Extent of damage covered under escape of liquid cover; insurer offered cash settlement of 20%, complainant sought 60%, 2012 repair costs and expert costs
Text of the determination
Determination
Case number 963537
Financial firm AAI Limited
Determination | Case number: 963537 Page 1 of 10
Case number: 963537 28 November 2023
1 Determination overview
1.1 Complaint
The complainant has a home and contents insurance policy (policy) with the financial firm
(insurer). The policy covers specified insured events, including escape of liquid (EOL). The
complainant lodged claims for damage to the property caused by a broken stormwater pipe
and a damaged stormwater drainage pit.
The insurer accepted that some of the damage was caused by an EOL covered by the policy.
It declined cover for the remaining damage on the basis it was caused by factors excluded
under the policy. It says because of that, its liability is limited and has offered to cash settle
the claims by paying 20% of the cost of the repair of the damage to the insured property.
The complainant is seeking payment of 60% of the damage, reimbursement of expert costs,
and reimbursement of repair costs incurred in 2012. The complainant says those repairs
were completed at the recommendation of the insurer’s engineer to fix movement damage
that later re-occurred because the underlying cause was not located and fixed by the insurer.
1.2 Issues and key findings
Should the insurer increase its cash settlement offer?
Yes. More of the damage was caused by EOL than was accepted by the insurer. The panel is
satisfied that 40% fairly reflects the proportion of the damage caused by insured events.
Is the insurer required to reimburse the complainant for the 2012 work?
No. The insurer is not required to reimburse the complainant for the repair work undertaken
in 2012. The panel is not satisfied the complainant has shown the 2012 damage was caused
by an insured event or that she suffered direct financial loss due to the recommendation.
Is the insurer required to reimburse professional costs?
Yes. The complainant’s expert reports have assisted her in showing an entitlement to have
more of the damage covered than the insurer had accepted.
Why is the outcome fair?
The outcome is fair because the panel is satisfied that 40% of the movement damage was
caused by insured events. It is also fair for the complainant to be reimbursed for expenses
she incurred establishing that a greater extent of the damage was caused by the insured
events than was previously accepted.
1.3 Determination
This determination is mostly in favour of the complainant.
Should the complainant accept this determination the claims and the complaint are to be
settled as set out in part 2.4 of this determination.
Determination | Case number: 963537 Page 2 of 10
2 Reasons for determination
2.1 Should the insurer increase its cash settlement offer?
Yes. More of the damage was caused by EOL than was accepted by the insurer. The panel is
satisfied that 40% fairly reflects the proportion of the damage caused by insured events.
No dispute property sustained damage due to EOL
The complainant’s home building policy is made up of the product disclosure statement (PDS)
and the certificate of insurance. There is no dispute the insurer sent these documents to the
complainant.
The complainant has the onus to establish, on the balance of probabilities (that is more likely
than not), that the loss or damage falls within the terms of the policy. Subject to its terms and
conditions, the policy provides cover for loss or damage caused by leaks from ‘any drain,
fixed pipes … rainwater downpipes, drainage and sewage systems ’ .
There is no dispute there were two leaks at the property:
the broken tee in the stormwater pipe (broken pipe). On 2 August 2018 t he insurer’s
builder, PB, found the broken pipe at the property, allowing water to escape. The
complainant says this break was located under the concrete driveway 25cm from the
north-west corner of the house. The complainant lodged the claim with the insurer and the
broken pipe was repaired on 4 February 2019. The insurer accepts that the broken pipe
caused damage to the property
the dislodged pipe at the stormwater drainage pit (damaged pit). On 8 July 2021 the
complainant’s plumber, LC, found the damaged pit and that water was going into the
ground. The damaged pit was also located under the concrete driveway and was situated
about a metre from the north-west corner of the house. The insurer disputes that the
damaged pit caused damage to the property.
T he insurer’s engineer, MC, estimates 20% of the damage was attributed to the leaking
pipes. The insurer, relying largely on reports from MC, says the remaining damage was
contributed to by long term ground movement, highly reactive soil and insufficient surface
drainage. Such damage is excluded under the terms of the policy.
Damaged pit caused damage to the property
The insurer, relying on MC’s expert report, says the damaged pit caused no damage to the
property because the leak was repaired as soon as it occurred. Further, the insurer says the
complainant did not lodge the claim about this leak until March 2022.
The panel is satisfied that the complainant notified the insurer about the damaged pit by
phone on 13 July 2021. She also informed the insurer by email 20 July 2021, asking it to
inspect the damaged drainage pit. The insurer responded by email dated 23 July 2021
recommending that she ‘address the plumbing relating issues as part of the maintenance that
is required at the property and t o prevent further damages to the property’. The complainant
repaired the damaged pit on 16 September 2021.
The panel is satisfied that it is likely that the pit had been leaking water for some time before it
was discovered. Although there is no evidence showing when the leak first occurred, LC’s
CCTV footage provides evidence of a cavity around the damaged pit beneath the concrete
driveway indicating that leaking water had washed away the surrounding soil over time.
Determination | Case number: 963537 Page 3 of 10
Therefore, the panel accepts the complainant has established the claims for the broken pipe
and damaged pit fall within the terms of the policy. To the extent the insurer seeks to limit its
liability the insurer must show, on balance, the damage was caused by a policy exclusion or it
is otherwise entitled to decline or limit its liability for the claim.
Expert reports differ as to the extent of the insured damage
The parties agree:
the property is built on reactive clay soil which can cause differential footing movement and
as is prone to shrinkage when dry and swelling when wet
differential footing movement can cause damage such as cracking
some of the damage to the house and pavements is from ground movement unrelated to
the EOL.
Both parties rely on expert opinion. Since 2012 numerous reports have been written.
Insurer’s experts say insured damage limited to 20%
The insurer has arranged for numerous reports from engineers, builders, plumbers, and
assessors.
The insurer’s eng ineer, GP, provided a causation report on 20 April 2021 (GP1). GP1 was
written after the broken pipe was found but before the damaged pit was discovered. GP1
says the leak from the broken pipe to the north-west corner of the dining room ‘has
contributed to the foundational movement of the dwelling in this area’. GP1 says the
plumbing reports show ‘that the stormwater lines had large amounts of mud/debris build up’
and that this ‘likely caused downpipes to overflow during heavy rainfall, causing localised
foundational movement of the dwelling in these areas’. GP1 confirms the presence of on-
going perimeter surface drainage problems. GP1 says ‘ long-term drying of the highly reactive
clay subfloor soil has led to long-term subsidence, particularly towards the centre of the
dwelling… exacerbated by anticipated shallow founding of stumps (with regards to current
Australian Standards) ’ .
GP1 concludes the damage to the dwelling (eg cracks) was caused by:
EOL from broken pipe 20%
the remaining damage to the dwelling was caused by:
> poor perimeter drainage (20%) and
> expected shallow founding of stumps and shrinkage of subfloor soil, and natural
seasonal movement of highly reactive founding soil (60%).
GP1 concludes the pavement slab damage was caused by:
EOL from the broken pipe: 20%
expected movement of pavement slab due to founding on highly reactive soil: 80%.
After the damaged pit was discovered, GP’s email to the insurer dated 26 July 2021 provided
further information (GP2) , namely ‘ the break in the SW system beneath the northwest
driveway floor waste (drain) explains the on-going heave in this area. It doe sn’t change
our…recommendations’ . Subsequent engineers retained by the insurer have generally
supported this position, attributing none of the damage to the damaged pit.
On 22 December 2021MC provided its first report (MC1). MC1 observes movement damage
(wall cracks and/or misalignment) to every room in the house, cracks in external brickwork
and pavement to the north west of the house. In this, and subsequent reports, MC finds the
broken pipe has caused localised hairline cracking to the north-west corner brickwork only. It
Determination | Case number: 963537 Page 4 of 10
finds the cause of the remaining damage grading of pavement toward the house and
inadequate surface drainage. MC says this has ‘ allow[ed] surface stormwater to seep into the
underlying soils and drain into the subfloor over a long period of time ’ .
Complainant and her expert says 60% of damage caused by leaks
The complainant saw the damaged drainage pit before it was repaired. She says she saw a
large cavity under the concrete around the damaged pit. She believes that the fact that the
soil was absent around the pit is evidence that a large volume of water had escaped over a
lengthy duration, washing the soil away.
The complainant’s engineer, AA, provided a report dated 30 September 2022. AA’s
conclusion is that it is ‘the escape of liquid and poor site drainage [that] has caused upheaval
along the external perimeter of the dwelling… has resulted in extensive damages throughout
the property’.
AA notes that his and other engineer’s floor level surveys show the highest elevated point of
the dwelling is the north-west corner. This coincides with the location of the broken pipe and
damaged pit. Also, the internal dama ge is ‘predominantly located on the western side,
coinciding with the highest elevation in floor level’.
AA agrees that the site drainage around the dwelling is inadequate. He also agrees with the
insurer’s experts that the surface of the concrete pavem ent along the east of the house
slopes toward the house contributing to the dampness of soil foundations.
AA estimates that the damaged pit and broken pipe collects stormwater from approximately
30% of the roof above the house and 100% of the roof above the garage and carport (a much
larger catchment than the concrete pavement at north and east of house). He says a
significant volume of stormwater had escaped from the broken pipe and drainage pit over an
extended period of time prior to its discovery and rectification.
AA notes that since the rectification of the broken pipe and drainage pit the subfloor soils
along the external perimeter of the house have remained relatively dry.
AA says a fair and reasonable apportionment of loss relating to EOL is: EOL: 60%; poor site
drainage: 40%.
Insurer’s engineers disagree with complainant’s expert
MC provided further reports (MC2 and MC3) that support its earlier conclusions. MC2
considers the crack in the broken pipe to be minor and insufficient to allow a significant
volume of water to escape. Further, MC says the leak could not have flowed through to the
subfloor and/or flow under building footings to the subfloor, nor flow throughout the subfloor or
to the opposite corners of the home. MC says this is because the stormwater pipe was
‘approximately 1 m from the home, embedded within the trenched soils which will not allow
water to escape, flow towards the home, up and over all down and under the footing and
through to the subfloor’. MC distinguishes that from surface water run-off that can flow down
and through the porous brick and mortar walls. MC2 also says that a leak in the north-west
corner of the home cannot cause global movement throughout the house.
Panel accepts that EOL was proximate cause of 40% of the damage
Having carefully considered the exchanged material the panel is satisfied that the EOL was
the cause of 40% of damage to the insured property. The panel is satisfied that none of the
reports accurately reflect the extent of the EOL damage. The complainant’s report does not
Determination | Case number: 963537 Page 5 of 10
set out how AA concluded that 60% of the damage was attributable to EOL. The insurer ’s
reports do not allow for a number of the factors set out below. Given the uncertainty on both
parties’ estimates, the panel’s view wa s that it would be fair that the parties bear the
difference equally, thus 40%. Accordingly, the panel determines that it is fair and reasonable
that the insurer cover 40% of the damage caused by movement. In particular, the panel had
regard to:
in 2018 LC found the broken pipe. LC also found the stormwater pipes contained sludge
and water
in 2021 GP found, and the insurer accepted, that the broken pipe itself caused 20% of the
damage to the dwelling and pavement slab
the damaged pit was discovered in 2021. The panel accepts that LC’s CCTV footage
shows a large cavity around the damaged pit under the concrete and that this shows that a
significant amount of liquid has escaped over a period of time
the panel is not satisfied that the evidence shows the pit was repaired as soon as it was
damaged. The insurer did not inspect the pit before it was repaired and has not presented
any evidence about when the damage first occurred, how long it was leaking water or the
volume of water attributable to the leak
the panel is persuaded by AA’s evidence that the broken pipe collected a significant
amount of rain water (30% from the roof and 100% from the car port) and that the photo of
the cracked pipe shows a sufficient break for a significant volume of water to escape
the broken pipe and drainage pit are located very close to the north-western corner of the
house, where floor levels are highest and where most of the damage (cracking) has
occurred
he panel is not satisfied that water escaping from the broken pipe and/or drainage pit could
not enter the subfloor given:
> the insurer’s evidence (MC1) that surface storm water run-off was ‘ seeping through to
the underlying soil and draining into the subfloor over a long period of time ’
> in the photo (AA’s report Image B) , while no indication of scale is given, it appears that
the broken pipe was close to the house and less than one metre away
> the soil around the broken pipe and damaged pit was very wet
> the explanation does not set out what the footings were constructed from (in the photo
there appear to be two courses of brick) and why water could not have seeped through
the footings over time – particularly where they were exposed to water from the leak
over period of time
> the apparent distinction between water seeping into the footings from the gap between
the brickwork and concrete pavement and seeping directly into the footings from the soil
is not clear
the panel is accordingly persuaded that stormwater escaping from the damaged pipe and
broken pit also seeped into the footings and entered the sub floor during storm or rain
events causing expansion and later contraction as the soil dried out.
2.2 Is the insurer required to reimburse the complainant for the
2012 work?
No. The insurer is not required to reimburse the complainant for the repair work undertaken
in 2012. The panel is not satisfied the complainant has shown the 2012 damage was caused
by an insured event or that she suffered direct financial loss due to the recommendation.
Determination | Case number: 963537 Page 6 of 10
Complainan t says 2012 repairs were recommended by insurer’s engineer
The complainant says in 2012 she repaired movement damage at the property on the
recommendation of the insurer’s engineer . She says the damage reoccurred because the
underlying cause was not located and fixed by the insurer. The complainant says, because of
that, the insurer should reimburse her for the cost of that work.
The insurer says the 2012 damage was caused by ground movement
The insurer says the 2012 claim was declined as the movement was attributed to ground
movement due to differential settlement of the footings.
Insurer is not required to reimburse 2012 repair costs
Having considered the available evidence, the panel is not satisfied that the complainant has
demonstrated damage to the property in 2012 was caused by an insured event. The EOL
incidents relied on in this complaint occurred were discovered in 2018 and 2021. No
evidence is available to show when the EOLs occurred. While the complainant has said the
EOLs may have been present before 2012 and caused the damage, there is insufficient
evidence to establish that.
Further, while the insurer’s engineer recommended the complainant undertake repairs, the
complainant does not say the insurer required her to do so. The panel does not consider the
complainant suffered direct financial loss because of any action of the insurer.
2.3 Is the insurer required to reimburse professional costs?
Yes. The complainant’s expert reports have assisted her in showing an entitlement to have
more of the damage covered than the insurer had accepted.
Insurer to reimburse complainant’s report costs
AFCA Rules provide that the insurer may contribute to professional costs (capped at $5,000)
incurred by a complainant during a complaint. When considering whether to require the
insurer to make a cost contribution AFCA considers the complexity of the complaint and
whether the complainant needed to incur the cost to understand or establish the claim.
The complainant provided expert reports from AA and LC which assisted in determining the
outcome of this complaint. The panel accepts it was fair for the complainant to obtain these
reports to assist in determining the cause of damage and to respond to the reports obtained
by the insurer.
The reports cost:
$4,775.20 confirmed by invoice dated 9 September 2022 for AA’s report
$450 confirmed by receipt dated 8 July 2021 for LC’s CCTV inspection report.
Therefore, the insurer is to reimburse the complainant $5,000.
2.4 Determination
Should the complainant accept this determination then:
within 28 days of notification of acceptance, the insurer is to have its expert provide a
scope of works (SOW) to repair damage to the insured property, covering all movement-
related damage. The insurer is to provide its expert with the complainant’s engineer’s , AA,
Determination | Case number: 963537 Page 7 of 10
SOW in Part 10 of the AA report and provide a clear written explanation for anything the
insurer’s expert excludes that was included in AA’s SOW
within 14 days obtain a quote reflecting current prices payable by a consumer to repair the
damage based on the insurer’s expert’s SOW
within seven days of receiving the quote pay the complainant 40% of that quote amount
plus a 15% uplift to cover unknown variations and contingencies that may arise once
repairs commence.
2.5 Why is the outcome fair?
The outcome is fair because the panel is satisfied that 40% of the movement damage was
caused by insured events. It is also fair for the complainant to be reimbursed for expenses
she incurred establishing that a greater extent of the damage was caused by the insured
events than was previously accepted.
Determination | Case number: 963537 Page 8 of 10
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
A panel determined this matter
Due to the nature of this complaint, we referred it to a panel for determination. The panel
includes:
an ombudsman
a member with significant experience in consumer and small business advocacy
a member with extensive experience in insurance matters.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.
Determination | Case number: 963537 Page 9 of 10
3.2 Relevant policy wording
Page Wording
22 Escape of Liquid
We cover
Loss or damage to the building
caused by liquid leaking, overflowing
or bursting from any of the following:
refrigerators, freezers,
dishwashers and washing
machines;
any drain, fixed pipes, roof
gutters or guttering and
rainwater downpipes,
drainage and sewage
systems;
fixed tanks;
swimming pools or spas;
waterbeds;
baths, sinks, toilets and
basins;
fixed heating or cooling
system;
wat er main, fire hydrant or
water supply pipe;
an aquarium.
Exploratory costs
We will pay the reasonable cost of
locating, at the insured address, the
source of the escaped liquid and to
repair and restore the damage to the
building caused by our exploratory
work but only if the escape of liquid
is covered under this insured event.
If the leak is not covered under the
insured event, we provide some
limited cover for exploratory costs
under additional cover ‘Exploratory
costs where a leak is not covered
under insured event ‘Escape of
liquid’. See page 30
If we pay for damage or expl oratory
costs under this insured event, we
will also pay up to $750 extra to
replace undamaged wall tiles in the
same room, hallway, stairs or
passageway* so they match or
complement new tiles used for
repairs. See ‘When we will repair or
rebuild undamage d parts’ on page
47.
*See pages 48 to 49
We do not cover
loss or damage caus ed by
flood or storm surge;
wear and tear, or loss or
damage by the escape of
liquid occurring as a result
of a gradual proc ess of
leaking, splashing, dripping
or overflowing over a
period of time when you
could reasonably be
expected to be aware of
this condition;
the cost of repairing or
replacing the item from
which the liquid escaped;
fixing leaks that have not
caused permanent
damage to the building;
leaks from agricultura l
pipes;
loss or damage caus ed by
liquid from a portable
container, such as plant
pot,, vase, terrarium, fish
bowl, beverage container,
saucepan, bucket or
watering can;
loss or damage caus ed by
liquid from a wat ering
system or hose;
loss or damage to reta ining
walls;
loss or damage to, or
caused by, a leaking
shower floor or base,
shower cubicle walls,
shower glass screening or
doors;
costs if you repair or
renovate a damaged area
of the building before we
can inspect it and find the
cause;
broken, worn or aged tiles
or grouting in walls in
bathrooms kitchens or
laundries unle ss the
damage is caused by liquid
leaking from pipes in walls
or floors (not forming part
Determination | Case number: 963537 Page 10 of 10
of a shower cubicle wall,
floor or base);
loss or damage caus ed by
wear, tear, rust, fading,
rising damp, mould,
mildew, corrosion, rot.
37 What we do not cover – general exclusions
You are not covered under any section of your policy for damage, loss, cost
or legal liability that is caused by, arises from or involves:
…
Ground movement
erosion, vibration, subsidence, landslip, landslide, mudslide, collapse,
shrinkage or any other earth movement, but we will cover landslide or
subsidence that is specifically covered under the following insured events:
‘ Storm’;
‘Flood’ (but only if you have cover for insured event ‘Flood’);
‘Earthquake and Tsunami’;
‘ Explosion’ .
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.