Home / RACQ / Determination 965147

Determination 965147

Denial of structural damage claim after lightning strike, plus claim handling delays and non-financial loss

FirmRACQ
Decided2024-04-08
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded$500
Non-financial loss$5,400
Amount claimed$31,119
SourceAFCA PDF

Summary

The insurer cash settled electrical damage from a lightning strike but declined a later claim for structural damage. AFCA upheld the decline but ordered $5,400 non-financial loss compensation and payment of the offered $500 for delayed settlement.

The complainant did not show the structural damage arose from a single event or incident so it was not a claimable loss, but the insurer's delays and failure to provide temporary accommodation warranted maximum non-financial loss compensation.

Issues

Subjects and remedies

elderly or capacityhealth or medicalhome or building damagenatural disasterpay compensationpay non financial loss

Related

All RACQ determinations · Find similar determinations

Text of the determination

Determination Case number 965147 Financial firm RACQ Insurance Limited Determination | Case number: 965147 Page 2 of 10 Case number: 965147 28 March 2024 1 Determination overview 1.1 Complaint The complainant holds a home building and contents policy with the financial firm (insurer). The complainant says the insured property was damaged by lightning on 3 March 2022. The complainant lodged a claim on 21 March 2022. The insurer accepted the claim and cash settled the complainant for electrical works and damaged appliances. The complainant says the lightning strike also caused structural damage to the property. The insurer says the complainant has not established the lighting caused structural damage to the property and has prejudiced the claim by not allowing it to assess the claimed damage. 1.2 Issues and key findings Is the insurer required to pay for structural damage? No. The complainant has not established that the structural damage claimed is a claimable loss under the policy. Is the complainant entitled to any other amounts? Yes. There were initial delays with handling the claim and restoring electricity to the property. The complainant was entitled to temporary accommodation which the insurer did not offer. It is fair for the insurer to pay the complainant $5,400 compensation for non-financial loss. The insurer has agreed to pay the complainant $500 to account for the delay cash settling the amount of $4,882 which should have been part of the original settlement. This exceeds the complainant’s entitlement to statutory interest and I consider it fair and reasonable. Why is the outcome fair? The outcome is fair because the terms, conditions and exclusions of the insurance policy have been correctly applied to determine the extent of coverage. The complainant has not established that the structural damage to the property is a claimable loss and refused the insurer’s request to access the insured property for further assessment. It would be unfair for the insurer to pay for the structural damage with the information available. However, it is fair for the insurer to pay compensation for the delays it caused handling the claim initially. 1.3 Determination This determination is substantially in favour of the insurer. The insurer is entitled to deny the claim for structural damage, but is to pay the complainant $5,400 compensation for non-financial loss. If the insurer has not already done so, it is to pay the complaint $500 (as offered) to account for the delay cash settling the claim including statutory interest. Determination | Case number: 965147 Page 3 of 10 2 Reasons for determination 2.1 Is the insurer entitled to partially deny the claim? Complainant bears the onus of establishing a claimable loss It is accepted insurance law that an insured has the initial onus to show, on the balance of probabilities (that it is more likely than not), that the loss or damage claimed falls within the terms of the policy. Where this is established, the onus then shifts to the insurer to prove that an exclusion applies if it seeks to deny or limit its liability for the loss. There is no dispute that the complainant received the policy documents including the Product Disclosure Statement (PDS) and Certificate of Insurance (COI). The policy covers several insured events subject to limits, conditions and exclusions. Page 35 of the PDS states that the policy covers loss or damage caused by a lightning strike. The COI shows the complainant also had the ‘Advanced cover’ optional benefi t. This benefit provides cover for loss or damage to the complainant’s home caused by accident al damage. The policy defines accident as: An event or incident which you did not intend or expect. History of claim and cash settlement There is no dispute that the property was struck by lightning on 3 March 2022. The complainant describes an enormous blast which caused the lights and power to go off. She initially engaged her own electrician, DA, who advised that the electrics had been damaged by lightning. She lodged a claim with the insurer on 21 March 2022. The insurer engaged PI to assess the claim and prepare a repair quotation. A roofer and plumber from PI attended the property on 4 April 2022, inspected the roof and prepared a report stating that the roof has been poorly installed with multiple issues. PI also reported that the upstairs light circuit had tripped and recommended that an electrician be engaged. The complainant says she had intermittent electricity and was able to keep some appliances running, but the lights in her home were not working at all. Her electrician, DA, marked the circuits on the switchboard as safe and unsafe and provided a report in April 2022 regarding the damage. The complainant says PI eventually attended to perform a make safe on 23 June 2022, but this was unsuccessful. PI temporarily reset the safety switch to get her lights working, but shortly after they left the power went off with a bang and she detected a burning smell. The complainant rang her electrician who advised her to turn everything off. The insurer subsequently cash settled the complainant $31,412 less the $750 excess based on a quotation from DA. The quotation from DA includes re-wiring the property and replacing electrical appliances, as well as removal and replacement of part of the roof. The insurer issued a cash settlement totalling $25,780 in August 2022, which was less than the full amount quoted. The insurer issued a further cash settlement for $4,882 in April 2023 to make up the difference. Determination | Case number: 965147 Page 4 of 10 The insurer also performed some make safe repairs to the complainant’s gutters. The insurer says the gutters were not damaged by the claimed event and this damage was excluded from cover, but it agreed to repair the gutters to prevent further loss. Approximately 4 lineal metres of rusted gutter was removed and replaced. Complainant says lightning strike caused structural damage The complainant says the lightning strike caused structural damage to the property which was not assessed by the insurer. T his damage was not included in the complainant’s initial claim and she raised it with the insurer in 2023 (after the claim was referred to AFCA). She says that she was focussed on the electrical issues and noticed the structural damage over time. However, some plaster damage was pointed out to PI during their initial inspection. The complainant has provided a report prepared by retired builder, DF. The report says:  there was heavy rainfall recorded in the complainant’s area throughout 2021 and extreme rainfall between 22 February 2022 and 1 March 2022  the complainant’s house was struck by lightning on 3 March 2 022  heavy rainfall continued through 2022  the house was in good condition prior to the loss and had been renovated in 2012-2013  following the lightning strike the condition of the house deteriorated. The complainant also provided a document showing the summary of the damage, required repairs, and repair costs. The complainant says she prepared the document with DF. The document notes damage to the following areas:  roof and gutters  timber decking  decking balustrade  entry stairs  ceiling and wall plaster  plumbing  windows. The document estimates repair costs to be $31,119. The complainant says she has already completed some of the repairs including the roof and gutters, timber decking, decking balustrade and entry stairs. She has provided an invoice dated 1 November 2022 for roof repairs performed by DF in the amount of $720. The damage to the plaster ceiling, external plumbing, toilet and windows remains outstanding. The complainant has provided photos of the items of structural damage claimed. Insurer says it cannot accept the claim based on information provided The exchanged information shows that the insurer offered to arrange a builder to attend the insured property on 9 May 2023 to inspect and report on the claimed damage. The complainant responded on 12 May 2023 advising she would get her own building report. On 19 May 2023 the complainant told the insurer she wanted no further contact about her claim and would only speak directly to AFCA. The insurer says that the complainant has prejudiced its ability to investigate the claim and it cannot accept the claim based on the information provided by DF. It says DF does not provide information to show the claimed damage is the direct result of the lightning strike. Determination | Case number: 965147 Page 5 of 10 The complainant says the insurer prejudiced the claim itself by failing to fully and competently investigate and assess the lightning strike damage from the outset. Complainant has not established a claimable loss Having considered all available information, I am not satisfied on the balance of probabilities that the complainant has established that the structural damage is a claimable loss under the policy. As the policy covers accidental damage, it is unnecessary for the complainant to establish that the damage was caused by the lightning strike. She simply needs to establish that it arose from ‘an event or incident’ which she did not intend or expect. These terms are not defined in the policy. The Macquarie dictionary defines:  event as ‘anything that happens or is regarded as happening; an occurrence’  incident as ‘an occurrence or event’ Both definitions refer to ‘an occurrence’. I am therefore satisfied the damage must arise from a single event or incident, rather than happening over time. I do not consider the report from DF establishes the damage claimed is from the lightning strike or any other single event during the period of insurance. The DF report does not provide an expert opinion about the cause and effect of the lightning strike and it does not include supporting information such as photographs. Rather, the report recounts the complainant’s complaint with the insurer. In relation to the damage to the roof, the complainant claims that all roof screws were loose because the roof had been lifted by the lightning strike. She also claims that gutters that previously had no leaks had flexed and burst. The insurer’s assessor, PI, inspected the roof after the lightning strike and reported that: The roof has been poorly installed with multiple issues throughout. These include but not limited [to] rusted gutters, rusted fixings, incorrectly installed/finished flashings, incorrectly lapping roof sheeting, incorrectly sealed penetration, insufficient fixings, insufficient batten spans and fixings not secured into the battens The PI report includes photographs of the roof which show that the gutters and fixings have significant rust and have rusted through in many places. I am not satisfied that this damage was caused by the lightning strike or any other single event. I consider it more likely that this damage occurred over a long period of time since the roof and gutters were installed. The complainant claims that various other items were dislodged or shaken loose by the lightning strike including timber balustrades, internal plaster ceiling, external plumbing, toilet and window putty. I am not satisfied this damage was caused by the lightning strike or any other single event or incident. The information from DF indicates that the timber balustrades were weakened by prolonged wet/no sun and they appear to have deteriorated over time. Overall, I am satisfied that the structural damage claimed was accidental in that it was unexpected by the complainant. However, based on the information provided, I am not persuaded that it arose from a single event or incident. Determination | Case number: 965147 Page 6 of 10 It follows that the complainant has not established the structural damage is a claimable loss under the policy. The insurer is entitled to decline this part of the claim and there is no requirement to consider and discuss the exclusions argued in the alternative by the insurer. Complainant prejudiced insurer’s ability to investigate the claim The insurer has previously offered to appoint an engineer/builder to attend to the property to provide a causation report regarding the structural damage. I consider the insurer’s offer was reasonable in the circumstances. I acknowledge that the insurer did not complete a thorough assessment of all damage to the property during its initial inspection. However, the complainant was not seeking indemnity for structural damage at that time. The complainant bears the onus of establishing a claimable loss and it is therefore up to her to identify the loss. She did not identify all of the claimed items of structural damage until early 2023 and then did not allow the insurer to assess it. I consider the complain ant has prejudiced the insurer’s ability to investigate the claim by refusing to allow the insurer to assess the structural damage. Further, the insurer may now not be able to assess the damage as the complainant has completed some of the repairs. Based on the information provided, the insurer is not required to pay for any of the structural damage. 2.2 Is the complainant entitled to any other amounts? Yes. There were initial delays with handling the claim and restoring electricity to the property. The complainant was entitled to temporary accommodation which the insurer did not offer. It is fair for the insurer to pay the complainant $5,400 compensation for non-financial loss. The insurer has agreed to pay the complainant $500 to account for the delay cash settling the amount of $4,882 which should have been part of the original settlement. This exceeds the complainant’s entitlement to statutory interest and I consider it fair and reasonable. AFCA can award compensation Under AFCA’s Rules, AFCA may awar d compensation for:  indirect loss in some circumstances, but this does not apply where the policy excludes cover for indirect loss  non-financial loss where there has been an unusual amount of physical inconvenience, time taken to resolve a situation, or i nterference with the complainant’s expectatio n of enjoyment or peace of mind. AFCA takes a conservative approach to compensation for non-financial loss. In assessing whether to award compensation, AFCA expects complainants to be moderately robust, bear the normal degree of inconvenience experienced when a problem occurs, and take reasonable steps to minimise the inconvenience suffered. AFCA considers the severity and impact of the financial firm’s conduct on the particular complainant. The maximum amount AFCA can award for non-financial loss is $5,400. Complainant says insurer mishandled her claim The complainant says the insurer mishandled her claim. The complainant says:  the insurer mismanaged the claim after lodgement and caused unnecessary delays  the insurer did not assess for structural damage in its assessment Determination | Case number: 965147 Page 7 of 10  the insurer delayed in paying a settlement  she did not have power for almost six months  she fell over three times causing injury I am satisfied that the complainant did not have reliable power and lights for 6 months between 3 March 2023 (when the incident occurred) and 10 September 2023 (when electrical repairs began). The insurer cash settled the electrical damage in early August 2023 and the period between claim lodgement and this settlement was approximately 5 months. The complainant has provided letters from her doctor and physiotherapist which state that she suffered falls as a result of poor lighting and experienced significant psychological and physical health difficulties due to lengthy delays settling her insurance claim. Extracts of these letters are set out in section 3.2 below. The complainant says she has also experienced loud ear ringing since the incident and was referred to a specialist in relation to this. Insurer is not required to pay any further compensation for indirect loss The insurer has no liability under the policy for medical and physiotherapy costs incurred by the complainant. This is because the policy does not respond to such loss and specifically excludes indirect loss (see page 78). On 2 June 2023, the insurer agreed to make an ex-gratia payment of $4,825 for medical and physiotherapy costs. This payment appears to account for the complainant’s out of pocket expenses incurred because of the falls and I am satisfied that it falls under indirect loss. I am not persuaded the insurer is required to pay any further amounts for indirect loss. Even if I was to accept the complainant has audiology issues from the lightning strike, any medical costs are a direct result of the lightning strike and not because of the insurer’s claim handling. Insurer is required to pay compensation for non-financial loss Having considered the available information, I am satisfied that the claim was handled poorly by the insurer and there were delays assessing the claim and restoring her electricity, which caused the complainant to suffer an unusual degree of stress and inconvenience. The complainant is elderly and lives alone so she was particularly vulnerable. The fact that she was left without any lights for a period of 5 months before the claim was settled is highly unsatisfactory. The policy provides cover for temporary accommodation after an insured event happens that makes the home unfit to live in (page 59). The insurer did not offer the complainant temporary accommodation despite the fact that she had intermittent electricity and no lighting at her home. I am satisfied that the complai nant’s home was unfit to live in as the electricity issues created a safety hazard. The insurer accepts that there have been delays which had a negative impact on the complainant’s overall claim experience, but says that it has already recognised this by providing benefits that she was not entitled to under the policy (including replacing some rusted gutters at a cost of $4,968.92 and reimbursing her physiotherapy costs). I acknowledge the insurer has made ex-gratia payments to the complainant in recognition of its errors. However, I am not satisfied that this fairly compensates the complainant for the stress and inconvenience she suffered due to the extensive delays, poor claims handling and failure to perform a proper make safe or provide temporary accommodation. Determination | Case number: 965147 Page 8 of 10 I consider it fair for the insurer to pay the complainant $5,400 compensation for non-financial loss. Insurer is required to pay interest on delayed cash settlement The complained says delays around cash settlement of the electrical damage resulted in increased material costs and she seeks an uplift on the settlement sum. The cash settlement was based on a quote from t he complainant’s electrician , DA, and I am not satisfied that she is entitled to an uplift for contingencies. However, I am satisfied that she is entitled to some interest under section 57 of the Insurance Contracts Act 1984. Section 57 provides that where an insurer is required to pay a claim but has not done so, interest is payable from the date it was unreasonable to withhold payment. The insurer says it made two cash payments on 11 August 2022, comprising:  $2,050 (contents and microwave)  $23,730 ($24,480 electrical repairs less $750 excess) The insurer made a further payment on 18 April 2023 on $4,882, bringing the total cash settlement to $30,662 ($31,412 quoted by DA less the $750 excess). The insurer has explained that it failed to cash settle the full amount quoted by DA in August 2022 due to a user error. In the circumstances, the insurer is required to pay interest on the delayed payment of $4,882 for the period between 11 August 2022 and 18 April 2023. The insurer acknowledges this and has agreed to pay the complainant $500 in recognition of its error. This exceeds the insurer ’ s liability for interest under section 57 and I consider it fair and reasonable in the circumstances. 2.3 Why is the outcome fair? The outcome is fair because the terms, conditions and exclusions of the insurance policy have been correctly applied to determine the extent of coverage. The complainant has not established that the structural damage to the property is a claimable loss and refused the insurer’s request to access the insured property for further assessment. It would be unfair for the insurer to pay for the structural damage with the information available. However, it is fair for the insurer to pay compensation for the delays it caused handling the claim initially. Determination | Case number: 965147 Page 9 of 10 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided. While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established. Determination | Case number: 965147 Page 10 of 10 3.2 Medical documents Record Key points Complainant’s doctor ( C ) Letter 17 April 2023 [ the complainant ] has consulted with me subs equent to falls, in context of inadequate lighting, after lightning struck her house in 2022. She saw me in October 2022, a few months after seeing physio in relation to one of these falls, in which her left knee was injured, and had imaging. In addition, she has reported a decline in hearing and a ringing in her ears, ENT referral has been made regarding this. The experience of the lightning strike, and subsequent events, have left [the complainant] significantly stressed and had a negative impact on her health, Complainant’s doctor (C ) Letter 29 May 2023 This i s to verify that [ the complainant ] is having significant psychological and physical health difficulties, in relation to lengthy delays in settlement of her insurance claim, subsequent to the lightening [sic] strike of her house early in March 2022. This includes the ongoing physical impact of the three falls (with no lights present in the house, or outside, for more than 6 months), in addition to the psychological stress of interaction wit h the insurance company and inaction. As a result, her health has declined, and this has impacted in he r ability to work (and thus support herself). Complainant’s physi o ( R ) Letter 19 April 2023 In March/April 2022 she had 2 falls on slippery stairs subsequent to a light ening [sic] strike on her house on 3rd March that caused considerable damage including taking out the electrics. Both resulted in low back and SIJ irritation and aggravation of her gluteal tendinopathy, which required subsequent treatment over the rest of the year and into 2023. She also had a further fall in lat e September/early October 202 2, where again in the dark she tripped on a bathroom ledge and fell heavily onto bot h knees, bruising both patellae and irritating the Patellofemoral joints and infrapatellar fat pads.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.