Home / QBE / Determination 971441
Determination 971441
Claim for a pit (decommissioned well) under pavers declined as not caused by an insured event
Summary
The complainant's claim for a deep pit found beside his house was declined by the insurer as not caused by an insured event. AFCA upheld the decline but required payment of $1,122 for deck damage from exploratory work and $1,500 for non-financial loss from delay.
Expert evidence showed the pit was a decommissioned well not caused by an insured event, so the claim was outside policy cover, but the insurer's delay in deciding and its damage to the deck warranted payment.
Issues
- Claim denial primary · not upheld“The insurer is entitled to deny the claim; the pit was not caused by water or liquid damage, landslide or subsidence.”
- Inadequate claim investigation secondary · not upheld“Persuaded by SW's report that core soil samples from the base of the pit were not necessary.”
- Delay secondary · upheld“The insurer took over six months to decide the claim, causing unnecessary stress and inconvenience.”
- Repairs or contractors secondary · upheld“Damage was done to the complainant's timber deck during exploratory work; insurer to pay $1,122 for repair. Make-safe complaint not upheld.”
Subjects and remedies
home or building damagepay compensationpay non financial loss
Related
Text of the determination
Determination
Case number 971441
Financial firm QBE Insurance (Australia) Limited
Determination | Case number: 971441 Page 1 of 6
Case number: 971441 26 March 2024
1 Determination overview
1.1 Complaint
The complainant holds a home building and contents insurance policy with the financial
firm(insurer). On 29 August 2022, the complainant lodged a claim after he discovered a deep
pit under pavers at his house.
The insurer arranged a number of experts to assess the pit but declined his claim. The insurer
says it found no damage caused by an event that is covered by the policy.
The complainant wants the insurer to cover the claim. He also says, in the course of
assessing the claim, the insurer did insufficient testing and inadequate make safe work.
1.2 Is the insurer entitled to deny the complainant’s claim?
Yes. The complainant has not established he more likely than not suffered damage due to an
event covered by the policy. That is because, on balance, the expert evidence shows that
neither the existence of the pit, nor further erosion at its head, was due to ‘ water or liquid
damage ’ , ‘ landslide or subsidence ’ , or any other insured event. Accordingly, the insurer is
entitled to deny the claim.
Is non-financial loss compensation payable?
Yes. The insurer did not handle the claim in a timely manner and this caused unnecessary
stress and inconvenience for the complainant. The insurer must pay $1,500 compensation
for non-financial loss.
Why is the outcome fair?
It would be unfair to expect the insurer to cover claims outside the agreed policy terms. The
insurer’s offer to pay $1,122 repair costs for damage caused during its exploratory work is fair
given it is based on an undisputed builder’s quote. Given the insurer’s delay in deciding t he
claim, it is also fair the insurer pays compensation.
1.3 Determination
This determination is substantially in favour of the insurer.
If the complainant accepts this determination, within 14 days of being notified of the
complainant’s acceptance, the insurer is to pay the complainant $1,122 for damage to the
complainant’s timber deck and $1,500 compensation for non-financial loss.
Determination | Case number: 971441 Page 2 of 6
2 Reasons for determination
2.1 Is the insurer entitled to deny the complainant’s claim ?
Yes. The complainant has not established he more likely than not suffered damage due to an
event covered by the policy. That is because, on balance, the expert evidence shows that
neither the existence of the pit, nor further erosion at its head, was due to ‘ water or liquid
damage ’ , ‘ landslide or subsidence ’ , or any other insured event. Accordingly, the insurer is
entitled to deny the claim.
Background to the claim
On 28 August 2022, a large hole (pit) approximately 4.5m deep was discovered at the
complainant’s house. The pit is to the north east of the house and under pavers which were
found to be at risk of collapsing. When found, the edge of the pit was 1.5m from the house, at
its closest point. The complainant claimed on his policy the following day. The insurer’s trades
attended that day and fenced off the area of the pit as a make safe.
Onus on the complainant to establish a claimable loss
The complainant is required to show, on the balance of probabilities (that it is more likely than
not) that the loss or damage claimed falls within the terms of the policy. This is known as a
claimable loss.
Once the complainant has established a claimable loss, the onus shifts to the insurer to
establish, on balance, the application of a policy exclusion or that it is otherwise entitled to
decline the claim under the policy.
Policy cover is subject to terms, conditions, and exclusions
The home building policy is made up of the product disclosure statement and the certificate of
insurance. There is no dispute the insurer sent these documents to the complainant. The
insurer is therefore entitled to rely on the terms of the policy in assessing the claim.
The policy is an ‘insured events’ policy. This means not all loss and damage is covered.
Rather, only loss or damage caused by one or more of the insured events and not subject to
exclusions, is covered. Therefore, to establish a claimable loss, the information must show
this.
Relevantly, the events covered by the policy include:
Water or liquid damage
We will cover
Loss or damage caused by water or liquid escaping from:
A fixed pipe or an object attached to a pipe, fixed gutter, fixed tank or a
drain
…
Landslide or subsidence
We will cover
Loss or damage as a result of a landslide or subsidence if the loss or damage
occurs within 72 hours or an insured event being:
…
Liquid escaping from:
A fixed pipe
Determination | Case number: 971441 Page 3 of 6
Complainant says damage caused by insured events
The complainant says the pit is a sink hole which was caused by a leaking pipe. He says
flows of water have been observed at the base of the pit including in October 2022. Further,
he says the soil erosion at the head of the pit was caused by leak of water or liquid.
Further, the complainant says the insurer failed to undertake sufficient and evidence-based
testing. In particular, it did not test further material from the base of the pit. The complainant
says the first test of that material was inconclusive because the soil tested was likely to be
soil that had fallen from the head of the pit. Accordingly, he says core samples from the base
of the pit should be taken and tested.
The complainant has not provided an expert report.
Experts’ evidence does not support damage caused by insured event
The insurer appointed a forensic structural engineer, GP, to assess the pit at the property. GP
attended the site three occasions and provided three reports including photos. GP also
advised plumbing tests should be conducted. The insurer’s plumbers, PP, conducted and
reported on those tests which were then reviewed by GP.
In summary, GP says:
the pit is a decommissioned well. Its square cut sides in clay soil is evidence of that
neighbours advised they were aware of a well in the area of the pit that had been
decommissioned more than 50 years ago. Therefore, the pit was present at the time of the
home’s cons truction
it is assumed that the well was capped but the capping has deteriorated over time
wells are constructed to capture water and bored to depths beneath the water table.
Accordingly, water would be expected to be found from time to time at the base of a well
sustained pressure testing of the sewer and stormwater pipes found no change to the
amount of water entering the pit. Additional water flowing into the base of the pit would be
expected during such testing if a leak from pipe led to the existence of the pit
based on PP’s testing results, water entering the base of the pit was not from the sewer
leak
there is no connection between the failure of the capping to the well and a sewer leak at
the property. That is shown by the fact that water is entering at the base of the pit and not
the head of the pit. Also, the sewer leak is downhill and 14m away from the head of the
pit, and
water samples were to be taken from the well to test for waste detergent contaminants that
would be present if water entering the pit was from a sewer. As there was soil at the base
of the pit, soil was collected for testing. The results were inconclusive. GP said a larger
amount of soil was required to complete testing. That further testing was not undertaken.
GP said the compl ainant’s request that core samples be taken from the base of the pit was
unsafe and unnecessary.
Following the recommendation of GP, PP tested for water leaks at the property. PP attended
on 15 September 2022 and 25 October 2022 and performed non-invasive leak detection
testing. PP’s reports contain photos of the site, tests being conducted and CCTV, and say:
the domestic hot and cold pipework passed pressure testing
hose flowing into the downpipe and rainwater overflow caused no change to the water
level in pit
CCTV to the stormwater and the laundry (closest pipe to pit) found no issues
Determination | Case number: 971441 Page 4 of 6
the sewer pipes run along the western side of the home and discharge to an easement at
the south of the property
deluge testing showed a leak in the sewer pipe at the rear of the property
there is no pipe network and no sewer pipes in the vicinity of the pit
the leak in the sewer line did not influence any water ingress within the pit, and
there are no leaks from the stormwater system.
The insurer also engaged engineers, SW, to inspect the site and prepare a report. SW’s
report, dated 13 July 2023, contains site photos, aerial photos, water and drainage diagrams,
and groundwater data. SW reviewed the relevant reports and testing and says:
the pit is a decommissioned well and not a sink hole. It has the distinct features of a
vertical mechanical cut in the ground in a square profile and no record of a growing cavity
caused by a leak event. Some loose soil debris had fallen from the head of the void
the leaking pipe was approximately 19m away from the pit. No damage or depressions
could be observed in the area surrounding the leak
the leak within the sewer gravity lines has not contributed to the pit, nor was there any
damage reported to the other plumbing lines to have caused such an extensive pit in the
ground, and
the pit would have become evident after the total failure of the capping from age
deterioration over time. The failure of the capping caused the built-up land above the
capping to cave in resulting in the opening in the ground.
Complainant has not established a claimable loss
Having considered all the exchanged information, I am satisfied that the complainant has not
established a claimable loss for the damage. That damage is: the existence of the pit itself,
and the erosion of soil at the head of the pit.
I am persuaded by the expert evidence of GP, SW and PP. That is because their reports and
fact-based, show analysis, and are accompanied by photos and, where appropriate,
diagrams. The expert evidence shows that, more likely than not, the damage was not caused
by ‘ water or liquid damage ’ , ‘ landslide or subsidence ’ , or any other event covered by the
policy. That is because:
the expert evidence shows that the pit is a disused well that was decommissioned before
the complainant’s house was constructed
despite numerous tests, the expert evidence shows no connection between the broken
sewer pipe, or any other leak, and existence of the pit, water at the base of the pit or
erosion at the head of the pit
while the complainant says he has seen, and the insurer does not dispute, water at the
base of the well including in October 2022 , I am persuaded by the SW’s evidence that
minor intermittent natural water flow is expected. That is because SW says a
decommissioned well would be connected to an underground aquifer that had
subsequently mostly dried up
had the sewer leak been the cause of the claimed damage, erosion of soil would have
been expected in the vicinity of the leak. No evidence of soil erosion was found, and
there is no dispute that the head of the pit has widened since discovered by the
complainant. However, ‘landslide or subsidence’ covered under the policy is limited to
damage that occurs within 72 hours of specific insured events (including water or liquid
damage). The exchanged information does not show any link between the widening at the
head of the pit and an escape of liquid 72 hours before the erosion, or any other insured
event.
Determination | Case number: 971441 Page 5 of 6
I have also considered the complainant’s concern that the insurer did not properly assess his
claim. In particular, it did not take core soil samples from the base of the pit. However, I am
persuaded by SW’s report. SW reviewed the inspections and testing reports, inspected the
site and undertook their own analysis. It concluded that, given the evidence available, it is not
necessary to take core soil samples from the base of the pit in order to determine the cause
of the claimed damage.
The complainant has said that the insurer failed to shore up the head of the pit resulting in
additional loss of pavers and the hole widening into neighbour ’ s land. The exchanged
information shows that, on the day the claim was made, the insurer performed a make safe
by fencing off the area around the pit. The insurer’s builders later put a temporary cover over
the pit. The complainant has not said what further make safe he believes would have been
reasonable that did not require undertaking the repair. As the claim is not covered by the
policy it would not be fair to require the insurer to undertake the repair.
The insurer accepts that, in the course of its exploratory work, damage was done to the
complainant’s timber deck. The insurer has obtained a quote from its builder, AT, for $1,122
for repair of that damage. The complainant has not disputed the amount of that quote.
Accordingly, I consider to be a fair settlement for that damage.
2.2 Is non-financial loss compensation payable?
Yes. The insurer did not handle the claim in a timely manner and this caused unnecessary
stress and inconvenience for the complainant. The insurer must pay $1,500 compensation for
non-financial loss.
AFCA may award compensation in certain circumstances
Under our Rules, AFCA can award up to $5,400 compensation for non-financial loss. This
must relate to poor claims handling or other actions of the insurer which cause an unusual
degree of stress, delay or inconvenience.
We expect complainants to be moderately robust, and we will not award compensation for the
ordinary degree of inconvenience involved in making a claim.
Complainant entitled to compensation for non-financial loss
The insurer has not met its claim handling obligations is assessing this claim. I accept that the
insurer arranged a number of experts to assess the claim and perform testing and this took
time. However, the insurer took over six months to decide the claim in circumstances that
caused unnecessary stress and inconvenience for the complainant.
In accordance with what is fair in all the circumstances, I consider an award of $1,500
compensation for non-financial loss should be paid.
2.3 Why is the outcome fair?
It would be unfair to expect the insurer to cover claims outside the agreed policy terms. The
insurer ’s offer to pay $1,122 repair costs for damage caused during its exploratory work is fa ir
given it is based on an undisputed builder’s quote . Given the insurer’s delay in deciding the
claim, it is also fair the insurer pays compensation.
Determination | Case number: 971441 Page 6 of 6
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.