Home / RACQ / Determination 968649

Determination 968649

Partial denial of storm claim including mould remediation and swimming pool, delays and builder conduct

FirmRACQ
Decided2024-02-26
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant
Amount awarded$1,775
Non-financial loss$10,800
Amount claimed—
SourceAFCA PDF

Summary

Homeowners' storm claim was partly denied and delayed after the insurer required maintenance first, and mould spread. AFCA found substantially for the complainants, ordering mould remediation, pool area assessment and repair, ongoing accommodation, loft carpet, a new builder and $10,800 non-financial loss.

The insurer's unreasonable maintenance precondition and avoidable delays caused mould to spread, so the mould exclusion did not apply and it was fair for the insurer to accept the damage and compensate.

Issues

Subjects and remedies

elderly or capacityhealth or medicalhome or building damagenatural disasterpay claimpay compensationpay non financial lossreassess claimrepair or rectify

Related

All RACQ determinations · Find similar determinations

Text of the determination

Determination Case number 968649 Financial firm RACQ Insurance Limited Determination | Case number: 968649 Page 1 of 12 Case number: 968649 15 February 2024 1 Determination overview 1.1 Complaint The complainants hold a home and contents insurance policy with the financial firm (insurer). On or around 17 March 2022 they lodged a claim for damage following a significant storm event in late February 2022. The insurer partially accepted the claim. However, cover was conditional on the complainants completing some maintenance works. The insurer partially denied mould remediation costs, saying it is atmospheric mould and caused by delays in the complainants completing the maintenance works. It also did not accept cover for the swimming pool. A further dispute has arisen over the conduct of the insurer’s appointed builders and the scope of works. The complainant is seeking full acceptance of their claim. They further seek an extension on temporary accommodation payments which they say have been exhausted because of delays. The panel understands the complainants initially raised concerns with the external painting of the property, which is no longer in dispute. 1.2 Issues and key findings Is the insurer liable for any further mould remediation? Yes, there have been significant avoidable delays caused by the insurer and its appointed trades which, on balance, led to mould spreading in the property. Is the insurer liable for damage to the swimming pool? Yes, the insurer is to accept the damage to the swimming pool area. Are the complainants entitled to ongoing temporary accommodation? Yes, the insurer is not entitled to limit temporary accommodation to 10% of the sum insured. Are the complainants entitled to have the loft carpet replaced? Yes, the carpet in the loft area is an open area that continues at the top of the stairs. The complainants are entitled to have this settled up to the policy limit of $500. What are t he insurer’s obligations regarding the repairs? The insurer is required to have an engineer produce a scope of works and appoint a different builder to complete the repairs. Determination | Case number: 968649 Page 2 of 12 Are the complainants entitled to non-financial loss? Yes, avoidable delays have caused a significant amount of stress and inconvenience to both complainants. Are the complainants entitled to indirect financial loss? No, the panel is not satisfied it is fair for the insurer to reimburse the complainants for the building improvements they were required to undertake as a condition of acceptance of their claim. Why is the outcome fair? The outcome is fair because the insurer and its trades have not taken steps to fairly assess the extent or cause of damage. The available information shows the insurer and its trades have caused delays which have created more damage and impacted the physical and emotional well-being of both complainants. 1.3 Determination This determination is substantially in favour of the complainants. If the complainants accept this determination, the insurer must:  Accept the claim for mould remediation. The complainants are to advise the insurer whether they accept a cash settlement of $1,775 for the mould remediation, or whether they want the insurer to arrange for further restoration of the remaining mould in the property. The insurer is to either provide the cash settlement or appoint the expert to attend to remediation within 14 days of receipt of the complainants’ choice of settlement .  Within 14 days of receipt of the complainants’ acceptance of the determination, appoint a relevantly qualified engineer to assess the pool and its surrounds for damage and prepare a scope of works to repair this area. The insurer is to then repair, or cash settle based on an actionable quote to repair this area within a reasonable timeframe after receipt of the engineer’s report.  Continue providing temporary accommodation to the complainants, outside the policy terms, for the fair and reasonable time to complete the claim-related repairs and any further mould remediation.  Settle the cost of the loft carpet up to the policy limit of $500.  Within 14 days of receipt of the complainants’ acceptance of the determination, appoint a relevantly qualified engineer to thoroughly inspect all areas of damage to the property and provide a detailed scope of works to form the basis of builder quotes. The insurer must then repair the damage based on this scope of works. Appointment of a new builder to the claim should occur within a fair and reasonable timeframe following receipt of this engineer’s scope of works.  Pay the sum of $5,400 to each complainant ($10,800 total) for non-financial loss compensation.  If any aspect of the mould remediation, pool and surrounds damage or other damage to the property is to be cash settled a 15% loading is to be applied to these aspects of the claim. Determination | Case number: 968649 Page 3 of 12 2 Reasons for determination 2.1 Is the insurer liable for any further mould remediation? Yes, there have been significant avoidable delays caused by the insurer and its appointed trades which, on balance, led to mould spreading in the property. Insurer required the complainants to complete maintenance works The insurer partially accepted the claim on 13 May 2022, which the panel accepts was conditional on the com plainants completing maintenance works at the property. The insurer’s email to the complainants on the same date stated: We would like to make you aware of some maintenance which is required to the property in an endeavour to ensure that there are no further issues with regard to the exterior areas around the property. • External - Poor condition exterior paintwork. • Decking - Poor condition exterior decking. • Entry Bridge - Poor condition entry bridge. Recommend the bridge to be replaced due to wood rot/potential termite damage observed at the time of assessment. • Roof - Heavy leaf debris to valley / eave gutters - (Recommend regular cleaning schedule/consider gutter guard) • Inadequate surface drainage around the back of the property. However, it is noted the sheer volume of rainfall recorded would have likely inundated any additional drainage, however further works are required to prevent future less severe events. As these items are maintenance related these repairs will be at your expense. As we have made you aware of the issues requiring rectification, you are obliged to ensure that these repair works are carried out by a licensed contractor in order to meet the general requirements of your insurance policy. The insurer’s email to the complainants further stated: Once the rectification work listed above has been completed, the approved repairs can then be carried out unless your arrangements on the scope state otherwise. The panel understands this direction was due to a report from the insurer’s bui lder (PB) dated 30 March 2022. PB states the resultant damage has been caused by a severe weather event which affected the area between 25 to 28 February 2022. PB says heavy leaf debris caused the ingress with the volume of rainfall noted as a contributing factor, however that was not the primary cause. PB says maintenance issues directly relating to the resultant damage included the roof, referring to heavy leaf debris to valley / eave gutters, and recommended regular cleaning schedule / consider gutter guard, as well as inadequate surface drainage. PB states: Determination | Case number: 968649 Page 4 of 12 However [PB] note the sheer volume of rainfall recorded would have likely inundated any additional drainage, however further works are required in order to prevent future less severe events. Is it he member's responsibility to ensure this is rectified prior to any proposed resultant damage repairs commencing. (sic) The complainant notified the insurer on or around 21 November 2022 they had completed the maintenance works. They say it took six months to arrange and pay for them because they are pensioners and did not have the funds available. Further, it was difficult to find trades to do the work due to high demand. Insurer’s actions led to delays and mould spreading The panel does not consider the insurer’s request for the complainants to complete this maintenance work prior to repairs commencing was a reasonable requirement and it placed an unnecessary financial burden on the complainants. An insurer may require certain maintenance work to be carried out prior to arranging any claim-related repairs. However, the panel accepts this direction to the complainants to complete these maintenance works was not appropriate in the circumstances. This is because whilst the home may have had some maintenance issues, PB acknowledges any additional drainage would have likely been inundated due to the event. The insurer has not explained why these works were necessary before commencing any claim-related repairs to the property. The complainants say they completed the maintenance work as requested, but when the works were completed, the insurer said they had taken too long and parts of the claim were denied, despite them keeping the insurer updated on the progression of works. They say this was misleading by the insurer. The complainants say the mould was present within the first five days of the event. The complainants say the insurer had committed to conducting mould remediation, which was never completed, and the mould got worse in that time. The panel accepts the insurer’s actions led to unnecessary delays on the claim , which caused mould to spread as no action was taken on the claim during this time, despite the insurer being aware of the mould and wet materials present at the property. The insurer agrees there were some delays in completing mould remediation caused by its hygienist (RI) not providing a clearance certificate. It does not agree the remediation undertaken by its restorer (WR) took too long. The insurer provided notes from WR. The notes show WR attended the site on 31 May 2022, and noted extensive contents remained onsite developing environmental mould. It sought instructions from the insurer and was advised the complainants had not yet completed maintenance and it would provide further instructions after this time. The notes show that in January 2023, it sought instructions from the insurer because it had not yet sorted contents or completed any mould remediation and drying. The information shows WR did not attend to remediation until around July 2023, and this was not completed until around November 2023. The panel is satisfied the insurer failed to remediate mould in a timely matter. Determination | Case number: 968649 Page 5 of 12 Fair for the insurer to accept any further mould remediation required The insurer says it accepted rem ediation based on its hygienist, RI’s, report. It says it approved all works required to complete a successful remediation. The insurer says it has obtained two post-remediation validation certificates and it confirmed with WR that the carpet in the upstairs office/loft is unaffected by storm water and the area was contained throughout all the mould remediation and no cross contamination would have occurred. The insurer says any further mould at the property is not due to the event. The PDS states: You are not covered for: Rust, corrosion, rot, mould or gradual deterioration. (But we will cover mould damage to your home or your contents that happens within 21 days of the first loss or damage caused by the insured events of storm, storm surge, flood/water runoff, tsunami, or leaks). RI’s report dated 21 June 2023 says there is environmental mould growth on contents and isolated building surfaces consistent with extended periods of high humidity, and states this is unrelated to the event. However, the panel notes RI’s attendance is over a year after the event occurred. Further, RI does not explain in detail how it concluded this mould is not related to the storm event, given the report accepts that when sufficient moisture is present in a property, mould spores can start vegetating. The panel is satisfied, on balance, the initial insured event caused mould to develop. The insurer’s requirement for the complainants to conduct maintenance repairs before the claim progressed was unreasonable and caused significant delays to the claim's progression. Due to these delays, mould was able to thrive causing further damage to the complainants' property. The panel is satisfied the worsening of the mould in the property is due to the insurer’s actions on the claim, not due to environmental factors or the complainants’ actions. This means the above exclusion does not apply to allow the insurer to decline any claim for mould damage. The panel considers it fair in all the circumstances for the insurer to be liable for full mould remediation. The complainants provided a quote for $1,775, which they say is to remove the mould from the house. The insurer offered to settle the complainants for this quote on a goodwill basis. It is unclear whether this quote is for the total cost to fully remediate the house of mould damage. Given the issues on the claim and insurer’s del ays, the panel considers it fair in the circumstances for the following to occur. If the complainants accept this determination, they are to advise the insurer whether they accept:  a cash settlement of $1,775 for the mould remediation; or  for the insurer to arrange for further restoration of the remaining mould in the property. Determination | Case number: 968649 Page 6 of 12 The insurer is to either provide the cash settlement or appoint the expert to attend to remediation within 14 days of receipt of the complainants’ choice of settlement. 2.2 Is the insurer liable for damage to the swimming pool? Yes, the insurer is to accept the damage to the swimming pool area. Complainants claimed for damage to the swimming pool surrounds The complainants have claimed for damage to their swimming pool, pool fences, paving and pool filters. The complainants say the paving area was underwater for two weeks after the storm event. The complainants provided a pool report from MP. MP inspected the pool on 31 November 2023 and states the pool requires draining and cleaning, and then the shell should be inspected to determine the extent of repairs. MP says:  the rocks seated into the pool coping have moved from excessive force and earth support causing pebblecrete cracking underneath rock and into pool pebblecrete  where cracking has happened in pebblecrete, weeds and plant roots are growing, with grinding out and pebblecrete repair required  pool coping seems fine but slight drummy / hollow noise is present on the outer edge of coping tiles due to excessive earth movement breaking the mortar base  pool shell is holding water fine but needs to be inspected again once cleaned  earth around the pool needs to be refilled and compacted down  paving in the pool zone has sunk causing the paving to pop out and become a tripping hazard due to excessive underground soil movement, and paving will need to be pulled up and done again at a new correct height  pump has become submerged underwater and no longer working, requires replacement  filtration will need to be relocated for earth works to be completed. The insurer says PB advised it would need to pump out the water of the swimming pool to conduct a thorough assessment. The insurer says it is unwilling to do so as the policy excludes damage to swimming pools under the flood insured event. Th e panel accepts, based on the complainants’ report, there is damage to the area surrounding the swimming pool due to the event. This is because the complainants provided information from before the event showing there was no damage, and the report now shows there are issues with the landscaping surrounding the pool, including the paving, as well as the pool pump. There is insufficient information to show the pool shell has any damage at this stage. Policy covers damage to swimming pool in certain circumstances Under the insured event of Flood, there is cover for: ‘ Loss or damage to your home or your contents caused by flood or water runoff ’ . The PDS defines water runoff as: Water which enters your home as a result of it running off or overflowing from any origin or cause There is a specific exclusion under this event for: Determination | Case number: 968649 Page 7 of 12 Loss or damage to: … • swimming pools and spas, and their covers and liners, • the water in swimming pools and spas, The policy defines Fixed swimming pool as: Includes an in ground or an above ground pool which involved completing excavations or installing permanent structures like decks, ladders and fences. A fixed swimming pool also includes its fixed accessories like a pump, motor and filters. The policy also covers storm damage. The PDS defines storm as: Strong winds that may also involve heavy rain, hail, or snow. For example, a cyclone. There is no exclusion under this insured event for swimming pools, only ‘swimming pool and spa covers and liners that are more than 5 years old’. It also includes an exclusion for: Loss or damage caused by: … • rain, hail or snow after it reaches the ground (but we may cover that under the insured event ‘Flood’ as flood or water runoff). Fair for the insurer to accept damage to swimming pool surrounds The panel does not consider the insurer has adequately assisted the complainants in assessing the damage to the pool and the surrounding area. The panel considers the insurer has had ample opportunity to inspect this area and address the cause of damage. The report from MP shows there is damage to the areas surrounding the pool, such as the paving, as well as the pump. The panel accepts this damage occurred, on balance, after the significant storm event. The panel does not consider the insurer has adequately considered this damage under the storm insured event and otherwise has not explained whether this damage is excluded under the policy. The panel accepts the rocks, paving and fencing surrounding the pool would fall within the building cover of the policy, and any removal of soil/earth required to repair this damage would fall within cover also. The panel notes there is insufficient information regarding the extent of damage to the pool area, including insufficient information to show there is damage to the pool shell. The panel therefore considers it fair in all the circumstances for the insurer to appoint a relevantly qualified engineer to assess the pool and its surrounds for damage and prepare a scope of works to repair this area. Given the delays on the claim, the panel considers it fair for the insurer to appoint the engineer within 14 days of receipt of the complainants’ acceptance of the determination. The insurer is to then repair, or cash settle based on an actionable quote to repair this area within a reasonable timeframe after receipt of the engineer’s report. Determination | Case number: 968649 Page 8 of 12 2.3 Is the complainant entitled to ongoing temporary accommodation? Yes, the insurer is not entitled to limit temporary accommodation to 10% of the sum insured. Fair for the insurer to continue paying for temporary accommodation costs The insurer has limited temporary accommodation to 10% of the building sum insured. It relies on the summary of cover table. The PDS outlines cover is for: The costs of temporary accommodation after an insured event happens that makes your home unfit to live in. These costs include: • short term accommodation costs for up to 14 days from when the insured event happened, • ongoing accommodation costs while your home is being rebuilt or repaired for up to 12 months from when the insured event happened until your home is fit to live in. We pay this benefit on top of your home sum insured. Under the ‘Limit’ section, it states: The costs of temporary accommodation. Accommodation costs up to the market rental value of your home prior to the insured event happening. The panel accepts the complainants ’ home became unliveable due to mould. The panel also accepts the mould spread due to avoidable delays caused by the insurer. It would be unfair for the insurer to impose a limit on the temporary accommodation when the claim-related repairs and mould remediation were unable to be completed due to the insurer’s delays that led to the temporary accommodation limit being exhausted. The panel therefore considers it fair for the insurer to continue providing temporary accommodation to the complainants, outside the policy terms, for the fair and reasonable time to complete the claim-related repairs and any further mould remediation. 2.4 Are the complainants entitled to have loft carpet replaced? Yes, the carpet in the loft area is an open area that continues at the top of the stairs. The complainants are entitled to have this settled up to the policy limit of $500. Fair for the insurer to settle the cost of the loft carpet The complainants are seeking replacement of the carpet in the loft. They describe the loft as an open space at the top of the stairs and is not separated by a door. The insurer agreed to replace water damaged carpet on the stairs, however it does not appear to have accepted the loft carpet on the basis that it was not damaged. Determination | Case number: 968649 Page 9 of 12 The policy covers matching of undamaged floor coverings that are in the same room or passageway where the damage took place. The photos provided by the complainant shows the loft as an open space that continues from the top of the stairs and is not separated by any doors or architectural breaks. Therefore, it is reasonable for it to be considered as the same room. Therefore, the panel considers it fair for the insurer to settle the cost of the loft carpet up to the policy limit of $500. 2.5 What are the insurer’s obligations regarding the repairs ? The insurer is required to have an engineer produce a scope of works and appoint a dif ferent builder to complete the repairs. Insurer to appoint engineer to prepare a scope of works and review damage The complainants have raised concerns with the approach and conduct of the insurer’s appointed builder PB. They do not want PB to complete the building repairs. They say PB has been unfairly critical of the pre-event condition of their home. They also say PB ’ s reports have been inaccurate resulting in some damage being incorrectly denied. Further, one of the complainants said PB made her feel uncomfortable and intimidated. The insurer acknowledges the concerns but says it will not appoint another panel builder this far into the claim. The panel accepts there has been a relationship breakdown between the complainants and the builder. The complainants also raise several inaccuracies in the PB reports, about the type of building materials present as well as certain descriptions of the property, as well as an understatement of the level of rain recorded during the event. One area of concern is the timber framing. The complainants are concerned with the potential damage to this area of the property. The insurer says it is unable to determine if the wood framing has been damaged and it is unwilling to commence destructive works without any reasonable cause to do so. It then agreed to conduct further invasive testing. The panel is satisfied the continued delays on the claim has led to confusion regarding the damage to be accepted and repaired under the claim. The insurer has not been able to provide a final scope of works due to mould remediation taking place. Instead, building repairs have been authorised to PB, dealing with small areas of damage at a time. There are also areas of damage that are in dispute or pending further investigation. Therefore, the panel considers it fair in the circumstances for the insurer to appoint a relevantly qualified engineer to thoroughly inspect all areas of damage and provide a detailed scope of works to form the basis of builder quotes. The engineer should be briefed on the full background of the claim, including:  the date of loss  quantity of rain  extent of mould remediation Determination | Case number: 968649 Page 10 of 12  where rainwater entered the home  how long the rainwater sat against the house and  length of time wet and damaged building materials remained in the home. The engineer report should include, but not be limited to:  full scope of repairs required to repair the storm damage  full scope of repairs required to repair areas stripped out to remediate mould  whether damage to ceilings and walls can be partially repaired  inspect and report on damage to the frames  inspect and report on damage to bathrooms. The panel considers it is also fair in the circumstances for the insurer to appoint a new builder to complete the works based on the engineer’s scop e of works. Given the delays on the claim, the panel considers it fair for the insurer to appoint the engineer within 14 days of receipt of the complainants’ acceptance of the determination. Appointment of a new builder to the claim should occur within a fair and reasonable timeframe following receipt of the engineer’s scope of works. 2.6 Are the complainants entitled to non-financial loss? Yes, avoidable delays have caused a significant amount of stress and inconvenience to both complainants. Both complainants have suffered physically and psychologically Under the AFCA rules, non-financial loss compensation may be awarded in circumstances where a complainant has suffered an unusual degree or extent of physical inconvenience, time taken to resolve the situation or interference with their expectation of enjoyment or peace of mind. AFCA takes a conservative approach to compensation for non-financial loss. It is not awarded when a person suffers the normal degree of inconvenience when a problem occurs. Both complainants in this matter suffered an unusual degree of physical inconvenience and interference with their expectation of enjoyment and peace of mind over a long period. The panel is satisfied each complainant suffered both physically and psychologically during the processing of this claim. One of the complainants resorted to sleeping on a couch in the shed after having a cardiac event, because the extent of mould in the house was hazardous to their health. The other complainant required hospitalisation, they say one of the factors was the stress of the claim handling by the insurer and PB. As explained above, significant delays originated from the unreasonable and unsupported requirement for the complaints to undertake building improvements. Further delays resulted from the mould remediation process. In all the circumstances, the panel is satisfied it is fair for the insurer to pay to each complainant the maximum non-financial loss compensation available under the AFCA Rules. This means the insurer must pay the sum of $5,400 to each complainant. Determination | Case number: 968649 Page 11 of 12 2.7 Is the complainant entitled to indirect financial loss? No, the panel is not satisfied it is fair for the insurer to reimburse the complainants for the building improvements they were required to undertake as a condition of acceptance of their claim. Insurer not required to pay for indirect financial loss Under the AFCA Rules, we can award up to $5,400 compensation for indirect financial loss. Many insurance policies exclude cover for indirect loss. If this is the case, we will not award this type of compensation for loss caused by the event giving rise to the claim. However, if the complainant suffered an additional loss because the insurer mishandled the claim, we may require the insurer to compensate for the additional loss. As explained above, the insurer’s acceptance of the claim was conditional on the complainants undertaking home improvements to avoid future losses. The complainants provided receipts showing they paid a total of $14,410. Whilst the panel accepts the insurer’s actions on the claim were not reasonable, the panel does not consider it would be fair to require the insurer to reimburse these costs. This is because these are still maintenance costs that most likely would have been required to be completed at some stage, albeit not before the insurer commenced claim-related repairs. It follows that the insurer is not required to reimburse the complainants for these costs. Determination | Case number: 968649 Page 12 of 12 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided. While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. A panel determined this matter Due to the nature of this complaint, we referred it to a panel for determination. The panel includes:  an ombudsman  a member with significant experience in consumer and small business advocacy  a member with extensive experience as an expert in the insurance industry. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.