Determination 970229
Claim for water damage to ensuite shower declined as caused by a gradual leak not covered by the policy
Summary
A corporate landlord claimed for water damage to an ensuite shower, which the insurer declined as caused by a gradual leak. AFCA found in favour of the insurer and required no action.
The complainant did not establish a valid claim, as the policy in force covered escape of liquid but excluded gradual leaking and the damage was agreed to be from a gradual leak.
Issues
- Claim denial primary · not upheld“The insurer is entitled to refuse the claim as the complainant has not established a valid claim within the terms of the policy.”
- Product terms interpretation secondary · not upheld“Complainant's earlier 2012 PDS was not the policy wording during the period of insurance; current PDS excluded gradual leaking.”
Subjects and remedies
home or building damageno remedy
Related
All Suncorp Group determinations · Find similar determinations
Text of the determination
Determination
Case number 970229
Financial firm AAI Limited
Determination | Case number: 970229 Page 1 of 5
Case number: 970229 25 September 2023
1 Determination overview
1.1 Complaint
The complainant, a corporation, held a landlord insurance policy with the financial firm
(insurer).
It was not in dispute that the cause of the damage to an ensuite shower was a gradual leak,
based on the insurer‟s expert reports and the complainant‟s position regarding the cause of
the damage.
The complainant has not established that the relevant policy wording during the period of
insurance did provide cover for the claim.
Accordingly, the complainant has not established a valid claim.
1.2 Issues and key findings
Is the insurer entitled to refuse payment of the claim?
Yes. The insurer is entitled to refuse the claim as the complainant has not established a valid
claim within the terms of the policy.
Why is the outcome fair?
The outcome is fair as the insurer is entitled to rely upon the terms of the policy to refuse the
claim.
1.3 Determination
The determination is in favour of the insurer.
The insurer is not required to take any further action.
Determination | Case number: 970229 Page 2 of 5
2 Reasons for determination
2.1 Is the insurer entitled to refuse payment of the claim?
Yes. The insurer is entitled to refuse the claim as the complainant has not established a valid
claim within the terms of the policy.
Complainant has the initial onus to establish a valid claim
The initial onus is with the complainant to establish on the balance of probabilities (that is
more likely than not) that the loss or damage claimed falls within the insuring provision of the
policy. This is known as a „ valid ‟ (or prima facie ) claim.
Once the complainant has established a valid claim, the onus shifts to the insurer to establish,
on balance, the application of a policy exclusion or that it is otherwise entitled to decline or
limit the claim under the policy.
The policy provided cover for escape of water but not gradual leaks
In this complaint both the corporation (which is the insured) and the complainant are referred
to as the „ complainant ‟ . The Certificate of Insurance recorded that insurance cover was
provided for four properties, two in South Australia and two in Queensland, between 15
September 2022 and 15 September 2023. In the renewal notice issued on 5 August 2022 the
insurer provided details of the insurance cover in the Certificate of Insurance and stated in
relation to the Product Disclosure Statement (PDS):
Other important information
The Product Disclosure Statement (PDS) is an important legal document that
contains details of your insurance if you purchase this product from us. Before
you decide to buy this product from us, please read this PDS carefully. If you
purchase this product, your policy comprises of this PDS and your certificate of
insurance which shows the details particular to you.
The PDS preparation date was 25 November 2020. The insurer has provided detailed
information regarding proof of dispatch which establishes that the PDS was issued via post
on 12 August 2021 to the complainant‟s correct address.
The insuring clause provided that the insurer would ‟ cover loss or damage to the property at
the insured address caused by an insured event during the period of insurance ‟ (p.43).
The policy provided that the insurer covered (at p.50-51) for escape of liquid:
We cover
Loss or damage caused by liquid leaking, overflowing or bursting from any of
the following:
— …
Determination | Case number: 970229 Page 3 of 5
— any drain, fixed pipes, drainage and sewage systems (not forming part of a shower cubicle
wall, floor or base
We don’t cover
..
- wear, tear and gradual deterioration or loss or damage by the gradual process
of liquid leaking, splashing, dripping or overflowing
The complainant provided a version of a PDS which was prepared 19 October 2012 which
provided cover for escape of liquid (at p.21) but not “wear and tear, or loss or damage by the
escape of liquid occurring as a result of a gradual process of leaking, splashing, dripping or
overflowing over a period of time when you could reasonably be expected to be aware of this
condition”. Based on the information provided, this was not the policy wording during the
period of insurance and in which the loss occurred.
On 3 March 2023 the complainant lodged a claim regarding one of the complainant‟s rental
properties in Queensland due to water damage. The insurer investigated the claim and
denied liability on 8 March 2023 on the basis that the cause of the damage in relation to an
ensuite shower was not covered by the terms of the policy and arose due to a gradual leak.
The insurer‟s reports included detailed Estimator and Leak Location Reports (with supporting
photographs) dated 7 March 2023 prepared by A which identified that damage was as a
result of a gradual l eak. A‟s reports stated:
that the ensuite shower had been stripped out prior to the inspection and that it was not
possible to carry out full testing and definitively confirm the cause of the leak
the plumber observed that the pipework tested ok except that the tap spindles leaked
badly while turning on due to leaking o-ring
the waterproofing membrane had been installed directly to yellow tongue timber flooring
and that the vertical perimeter behind the vanity had been installed under the required
100mm height making the waterproofing membrane non-compliant at the time of
installation
the wall linings were left on site in the garage and were observed to only have mould
growth at the bottom 300 mill of the wall lining which was not consistent with a pipe leak in
the shower breach as the rear section of the wall lining at the shower breach was observed
to be undamaged
the likely cause of the damage to the bathroom is from a failed waterproofing membrane
due to the strip out being conducted prior to inspection, flood test to the shower area,
shower screen and wall tiles was not possible
the evidence suggested that there was not a pipe leak in the shower breach and that the
shower base had failed. The timber rot to the architrave, yellow tongue, flooring and
smooth edge in the master bedroom are all consistent with long-term exposure to a leak
it appeared the leak had been present at the property for a long period of time to cause
this wet rot
that the escape of liquid was caused by:
> wear, tear and gradual deterioration or loss or damage as a result of gradual process of
liquid leaking, splashing, dripping or overflowing
> loss or damage to, or caused by, a leaking shower floor or base, leaking shower cubicle
walls, leaking shower glass screening or doors, leaking open shower floor areas or wet
areas
Determination | Case number: 970229 Page 4 of 5
The complainant did not provide any contrary expert evidence but submitted (together with a
video) that the leak was not from the base of the shower but the tap. Further, during the
course of the complaint, the complainant made submissions that the gradual leak occurred
prior to the insurance period in which the claim was made and stated “this gradual leak
probably occurred prior to August 2021” (8 June 2023) and “as this was a slow leak that
caused the damage” (18 July 2023). The complainant therefore acknowledges that the cause
was a gradual leak but its submissions also do not assist the complainant ‟s position . That is
because the claim was made on 3 March 2023 and the relevant policy is the one applicable
during the period of the insurance i.e. from 15 September 2022 and 15 September 2023.
In practical terms, the parties did not dispute that the loss due to escape of liquid (water)
arose due to a gradual leak. This was not an insured event which was covered by the
relevant policy wording.
The complainant has not established that a claim covered under the terms of the policy arose
during the relevant period of insurance. That means the insurer is not liable for the damage.
2.2 Why is the outcome fair?
The outcome is fair as the insurer is entitled to rely upon the terms of the policy to refuse the
claim.
Determination | Case number: 970229 Page 5 of 5
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. I have reviewed and considered
all the information the parties have provided.
While the parties have raised several issues in their submissions, this determination is
restricted to the issues that are relevant to the outcome. We assess complaints on available
information and circumstances.
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information. If there are conflicting recollections and these are evenly weighted, we may find
that a claim cannot be established.