Home / Suncorp Group / Determination 967605

Determination 967605

Partial denial of water damage claim as pre-existing damage and adequacy of building settlement offer

FirmSuncorp Group
Decided2023-10-23
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded$9,542
Non-financial loss—
Amount claimed$87,846
SourceAFCA PDF

Summary

The insurer accepted contents and part of a building water damage claim, treating the remainder as pre-existing. AFCA upheld the limitation of cover but required an extra $3,229.10 for contingencies and $6,313 for temporary accommodation.

The complainant bore the onus to show damage arose from the insured event; evidence showed significant pre-existing and gradual damage excluded by the policy, but a contingency allowance and temporary accommodation were fair.

Issues

Subjects and remedies

health or medicalhome or building damagenatural disasterpay claimpay compensation

Related

All Suncorp Group determinations · Find similar determinations

Text of the determination

Determination Case number 967605 Financial firm AAI Limited Determination | Case number: 967605 Page 1 of 7 Case number: 967605 11 October 2023 1 Determination overview 1.1 Complaint The complainant holds a home and contents insurance policy with the financial firm (insurer) and lodged a claim for water related damage on 7 March 2022. The insurer partially accepted the claim. The insurer agreed to cover the contents claim and offered settlement of $12,916.42 for the accepted building damage. The insurer maintains the remaining damages were not caused by the insured event but were pre-existing. The complainant disputes the insurers findings and seeks cover as per scope of works prepared by JLDMA for $87,846. The complainant has also sent a quote from MG for $59,810. 1.2 Issues and key findings Is the insurer entitled to limit liability for the damage claimed? Yes. There is no dispute there was water damage to the property following the claimed event. I am satisfied however that the damage is limited as per the insurance assessors report. I am satisfied that the balance of the damage is most likely pre-existing and not covered under the terms of the policy. Is the insurer ’ s offer of settlement fair in the circumstances? No. The settlement of the building damage should be increased by $3,229.10 to cover any contingencies. plus $6,313 to cover two weeks temporary accommodation during the repair period. Why is the outcome fair? The outcome is fair as the available information clearly limits the extent of damage caused by the insured event in March 2022. While the complainant maintains all the damage is related to the storm event, the evidence confirms significant pre-existing damage existed. It is fair in the circumstances the insurers entitled to limit its liability to the event related damage. By allowing for contingencies and temporary accommodation this should allow the complainant to complete the event related repairs. 1.3 Determination This determination is partially in favour of the complainant. Within 14 days of notification of the complainant's acceptance of this determination the insurers to pay the compliant:  $3,229.10 to cover potential contingencies in the repair process.  $6,313.00 to cover temporary accommodation for the further repair period. The insurer is otherwise entitled to maintain the denial of liability for the pre-existing damage in accordance with the terms of the policy. Determination | Case number: 967605 Page 2 of 7 2 Reasons for determination 2.1 Is the insurer entitled to limit the liability for the damage claimed? Yes. The available information confirms there was water damage to the property following the claimed event. I am satisfied however that the damage is limited as per the insurance assessors report. I am satisfied that the balance of the damage is pre-existing and not covered under the terms of the policy. Complainant has onus to establish claim falls within terms of the policy It is established insurance law that an insured has the initial onus to prove, on the balance of probabilities (that is more likely than not), that the damage claimed falls within the terms of the policy. Once established, the onus shifts to the insurer to establish, on balance, the application of a relevant policy exclusion or that it is otherwise entitled to decline the claim under the policy. The complainant’s policy is a home and content policy that provides cover for a series of insured events including storm, flood and optional accidental damage. Cover is subject to various conditions and exclusions. When making a claim the policy provides that the insured must be able to prove that an incident covered by the policy took place. An incident is a single event, accident or occurrence which you did not intend or expect to happen. Policy specifically excludes damage due to mould or mildew unless directly caused by an insured event and there is no evidence of pre-existing mould. Policy also excludes loss of damage caused by wear, tear and gradual deterioration. The onus is therefore on the complainant to prove that most likely, the damage claimed arose from the single storm event in or about February 2022. Circumstances of claim The complainant notified the insurer on 23 March 2022 of the claim and says the event happened on 7 March 2022 after a period of heavy rain. The insurer ’ s claim notes record the claim description as follows: Due to the heavy rain, it had come up into the house and damaged the carpet, near the entrance and near the bathroom. There is mould in the corner of the bathroom. The sliding door is not closing property, it does not roll smoothly, and it looks warped to client. Outside, there is a back veranda and pergola the colour bound five or six sheets have been damaged. Outside furniture, such as couches, coffee table, cupboard, whipper snipper and ceramic pot plants have been damaged. The couch is now all mouldy. There is no dispute there was a significant storm event that impacted the complainant’s area in late February/March 2022. The insurer does not dispute the complainant suffered a loss. The insurer completed make safe works on the property that included the removal of carpets and wardrobe cupboards to assist in remediating mould. The insurer also paid the Determination | Case number: 967605 Page 3 of 7 complainant $6313 temporary accommodation while mould remediation occurred and settled the complainant for damaged contents for the sum insured of $11,600. The insurer subsequently denied liability for mould to the carpet which it considered was gradual damage and external and internal damage considered to be pre-existing and maintenance related. Complainant’s expert evidence inconclusive as to event related damage The complainant relies on photographs of the damage and reports from JLDMA, F Engineering, and DJ roofing to establish the claim. The JLDMA were engaged by the NSW Government as part of the disaster relief grant structural repair programme to determine whether the property had been flood damaged and was eligible for free demolition. JLDMA we're not engaged to determine the cause of the damage claimed by the complainant. In its report dated 30 November 2022 it reported: The damage sustained to the property has been caused by water ingress via the roof. Consequently, there has been water damage to the internal and external finishes of the property. The property was not damaged by flood waters. Properties not affected by flood waters are ineligible to opt in for a free demolition. A structural engineers report has been provided as part of this property assessment report indicating the current serviceability of the property. F engineering were engaged by JLDMA to consider the structural integrity of the building. Their report concluded: It is our opinion that the structural component of the dwelling has been affected mainly due to its own age and further severely compounded by the ingress of water flow during recent flooding. The uneven floor, vibration on the floor and separation gap between two walls and between walls and cornice are due to subsequent tilted/subsided brick piers and storm water leakage from the roof. The timber flooring members are decayed and moisture damaged due to moisture ingress for long time and stormwater leakage from the roof. DJ roofing confirmed the roof had been repaired and replaced in 2018 with the repairs including a new front awning roof, new main roof, new rear skeleton roof, repair back veranda roof, new gutters and new facias. DJ also confirmed routine maintenance including gutter cleaning occurred from March 2019 until 20 December 2021. I accept the maintenance was performed. Determination | Case number: 967605 Page 4 of 7 There is no dispute that the property has significant structural movement or that there is damage to the flooring and mould underneath the carpet. Photographs provided by JLDMA confirm this. Neither JDLMA or F engineering were engaged to assess the claim related damage under the terms of the policy. The report from F engineering make some assumption that the property had been impacted by the ingress of water flow during recent flooding. This is not consistent with the report from JLDMA that the property was not impacted by the floods. The reports are in my view inconclusive as to whether the damage claimed is related to the insured event. Insurer ’ s experts say that there was pre-existing damage The insurer provided a report from JLG dated 9 May 2022. JLG noted the complainant claimed:  there was major roof damage which resulted in large amount of damage to the internal space.  the roof was temporarily tarped, and silicone used.  water has entered the house resulting in carpet damage in the living room, hall and both bedroom 1 and bedroom 2.  the make safe team has ripped sections of the carpet which showed the timber flooring.  there were several cracks and sagging on the bare timber floor in both bedrooms, living room and hallway. Nails were popping out and sections were cracked because of moisture built up.  the wardrobes have been ripped out by make safe in the bedrooms exposing the wet plaster boards.  there is major paint, plasterboard and cornice damage in the hall, bedrooms, kitchen, living room and bathroom. There was paint bubbles, water stains and mould growing throughout the house.  there was sinking of bare timber boards in the bathroom, living room, dining room and bedrooms. The sliding door in the dining room could not be closed as the floor has sunk and jammed the sliding door and flyscreen door.  the tiles have cracked in the bathroom due to the sinking of the floor.  there are numerous locations where the wall plaster has caved in resulting in a split between the flooring and wall.  the veranda sustained damages to the roof sheets as water is leaking to the concrete floor. The complainant had temporary fixed the issue by installing extra sheets and using silicone. JLG considered there was damage that a direct result of heavy rains and flooding. JLG reported that the damage was a direct result of the storm being too much rain for the roof to cope added with the fact that the gutters are full of leaves. JLG also considered:  the damage to flooring in the kitchen was a result of long term water damages.  the shower is leaking during use which is allowing water to rot the timber.  the damages to the two front bedrooms and hallway is due to the event.  damage was sustained damages to the wall linings when the carpet was removed by the insurer.  the dining/kitchen paint is cracking and flaking which is a result of poor preparation of the previous surface. This is not a result of the storm event.  did not observe any damages to the living or laundry area.  observed damages to the bathroom however, these damages are long term shower leaks not from an insurable event.  the report from JLDMA reflects the long-term damages and issues with the property. Determination | Case number: 967605 Page 5 of 7 A report was also obtained by PB plumbers. PB attended the site on the 27 May 2022 and concluded that damage was a direct result of storm being too much rain for the roof to cope add it with the fact that the gutters are full of leaves and dirt and the water cannot make it down the down pipes. The insurer ’ s assessor reviewed all the reports and notes various previous claims for damage as follows:  claim H... 0673 … to replace pergola roofing 2017  claim H … 1563 … pergola roofing leaking - cash settle  claim H ...3468 … external rear sliding door not closing properly- 2021  claim H … 7875 … cracked floor tiles- 2018 The complainant does not dispute the clams for pre-existing damage. The assessor considered most of the repair work scoped by JLDMA did not relate to damages caused by rain water ingress and that the issues pre-existing. Insurer entitled to limit liability I am satisfied having reviewed the available information including that recently submitted by the complainant, that the insurer is entitled to limit its liability for the damage claimed. The available information confirms that the complainant had lodged previous claims for damage to the bathroom floor tiles, warped fibro wall to the shower, water ingress due to lower roof and gutter issues, leaking from the front roof and front veranda soffits and damage to the rear warning. In so far as the damage claimed has been identified as pre-existing or due to wear, tear, gradual deterioration such damage is excluded from cover. The insurer has settled the claim for damage caused by its trades during the make safe and settled the contents claim in full. JLG has provided a scope of works and quote for the repair of the accepted damage. The question remains whether the settlement paid is fair in the circumstances. 2.2 Is the insurer ’ s offer of settlement fair the circumstances? No. The settlement should be increased to $16,145.52 to cover any contingencies. The insurer should also make a further payment of $6,313 to cover two weeks temporary accommodation during the repair bringing the total settlement to $22,458.52. Insurer to increase offer of settlement The insurer originally offered the complainant $12,916.42 based on the scope of works from JLG dated 11 July 2022. It later cash settled the complainant for this amount on 22 October 2022. The offer while including an event loading of 20% does not include an amount to cover contingencies. The offer is based on what it would cost the insurer to repair the accepted damage subject to the complainant completing any necessary maintenance. I accept the insurer is entitled to limit its liability based on the scope of works from JLG. In my view however an allowance should be provided for contingencies that may arise in the repair process. I consider an allowance of 25% ($3,229.10) is fair to cover such contingencies. This is because the complainant will need to engage her own repairers, building costs have increase substantially and it is likely further damage may be identified during the repair process. This would bring the settlement for the building damage to $16,145.52. Determination | Case number: 967605 Page 6 of 7 The insurer says temporary accommodation is not required. I am not satisfied the insurer has had regard to the complainant’s health issues. T he complainant and her son have medical issues that would likely make it unsafe for them to remain in the home during repairs. In the circumstances, I consider it fair to allow two weeks temporary accommodation to cover the repair period for the accepted repairs. Based on the previously accepted temporary accommodation allowance, I consider it fair the insurer pays a further $6,313 to cover the two weeks temporary accommodation. Accordingly, I determine that within 14 days of notification of the complainant's acceptance of this determination the insurer is to pay the compliant:  $3,229.10 being the amount payable to cover contingencies  $6,313 as compensation for temporary accommodation The insurer is otherwise entitled to maintain the denial of liability for the pre-existing damage in accordance with the terms of the policy. 2.3 Why is the outcome fair? The outcome is fair as the available information clearly limits the extent of damage caused by the insured event in March 2022. The complainant maintains all of the damage is related to the storm event, however the evidence confirms significant pre-existing damage existed. It is fair in the circumstances the insurers entitled to limit its liability to the event related damage. By allowing for contingencies and temporary accommodation this should allow the complainant to complete the event related repairs. Determination | Case number: 967605 Page 7 of 7 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all the information the parties have provided. While the parties have raised several issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.