Scope of works and settlement for accepted water damage claim, tile damage by contractors, and delay

FirmAuto & General
Decided2023-12-19
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded$300
Non-financial loss$1,000
Amount claimed—
SourceAFCA PDF

Summary

The insurer accepted a water damage claim but disputed the scope of works, and its contractors cracked floor tiles removing skirting boards. AFCA required replacement of all tiles with cash settlement plus 15% uplift, temporary accommodation, $300 cleaning and $1,000 non-financial loss, but rejected the plaster claim.

Tile damage arose from the repair, not the insured event, so the architectural break limitation did not apply, and the insurer failed to cash settle after the 30 March 2023 quote.

Issues

Subjects and remedies

home or building damagepay claimpay compensationpay non financial lossreassess claim

Related

All Auto & General determinations · Find similar determinations

Text of the determination

Determination Case number 968179 Financial firm Auto & General Services Pty Ltd Determination | Case number: 968179 Page 1 of 6 Case number: 968179 14 December 2023 1 Determination overview 1.1 Complaint The complainants hold a home and contents insurance policy with the financial firm (insurer). On 10 January 2023, the complainants lodged a claim for damage to their property caused by water overflowing from a bathtub. The insurer has accepted the claim. However, a dispute has arisen regarding the scope of works to repair the damage. The complainants also say the insurer’s contractors have damaged the floor tiles during the removal of the skirting boards and that the insurer has caused delays in its handling of the claim. The complainants seek that the scope of cover is extended, the tiles replaced and compensation. The insurer says it is not required to provide further cover. 1.2 Issues and key findings Should the insurer increase its settlement for the claim? Yes. The insurer is required to replace all tiles in the dwelling and include the tile claim in its scope of works. The insurer should obtain an actionable updated scope of works from JP and cash settle the complainant with a 15% uplift. However, the insurer is not required to cover the plaster claim. Are the complainants entitled to compensation? Yes. The insurer is required to pay the complainants $1,000 in compensation. Why is the outcome fair? The insurer has caused damage to the property in repairing the damage caused by the insured event. Therefore, it is fair that the insurer increases its settlement, pay temporary accommodation and cleaning costs and non-financial loss compensation. 1.3 Determination This determination is in favour of the complainants. Within 14 days of being advised of the complainants’ acceptance of the determination, the insurer must:  pay $1,000 in compensation and $300 for cleaning costs; and  request an updated actionable scope of works from JP. Once the updated actionable quote is received from JP, the complainants should be cash settled, with a 15% uplift, within 14 days. The insurer is also required to pay the complainants’ temporary accommodation costs in accordance with JP’s estimate. Determination | Case number: 968179 Page 2 of 6 2 Reasons for determination 2.1 Should the insurer increase its settlement for the claim? Yes. The insurer is required to replace all tiles in the dwelling and include the tile claim in its scope of works. The insurer should obtain an actionable updated scope of works from JP and cash settle the complainant with a 15% uplift. It is also required to cover the temporary accommodation costs and cleaning costs. However, the insurer is not required to cover the plaster claim. Insurer has accepted claim and offered cash settlement The insurer accepts that the claim for damage caused by the overflowing bathtub is covered. On 30 March 2023, the insurer obtained a quote and scope of works which included all resultant damage and totalled $28,989.84 (quote). The quote excluded the tiles in the lounge and kitchen areas and the carpet in bedroom 1, which the insurer says was undamaged. It did however include replacement of the tiles in the bathroom, toilet, laundry and hallway. In its notice of response, the insurer has offered to carry out the repairs or cash settle the complainants with a 15% uplift ($4,348.48) for contingencies and the loss of a lifetime guarantee on repairs. In addition to the items covered in the quote, the complainants seek that all tiles in the dwelling are replaced in order to achieve a uniform appearance (tile claim) and that all plaster walls be replaced wherever skirting boards have been removed (plaster claim). Onus on complainants to establish a claimable loss The complainants are required to show, on the balance of probabilities (that it is more likely than not), that there is a claimable loss under the policy. This means the complainants must prove the loss or damage was caused by a risk that is covered under the policy. Once the complainants prove there is a claimable loss, the insurer is liable for the loss unless it shows an exclusion or limiting condition applies. The insurer has the onus of proving, on the balance of probabilities, that the exclusion or condition applies. On balance, insurer is not required to cover the plaster claim The complainants seek that the plaster walls be replaced, rather than repaired, wherever the skirtings have been damaged. They are concerned that the insurer is not replastering the walls to the required height and that, as a result, the walls may become warped. The complainants have not provided any expert reports in support of their claim. The insurer has obtained reports from a builder, JP and its internal home assessor, HA. They say:  there appears to be a long-term water leak from the bathroom shower;  the plaster and skirting to the walls either side of the shower show signs of long term water damage. The hallway and back bedroom skirting that back onto the shower also show signs of long term water damage;  there is no evidence to suggest that replacement of the plaster walls impacted by the insured event is required. As per Australian Standards, replacement of sections and integration with existing surfaces is an accepted repair method; and Determination | Case number: 968179 Page 3 of 6  plasterboard walls only need to be replaced where the damage is extensive, or the plasterboard is beyond repair. I am persuaded by the reports of JP and HA. On balance, the complainants have not provided sufficient evidence to establish that the plaster walls have been extensively damaged by the insured event or that the plasterboard is beyond repair. In the absence of any expert evidence to suggest the plasterboard needs to be replaced to a higher level/nearest joint (1200mm or 1350mm), I am satisfied that the insurer is not required to extend the quote to cover the plaster claim. On balance, insurer is required to replace tiles in all tiled areas of the dwelling The insurer does not dispute that the tiles were damaged when the damaged skirting boards were being removed. It acknowledges that it is unable to match the existing tiles in the dwelling as they are no longer available. However, it has agreed to replace the floor tiles in certain rooms only, being the bathroom, toilet, laundry and hallway. The complainants say that the floor tiles have been cracked in various places by the insurer’s contractor when it removed the skirting boards. The complainants accept that if the tiles had been cracked as a result of the insured event, the insurer would have been entitled to only replace the tiles up to the nearest architectural break. However, they say the insured event did not damage the tiles. Rather, the insurer damaged the tiles when it was removing the damaged skirting boards. Therefore, the policy conditions should not apply, and the insurer should return the complainants to the position they would have been in before the tiles were damaged. They seek that all tiles in the dwelling be replaced in order to achieve a uniform appearance. The complainants also say:  having to look at two different types of tiles will affect their mental health, affect the continuity of the flooring and devalue the home;  after following up the insurer multiple times, two separate contractors were approached by the insurer. The first said it would not touch any tiles as he would be liable for the entire home if any of the tiles cracked and wanted to seek clarification from the insurer. The second contractor also said it would not undertake any repairs without seeking clarification from the insurer;  without warning a third contractor attended the site on 15 February 2023 and began removing the skirting boards. The contractor cracked tiles in five different places and left exposed nails in the hallway, bathroom, toilet and children’s bedrooms;  after the damage caused by the contractor, JP and HA attended the site. They agreed to send a trade out to repair the exposed nails; and  JP provided an updated scope of works on 1 March 2023. This was revised, and the quote was provided on 30 March 2023. The insurer says:  damage to the tiles was unavoidable as the tiles were installed up to the skirting;  due to the policy terms, any undamaged areas were not required to be replaced and would not be covered solely to achieve a match;  the insurer considers there is an architectural break between the hallway and lounge room and, therefore, that the tiles beyond this point do not need to be replaced;  the tiles were not damaged due to the negligence of the builder or any of its contractors. Rather, tile damage was inevitable in order to remove and repair the skirting which needed to be replaced in order to avoid further damage. Therefore, the tile damage is part of the repair and restoration process; Determination | Case number: 968179 Page 4 of 6  it cannot comment on the conversations that took place between the complainants and the contractors as they cannot be substantiated;  the risk of damage to the tiles could not be eliminated;  the insurer’s liability extend s to the tiles and falls under the resultant damage from the claimed event to which policy conditions apply, given they were damaged during the repair and restoration process; and  it does not say the complainants are responsible for the damage but, rather, that the applicable policy conditions apply where the repairs are concerned. On balance, I am more persuaded by the complainants’ submissions. There is no evidence whatsoever to suggest the tiles were damaged by the insured event, being the overflowing bathtub. Rather, the tiles were damaged when the skirting boards were being repaired. This is not damage that has resulted from the insured event. This is damage that has resulted from the repair of the damage caused by the insured event. I do not accept th e insurer’s submission that these are one in the same thing. I acknowledge the insurer’s submission that damage to the tiles was inevitable. If this was so, the insurer ought to have advised the complainants that it could not carry out the repairs without damaging the tiles and, therefore, that it would: (a) cash settle the claim; or (b) put the complainants on notice that if the tiles were damaged it would not cover replace all the tiles to ensure they matched. The insurer failed to do either. Since the damage has not been caused by the insured event, I am satisfied that the policy terms do not apply to restrict cover for the undamaged parts of the tiled flooring. Even if I was to accept the insurer’s submission that the damage to the tiles was part of the claim r epair, it would not be fair to allow the insurer to rely on the policy terms when it has failed to take the steps outlined in (a) and (b) above. Therefore, on balance, the insurer is not entitled to rely on the policy limitation of only replacing the tiles to the nearest architectural break. Further, I have reviewed the insurer’s claim notes. An entry on 3 March 2023 shows that JP told the insurer: We cannot match due to the tiles not being a flat colour and the age of the property. These tiles will no longer be in circulation and any deviation will be extremely noticeable. I also consider that the additional area of tiled flooring is not so large as to make it unreasonable for it to be included in the scope of works. Therefore, the insurer is required to cover the tile claim. An actionable updated scope of works should be obtained from JP which includes replacement of all tiles in the dwelling. The tiles should be of a similar quality and type to the tiles that were previously in the dwelling. The insurer should then cash settle the claim with a 15% uplift. Insurer is required to pay temporary accommodation In its notice of response dated 21 April 2023, the insurer confirmed that the PDS does respond to temporary accommodation costs if the home is deemed unliveable in accordance with the policy definition. Determination | Case number: 968179 Page 5 of 6 In circumstances where the flooring in most of the home is being replaced, I consider the home is likely to be unliveable in accordance with the terms of the policy. Therefore, it is fair and reasonable that the insurer pays the complainants’ temporary accommodation costs while the repairs are being completed. To this end, the updated actionable quote should include an estimate for the time required to complete the works (JP estimate). The JP estimate should then be used as a basis to calculate the temporary accommodation costs. The insurer is also required to honour the $300 it offered the complainants for cleaning costs on an ex-gratia basis (cleaning costs). 2.2 Are the complainants entitled to compensation? Yes. The insurer is required to pay the complainants $1,000 in compensation. AFCA may award compensation in certain circumstances Under paragraph D.3 of the AFCA Rules, we may award compensation for non-financial loss (capped at $5,400) where the insurer’s actions have caused an unusual amount of:  physical inconvenience;  time taken to resolve the situation; or  interference with the complainant’s expectation of enjoyment or peace of mind. We take a conservative approach to compensation for non-financial loss. It is not awarded when a person suffers the normal degree of inconvenience when a problem occurs. Compensation is warranted in the circumstances The complainants say the insurer has caused significant delays in its handling of the claim and this has resulted in enormous stress as they cannot move on with their lives. In a practical sense no works have been completed. For example, there is no carpet in the bedrooms used by their children which is very inconvenient and potentially dangerous. The insurer was entitled to obtain further reports in order to respond to the issues raised by the complainants and this took some time. Therefore, I consider that there has not been an unreasonable delay in the handling of the claim prior to 30 March 2023. However, after receiving the quote on 30 March 2023, the insurer has not carried out the works or cash settled the accepted part of the claim. Had it done so it could have minimised the stress and inconvenience caused to the complainants and/or allowed them to commence repairs. Having reviewed the available information, I am not satisfied that insurer has acted reasonably in the circumstances. Accordingly, I consider the insurer should pay the complainants $1,000 in non-financial loss compensation. 2.3 Why is the outcome fair? The insurer has caused damage to the property in repairing the damage caused by the insured event. Therefore, it is fair that the insurer increases its settlement, pay temporary accommodation and cleaning costs and non-financial loss compensation. Determination | Case number: 968179 Page 6 of 6 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided. While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.