Home / QBE / Determination 971546
Determination 971546
Insurer limited flood claim scope, excluding sub-floor and footing damage, and handled claim poorly
Summary
The complainant's home was flooded and the insurer accepted only part of the damage, excluding sub-floor and footing issues. AFCA required the insurer to prepare a new scope of works and repair all damage except an external wall crack, and pay $3,000 for non-financial loss.
The insurer bore the onus of showing exclusions applied and did not show that pre-existing issues were more causal than the flood, while contractor conduct and delays justified non-financial loss compensation.
Issues
- Claim denial primary · upheld“The insurer has also not shown why it should be entitled to exclude much of this damage.”
- Claim amount dispute secondary · not upheld“As she provided no documentary evidence that she incurred a loss, I am not satisfied the insurer is required to cover these expenses.”
- Inadequate claim investigation secondary · upheld“The insurer's SOW does not adequately address this damage.”
- Delay secondary · upheld“There were unreasonable delays with the handling of the matter.”
- Third-party or outsourcing failure secondary · upheld“The insurer's contractor acted poorly; contractor KB belatedly advised it lacked capability for major loss cases.”
Subjects and remedies
home or building damagenatural disasterpay non financial lossrepair or rectify
Related
Text of the determination
Determination
Case number 971546
Financial firm QBE Insurance (Australia) Limited
Determination | Case number: 971546 Page 1 of 7
Case number: 971546 7 December 2023
1 Determination overview
1.1 Complaint
The complainant holds and home and contents insurance policy with the financial firm
(insurer). She lodged a claim for flood damage to her home on or about 14 October 2022.
The insurer accepts the internal damage is covered. However, it says it will not cover the
maintenance issues and cracking damage. It says this damage is excluded by the policy.
The complainant considers all the damage to the home should be covered. She is seeking
clean- up costs and compensation for the insurer’s poor handling of the claim .
1.2 Issues and key findings
Has the insurer correctly assessed the scope of damage?
No. The flood caused damage to the property and the insurer’s scope of works (SOW) does
not adequately address this. The insurer has also not shown why it should be entitled to
exclude much of this damage. Given this, the insurer is required to repair all damage to the
home, except the crack to the external stone wall. As the complainant provided no persuasive
evidence she incurred costs to attend to cleaning the home, the insurer is not liable for this.
Is an award of compensation appropriate?
Yes. The insurer’s contractor acted poorly and there were unreasonable delays with the
handling of the matter. This severely upset and affected the complainant. It is appropriate the
insurer pays compensation of $3,000.
Why is the outcome fair?
There is no dispute the complainant’s home was flooded or that this caused extensive
damage. The insurer has not adequately explained why it should be entitled to limit its offer to
cover this damage as it has done. It is therefore fair that the insurer repairs the damage, as
specified. Given the conduct of its contractor and the effect this had on the complainant, it is
also fair that the insurer pays compensation for non-financial loss.
1.3 Determination
This determination is substantially in favour of the complainant. The insurer is required to:
prepare a new SOW and undertake the repairs to the home, except for the cracks to the
external stone wall
pay the complainant $3,000 compensation for non-financial loss.
Determination | Case number: 971546 Page 2 of 7
2 Reasons for determination
2.1 Has the insurer correctly assessed the scope of damage?
No. The flood caused damage to the property and the insurer’s SOW does not adequately
address this. The insurer has also not shown why it should be entitled to exclude much of this
damage. Given this, the insurer is required to repair all damage to the home, except the crack
to the external stone wall. As the complainant provided no persuasive evidence she incurred
costs to attend to cleaning the home, the insurer is not liable for this.
Insurer accepted liability for internal damage but declined some areas
The complainant’s home was built in or about 1854. It is a single storey home with a
corrugated iron roof. The complainant purchased it about 18 months prior to the loss.
It is not in dispute the home was inundated by floodwater and sustained damage.
The insurer accepted liability for the internal damage. This includes cover for replacement of
floorboards, skirting boards, doors, architraves tiles and plasterboard. It says it is not liable to
cover:
the damage to the sub-floor, including long-term surface drainage/maintenance issues and
the subsequent loss of support for the flooring and wall
subsidence of the footings
a vertical crack through the stone wall cladding.
A claim for contents damage was also made and has been resolved.
Policy covers flood damage subject to terms, conditions and exclusions
The terms of the policy include the Certificate of Insurance (COI) and the Product Disclosure
Statement (PDS). There is no dispute the insurer sent these documents to the complainant.
The policy covers damage caused by one or more of the listed events. It does not provide
cover for all damage. Amongst these events is cover for storm, storm surge, rain, hail or
flood. This cover is provided subject to the terms, conditions and exclusions of the policy.
There is no dispute the home sustained flood damage. The insurer says the cover it is
required to provide is limited due to the age and existing damage at the property. To the
extent it intends to limit cover under the policy, the onus rests with the insurer to show, on
balance, any conditions or exclusions it relies upon apply.
Insurer ’s experts say the damage is not entirely due to the flood
The insurer arranged for experts to review the damage to the complainant’s home.
Builder KB attended on 24 October 2022. It found floodwater entered through the mud room
at the rear of the home, inundating the property up to a maximum height of about 260mm. KB
says the mudroom had no gutters and was non-compliant with building standards. This
allowed water to pool at the doorway, increasing the level of inundation.
Engineer EI inspected the home on 7 November 2022. EI found:
the local creek overflowed during the flood event and wrapped around the home like a
horseshoe, meaning water inundated from both sides
Determination | Case number: 971546 Page 3 of 7
a floor survey showed there was differential settlement of 96mm across the home, with
‘obvious subsidence’ at the northeast corner where the floor was propped
the foundations were affected by three different issues:
> poor surface water drainage allowing water to pool at the northeast corner footing
> trees close to the home causing ‘drying shrinkage’
> inundation of the floor cavity by floodwater
a lack of damp proof barriers meant the subfloor degraded and this affected the support for
the walls and floors, which was exacerbated by the flooding
the subfloor cavity depth is about 200mm, which is inadequate for effective ventilation
the damage is ‘associated wi th long- term surface drainage and maintenance issues’.
Complainant’s engineer says footings and sub-structure must be replaced
The complainant disagreed with the insurer’s view that the flood damage to the property is
limited. She obtained her own expert report from engineer RF. RF inspected the home on 27
February 2023 and wrote:
the sub-structure of the building needs to be replaced with new footings and support due to
the flooding event
it is not certain the insurer’s repair quote has allowed for upgrades necessary to meet
modern building standards.
Insurer is required to replace the sub-structure and foundations
EI broadly considered the flood inundation had a marginal effect on the underpinning for the
property. It identified three issues, of which the flood was one. The other issues were the
influence of surrounding trees and poor surface drainage.
EI confirmed floodwater:
entered the subfloor and based on our observation, saturated the upper surface of
the ground. This can exacerbate the consolidation settlement under the load-
bearing walls. Based on the total movement of the building, the exacerbated
amount would be less than 5% and, in effect, we consider this negligible on the
overall performance of the building.
In contrast, RF, said the sub-structure had been exposed due to the flooding, and:
It is my opinion that the sub-structure needs to be replaced with new pad footings,
stumps, bearers, and joists. Due to the flooding, the substructure has been
exposed and any replacement work required would need the stumps and floor
bearers and floor joists to be replaced to make the substructure comply with
current Standards. The re-construction work should allow for this re-installing of
work in compliance with current building regulations.
Whilst I acknowledge the home was aged and might not have been as ideally suited to
withstand the flooding as other homes, I accept the damage was caused by flooding. I do not
accept EI’s view the effect of the flooding was negligible. Particularly noting its observation
that the local river surrounded the property like a horseshoe and the level of inundation, I
consider the flood’s influence was significant.
There is no persuasive evidence to support the view the trees had any practical impact on the
damage. I acknowledge there had likely been some pre-flood movement and differential
Determination | Case number: 971546 Page 4 of 7
settlement across the flooring. However, the home had stood for nearly 170 years and some
existing movement is not surprising.
EI also acknowledged there was limited cracking within the building and considered more
movement might have been expected, given the differential settlement present.
I cannot be satisfied as to the extent of differential settlement which was present prior to the
flooding event. There is no persuasive evidence the home was not fit for purpose. I do not
consider any pre-loss differential movement to be more predominantly causal than the flood
events, which were severe.
Given this, I am satisfied the insurer is liable for the replacement of the sub-structure, piers
and foundations.
Insurer not liable for vertical crack to external wall on southern elevation
The complainant has not provided anything to show the vertical cracking through the external
stone wall was caused by the flooding event.
EI acknowledges there is a 5mm vertical crack in the stone cladding. RF has not directly
addressed the issue. Neither appears to have analysed how it was caused.
A photo of this damage shows the crack is near the roof of the building, above a red door.
On balance, I consider there is no likely reason the flooding would likely have caused or
contributed to this cracking. I am not satisfied it was caused in the event. It is more likely
related to the age of the building, deterioration and wear and tear (which the policy does not
cover). I am not satisfied the insurer is required to cover this damage.
No persuasive evidence the waterproofing issues lessen the insurer’s liability
EI wrote that ‘prolonged wetting’ and water pooling around the home and against the footings
‘can’ affect the bearing capacity of these structures. It says when the ground is
‘supersaturated’ water displaces the heavy soil and the density of the soil decreases. EI wrote
that at the complainant’s home :
the lack of damp-proof barriers has resulted in the material degradation of the
subfloor and loss of support of the wall and flooring. This has been exacerbated
by the [localised] subsidence of the footing.
It also says there is settlement along the eastern e levation which it considers ‘within the zone
of influence’ of the surrounding trees.
I am not satisfied the report shows these issues were necessarily present or that they were
more relevant to the loss than the flooding event. Much of this is theorised as a possible
cause of damage. I am not satisfied EI can show to what extent damage was clearly present
prior to the claimed event.
In contrast, it is evident the home was flooded. The insurer considers it was not suitably
constructed to withstand the elements. However, it is not clear to what extent these issues (if
present) caused damage before the flood. I accept the flood was a catastrophic event and
caused clear and identifiable damage.
I acknowledge the home was aged and imperfect. The COI notes it was a Victorian-era home
(constructed between 1840 and 1890). Therefore, the insurer knew what it was insuring. If it
Determination | Case number: 971546 Page 5 of 7
had concerns about the insurability of a home of this age, it could have elected not to take the
risk. There are no obvious issues raised to show the home was in poor condition prior to the
flood event.
Given this, I am satisfied the insurer is liable to repair the entirety of the claimed damage,
except for the identified external crack in the stone wall.
Insurer to prepare new SOW and undertake repairs
Given the insurer’s SOW does not address all the claimed damage, I am satisfied a new
SOW will be required to address the damage.
Further, given the only excluded element is the external crack to the stone wall, I consider
there is no impediment to the insurer completing the work. I am therefore satisfied the insurer
must do this. It means the complainant will have:
the security of a repaired home
temporary accommodation for the length of time it takes the insurer to make the home
relivable
a lifetime guarantee for the repairs, and
repairs conducted to ‘comply with current building codes and statutory requirements’, as
noted in the PDS.
The last point will not require the insurer to rebuild all parts of the home to comply with current
standards. It will not have to improve the site drainage (except as it relates to building
damage which must be addressed). The insurer is only liable for those repairs which are part
of the claimed damage and for ensuring these repairs are conducted to comply with modern
repair standards.
Should the complainant elect not to have the insurer conduct the work, the insurer may
prepare its SOW (based on a current viable quote) and settle for this amount. The insurer will
also be required to pay a contingencies uplift on this quote of 10%. This will compensate the
complainant for the loss of the lifetime guarantee and the transfer of risk.
Insurer not liable for complainant’s cleaning and debris removal costs
The complainant says she removed some of the debris from her home to fast track the repair
process. She provided no invoices or receipts to show what expenses she incurred.
As she provided no documentary evidence that she incurred a loss, I am not satisfied the
insurer is required to cover these expenses.
2.2 Is an award of compensation appropriate?
Yes. The insurer’s contractor acted poorly and there were unreasonable delays with the
handling of the matter. This severely upset and affected the complainant. It is appropriate the
insurer pays compensation of $3,000.
AFCA can award compensation for non-financial loss
Under our Rules, AFCA can award up to $5,400 compensation for non-financial loss. This
must relate to poor claims handling or other actions of the insurer which cause an unusual
degree of stress, delay, or inconvenience.
We expect complainants to be moderately robust, and we will not award compensation for the
ordinary degree of inconvenience involved in making a claim.
Determination | Case number: 971546 Page 6 of 7
Insurer to pay non-financial loss compensation of $3,000
There were significant delays caused by the insurer’s building contractor KB, which belatedly
advised it did not have the capability to deal with major loss cases. This meant several
months passed before another builder was retained to quote the damage.
The complainant also reported issues and concerns of inappropriate behaviour with another
of the insurer’s contractors. The insurer acknowledged these concerns and notes the
contractor:
called the complainant directly to apologise for the incidents
sent flowers in acknowledgement of the effect on the complainant and to apologise
dismissed the staff member involved in the incidents.
I acknowledge the insurer ’s contractor responded to the concerns, however the delays and
the effect it had on the complainant are considerable. She was distressed and placed in a
position no complainant should be in. This is ultimately the insurer’s responsibility.
I accept the complainant was understandably upset by the contractor’s actions and by the
delays involved in the handling of the claim. I acknowledge the insurer has kept her in
temporary accommodation for an extended period, as is appropriate. This is no substitute for
having a repaired home, however.
I am satisfied it is appropriate the insurer should pay compensation. Given the impact on the
complainant and her peace of mind, I consider payment of $3,000 for non-financial loss is fair.
2.3 Why is the outcome fair?
There is no dispute the complainant’s home was flooded or that this caused extensive
damage. The insurer has not adequately explained why it should be entitled to limit its offer to
cover this damage as it has done. It is therefore fair that the insurer repairs the damage, as
specified. Given the conduct of its contractor and the effect this had on the complainant, it is
also fair that the insurer pays compensation for non-financial loss.
Determination | Case number: 971546 Page 7 of 7
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.