
…
If you have home cover
We cover loss or damage to the home at the insured address caused by an
insured event in the period of insurance.
We cover
Loss or damage caused by a storm.
Storm
Determination | Case number: 974338 Page 7 of 7
means a storm, cyclone or severe atmospheric disturbance. It can be
accompanied by strong winds, rain, lightning, hail, snow or dust.
Things we don’t cover
Loss or damage to, or caused by, connected with or arising from, or liability
caused by, connected with or arising from:
Wear, tear and gradual deterioration
any part of the home, unit or contents that has wear, tear, rust, fading, rising
damp, corrosion, rot, action of light, atmospheric or climatic conditions or gradual
deterioration such as, but not limited to:
— tiles and their adhesive or grouting breaking down;
— weathering of roof tiles or roof ridge capping;
— gradual weathering and breakdown of bricks, mortar or concrete;
…
How we settle home claims
We will aim to use a member of our builder supplier network to repair or rebuild
the damage to the home. Sometimes this is not always possible e.g. if there is
pre-existing damage. This will determine how the home claim will be settled.
…
When a me mber of our supplier network is unable to complete the repair or
rebuild
When your claim for loss or damage to the home is covered and a member of our
supplier network is unable to complete the repair or rebuild, we will ask you to
engage a builder to provide a scope of works and provide a quote on the cost to
repair or rebuild your home on a ‘new for old’ basis.
Once the scope of works and quote is provided to us, we will arrange for it to be
assessed. This will involve reviewing the quote to determine it is appropriate and
reasonable for the scope of works. This includes a consideration of the
appropriateness of materials, repair method, labour and material costs and overall
cost effectiveness.
If the quote is appropriate and reasonable for the scope of works, we will then pay
you the assessed amount. If it is not, the quote may be adjusted. This may
include adjusting the scope of works or the quote. We will then pay you the
adjusted amount of the quote.