Extent of damage covered under escape of liquid cover; insurer offered cash settlement of 20%, complainant sought 60%, 2012 repair costs and expert costs

FirmSuncorp Group
Decided2023-11-30
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded$5,000
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The insurer accepted only 20% of movement damage as caused by escape of liquid and offered a cash settlement on that basis. AFCA found 40% was caused by insured events, ordered a scope of works and payment of 40% plus a 15% uplift, reimbursement of $5,000 expert costs, and rejected the 2012 repair costs.

On the balance of probabilities and given uncertainty in both parties' expert estimates, the panel apportioned 40% of the movement damage to escape of liquid, while the 2012 damage was not shown to be caused by an insured event.

Issues

Subjects and remedies

home or building damagepay claimpay compensationreassess claim

Related

All Suncorp Group determinations · Find similar determinations

Text of the determination

Determination Case number 963537 Financial firm AAI Limited Determination | Case number: 963537 Page 1 of 10 Case number: 963537 28 November 2023 1 Determination overview 1.1 Complaint The complainant has a home and contents insurance policy (policy) with the financial firm (insurer). The policy covers specified insured events, including escape of liquid (EOL). The complainant lodged claims for damage to the property caused by a broken stormwater pipe and a damaged stormwater drainage pit. The insurer accepted that some of the damage was caused by an EOL covered by the policy. It declined cover for the remaining damage on the basis it was caused by factors excluded under the policy. It says because of that, its liability is limited and has offered to cash settle the claims by paying 20% of the cost of the repair of the damage to the insured property. The complainant is seeking payment of 60% of the damage, reimbursement of expert costs, and reimbursement of repair costs incurred in 2012. The complainant says those repairs were completed at the recommendation of the insurer’s engineer to fix movement damage that later re-occurred because the underlying cause was not located and fixed by the insurer. 1.2 Issues and key findings Should the insurer increase its cash settlement offer? Yes. More of the damage was caused by EOL than was accepted by the insurer. The panel is satisfied that 40% fairly reflects the proportion of the damage caused by insured events. Is the insurer required to reimburse the complainant for the 2012 work? No. The insurer is not required to reimburse the complainant for the repair work undertaken in 2012. The panel is not satisfied the complainant has shown the 2012 damage was caused by an insured event or that she suffered direct financial loss due to the recommendation. Is the insurer required to reimburse professional costs? Yes. The complainant’s expert reports have assisted her in showing an entitlement to have more of the damage covered than the insurer had accepted. Why is the outcome fair? The outcome is fair because the panel is satisfied that 40% of the movement damage was caused by insured events. It is also fair for the complainant to be reimbursed for expenses she incurred establishing that a greater extent of the damage was caused by the insured events than was previously accepted. 1.3 Determination This determination is mostly in favour of the complainant. Should the complainant accept this determination the claims and the complaint are to be settled as set out in part 2.4 of this determination. Determination | Case number: 963537 Page 2 of 10 2 Reasons for determination 2.1 Should the insurer increase its cash settlement offer? Yes. More of the damage was caused by EOL than was accepted by the insurer. The panel is satisfied that 40% fairly reflects the proportion of the damage caused by insured events. No dispute property sustained damage due to EOL The complainant’s home building policy is made up of the product disclosure statement (PDS) and the certificate of insurance. There is no dispute the insurer sent these documents to the complainant. The complainant has the onus to establish, on the balance of probabilities (that is more likely than not), that the loss or damage falls within the terms of the policy. Subject to its terms and conditions, the policy provides cover for loss or damage caused by leaks from ‘any drain, fixed pipes … rainwater downpipes, drainage and sewage systems ’ . There is no dispute there were two leaks at the property:  the broken tee in the stormwater pipe (broken pipe). On 2 August 2018 t he insurer’s builder, PB, found the broken pipe at the property, allowing water to escape. The complainant says this break was located under the concrete driveway 25cm from the north-west corner of the house. The complainant lodged the claim with the insurer and the broken pipe was repaired on 4 February 2019. The insurer accepts that the broken pipe caused damage to the property  the dislodged pipe at the stormwater drainage pit (damaged pit). On 8 July 2021 the complainant’s plumber, LC, found the damaged pit and that water was going into the ground. The damaged pit was also located under the concrete driveway and was situated about a metre from the north-west corner of the house. The insurer disputes that the damaged pit caused damage to the property. T he insurer’s engineer, MC, estimates 20% of the damage was attributed to the leaking pipes. The insurer, relying largely on reports from MC, says the remaining damage was contributed to by long term ground movement, highly reactive soil and insufficient surface drainage. Such damage is excluded under the terms of the policy. Damaged pit caused damage to the property The insurer, relying on MC’s expert report, says the damaged pit caused no damage to the property because the leak was repaired as soon as it occurred. Further, the insurer says the complainant did not lodge the claim about this leak until March 2022. The panel is satisfied that the complainant notified the insurer about the damaged pit by phone on 13 July 2021. She also informed the insurer by email 20 July 2021, asking it to inspect the damaged drainage pit. The insurer responded by email dated 23 July 2021 recommending that she ‘address the plumbing relating issues as part of the maintenance that is required at the property and t o prevent further damages to the property’. The complainant repaired the damaged pit on 16 September 2021. The panel is satisfied that it is likely that the pit had been leaking water for some time before it was discovered. Although there is no evidence showing when the leak first occurred, LC’s CCTV footage provides evidence of a cavity around the damaged pit beneath the concrete driveway indicating that leaking water had washed away the surrounding soil over time. Determination | Case number: 963537 Page 3 of 10 Therefore, the panel accepts the complainant has established the claims for the broken pipe and damaged pit fall within the terms of the policy. To the extent the insurer seeks to limit its liability the insurer must show, on balance, the damage was caused by a policy exclusion or it is otherwise entitled to decline or limit its liability for the claim. Expert reports differ as to the extent of the insured damage The parties agree:  the property is built on reactive clay soil which can cause differential footing movement and as is prone to shrinkage when dry and swelling when wet  differential footing movement can cause damage such as cracking  some of the damage to the house and pavements is from ground movement unrelated to the EOL. Both parties rely on expert opinion. Since 2012 numerous reports have been written. Insurer’s experts say insured damage limited to 20% The insurer has arranged for numerous reports from engineers, builders, plumbers, and assessors. The insurer’s eng ineer, GP, provided a causation report on 20 April 2021 (GP1). GP1 was written after the broken pipe was found but before the damaged pit was discovered. GP1 says the leak from the broken pipe to the north-west corner of the dining room ‘has contributed to the foundational movement of the dwelling in this area’. GP1 says the plumbing reports show ‘that the stormwater lines had large amounts of mud/debris build up’ and that this ‘likely caused downpipes to overflow during heavy rainfall, causing localised foundational movement of the dwelling in these areas’. GP1 confirms the presence of on- going perimeter surface drainage problems. GP1 says ‘ long-term drying of the highly reactive clay subfloor soil has led to long-term subsidence, particularly towards the centre of the dwelling… exacerbated by anticipated shallow founding of stumps (with regards to current Australian Standards) ’ . GP1 concludes the damage to the dwelling (eg cracks) was caused by:  EOL from broken pipe 20%  the remaining damage to the dwelling was caused by: > poor perimeter drainage (20%) and > expected shallow founding of stumps and shrinkage of subfloor soil, and natural seasonal movement of highly reactive founding soil (60%). GP1 concludes the pavement slab damage was caused by:  EOL from the broken pipe: 20%  expected movement of pavement slab due to founding on highly reactive soil: 80%. After the damaged pit was discovered, GP’s email to the insurer dated 26 July 2021 provided further information (GP2) , namely ‘ the break in the SW system beneath the northwest driveway floor waste (drain) explains the on-going heave in this area. It doe sn’t change our…recommendations’ . Subsequent engineers retained by the insurer have generally supported this position, attributing none of the damage to the damaged pit. On 22 December 2021MC provided its first report (MC1). MC1 observes movement damage (wall cracks and/or misalignment) to every room in the house, cracks in external brickwork and pavement to the north west of the house. In this, and subsequent reports, MC finds the broken pipe has caused localised hairline cracking to the north-west corner brickwork only. It Determination | Case number: 963537 Page 4 of 10 finds the cause of the remaining damage grading of pavement toward the house and inadequate surface drainage. MC says this has ‘ allow[ed] surface stormwater to seep into the underlying soils and drain into the subfloor over a long period of time ’ . Complainant and her expert says 60% of damage caused by leaks The complainant saw the damaged drainage pit before it was repaired. She says she saw a large cavity under the concrete around the damaged pit. She believes that the fact that the soil was absent around the pit is evidence that a large volume of water had escaped over a lengthy duration, washing the soil away. The complainant’s engineer, AA, provided a report dated 30 September 2022. AA’s conclusion is that it is ‘the escape of liquid and poor site drainage [that] has caused upheaval along the external perimeter of the dwelling… has resulted in extensive damages throughout the property’. AA notes that his and other engineer’s floor level surveys show the highest elevated point of the dwelling is the north-west corner. This coincides with the location of the broken pipe and damaged pit. Also, the internal dama ge is ‘predominantly located on the western side, coinciding with the highest elevation in floor level’. AA agrees that the site drainage around the dwelling is inadequate. He also agrees with the insurer’s experts that the surface of the concrete pavem ent along the east of the house slopes toward the house contributing to the dampness of soil foundations. AA estimates that the damaged pit and broken pipe collects stormwater from approximately 30% of the roof above the house and 100% of the roof above the garage and carport (a much larger catchment than the concrete pavement at north and east of house). He says a significant volume of stormwater had escaped from the broken pipe and drainage pit over an extended period of time prior to its discovery and rectification. AA notes that since the rectification of the broken pipe and drainage pit the subfloor soils along the external perimeter of the house have remained relatively dry. AA says a fair and reasonable apportionment of loss relating to EOL is: EOL: 60%; poor site drainage: 40%. Insurer’s engineers disagree with complainant’s expert MC provided further reports (MC2 and MC3) that support its earlier conclusions. MC2 considers the crack in the broken pipe to be minor and insufficient to allow a significant volume of water to escape. Further, MC says the leak could not have flowed through to the subfloor and/or flow under building footings to the subfloor, nor flow throughout the subfloor or to the opposite corners of the home. MC says this is because the stormwater pipe was ‘approximately 1 m from the home, embedded within the trenched soils which will not allow water to escape, flow towards the home, up and over all down and under the footing and through to the subfloor’. MC distinguishes that from surface water run-off that can flow down and through the porous brick and mortar walls. MC2 also says that a leak in the north-west corner of the home cannot cause global movement throughout the house. Panel accepts that EOL was proximate cause of 40% of the damage Having carefully considered the exchanged material the panel is satisfied that the EOL was the cause of 40% of damage to the insured property. The panel is satisfied that none of the reports accurately reflect the extent of the EOL damage. The complainant’s report does not Determination | Case number: 963537 Page 5 of 10 set out how AA concluded that 60% of the damage was attributable to EOL. The insurer ’s reports do not allow for a number of the factors set out below. Given the uncertainty on both parties’ estimates, the panel’s view wa s that it would be fair that the parties bear the difference equally, thus 40%. Accordingly, the panel determines that it is fair and reasonable that the insurer cover 40% of the damage caused by movement. In particular, the panel had regard to:  in 2018 LC found the broken pipe. LC also found the stormwater pipes contained sludge and water  in 2021 GP found, and the insurer accepted, that the broken pipe itself caused 20% of the damage to the dwelling and pavement slab  the damaged pit was discovered in 2021. The panel accepts that LC’s CCTV footage shows a large cavity around the damaged pit under the concrete and that this shows that a significant amount of liquid has escaped over a period of time  the panel is not satisfied that the evidence shows the pit was repaired as soon as it was damaged. The insurer did not inspect the pit before it was repaired and has not presented any evidence about when the damage first occurred, how long it was leaking water or the volume of water attributable to the leak  the panel is persuaded by AA’s evidence that the broken pipe collected a significant amount of rain water (30% from the roof and 100% from the car port) and that the photo of the cracked pipe shows a sufficient break for a significant volume of water to escape  the broken pipe and drainage pit are located very close to the north-western corner of the house, where floor levels are highest and where most of the damage (cracking) has occurred  he panel is not satisfied that water escaping from the broken pipe and/or drainage pit could not enter the subfloor given: > the insurer’s evidence (MC1) that surface storm water run-off was ‘ seeping through to the underlying soil and draining into the subfloor over a long period of time ’ > in the photo (AA’s report Image B) , while no indication of scale is given, it appears that the broken pipe was close to the house and less than one metre away > the soil around the broken pipe and damaged pit was very wet > the explanation does not set out what the footings were constructed from (in the photo there appear to be two courses of brick) and why water could not have seeped through the footings over time – particularly where they were exposed to water from the leak over period of time > the apparent distinction between water seeping into the footings from the gap between the brickwork and concrete pavement and seeping directly into the footings from the soil is not clear  the panel is accordingly persuaded that stormwater escaping from the damaged pipe and broken pit also seeped into the footings and entered the sub floor during storm or rain events causing expansion and later contraction as the soil dried out. 2.2 Is the insurer required to reimburse the complainant for the 2012 work? No. The insurer is not required to reimburse the complainant for the repair work undertaken in 2012. The panel is not satisfied the complainant has shown the 2012 damage was caused by an insured event or that she suffered direct financial loss due to the recommendation. Determination | Case number: 963537 Page 6 of 10 Complainan t says 2012 repairs were recommended by insurer’s engineer The complainant says in 2012 she repaired movement damage at the property on the recommendation of the insurer’s engineer . She says the damage reoccurred because the underlying cause was not located and fixed by the insurer. The complainant says, because of that, the insurer should reimburse her for the cost of that work. The insurer says the 2012 damage was caused by ground movement The insurer says the 2012 claim was declined as the movement was attributed to ground movement due to differential settlement of the footings. Insurer is not required to reimburse 2012 repair costs Having considered the available evidence, the panel is not satisfied that the complainant has demonstrated damage to the property in 2012 was caused by an insured event. The EOL incidents relied on in this complaint occurred were discovered in 2018 and 2021. No evidence is available to show when the EOLs occurred. While the complainant has said the EOLs may have been present before 2012 and caused the damage, there is insufficient evidence to establish that. Further, while the insurer’s engineer recommended the complainant undertake repairs, the complainant does not say the insurer required her to do so. The panel does not consider the complainant suffered direct financial loss because of any action of the insurer. 2.3 Is the insurer required to reimburse professional costs? Yes. The complainant’s expert reports have assisted her in showing an entitlement to have more of the damage covered than the insurer had accepted. Insurer to reimburse complainant’s report costs AFCA Rules provide that the insurer may contribute to professional costs (capped at $5,000) incurred by a complainant during a complaint. When considering whether to require the insurer to make a cost contribution AFCA considers the complexity of the complaint and whether the complainant needed to incur the cost to understand or establish the claim. The complainant provided expert reports from AA and LC which assisted in determining the outcome of this complaint. The panel accepts it was fair for the complainant to obtain these reports to assist in determining the cause of damage and to respond to the reports obtained by the insurer. The reports cost:  $4,775.20 confirmed by invoice dated 9 September 2022 for AA’s report  $450 confirmed by receipt dated 8 July 2021 for LC’s CCTV inspection report. Therefore, the insurer is to reimburse the complainant $5,000. 2.4 Determination Should the complainant accept this determination then:  within 28 days of notification of acceptance, the insurer is to have its expert provide a scope of works (SOW) to repair damage to the insured property, covering all movement- related damage. The insurer is to provide its expert with the complainant’s engineer’s , AA, Determination | Case number: 963537 Page 7 of 10 SOW in Part 10 of the AA report and provide a clear written explanation for anything the insurer’s expert excludes that was included in AA’s SOW  within 14 days obtain a quote reflecting current prices payable by a consumer to repair the damage based on the insurer’s expert’s SOW  within seven days of receiving the quote pay the complainant 40% of that quote amount plus a 15% uplift to cover unknown variations and contingencies that may arise once repairs commence. 2.5 Why is the outcome fair? The outcome is fair because the panel is satisfied that 40% of the movement damage was caused by insured events. It is also fair for the complainant to be reimbursed for expenses she incurred establishing that a greater extent of the damage was caused by the insured events than was previously accepted. Determination | Case number: 963537 Page 8 of 10 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided. While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. A panel determined this matter Due to the nature of this complaint, we referred it to a panel for determination. The panel includes:  an ombudsman  a member with significant experience in consumer and small business advocacy  a member with extensive experience in insurance matters. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established. Determination | Case number: 963537 Page 9 of 10 3.2 Relevant policy wording Page Wording 22 Escape of Liquid We cover Loss or damage to the building caused by liquid leaking, overflowing or bursting from any of the following:  refrigerators, freezers, dishwashers and washing machines;  any drain, fixed pipes, roof gutters or guttering and rainwater downpipes, drainage and sewage systems;  fixed tanks;  swimming pools or spas;  waterbeds;  baths, sinks, toilets and basins;  fixed heating or cooling system;  wat er main, fire hydrant or water supply pipe;  an aquarium. Exploratory costs We will pay the reasonable cost of locating, at the insured address, the source of the escaped liquid and to repair and restore the damage to the building caused by our exploratory work but only if the escape of liquid is covered under this insured event. If the leak is not covered under the insured event, we provide some limited cover for exploratory costs under additional cover ‘Exploratory costs where a leak is not covered under insured event ‘Escape of liquid’. See page 30 If we pay for damage or expl oratory costs under this insured event, we will also pay up to $750 extra to replace undamaged wall tiles in the same room, hallway, stairs or passageway* so they match or complement new tiles used for repairs. See ‘When we will repair or rebuild undamage d parts’ on page 47. *See pages 48 to 49 We do not cover  loss or damage caus ed by flood or storm surge;  wear and tear, or loss or damage by the escape of liquid occurring as a result of a gradual proc ess of leaking, splashing, dripping or overflowing over a period of time when you could reasonably be expected to be aware of this condition;  the cost of repairing or replacing the item from which the liquid escaped;  fixing leaks that have not caused permanent damage to the building;  leaks from agricultura l pipes;  loss or damage caus ed by liquid from a portable container, such as plant pot,, vase, terrarium, fish bowl, beverage container, saucepan, bucket or watering can;  loss or damage caus ed by liquid from a wat ering system or hose;  loss or damage to reta ining walls;  loss or damage to, or caused by, a leaking shower floor or base, shower cubicle walls, shower glass screening or doors;  costs if you repair or renovate a damaged area of the building before we can inspect it and find the cause;  broken, worn or aged tiles or grouting in walls in bathrooms kitchens or laundries unle ss the damage is caused by liquid leaking from pipes in walls or floors (not forming part Determination | Case number: 963537 Page 10 of 10 of a shower cubicle wall, floor or base);  loss or damage caus ed by wear, tear, rust, fading, rising damp, mould, mildew, corrosion, rot. 37 What we do not cover – general exclusions You are not covered under any section of your policy for damage, loss, cost or legal liability that is caused by, arises from or involves: … Ground movement erosion, vibration, subsidence, landslip, landslide, mudslide, collapse, shrinkage or any other earth movement, but we will cover landslide or subsidence that is specifically covered under the following insured events:  ‘ Storm’;  ‘Flood’ (but only if you have cover for insured event ‘Flood’);  ‘Earthquake and Tsunami’;  ‘ Explosion’ .

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.