Home / IAG / Determination 969511

Determination 969511

Claim declined for cracking damage to building attributed to drainage and earth movement rather than a single storm event

FirmIAG
Decided2023-10-11
ProductGeneral Insurance · Landlord
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The complainant's landlord building claim for cracking damage was declined by the insurer as caused by long-term poor drainage rather than a storm. AFCA found the insurer entitled to decline and required no action.

Expert evidence showed inadequate drainage causing soil expansion and contraction was the proximate cause, an excluded cause, and a storm was not shown to be a single-occurrence cause.

Issues

Subjects and remedies

home or building damageno remedy

Related

All IAG determinations · Find similar determinations

Text of the determination

Determination Case number 969511 Financial firm Insurance Australia Limited Determination | Case number: 969511 Page 1 of 9 Case number: 969511 11 October 2023 1 Determination overview 1.1 Complaint The complainant holds a landlord policy of insurance with the financial firm (insurer) which provides building cover. On or about 22 February 2022 the complainant lodged a claim for damage to the insured building which includes cracking to the plaster in the lounge room, kitchen, hallway, main bedroom, robe and external column/walls of the front entrance. The date of loss was reported as 16 February 2022. The insurer has declined the claim on the basis the damage is not from a one off insured event but the effects of ground drainage issues over time. The complainant disputes the declinature on the basis that the storm event occurred. He says there is appropriate drainage in place, so the damage must have been caused by the storm . 1.2 Issues and key findings Was the insurer entitled to decline the claim? Yes. There is insufficient evidence to demonstrate a single occurrence of storm caused the claimed damage. Further, there is evidence that inadequate drainage led to expansion and contraction in the soil around the foundations of the building which caused the cracking damage. This is an excluded cause of loss which allows the insurer to decline the claim. Why is the outcome fair? The outcome is fair as it is in accordance with the law, evidence and policy terms and conditions. The insurer has shown that exclusions apply to preclude cover for the claim. 1.3 Determination This determination is in favour of the insurer. The insurer is entitled to deny the claim. It is not required to take any further action. Determination | Case number: 969511 Page 2 of 9 2. Reasons for determination 2.1 Was the insurer entitled to decline the claim? Yes. There is insufficient evidence to demonstrate a single occurrence of storm caused the claimed damage. Further, there is evidence that inadequate drainage led to expansion and contraction in the soil around the foundations of the building which caused the cracking damage. This is an excluded cause of loss which allows the insurer to decline the claim. The policy provides cover for storm damage subject to exclusions The policy defines incident as a single occurrence, or a series of occurrences arising out of the one event. The policy contains cover for loss or damage to the home building caused by storm. The cover is subject to event specific exclusions including: If loss or damage is caused by a storm Covered Storm Landslide or subsidence that happens immediately as a directly result of storm. For example, hail damage your roof. Not covered .. Loss or damage caused by: Erosion, deterioration, collapse, shrinkage or any other earth movement The cover is also subject to general exclusions that apply to all listed events, in particular: Loss, damage, injury or death arising from: .. - Erosion, deterioration, collapse, shrinkage or any other earth movements - Landslide or subsidence unless it happens immediately as a direct result of: Flood Rainwater run-off Storm Storm surge Water or oil leak .. - The settling, shrinkage or expansion in buildings, foundations, walls or pavements Determination | Case number: 969511 Page 3 of 9 The cause of loss must be due to storm and not excluded from cover In a claim under a general insurance policy, the term ‘proximate cause’ is used to describe whether a listed event is the cause of the loss or damage. The proximate cause of a loss is the dominant, effective or operative cause. It does not have to be the first, the last or the only cause. If there are several causes, each should be examined to determine whether it is a dominant, effective or operative cause of the loss. For example, if one cause would have caused the loss on its own, and the other cause would not have caused the loss without the first, then the first is the proximate cause. It is possible to have more than one proximate cause of a loss. However, in most cases, there will be one proximate cause. Under insurance law principles, the complainant is required to show, on the balance of probabilities (that it is more likely than not), that he suffered a claimable loss under the policy. This means he must show the loss was caused by a risk for which he is insured. Once the complainant proves the existence of a claimable loss, the insurer is liable for the loss unless it shows an exclusion or limiting condition applies. The insurer has the onus of proving on the balance of probabilities the application of the exclusion or condition. Accordingly, it is important to review the evidence as to the cause of the damage to determine if there is cover or an exclusion applies to the damage. The evidence does not show a storm was the proximate cause of damage After reviewing the material, there have been three potential causes of the cracking to the property identified during this claim. The first was an overflow from a water tank on the property. However, I am satisfied that the complai nant’s plumbing report by JP has established that the water tank was not the cause of loss. This is because the water tank’s pump and changeover were found to be inoperable and the flooded line to the water tank does not hold water. The second potential cause was from water ingress through the roof. However, the report from roofer WV confirmed that the prior repairs to the tiles were still in place. Further, no other expert confirmed water ingress through the roof had occurred. Any water ingress through the roof would also not explain the external cracking to the front entry column or the variations to floor levels identified. Given this, I do not accept that water ingress through the roof created the claimed loss. The third potential cause of loss identified by CE, an engineer, related to inadequate drainage around the home and lack of capping (sealed pathways that drain water away from the building). CE said that the drainage was poor and could be considered ineffective which has allowed surface water to pond against or near the foundations (slab). This has then created movement in the foundations which has led to the cracking to the plasterboard and front entry column. CE also located pictures from 2014 and 2019 of the insured building which indicated prior cracking to the front column as well as patching to same. CE was of the opinion the damage had been occurring over a long period of time. The complainant has indicated that there was a significant rainfall event in February 2022. CE reviewed the rainfall data in the locale of the complainant’s property, which recorded a major Determination | Case number: 969511 Page 4 of 9 rainfall event which occurred on 26 February 2022, during which 226mm fell. The lodgement of the claim however was prior to this major rainfall event. I note the material does suggest that the total rainfall in February 2022 was 472mm which would be a significant monthly rainfall. The complainant’s email dated 8 June 2023 provided plumbing and drainage certificates which confirmed the drainage was compliant and that the soil was well drained. He also noted that there was significant weather events which damaged the property, and on the balance of probabilities ‘….are the event that are insured for the damage caused, despite structural damage manifesting over time. ’ The complainant has further noted discussions with a plumber, a builder and a representative from a company, R, which indicated it could quote on all repairs required. The complainant states the experts informed him the whole one side of the property falls away from the house and the other side, which does not have much fall away from the house, has 2 x 100mm drainage lines that run into storm water which are 7 metres apart. The builder and plumber both informed the complainant that this was adequate. The complainant has not provided written statements or reports from these experts though, despite the insurer raising this concern over the evidence. The policy does provide limited storm cover for earth movement which presents as landslide or subsidence that happens immediately and as a direct result of storm. The policy also excludes other earth movement specifically under storm and as part of general exclusions. The general exclusions also apply to settling, shrinkage or expansion in buildings, foundations, walls or pavements. There is no evidence presented by the parties that the movement which has damaged the property is due to landslip or subsidence (downward vertical movement of the soil) immediately as a direct result of storm. This presents a challenge to the complainant in establishing the claimed damage is a result of a listed storm event and falls within cover provided for that listed event. There is further evidence from CE that the issues are long standing and have occurred over time. The complainant has acknowledged that structural damage may have manifested over time notwithstanding that a listed event has occurred. This creates an issue as to whether the damage arises from an ‘incident’ of storm, being a single occurrence rather than multiple incidents, or just seasonal effects of drying and saturation of the soil. Although there is documentation noting the soil is well drained in original plumbing certification, the documents also indicated that the site was classed as P site which can create issues for foundations. However, the structural engineer indicated that with appropriate foundations the soil underneath the building could perform like a class S. There is no opinion from CE on the classification of the soil and how drainage would impact same. Based on the material provided, there is no substantive evidence that the claimed damage arises from a listed event of storm and from a single occurrence. There is expert evidence that the damage has been occurring over time and is due to inadequate drainage which has impacted the foundations. This supports a finding that the exclusion relating to excluded forms of earth movement or to the general exclusion of settling, shrinkage or expansion in buildings, foundations or walls is the proximate cause of the loss. Determination | Case number: 969511 Page 5 of 9 Even if I were to accept the complainant’s position that both the storm event and long -term issues caused the damage, this is still problematic. Where there are two effective and interdependent causes, one covered and one excluded, the exclusion prevails to deny cover. 1 Given this, I conclude the insurer was entitled to decline cover. 2.2 Why is the outcome fair? The outcome is fair as it is in accordance with the law, evidence and policy terms and conditions. The insurer has shown that exclusions apply to preclude cover for the claim. 1 See Wayne Tank & Pump Co Ltd v The Employers' Liability Assurance Corporation Ltd [1974] QB 57 Determination | Case number: 969511 Page 6 of 9 3. Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided. While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established. Determination | Case number: 969511 Page 7 of 9 3.2 Expert Reports Record Key points Compliance Permit s Plumbing and Building 9 December 2009  The documentation shows the local Council issued a compliance permit subject to conditions which required compliance with the Plumbing and Drainage Act 2002 for the state.  The soil was classed as Class P for fo undation design but the material beneath the building will behave as a Class S material if the design and recommendations in the report are adopted.  The water table was not found but the drainage was indicated as well drained.  It was likely that there woul d be moisture cont ent change.  The building construction appears to have received all relevant permits toget her with a 20 - year structural guarantee. Complainant’s expert (JP ) Plumber Report Undated  JP was called to inspect water damage.  Pipes were pressure tested and passed at time on testing.  The pump and rain changeover were inspected and were found to be not working.  The flooded line to the water tank does not hold water.  The cause of the damage could not be located at the time of inspection.  J P recommended: > installing new pump and rain changer over device, > locate and repair faults to flooded line to tank and > more invasive testing to locate the cause of damage. Insurer’s expert (OB ) Building Assessment r eport Attended 1 March 2022  The inspection showed cracking to the: > Lounge room plasterboard > Kitchen plasterboard > Hallway plasterboard > Main bedroom plasterboard > Robe plasterboard > external column and walls of front entrance  the damage has been caused by building movement  there is limited drainage against the southern side of the building an d ground water is sitting where it overflows from the water tank.  Overland water does not drain easily in the locale of the insured building and this could be causing differential moisture profile and m ovement of the foundations.  This movement causes the linings to crack.  OB recommended increase of drainage against the foundations, repair and keep well maintained all roof drainage so that it is free draining away from the building. Complainant expert (WV) Property Maintenanc e Report 22 May 2022  WV visited the property to assess the gyprock damage.  Tile roof was inspected for leaks  Ten plus roof tiles were cracked with silicone sealing them  All the tiles were sealed ok. Determination | Case number: 969511 Page 8 of 9 Record Key points  No evidence of water leak was lo cated in the ceiling space Insurer’s Expert (CE) Engineer’s Report  Engineer loc ated extensive cracking throughout the dwelling. It was reported that the cracking became evidence following a significant rain event during February 2022.  No water ingress from the roof was not ed.  A floor level survey measured a 42mm variance across the dwelling with the highest point being located at the eastern side (master bedroom) and the lowest being the western partition wall in bedroom 2.  The topography of the insure d site lend to storm water running towards the insured property given the differential in various finished ground levels.  The southern, northern and eastern elevations of the dwelling are uncapped as well as a portion of the western elevation.  The guideli ne for building foundation design and optimum performance is outlined in AS2870 - 2011 Residential Slabs and Footings. The site should be graded or drained so that water cannot pond against or near the building. The ground immediately adjacent to the buildin g should be graded at a uniform fall of 50mm minimum away from the building over the first metre.  Drainage that is pres ent is poor and can be considered ineffective. This has and will continue to allow surface water to pond against or near the foundations slab.  It is our professional opinion that the cause of the cracking throughout the property is due to the lack of sufficient drainage and hardstand capping to the southern, northern and eastern elevations as well as a section of the western elevation. Si nce the time of construction (circa 14 years ago) this has led to expansion and contraction of the subgrade due to exposure to surface water over the years and ultimately made evident by the cracking observed to the dwelling due to movement of the slab fou ndation.  Online images sourced showing cracking to the dwelling in 2014 and 2019 support our opinion.  Structural engineering design plans and results of a geotechnical investigation have not been provided which may expose building design and construction failures, considering the age of the dwelling.  The cracking and damage to the dwelling cannot be attributed to a single defined event. CE Email 19 June 2023  CE was provided with additional material received from the complainant and provided the following response: ‘ the information supplied does not change our position regarding the causation of the observed damage to the Insured’s dwelling. The documentation pres ented specifically pertains to the compliance and certification in relation to the c onstruction of the dwelling. Our report does not attribute the cause of the damage to any building defects. Determination | Case number: 969511 Page 9 of 9 Record Key points While we attribute the absence of paths to sections of the dwelling as a contributing factor to the damage, the installation of footpaths to the per imeter of the dwelling/foundations is not commonly the builder’s responsibility unless agreed on prior to/during construction. The cause we have put forward is relating to the absence of sufficient land drainage and ground capping (i.e. paths ) to the permi tter of the dwelling’s foundations as per our report. Given the dwelling is circa 14 years old, the foundations have been exposed to surface water since the time of construction. This has resulted in movement of the ground and ultimately caused movement an d cracking to the dwelling over that period. Online images sourced that have been captured in 2014 and 2019 show cracking to be present historically to the dwelling, supporting the above. The CSIRO and QBCC have very specific advic e i n relation to the impo rtance of ground capping and drainage so as to protect foundations systems which can also be referred to for further information ’

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.