Home / IAG / Determination 965563

Determination 965563

Partial acceptance of storm damage claim from 2015; dispute over scope of damage and offer amount, plus delay

FirmIAG
Decided2024-02-12
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded$1,276
Non-financial loss$2,000
Amount claimed—
SourceAFCA PDF

Summary

The complainant claimed for 2015 storm damage to his home; the insurer accepted only part of it and offered $13,537.98. AFCA found the offer fair but required a higher 20% uplift (additional $1,276.18) and $2,000 non-financial loss for delay.

The complainant did not establish additional storm-related damage on the evidence, but the insurer's unexplained delay in recording the claim and later delays warranted compensation and a higher contingency uplift.

Issues

Subjects and remedies

broker or intermediaryhome or building damagenatural disasterpay claimpay non financial loss

Related

All IAG determinations · Find similar determinations

Text of the determination

Determination Case number 965563 Financial firm Insurance Australia Limited Determination | Case number: 965563 Page 1 of 6 Case number: 965563 10 January 2024 1 Determination overview 1.1 Complaint This complaint relates to a claim by the complainant under his home insurance policy held with the financial firm (insurer), for damage to the insured property caused by a storm event in 2015. The insurer partially accepted the claim but says that there is no evidence of damage related to the 2015 storm event. 1.2 Issues and key findings Is the insurer’s offer fair ? Yes. Given the exchanged material the insurer ’s offer is fair but it must increase the uplift for contingencies in accordance with this determination. Is the insurer required to pay compensation? Yes. The insurer is required to pay the complainant non-financial loss compensation of $2,000. Why is the outcome fair? The outcome is fair as the insurer is required to apply the terms and conditions of the policy to the exchanged material and determine its obligations to the complainant. 1.3 Determination This determination is in favour of the insurer. The insurer is required to increase the uplift on its offer by an additional $1,276.18. The insurer is required to comply with the provisions of this determination and within 14 days of the complainant’s acceptance of this determination , is required to pay the complainant non- financial loss compensation of $2,000. Determination | Case number: 965563 Page 2 of 6 2 Reasons for determination There has been a full exchange of all material information relied on for the purposes of this determination and each party has had the opportunity to address all issues. This complaint has been determined based on what is fair in all the circumstances, having regard to the relevant law, good industry practice, codes of practice and previous decisions where applicable. While the parties have raised numerous issues in their submissions, for the purposes of this determination commentary has been restricted to those issues considered directly relevant to the outcome only. The complainant is assisted by a representative. Any reference to the complainant within this determination, includes a reference to the representative. 2.1 Is the insurer entitled to deny the complainant’s claim? Coverage of the policy The complainant’s accidental damage home insurance policy provides cover for accidental loss or damage caused by an insured incident during the period of insurance. Insured incident s include “ Storm, flood, rainwater or wind ” and “Water or liquid damage” . Incident is defined in the policy as; a single occurrence or a series of occurrences, including an accident or a series of accidents, arising out of one event. The coverage provided by the policy is subject to conditions, limitations, and exclusions. This means that not all loss and damage is automatically covered. Rather, only loss and damage caused by an insured incident, during the period of insurance and subject to the conditions, limitations and exclusions, is covered. The full details of the policy coverage, conditions, limitations, and exclusions are contained within the Product Disclosure Statement (PDS) and Certificate of Insurance (COI). I am satisfied that the PDS and COI have been provided to the complainant. Therefore, the insurer is entitled to rely upon the terms of the policy, including its conditions, limitations, and exclusions, to determine its obligations to the complainant. It is accepted insurance law that the complainant carries the initial onus to establish, on the balance of probabilities (that is, more likely than not), a loss which is covered by the terms and conditions of the policy. Once the complainant has established a loss which is covered under the policy, the onus transfers to the insurer to establish the application of a condition, limitation or exclusion upon which it seeks to rely, to limit its obligations regarding the claim, or to deny the claim. In the circumstances I am satisfied that the complainant’s initial obligation is to establish that the damage occurred because of the 2015 storm event. Determination | Case number: 965563 Page 3 of 6 Circumstances of the loss and claim The complainant says that he lodged his claim through his broker on 18 May 2015, advising that the property had been damaged during a storm. The insurer says that the complainant was aware of the loss in 2015 but failed to complete the claim lodgement process at that time. The insurer records claim lodgement as occurring on 29 January 2021. There is limited information to establish what transpired between 2015 and 2021, but I am satisfied that there is no evidence that the insurer was aware of the claim in 2015. On the other hand, the complainant has provided a copy of an email dated 27 August 2018, he sent to the insurer. As stated, the insurer did not record the lodgement of the claim until 29 January 2021 and that is when the insurer’s claim notes commence. No explanation has been provided for the time gap. However, the fact the time gap remains unexplained does not simply mean that the claim must be paid. The time gap must be viewed given all available evidence. Expert evidence The insurer engaged a builder (BB), who appointed an assessor (AA), who inspected the property on 18 March 2021. AA advised;  The terracotta tiles are in good condition for their age, with a slight build-up of moss and lichen. Structural movement has resulted in some movement leaving some small gaps between tiles but there are no visible cracks or breaks across the roof resulting from the recent storm event (my emphasis).  Some valley cut tiles have slipped/broken from general wear and tear and structural movement and there is a build-up of debris, impeding water flow, causing blockages and leaving gaps into the roof space resulting in ingress.  Damage reported to left and right sides of the front of the garage roof. AA says that the complainant advised that there are no signs of water ingress and there hasn’t been since 2015. AA observed no visible damage to the tile areas above the garages resulting from the recent storm event (my emphasis). AA made no recommendations regarding the tiles but recommended clearing valleys of debris and replace and reposition cracked and slipped valley cut tiles. AA also recommended that its report be read in conjunction with an internal inspection of the garage ceiling to confirm water staining or whether sheets have come loose, which AA regarded as an internal maintenance issue. AA supported its finding with several photographs. BB inspected the property on 22 March 2021. BB had a copy of AA’s report as part of its assessment. BB recorded that the complainant advised of a freak storm in April 2015, causing wind driven rain to enter the ceiling cavity of the garage causing damage to the garage ceiling and damage in the rumpus room, open plan living area and in garage 2. Determination | Case number: 965563 Page 4 of 6 Within its report, BB advised; …. The resultant damages to the garage appear to have been caused by a storm in 2015. The damages have become worse since the event as the main roof is not water tight. The (complainant) is aware of the roof tiles having gaps and has not addressed this issue which would have allowed water ingress since the initial storm in 2015. (AA) have confirmed that there are no storm related damages to the roof. …. (BB) can confirm that the resultant damages in the garage have been caused by “Storm”. The remains (sic) damages are unrelated to the storm event the (complainant) is claiming on and fall under general maintenance. The attached scope of work only includes the cost of repairs to the event related damages, any unforeseen damages will require a variation. …. The initial quotation, for garage ceiling repairs, provided by BB is in the amount of $6,491.69. BB’s second quotation for removal/replacement of broken/shifted roof tiles abov e the garage and open plan living is in the amount of $961.30. A third quotation from BB for repairs to open plan living, rumpus and garage 2, is in the amount of $5,353.81. BB supported its findings with several photographs. The insurer offered $13,537.98, which is the sum of BB’s three quotations, plus a 10% uplift, less the policy excess of $500. The complainant has exchanged photographs but has not provided an expert report and relies upon conversations he says he has had with the insurer’s re presentatives to challenge the insurer’s denial of the claim. The insurer’s claim notes from the conversations referred to by the complainant, confirm cyclonic wind gusts in the region of the property for the storm that occurred in April 2015. The insurer’ s claim notes also confirm a complete review of the scope of works is required. However, the complainant’s claim for additional repairs is not supported by the evidence. The insurer has, on several occasions offered to send a structural engineer to report on the damage. In the circumstances, I consider this to be a fair and reasonable approach. The complainant has refused this offer. Conclusion In my view the exchanged material does not support the complainant’s claim for the additional damage. I am satisfi ed that given the exchanged material the insurer’s offer is fair with the exception it is to increase the uplift to 20% and include an additional amount of $1,276.18 with the offer. The complainant may either agree to the insurer’s offer to arrange for the attendance of a structural engineer. If the complainant agrees the insurer is to make the necessary arrangements within 14 days of the complainant’s acceptance of this determination and reconsider its position within a timely manner. Determination | Case number: 965563 Page 5 of 6 In the alternative, the complainant may accept the monetary offer as detailed by this determination. 2.2 Is the insurer required to pay compensation? Under AFCA’s Rules, we may award compensation (capped at $5,400) for non - financial loss where a complainant has suffered an unusual degree or extent of physical inconvenience, time taken to resolve the situation or interference with their expectation of enjoyment or peace of mind. However, we adopt a conservative approach to the award of compensation for non- financial loss. We expect complainants to be moderately robust and bear the usual stress and inconvenience associated with an insurance claim. Moreover, non-financial loss is not intended to be a punishment for any wrongdoing on the part of the insurer. I have carefully reviewed all the exchanged information and I am satisfied that the insurer’s delay in recording the claim remains unexplained. I am also satisfied that further delays followed. These delays no doubt impacted upon the time taken to resolve the claim and the expectations of the complainant. In the circumstances of this claim and this complaint it is appropriate that upon acceptance of this determination by the complainant, the insurer is to pay $2,000 in non-financial loss compensation. 2.3 Why is the outcome fair? The outcome is fair as the insurer is entitled to rely upon the terms and conditions of the policy to determine its obligations to the complainant, regarding the claim. Determination | Case number: 965563 Page 6 of 6 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all the information the parties have provided. While the parties have raised several issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.