Home / Allianz Australia / Determination 972228
Determination 972228
solar panel system and air conditioner settlement amount; claim handling
Summary
The complainant claimed the insurer's cash settlement for her solar system and air conditioners was insufficient and that claim handling was poor. AFCA found the settlement fair but ordered $500 compensation for non-financial loss arising from an unauthorised early-morning reconnection by a tradesperson.
Settlement amounts are assessed for fairness against the quote and evidence; non-financial loss is awarded only for unusual upset beyond the ordinary inconvenience of a claim.
Issues
- Claim amount dispute primary · not upheld
“The insurer's settlement for the solar panel system, including inverter, was fair in the circumstances.”
- Poor claim handling secondary · upheld
“The complainant is upset that... an electrician then entered her property at 5am... without her knowledge or consent. I consider an award of $500 compensation is fair.”
- Inadequate claim investigation secondary · not upheld
“The complainant has not provided evidence which shows the air conditioning units require replacement.”
- Delay secondary · not upheld
“Any delays in claim handling not unreasonable overall.”
Subjects and remedies
home or building damagenatural disasterpay non financial loss
Text of the determination
Determination
Case number 972228
Financial firm Allianz Australia General Insurance Limited
Determination | Case number: 972228 Page 2 of 6
Case number: 972228 9 February 2024
1 Determination overview
1.1 Complaint
The complainant held a home insurance policy with the financial firm (insurer).
The complainant lodged a claim on 2 November 2020, following a hail event on 31 October
2020 which caused damage to her property. The insurer accepted the claim and agreed to
cover the roof damage, replace the solar panel system and cover other miscellaneous items.
On 24 May 2021, the complainant accepted the insurer’s settlement offer of $33,748.00 (after
deduction of the $2,000 policy excess). However, the complainant now says the settlement
for the solar panel system and air conditioners was insufficient. She also says the insurer
mishandled the claim because the hot water was disconnected and the tradesmen who re-
attended the property to re-connect it did so without her permission. The complainant says
the claim experience was poor and involved delays and incorrect assessment of the claim.
1.2 Issues and key findings
Was the insurer’s settlement for solar panel system fair ?
Yes. The insurer ’s cash settlement for the complete solar system replacement (panels and
inverter), based on the complainant’s quote , was fair. The insurer is not responsible for the
complainant not taking advantage of the rebate which was, on balance, available at the time.
Did the air conditioning units require replacement?
No. The complainant has not established the three air-conditioning units required
replacement. The available evidence indicated the units sustained damage only to the covers
and one duct. The insurer’s settlement for the air conditionin g units was fair in the
circumstances.
Did the insurer mishandle the claim?
No. The insurer handled the claim reasonably overall. While there were some delays, they
were not unreasonable in the circumstances (but allowed for the parties to reconsider their
respective positions). However, the complainant did experience some avoidable upset for
which compensation of $500 is warranted.
Why is the outcome fair?
The available evidence shows the insurer investigated and cash settled the claim
appropriately overall. It would not be fair to require it to increase the settlement amount.
However, given the complainant’s claims experience, it is fair that compensation be paid.
1.3 Determination
This determination is substantially in favour of the insurer. It is required to pay $500
compensation for non-financial loss. It is not required to take any other action.
Determination | Case number: 972228 Page 3 of 6
2 Reasons for determination
2.1 Was the insurer’s settlement for solar panel system fair?
Insurer’s settlement for solar panel system was fair
The insurer cash settled the complainant $6,895 for the solar panel system, based on the OE
quote (January 2021) which the complainant provided. That quote was for a total of
$10,225.40 (which included a new inverter), less $3,330.40 for the applicable Small Scale
Technology Certificate (STC).
The STC amount is explained in the quote as being the amount payable ‘ subject to you [the
complainant] assigning the solar system to STCs to us [OE]. This amount is calculated as at
the date of this email based on when we estimate your system will be installed .’
The insurer (and its expert MK who had inspected the site and the damage) explained the
damaged solar panels had been removed as part of the make-safe after the event; and the
inverter was also removed, even though ‘it was unable to be tested’, as that action was
required in order to ‘replace and warrant the entire system’.
MK also pointed out the complainant’s quote from OE was for a ‘much higher quality unit’
than her damaged system. MK’s solar technician provided a like-for-like quote for $4,451.43
for replacement solar panels which would have complied with the existing inverter. However,
the insurer noted the complainant wanted the entire system changed.
The complainant says the inverter was not removed and she believes the price for that was
not included in her quote. She believes she should have received the full amount quoted by
OE ($10,225.40). That is because she says she was unable to claim the STC energy rebate
since her solar system was not working for about 2 years. The complainant also submitted
she had already previously taken advantage of the rebate, and that she would not have been
eligible for it again unless she purchased a whole new system.
The evidence indicates she was cash settled in May 2021 for a whole new system, but by
July 2023 she had still not replaced the solar panels and system. MK said that at the time of
settlement the STC rebates were still available, and the reason the complainant was not able
to claim the rebate is because she had not completed the repair/replacement of the solar
system.
The settlement the complainant received was based on a quote for replacement of the
system provided by OE at her request. On the evidence, the only requirement in order for her
to receive the rebate was that she assign the STC to OE. It is not clear why she did not
proceed promptly with replacement of the system once she received the cash settlement.
I am satisfied the insurer’s settlement for the solar panel system, including inverter, was fair in
the circumstances. It is not required to increase the amount for this component of the claim.
2.2 Did the air conditioning units require replacement?
Complainant has not established further damage to air conditioning units
The complainant believes all three air conditioning units were damaged beyond repair. She is
concerned that the assessment was a visual inspection only, and did not investigate possible
internal damage. She points out that her neighbours’ units were replaced.
Determination | Case number: 972228 Page 4 of 6
MK’s report showed dents to the casing of the units. MK concluded only the dented covers
and one duct needed replacing. The settlement was made on that basis.
The complainant has not provided evidence which shows the air conditioning units require
replacement.
I am satisfied the insurer’s decision to cash settle as it did was fair in the circumstances.
2.3 Did the insurer mishandle the claim?
Compensation for non-financial loss awarded in limited circumstances
We may award compensation for non-financial loss in certain limited circumstances. That
includes where a complainant has suffered an unusual degree of upset or inconvenience
because if the insurer’s actions.
However, we also consider that a complainant should accept the ordinary degree of
inconvenience which comes with an event that causes damage to their property, and with
having to make a claim in the first place.
Electrician entered complainant’s property without permission
The complainant is upset that her hot water was disconnected and unavailable for about 24
hours, and that an electrician then entered her property at 5am to reconnect the service, but
without her knowledge or consent.
I accept that those occurrences will have been inconvenient and disconcerting, and the trade
might reasonably have given some forewarning of their intended attendance (particularly at
that time of day).
I consider an award of $500 compensation is fair in the circumstances.
Any delays in claim handling not unreasonable overall
The complainant’s other particular concern is that the insurer caused delays in finalising the
claim and handled it poorly.
I have considered all submissions and chronologies of events already provided by the parties
(and shared with both), and will not repeat them here.
I am satisfied, on that evidence, that the insurer handled the claim reasonably overall. That
includes in making the final cash settlement when it did. I consider there were delays while
the parties sought to finalise their positions on certain issues, including whether the
complainant wanted the insurer to undertake repairs or whether she wanted a cash
settlement.
While I appreciate the complainant will have been keen to have the matter finalised as soon
as possible, and her home restored to its previous condition, I do not consider the insurer
acted unreasonably in allowing the complainant time to decide how she wished to proceed,
and doing what it could to accommodate her position, while broadly maintaining oversight and
contact in the meantime.
It was also reasonable for the insurer to properly consider, investigate and respond to the
complainant’s concerns as to the settlement amounts and scopes.
No further compensation is warranted in the circumstances.
Determination | Case number: 972228 Page 5 of 6
2.4 Why is the outcome fair?
It would not be fair to require the insurer to increase its settlement for the claim-related
damage, when the available evidence shows it was, on balance, fair and appropriate.
While some compensation for non-financial loss is warranted, the insurer did not handle the
claim or complaint unreasonably overall.
Determination | Case number: 972228 Page 6 of 6
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.