Partial decline of storm damage claim, settlement amount for covered items, and timber floor damage during make safe

FirmQBE
Decided2024-03-06
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded$11,082
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The complainant claimed for storm damage to her home; the insurer covered some items and declined others as excluded. AFCA upheld the declinature of the disputed items but required a higher cash settlement for covered items and payment for timber floor damage caused during make safe.

The insurer proved exclusions (pre-existing damage, gradual deterioration, defective workmanship) applied to the disputed items, but the covered items settlement was inadequate and the insurer's restorer caused the floor damage.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimpay compensationrepair or rectify

Related

All QBE determinations · Find similar determinations

Text of the determination

Determination Case number 965354 Financial firm QBE Insurance (Australia) Limited Determination | Case number: 965354 Page 2 of 10 Case number: 965354 22 February 2024 1 Determination overview 1.1 Complaint The complainant held a home and contents insurance policy with the financial firm (insurer). She lodged a claim on 6 October 2022 for damage to the property which she says was due to a storm. The insurer partially accepted the claim. However, it excluded cover for damage which it says is due to a variety of extenuating factors and which is not consistent with a storm event. It says the damage is due to various factors including faulty or poor workmanship, gradual deterioration and previous damage that had not been repaired. Th e complainant disagrees with the insurer’s decision and seeks that the claim is covered in full. She also says the insurer’s contractors damaged the timber floors and that the insurer is responsible for these repairs. 1.2 Issues and key findings Is the insurer entitled to partially decline the claim? Yes. The insurer is entitled to decline cover for the disputed items as they are excluded under the policy. However, the insurer is required to cover the damage caused to the timber floors in the comp lainant’s son’s room and the hallway ( up to the nearest change or join in the flooring or an archway, doorway or similar opening, whichever is closest to the damage). Is the insurer’s settlement for the covered items fair? No. The insurer is required to cash settle the complainant for the covered items based on the CS quote with a 20% uplift. This totals $11,081.76. Why is the outcome fair? I am satisfied the insurer is entitled to decline cover for the disputed items based on various exclusions. It would not be fair to require the insurer to cover the disputed items in the circumstances. However, the insurer is required to increase its settlement for the covered items and cover the damage to the timber floors which, on balance, occurred during the make safe. 1.3 Determination This determination is partially in favour of the complainant. Within 14 days of being notified of the complainant’s acceptance of the determination, the insurer is required to pay the complainant $11,081.76 for the covered items. Within 30 days of being notified of the complainant’s acceptance of the determination, the insurer is required to obtain an actionable quote to repair the damage to the timber floors. Within 14 days of receipt of the quote, a cash settlement should be issued to the complainant for the quote plus a 20% uplift. Determination | Case number: 965354 Page 3 of 10 2 Reasons for determination 2.1 Is the insurer entitled to partially decline the claim? Yes. The insurer is entitled to decline cover for the disputed items as they are excluded under the policy. However, the insurer is required to cover the damage caused to the timber floors in the complainant’s son’s room and the hallway ( up to the nearest change or join in the flooring or an archway, doorway or similar opening, whichever is closest to the damage). Policy covers accidental loss or damage The complainant is required to show, on the balance of probabilities (that it is more likely than not), that there is a claimable loss under the policy. This means the complainant must prove the loss or damage was caused by a risk that is covered under the policy. Once the complainant proves there is a claimable loss, the insurer is liable for the loss unless it shows an exclusion or limiting condition applies. The insurer has the onus of proving, on the balance of probabilities, that the exclusion or condition applies. The insurer’s policy consists of the policy schedule and product disclosure statement (PDS). It is not in dispute the insurer provided the policy documents to the complainant. The co mplainant’s policy covers accidental loss or damage. The PDS defines accidental as ‘unintended or unexpected’. Conversely, the insurer has referred to the following policy exclusions: Reasonable actions and precautions There is no cover under any section of your Policy for any claim, loss, cost, damage, injury, death or legal liability, to the extent that it is caused by or arises from you or your family: • not taking reasonable care to protect and maintain the insured property; • not taking reasonable ste ps to minimise the cost of any claim under your Policy … Condition of your buildings: There is no cover under any section of your Policy for any claim, loss, cost, damage, injury, death or legal liability caused by or arising from: • … your failure to fix damage that existed prior to the incident or occurrence as soon as is reasonable after you become aware of the damage, or a reasonable person in the circumstances would have become aware of it; • your buildings not being structurally sound, watertight, secure, well maintained and in a good state of repair, Determination | Case number: 965354 Page 4 of 10 There is no cover under any section of your Policy for any: • wear, tear, depreciation, rust, oxidisation, corrosion, fading; • defect, structural fault, design fault or faulty workmanship; • rising damp, seepage, mould, mildew, rot; • previous damage that hasn ’ t been repaired; or • gradual deterioration due to action of light, air, sand, sea salt, sea water, or atmospheric or climatic conditions … Insurer has accepted parts of the claim but excluded certain damage In its claim response dated 22 December 2022, the insurer accepted cover for the damage to the ensuite, outdoor cabinetry and BBQ cabinetry. It declined cover for the other damage. However, on 8 June 2023, following lodgement of the AFCA complaint, the insurer revised its position to cover further items. Therefore, to date, it has agreed to cover the following damage (covered items):  ensuite;  outdoor cabinetry;  BBQ cabinetry;  bedroom;  bathroom;  hallway; and  front porch. It has maintained its declinature for the following damage (excluded items):  front elevation, rear and left-hand side rendered walls;  retaining walls;  internal cracking damage; and  roof damage. Insurer has provided reports commenting on the damage to the excluded items The insurer appointed a builder, CS, and an engineer, ES, to attend the property and assess the damage. A summary of their findings in relation to the excluded items is set out in section 3.2 of this determination. ES concludes: The storm-related damage can be classified as water ingress through the roof from defective weather seals around penetrations resulting in light mould forming on the ceilings. The retaining wall, flooring and rendered cladding depression on the northeast and north-western corners are unrelated to the claimed storm The insurer has also referred to a previous claim lodged with the insurer following a storm on 26 July 2020 (prior claim). The insurer cash settled that claim on 23 December 2021. The insurer obtained reports from a builder, AB, and engineer, MB, in relation to the prior claim. Those reports note, in relation to the excluded items, that: Determination | Case number: 965354 Page 5 of 10  falling branches damaged the roof following the storm. There was internal damage to the upstairs floors and walls;  there was no evidence of staining or water damage to the plasterboard ceiling and walls of the upstairs lounge room and hallway. There was, however, evidence of internal cracking in the upstairs lounge room and hallway. The damage to the timber flooring is very minor;  in AB’s opinion, there are pre-existing settlement cracks throughout the dwelling. Further, the damage to the timber flooring is not consistent with event or water damage. Rather, the damage appears to be due to movement within the subfloor, though there is no evidence of cupping or swelling of the timber floors;  in MB’s opinion, the damage to the upstairs walls and floors is due to foundation soil movement caused by seasonal changes, in which trees has some effect;  the inspection showed a pattern that points to ground movement with specified damages scattered along the length of the residence (which the tree line follows);  both experts note that the property had been renovated in 2019 (including the entire house being painted). Therefore, there may have been further pre-existing cracking that has been covered up; and  MB’s overall assessment suggests that moveme nt and subsequent cracking has been a gradual issue with long term soil movement. Given this, the insurer submits that the excluded items are a result of a variety of extenuating factors not related to storm damage. This includes, but is not limited to, faulty or poor workmanship, gradual deterioration and previous damage that had not been repaired. Further, the timber floor damage is consistent with general wear and tear expected for a property of this age and the signs of historical putty fill in the flooring. The timber floor damage is not typical of short term water exposure. Complainant says storm caused the damage to the excluded items The complainant has obtained two reports from a civil engineer, RC. RC ’s report s dated 20 November 2023 and 30 January 2024 say:  in relation to the covered rooms, the main point of contention is the amount of walls and ceilings that need repairing. He does not accept that sections of plasterboard can be repaired without visible defects. Therefore, he says whole walls or ceilings should be replaced;  he disagrees with CS, EC and ES in relation to the roof and render. He says the solar and flashings have been correctly installed and the roof was restored and repainted approximately one year ago in 2022. In his opinion, the damage was caused by the storm because: > the render applied is an acrylic render. Wear and tear is extremely slow and takes approximately 15 years before the render needs to be repainted or replaced; > the high winds and storm caused the water ingress into the roof space causing damage to the roof and render. The house is double brick. The water soaked into the brickwork causing parts of the render to come loose and break off;  the render also cannot be spot repaired. Any colour difference will be noticeable when applied. The insurer should repair the roof and re-render the house;  the solar panels are correctly installed but could potentially leak around the sealing of the roof attachment points. Some backflow could also occur at the gutter level where water can flow back into the roof cavity if the sealing at the gutters isn’t water tight. RC recommends that a roofing expert be engaged to investigate these issues;  the timber flooring through the first floor living room dining and hallway have been scratched by people dragging a dehumidifier across the floor without floor protection pads Determination | Case number: 965354 Page 6 of 10 being used. The floor in bedroom 4 has a chemical stain which has penetrated the varnish. This damage has happed during the make safe activities;  the storm was the primary cause of the damage;  the direct route the water came into the house is as yet unknown as there are too many potential routes and the damage is too widespread to be attributed to just one part of the roof failing; and  further investigation is required to locate all the ingress points for the water in large storm events. A roofing specialist should be engaged to investigate and repair the roof. Exchanged information shows excluded items are not due to the storm On balance, I am satisfied a storm occurred which caused damage to the property that was unintended or unexpected. Accordingly, the complainant has established a claimable loss under the policy. The onus therefore shifts to the insurer to show it is entitled to decline cover for the disputed items. To deny the claim, the insurer must show the proximate cause of the damage falls within an exclusion clause it is relying upon. This is a question of fact depending on the circumstances. The proximate cause is not necessarily the first or last or the sole cause of the loss. It is the effective, dominant or operative cause of the loss. The excluded items comprise the rendered and retaining walls, the internal cracking and the roof damage. Based on the expert reports of AB and MB, which have also been exchanged in this claim, I am satisfied the internal cracking damage was present before the storm event. I note that the previous storm claim was in 2020 and the insurer’s experts’ observatio ns that the movement and subsequent cracking has been occurring gradually because of long term soil movement. CS and ES also believe there is pre-existing movement cracking to the internal walls and external render. They also say that most of the damage is Category 0 – Negligible. RC does not provide any specific comment on the cause of the cracking damage. Therefore, in the absence of any evidence to the contrary, I consider the cracking damage should be excluded from cover. I acknowledge that roof repairs were carried out after the 2020 storm event and that the roof was restored and repainted in late 2022. However, CS, EC and ES have identified various defects and workmanship issues as having contributed to roof damage, thereby allowing water to enter the roof cavity. RC does not comment on the cause of the roof damage. Rather, he recommends a roofing specialist be engaged. He also acknowledges the possibility of leaks due to roof sealant and/or the gutters. I also note the quote obtained by the complainant from a roofing specialist, TR, on 30 October 2022. This refers to the roof leaking in a few places and states that repairs are required to broken tiles, adjustment of tiles under the solar panels, roof seals and flashings on the front entrance roof. Given this, I am satisfied that the defects and workmanship exclusion applies and that, on balance, the roof damage is excluded from cover. In relation to the rendered and retaining walls, the insurer’s experts point to discolouration that appears consistent with wear and tear and gradual deterioration. They also observed hairline cracks and delamination to the render and paint in the cracks indicating they are historical. There is also evidence of a repair to the render in one area. I acknowledge the evidence of RC regarding the cause of this damage and the longevity of the acrylic render. However, I am more persuaded by the insurer’s evidence. On balance, the damage to the rendered and retaining walls has not been caused by the storm event but, rather, is pre- Determination | Case number: 965354 Page 7 of 10 existing and has occurred gradually over time. Therefore, the insurer is not required to cover this damage. Accordingly, for the reasons outlined above, I am satisfied that the insurer in is not required to cover the disputed items. On balance the insurer has established that the disputed items are excluded under the policy. Insurer required to cover damage to timber floors The insurer’s engineer, ES, says in relation to the timber floors:  the level of damage is minor and consistent with scratches, slight blemishes, hairline cracks along the joints of the timber (assumed to be tongue and groove), and a small patch of deteriorated sealant;  the floor damage is consistent with general wear and tear expected for the age of the residence; and  there are signs of some historical putty fill in the flooring, and the new damage is not typical of short-term water exposure. The complainant says the damage occurred on 11 October 2022 when the insurer’s restorer, AJ, attended the property to treat the mould and carry out the make safe. The damage occurred when machinery was dragged across the floor and when chemicals spilt on the floor. I have seen the complainant’s photographs of the damage to the timber flooring in the hallway and her son’s room. I am satisfied th e insurer is responsible for this and that it should rectify the damage. The complainant has obtained a quote from EF for the repair of the timber floors. EF says it is impossible to just repair a 1 metre section of floor. Matching two sections of water-based stain on timber flooring is virtually impossible. Therefore, all timber floors should be re-sanded and stained. EF also says the complainant will have to move out for the duration and alternate accommodation will be required. I do not consider the insurer is required to match all the timber floors. Therefore, all of the timber flooring does not need to be re-sanded and stained. The insurer is only required to repair or, alternatively, obtain an actionable quote and cash settle the complainant for the damaged floors. However, the insurer should sand and stain the complainant’s son’s bedroom and the entire hallway up to the nearest change or join in the flooring or an archway, doorway or similar opening, whichever is closest to the damage. The insurer is required to obtain an actionable quote for the repair of the damage to the timber floors. The insurer should then cash settle the complainant with a 20% uplift for contingencies and the loss of a lifetime guarantee on repairs. 2.2 Is the insurer’s settlemen t for the covered items fair? No. The insurer is required to cash settle the complainant for the covered items based on the CS quote with a 20% uplift. This totals $11,081.76. Insurer should increase settlement for covered items The insurer has obtained a scope of works for the covered items. The scope of works from CS, which is undated, is for $9,234.23. Since it is unclear if the quote is actionable, the insurer is required to cash settle the complainant on the quote with a 20% uplift for contingencies and the loss of a lifetime guarantee on repairs. Determination | Case number: 965354 Page 8 of 10 2.3 Why is the outcome fair? I am satisfied the insurer is entitled to decline cover for the disputed items based on various exclusions. It would not be fair to require the insurer to cover the disputed items in the circumstances. However, the insurer is required to increase its settlement for the covered items and cover the damage to the timber floors which, on balance, occurred during the make safe. Determination | Case number: 965354 Page 9 of 10 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided. While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established. 3.2 Summary of insurer’s reports on excluded items Damage Extracts from insurer reports Roof CS refers to the roo f report from E C dated 27 October 2022 and says:  t here is no evidence o f any storm created opening allowing rain wat er entry;  gutters and downpipes were sufficient;  water has ent ered the roof cavity;  poor building practices in the installation of the solar mec hanical fixing has contribut ed to the gradual deterioration of the resul tant damage; ES says:  the main source of wat er ingress has been around penetrations of the roof cladding;  there is no evidence of direct damage from the storm to the waterproofing; Determination | Case number: 965354 Page 10 of 10  there are tears in the sarking consistent with installation defects or overstretching of t he material; Render ed walls CS says:  the front elevation shows discolouration that appears more consistent to gradual wear and tear and causing the paint to fade over time;  the rear and left - hand side shows hairline cracking and delamination to the render that appears consistent with structural settlement ;  there does not appear to be any damage caused by an insured event; ES says:  there is paint in the hairline crack and it does not exhibit the properties of a new crack, indicating historical damage;  ther e is diagonal indentation through the render below a horizont al control joint . This is evidence of a historical repair;  in some isolated loc ations the rendered cladding butts the timber cladding of the gable portico entrance and has resulted in spalling of the rendered edge due to a lack of articulation by the use of flexible sealant ; Retaining wall ES says:  three retaining walls terrace the eastern side of the property. The walls have a small return on the ends. At the junction of the return and fac e on the middle of the three walls, a hairline crack has formed which extends down the side of the joint as well;  there is paint in the crack, indicating historical damage;  the damage does not exhibit the properties of new damage and is unrelated to the claimed storm; Internal cracking CS says there is pre - existing movement cracking to the internal walls and external render. ES says with the exception of the single crack identified, the damage noted is Category 0 – Negligible. Hairline cracks less than 0.1mm in width at timber and brick joints. The isolated nature of the single crack is from stress in the wall frame. It is not related to general foundation movement. The crack is consistent with the unpredictable nature of plasterboard on stud frames which can undergo changes in movement from moisture and thermal variations. It is not related to a single defined storm event. Ceiling ES notes that at the time of its inspection, the ceiling damage had been cleaned or repaired. There is no structural damage caused as a result of the storm.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.