Partial denial of storm claim including mould remediation and swimming pool, delays and builder conduct
Text of the determination
Determination
Case number 968649
Financial firm RACQ Insurance Limited
Determination | Case number: 968649
Page 1 of 12
Case number: 968649 15 February 2024
1 Determination overview
1.1 Complaint
The complainants hold a home and contents insurance policy with the financial firm (insurer).
On or around 17 March 2022 they lodged a claim for damage following a significant storm
event in late February 2022.
The insurer partially accepted the claim. However, cover was conditional on the complainants
completing some maintenance works.
The insurer partially denied mould remediation costs, saying it is atmospheric mould and
caused by delays in the complainants completing the maintenance works. It also did not
accept cover for the swimming pool.
A further dispute has arisen over the conduct of the insurer’s appointed builders and the
scope of works. The complainant is seeking full acceptance of their claim. They further seek
an extension on temporary accommodation payments which they say have been exhausted
because of delays.
The panel understands the complainants initially raised concerns with the external painting of
the property, which is no longer in dispute.
1.2 Issues and key findings
Is the insurer liable for any further mould remediation?
Yes, there have been significant avoidable delays caused by the insurer and its appointed
trades which, on balance, led to mould spreading in the property.
Is the insurer liable for damage to the swimming pool?
Yes, the insurer is to accept the damage to the swimming pool area.
Are the complainants entitled to ongoing temporary accommodation?
Yes, the insurer is not entitled to limit temporary accommodation to 10% of the sum insured.
Are the complainants entitled to have the loft carpet replaced?
Yes, the carpet in the loft area is an open area that continues at the top of the stairs. The
complainants are entitled to have this settled up to the policy limit of $500.
What are t he insurer’s obligations regarding the repairs?
The insurer is required to have an engineer produce a scope of works and appoint a different
builder to complete the repairs.
Determination | Case number: 968649
Page 2 of 12
Are the complainants entitled to non-financial loss?
Yes, avoidable delays have caused a significant amount of stress and inconvenience to both
complainants.
Are the complainants entitled to indirect financial loss?
No, the panel is not satisfied it is fair for the insurer to reimburse the complainants for the
building improvements they were required to undertake as a condition of acceptance of their
claim.
Why is the outcome fair?
The outcome is fair because the insurer and its trades have not taken steps to fairly assess
the extent or cause of damage. The available information shows the insurer and its trades
have caused delays which have created more damage and impacted the physical and
emotional well-being of both complainants.
1.3 Determination
This determination is substantially in favour of the complainants.
If the complainants accept this determination, the insurer must:
Accept the claim for mould remediation. The complainants are to advise the insurer
whether they accept a cash settlement of $1,775 for the mould remediation, or whether
they want the insurer to arrange for further restoration of the remaining mould in the
property. The insurer is to either provide the cash settlement or appoint the expert to
attend to remediation within 14 days of receipt of the complainants’ choice of settlement .
Within 14 days of receipt of the complainants’ acceptance of the determination, appoint a
relevantly qualified engineer to assess the pool and its surrounds for damage and prepare
a scope of works to repair this area. The insurer is to then repair, or cash settle based on
an actionable quote to repair this area within a reasonable timeframe after receipt of the
engineer’s report.
Continue providing temporary accommodation to the complainants, outside the policy
terms, for the fair and reasonable time to complete the claim-related repairs and any
further mould remediation.
Settle the cost of the loft carpet up to the policy limit of $500.
Within 14 days of receipt of the complainants’ acceptance of the determination, appoint a
relevantly qualified engineer to thoroughly inspect all areas of damage to the property and
provide a detailed scope of works to form the basis of builder quotes. The insurer must
then repair the damage based on this scope of works. Appointment of a new builder to the
claim should occur within a fair and reasonable timeframe following receipt of this
engineer’s scope of works.
Pay the sum of $5,400 to each complainant ($10,800 total) for non-financial loss
compensation.
If any aspect of the mould remediation, pool and surrounds damage or other damage to
the property is to be cash settled a 15% loading is to be applied to these aspects of the
claim.
Determination | Case number: 968649
Page 3 of 12
2 Reasons for determination
2.1 Is the insurer liable for any further mould remediation?
Yes, there have been significant avoidable delays caused by the insurer and its appointed
trades which, on balance, led to mould spreading in the property.
Insurer required the complainants to complete maintenance works
The insurer partially accepted the claim on 13 May 2022, which the panel accepts was
conditional on the com plainants completing maintenance works at the property. The insurer’s
email to the complainants on the same date stated:
We would like to make you aware of some maintenance which is required to the
property in an endeavour to ensure that there are no further issues with regard to
the exterior areas around the property.
• External - Poor condition exterior paintwork.
• Decking - Poor condition exterior decking.
• Entry Bridge - Poor condition entry bridge. Recommend the bridge to be
replaced due to wood rot/potential termite damage observed at the time of
assessment.
• Roof - Heavy leaf debris to valley / eave gutters - (Recommend regular cleaning
schedule/consider gutter guard)
• Inadequate surface drainage around the back of the property.
However, it is noted the sheer volume of rainfall recorded would have likely
inundated any additional drainage, however further works are required to prevent
future less severe events.
As these items are maintenance related these repairs will be at your expense. As
we have made you aware of the issues requiring rectification, you are obliged to
ensure that these repair works are carried out by a licensed contractor in order to
meet the general requirements of your insurance policy.
The insurer’s email to the complainants further stated:
Once the rectification work listed above has been completed, the approved
repairs can then be carried out unless your arrangements on the scope state
otherwise.
The panel understands this direction was due to a report from the insurer’s bui lder (PB) dated
30 March 2022. PB states the resultant damage has been caused by a severe weather event
which affected the area between 25 to 28 February 2022. PB says heavy leaf debris caused
the ingress with the volume of rainfall noted as a contributing factor, however that was not the
primary cause. PB says maintenance issues directly relating to the resultant damage included
the roof, referring to heavy leaf debris to valley / eave gutters, and recommended regular
cleaning schedule / consider gutter guard, as well as inadequate surface drainage.
PB states:
Determination | Case number: 968649
Page 4 of 12
However [PB] note the sheer volume of rainfall recorded would have likely
inundated any additional drainage, however further works are required in order to
prevent future less severe events.
Is it he member's responsibility to ensure this is rectified prior to any proposed
resultant damage repairs commencing. (sic)
The complainant notified the insurer on or around 21 November 2022 they had completed the
maintenance works. They say it took six months to arrange and pay for them because they
are pensioners and did not have the funds available. Further, it was difficult to find trades to
do the work due to high demand.
Insurer’s actions led to delays and mould spreading
The panel does not consider the insurer’s request for the complainants to complete this
maintenance work prior to repairs commencing was a reasonable requirement and it placed
an unnecessary financial burden on the complainants.
An insurer may require certain maintenance work to be carried out prior to arranging any
claim-related repairs. However, the panel accepts this direction to the complainants to
complete these maintenance works was not appropriate in the circumstances. This is
because whilst the home may have had some maintenance issues, PB acknowledges any
additional drainage would have likely been inundated due to the event. The insurer has not
explained why these works were necessary before commencing any claim-related repairs to
the property.
The complainants say they completed the maintenance work as requested, but when the
works were completed, the insurer said they had taken too long and parts of the claim were
denied, despite them keeping the insurer updated on the progression of works. They say this
was misleading by the insurer. The complainants say the mould was present within the first
five days of the event. The complainants say the insurer had committed to conducting mould
remediation, which was never completed, and the mould got worse in that time.
The panel accepts the insurer’s actions led to unnecessary delays on the claim , which caused
mould to spread as no action was taken on the claim during this time, despite the insurer
being aware of the mould and wet materials present at the property.
The insurer agrees there were some delays in completing mould remediation caused by its
hygienist (RI) not providing a clearance certificate. It does not agree the remediation
undertaken by its restorer (WR) took too long.
The insurer provided notes from WR. The notes show WR attended the site on 31 May 2022,
and noted extensive contents remained onsite developing environmental mould. It sought
instructions from the insurer and was advised the complainants had not yet completed
maintenance and it would provide further instructions after this time. The notes show that in
January 2023, it sought instructions from the insurer because it had not yet sorted contents or
completed any mould remediation and drying. The information shows WR did not attend to
remediation until around July 2023, and this was not completed until around November 2023.
The panel is satisfied the insurer failed to remediate mould in a timely matter.
Determination | Case number: 968649
Page 5 of 12
Fair for the insurer to accept any further mould remediation required
The insurer says it accepted rem ediation based on its hygienist, RI’s, report. It says it
approved all works required to complete a successful remediation. The insurer says it has
obtained two post-remediation validation certificates and it confirmed with WR that the carpet
in the upstairs office/loft is unaffected by storm water and the area was contained throughout
all the mould remediation and no cross contamination would have occurred.
The insurer says any further mould at the property is not due to the event.
The PDS states:
You are not covered for:
Rust, corrosion, rot, mould or gradual deterioration.
(But we will cover mould damage to your home or your contents that happens
within 21 days of the first loss or damage caused by the insured events of storm,
storm surge, flood/water runoff, tsunami, or leaks).
RI’s report dated 21 June 2023 says there is environmental mould growth on contents and
isolated building surfaces consistent with extended periods of high humidity, and states this is
unrelated to the event. However, the panel notes RI’s attendance is over a year after the
event occurred. Further, RI does not explain in detail how it concluded this mould is not
related to the storm event, given the report accepts that when sufficient moisture is present in
a property, mould spores can start vegetating.
The panel is satisfied, on balance, the initial insured event caused mould to develop. The
insurer’s requirement for the complainants to conduct maintenance repairs before the claim
progressed was unreasonable and caused significant delays to the claim's progression. Due
to these delays, mould was able to thrive causing further damage to the complainants'
property. The panel is satisfied the worsening of the mould in the property is due to the
insurer’s actions on the claim, not due to environmental factors or the complainants’ actions.
This means the above exclusion does not apply to allow the insurer to decline any claim for
mould damage.
The panel considers it fair in all the circumstances for the insurer to be liable for full mould
remediation.
The complainants provided a quote for $1,775, which they say is to remove the mould from
the house.
The insurer offered to settle the complainants for this quote on a goodwill basis.
It is unclear whether this quote is for the total cost to fully remediate the house of mould
damage. Given the issues on the claim and insurer’s del ays, the panel considers it fair in the
circumstances for the following to occur. If the complainants accept this determination, they
are to advise the insurer whether they accept:
a cash settlement of $1,775 for the mould remediation; or
for the insurer to arrange for further restoration of the remaining mould in the property.
Determination | Case number: 968649
Page 6 of 12
The insurer is to either provide the cash settlement or appoint the expert to attend to
remediation within 14 days of receipt of the complainants’ choice of settlement.
2.2 Is the insurer liable for damage to the swimming pool?
Yes, the insurer is to accept the damage to the swimming pool area.
Complainants claimed for damage to the swimming pool surrounds
The complainants have claimed for damage to their swimming pool, pool fences, paving and
pool filters. The complainants say the paving area was underwater for two weeks after the
storm event.
The complainants provided a pool report from MP. MP inspected the pool on 31 November
2023 and states the pool requires draining and cleaning, and then the shell should be
inspected to determine the extent of repairs.
MP says:
the rocks seated into the pool coping have moved from excessive force and earth support
causing pebblecrete cracking underneath rock and into pool pebblecrete
where cracking has happened in pebblecrete, weeds and plant roots are growing, with
grinding out and pebblecrete repair required
pool coping seems fine but slight drummy / hollow noise is present on the outer edge of
coping tiles due to excessive earth movement breaking the mortar base
pool shell is holding water fine but needs to be inspected again once cleaned
earth around the pool needs to be refilled and compacted down
paving in the pool zone has sunk causing the paving to pop out and become a tripping
hazard due to excessive underground soil movement, and paving will need to be pulled up
and done again at a new correct height
pump has become submerged underwater and no longer working, requires replacement
filtration will need to be relocated for earth works to be completed.
The insurer says PB advised it would need to pump out the water of the swimming pool to
conduct a thorough assessment. The insurer says it is unwilling to do so as the policy
excludes damage to swimming pools under the flood insured event.
Th e panel accepts, based on the complainants’ report, there is damage to the area
surrounding the swimming pool due to the event. This is because the complainants provided
information from before the event showing there was no damage, and the report now shows
there are issues with the landscaping surrounding the pool, including the paving, as well as
the pool pump. There is insufficient information to show the pool shell has any damage at this
stage.
Policy covers damage to swimming pool in certain circumstances
Under the insured event of Flood, there is cover for: ‘ Loss or damage to your home or your
contents caused by flood or water runoff ’ . The PDS defines water runoff as:
Water which enters your home as a result of it running off or overflowing from any
origin or cause
There is a specific exclusion under this event for:
Determination | Case number: 968649
Page 7 of 12
Loss or damage to:
…
• swimming pools and spas, and their covers and liners,
• the water in swimming pools and spas,
The policy defines Fixed swimming pool as:
Includes an in ground or an above ground pool which involved completing
excavations or installing permanent structures like decks, ladders and fences. A
fixed swimming pool also includes its fixed accessories like a pump, motor and
filters.
The policy also covers storm damage. The PDS defines storm as:
Strong winds that may also involve heavy rain, hail, or snow. For example, a
cyclone.
There is no exclusion under this insured event for swimming pools, only ‘swimming pool and
spa covers and liners that are more than 5 years old’. It also includes an exclusion for:
Loss or damage caused by:
…
• rain, hail or snow after it reaches the ground (but we may cover that under the
insured event ‘Flood’ as flood or water runoff).
Fair for the insurer to accept damage to swimming pool surrounds
The panel does not consider the insurer has adequately assisted the complainants in
assessing the damage to the pool and the surrounding area. The panel considers the insurer
has had ample opportunity to inspect this area and address the cause of damage.
The report from MP shows there is damage to the areas surrounding the pool, such as the
paving, as well as the pump. The panel accepts this damage occurred, on balance, after the
significant storm event. The panel does not consider the insurer has adequately considered
this damage under the storm insured event and otherwise has not explained whether this
damage is excluded under the policy. The panel accepts the rocks, paving and fencing
surrounding the pool would fall within the building cover of the policy, and any removal of
soil/earth required to repair this damage would fall within cover also.
The panel notes there is insufficient information regarding the extent of damage to the pool
area, including insufficient information to show there is damage to the pool shell.
The panel therefore considers it fair in all the circumstances for the insurer to appoint a
relevantly qualified engineer to assess the pool and its surrounds for damage and prepare a
scope of works to repair this area.
Given the delays on the claim, the panel considers it fair for the insurer to appoint the
engineer within 14 days of receipt of the complainants’ acceptance of the determination. The
insurer is to then repair, or cash settle based on an actionable quote to repair this area within
a reasonable timeframe after receipt of the engineer’s report.
Determination | Case number: 968649
Page 8 of 12
2.3 Is the complainant entitled to ongoing temporary
accommodation?
Yes, the insurer is not entitled to limit temporary accommodation to 10% of the sum insured.
Fair for the insurer to continue paying for temporary accommodation costs
The insurer has limited temporary accommodation to 10% of the building sum insured. It
relies on the summary of cover table.
The PDS outlines cover is for:
The costs of temporary accommodation after an insured event happens that
makes your home unfit to live in. These costs include:
• short term accommodation costs for up to 14 days from when the insured event
happened,
• ongoing accommodation costs while your home is being rebuilt or repaired for
up to 12 months from when the insured event happened until your home is fit to
live in.
We pay this benefit on top of your home sum insured.
Under the ‘Limit’ section, it states:
The costs of temporary accommodation.
Accommodation costs up to the market rental value of your home prior to the
insured event happening.
The panel accepts the complainants ’ home became unliveable due to mould. The panel also
accepts the mould spread due to avoidable delays caused by the insurer. It would be unfair
for the insurer to impose a limit on the temporary accommodation when the claim-related
repairs and mould remediation were unable to be completed due to the insurer’s delays that
led to the temporary accommodation limit being exhausted.
The panel therefore considers it fair for the insurer to continue providing temporary
accommodation to the complainants, outside the policy terms, for the fair and reasonable time
to complete the claim-related repairs and any further mould remediation.
2.4 Are the complainants entitled to have loft carpet replaced?
Yes, the carpet in the loft area is an open area that continues at the top of the stairs. The
complainants are entitled to have this settled up to the policy limit of $500.
Fair for the insurer to settle the cost of the loft carpet
The complainants are seeking replacement of the carpet in the loft. They describe the loft as
an open space at the top of the stairs and is not separated by a door.
The insurer agreed to replace water damaged carpet on the stairs, however it does not
appear to have accepted the loft carpet on the basis that it was not damaged.
Determination | Case number: 968649
Page 9 of 12
The policy covers matching of undamaged floor coverings that are in the same room or
passageway where the damage took place.
The photos provided by the complainant shows the loft as an open space that continues from
the top of the stairs and is not separated by any doors or architectural breaks. Therefore, it is
reasonable for it to be considered as the same room.
Therefore, the panel considers it fair for the insurer to settle the cost of the loft carpet up to
the policy limit of $500.
2.5 What are the insurer’s obligations regarding the repairs ?
The insurer is required to have an engineer produce a scope of works and appoint a dif ferent
builder to complete the repairs.
Insurer to appoint engineer to prepare a scope of works and review damage
The complainants have raised concerns with the approach and conduct of the insurer’s
appointed builder PB. They do not want PB to complete the building repairs.
They say PB has been unfairly critical of the pre-event condition of their home. They also say
PB ’ s reports have been inaccurate resulting in some damage being incorrectly denied.
Further, one of the complainants said PB made her feel uncomfortable and intimidated.
The insurer acknowledges the concerns but says it will not appoint another panel builder this
far into the claim.
The panel accepts there has been a relationship breakdown between the complainants and
the builder. The complainants also raise several inaccuracies in the PB reports, about the
type of building materials present as well as certain descriptions of the property, as well as an
understatement of the level of rain recorded during the event.
One area of concern is the timber framing. The complainants are concerned with the potential
damage to this area of the property. The insurer says it is unable to determine if the wood
framing has been damaged and it is unwilling to commence destructive works without any
reasonable cause to do so. It then agreed to conduct further invasive testing.
The panel is satisfied the continued delays on the claim has led to confusion regarding the
damage to be accepted and repaired under the claim.
The insurer has not been able to provide a final scope of works due to mould remediation
taking place. Instead, building repairs have been authorised to PB, dealing with small areas of
damage at a time.
There are also areas of damage that are in dispute or pending further investigation.
Therefore, the panel considers it fair in the circumstances for the insurer to appoint a
relevantly qualified engineer to thoroughly inspect all areas of damage and provide a detailed
scope of works to form the basis of builder quotes.
The engineer should be briefed on the full background of the claim, including:
the date of loss
quantity of rain
extent of mould remediation
Determination | Case number: 968649
Page 10 of 12
where rainwater entered the home
how long the rainwater sat against the house and
length of time wet and damaged building materials remained in the home.
The engineer report should include, but not be limited to:
full scope of repairs required to repair the storm damage
full scope of repairs required to repair areas stripped out to remediate mould
whether damage to ceilings and walls can be partially repaired
inspect and report on damage to the frames
inspect and report on damage to bathrooms.
The panel considers it is also fair in the circumstances for the insurer to appoint a new builder
to complete the works based on the engineer’s scop e of works.
Given the delays on the claim, the panel considers it fair for the insurer to appoint the
engineer within 14 days of receipt of the complainants’ acceptance of the determination.
Appointment of a new builder to the claim should occur within a fair and reasonable
timeframe following receipt of the engineer’s scope of works.
2.6 Are the complainants entitled to non-financial loss?
Yes, avoidable delays have caused a significant amount of stress and inconvenience to both
complainants.
Both complainants have suffered physically and psychologically
Under the AFCA rules, non-financial loss compensation may be awarded in circumstances
where a complainant has suffered an unusual degree or extent of physical inconvenience,
time taken to resolve the situation or interference with their expectation of enjoyment or peace
of mind.
AFCA takes a conservative approach to compensation for non-financial loss. It is not awarded
when a person suffers the normal degree of inconvenience when a problem occurs.
Both complainants in this matter suffered an unusual degree of physical inconvenience and
interference with their expectation of enjoyment and peace of mind over a long period. The
panel is satisfied each complainant suffered both physically and psychologically during the
processing of this claim. One of the complainants resorted to sleeping on a couch in the shed
after having a cardiac event, because the extent of mould in the house was hazardous to their
health. The other complainant required hospitalisation, they say one of the factors was the
stress of the claim handling by the insurer and PB.
As explained above, significant delays originated from the unreasonable and unsupported
requirement for the complaints to undertake building improvements. Further delays resulted
from the mould remediation process.
In all the circumstances, the panel is satisfied it is fair for the insurer to pay to each
complainant the maximum non-financial loss compensation available under the AFCA Rules.
This means the insurer must pay the sum of $5,400 to each complainant.
Determination | Case number: 968649
Page 11 of 12
2.7 Is the complainant entitled to indirect financial loss?
No, the panel is not satisfied it is fair for the insurer to reimburse the complainants for the
building improvements they were required to undertake as a condition of acceptance of their
claim.
Insurer not required to pay for indirect financial loss
Under the AFCA Rules, we can award up to $5,400 compensation for indirect financial loss.
Many insurance policies exclude cover for indirect loss. If this is the case, we will not award
this type of compensation for loss caused by the event giving rise to the claim. However, if the
complainant suffered an additional loss because the insurer mishandled the claim, we may
require the insurer to compensate for the additional loss.
As explained above, the insurer’s acceptance of the claim was conditional on the
complainants undertaking home improvements to avoid future losses.
The complainants provided receipts showing they paid a total of $14,410.
Whilst the panel accepts the insurer’s actions on the claim were not reasonable, the panel
does not consider it would be fair to require the insurer to reimburse these costs. This is
because these are still maintenance costs that most likely would have been required to be
completed at some stage, albeit not before the insurer commenced claim-related repairs. It
follows that the insurer is not required to reimburse the complainants for these costs.
Determination | Case number: 968649
Page 12 of 12
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
A panel determined this matter
Due to the nature of this complaint, we referred it to a panel for determination. The panel
includes:
an ombudsman
a member with significant experience in consumer and small business advocacy
a member with extensive experience as an expert in the insurance industry.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.