Home / IAG / Determination 963362

Determination 963362

Partial decline of storm claim for retaining walls, fence and concrete pavers based on exclusions

FirmIAG
Decided2024-05-07
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The insurer part-accepted a storm claim and declined the retaining walls, fence and concrete pavers under exclusions. AFCA found the insurer entitled to decline the walls and fence but required the pavers claim to be accepted, and awarded no non-financial loss.

The insurer reasonably relied on engineer reports for the faulty design and gradual deterioration exclusions, but the storm was the proximate cause of the paver lifting so the earth movement exclusion did not apply.

Issues

Subjects and remedies

home or building damagenatural disasterreassess claim

Related

All IAG determinations · Find similar determinations

Text of the determination

Determination Case number 963362 Financial firm Insurance Australia Limited Determination | Case number: 963362 Page 2 of 9 Case number: 963362 5 January 2024 1 Determination overview 1.1 Complaint The complainant holds an accidental damage insurance policy (the policy) issued by the financial firm (the insurer). On 27 January 2022, the insured property was affected by a storm . The complainant lodged a claim with the insurer the following day for damage to carpets, ceilings, retaining walls, timber fence, a pool and concrete pavers. In addition, an associated power outage had caused food spoilage which was also claimed for. The insurer initially accepted the claim and:  settled the internal water damage, pool cleaning costs and food spoilage and  appointed engineers, Company P, to assess the cause of damage to the retaining wall, fence and concrete pavers. Company P determined the cause of damage to the retaining wall and fence was inadequate design and earth movement caused the lifting of the concrete pavers. As a result, the insurer relied on exclusions in the policy to decline these aspects of the claim. The complainant disputes this outcome and seeks the claim paid. 1.2 Issues and key findings Has the complainant established a claimable loss? Yes. I am satisfied the complainant has established there was damage to the insured property caused by the storm. Is the insurer entitled to rely on the exclusions? Yes. While the Company P reports have their limitations, on balance, I am satisfied they form a reasonable basis for the insurer‟s position. Has the insurer complied with its claim handling obligations? Yes. The insurer has complied with its claim handling obligations under the General Insurance Code of Practice (the Code). Why is the outcome fair? While the complainant has a claimable loss, the insurer has established a reasonable basis for it to have concluded that relevant exclusions applied to parts of the claim. The complainant has provided insufficient evidence to contest the position taken by the insurer, and therefore the insurer is entitled to take the decision it did under the terms of the insurance contract the parties both agreed to. The exception to this is in respect of the concrete pavers. 1.3 Determination This determination is partly in favour of the complainant as the claim for the concrete pavers should be accepted. Determination | Case number: 963362 Page 3 of 9 2 Reasons for determination 2.1 Has the complainant established a claimable loss? Yes. I am satisfied the complainant has established there was damage to the insured property caused by the storm. The complainant must establish a claimable loss When bringing a complaint to AFCA, the complainant is required initially to show it is more likely than not there is a claimable loss under the policy. This means demonstrating the loss or damage was caused by a risk that is covered under the policy. Once the complainant proves there is a claimable loss, the insurer is liable for the loss unless it shows an exclusion or limiting condition applies. The insurer has the responsibility to show it is more likely than not the exclusion or condition applies. The policy coverage is set out in the Product Disclosure Statement (PDS) General insurance policies provide cover subject to the policy terms. The policy wording and certificate of insurance outline the type of cover provided by the insurer, and any applicable conditions and exclusions. The terms of the policy are set out in the PDS. Relevant sections have been set out in section 3.2 of this determination for convenience. The insurer has part accepted the claim As noted in section 1 above, the insurer has part accepted the claim. Accordingly, it has accepted the complainant has established a claimable loss. In its submission dated 9 July 2023, the insurer says it denied cover for the remainder of the claim on the basis:  the proximate cause of the damage to the retaining wall and timber fence was inadequate design and this is excluded from cover and  the soil below the concrete pavement expanded and swelled due to increasing moisture content which resulted in an uneven surface, representing movement of earth which is not covered under the policy. It is the insurer‟s responsibility to establish these exclusions apply. 2.2 Is the insurer entitled to rely on the exclusions? Yes. While the Company P reports have their limitations, on balance, I am satisfied they form a reasonable basis for the insurer‟s position. ‘Inadequate design’ is not an exclusion under the policy As a preliminary matter, the insurer‟s submission dated 9 July 2023 suggests „inadequate design‟ is a factor which is excluded under the policy. This is incorrect. In an environment where interpretation of the policy is key to determining liability, the wording matters. The policy relevantly says the insurer will not cover: Determination | Case number: 963362 Page 4 of 9 • […] a defect in an item, structural defects, or faulty workmanship or design Accordingly, the appropriate test would be „faulty design‟, not „inadequate design‟. The design must be assessed against the standard a t the time of construction The Company P reports, dated May 2022 and September 2022, relevantly note:  the insured property was built in the 1990s and  the retaining walls do not comply with Australian Standard AS4678-2002 Earth-retaining structures , published on 28 February 2002. In a further letter to the insurer, dated 16 January 2023, Company P relevantly advises: In response to your question, “If the retaining wall was designed correctly would it have still gotten damaged in the way it did by the one- off event?” we offer the following response. If the retaining wall was designed in accordance with Australian Standards and good design practise, there are safety factors incorporated into the design and the retaining wall would resist the loads applied to the wall that were applied during this one-off event and would not fail. The onsite example of this, is the steel post and timber plank retaining wall along the west boundary that was design by the engineer as part of the building works which was not effected by the one off event. In this letter, and the preceding reports, Company P has relied on AS4678-2002 as the relevant standard and has presented evidence (contested by the complainant) to show this building standard has not been met. Unfortunately, there is no indication in the Company P reports about when the retaining walls and timber fences were built and why AS4678-2002 applies. However, the insurer has provided documentation from September 1998 which relate to a „proposed new residence‟ at th e insured address and a subsequent building permit for the swimming pool and fence to be added, dated 24 February 2002. From the photographs in the Company P reports, I am satisfied some of the retaining walls surround the pool and would therefore have been installed at the time of the pool installation in 2002. These walls have the same general appearance as the remaining retaining walls and so I am satisfied it is likely the entire garden space was redesigned and built at the same time. On this basis, I am therefore satisfied it is more likely than not AS4678-2002 is the requisite standard to which the retaining walls and fence should have been built. Company P’s analysis has limitations Despite having established the correct standard to apply and providing a range of photographs, measurements and structural testing over more than 25 pages, the Company P reports suffer from the following limitations:  the inspection was visual and non-destructive and Determination | Case number: 963362 Page 5 of 9  there is a lack of detail about the extent and methodology of the structural tests performed and  the reports do not clearly reference the applicable standard, although the appendices appear to source minimum measurements which I assume are based on the standard. The complainant’s evidence is unpersuasive To refute the Company P reports, the complainant has provided two reports from May 2022, one from Company U (a landscape firm) and one from Company G (an excavation firm). The Company U report, dated 5 May 2022, is a single page which notes the outcome of a visual inspection was the retaining walls had adequate drainage, crushed rock and aggi pipe for discharge and complied with AS4678-2002. The Company G report, dated 25 May 2022, is substantively three pages which details Company G‟s „visual, non -disruptive inspection‟ resulted in a view that the walls were compliant with AS4678-2002. Neither report contains evidence of sufficient investigation or investigative testing in the manner set out in the Company P report. The insurer is entitled to rely on the faulty design exclusion Despite the limitations set out above, I am satisfied Company P has applied its assessment of the design of the retaining walls and timber fence against the applicable standard which applied at the time of construction. Its conclusion, which on balance I accept, is the retaining walls were not sufficiently deep nor designed to hold back the earth and the required surplus load required by the applicable standard. Accordingly, the insurer is able to reasonably rely on it to establish an exclusion applies. The insurer is entitled to rely on the ‘gradual deterioration’ exclusion Even if I was not satisfied about the Company P analysis, it is clear from the photographs in the Company P reports the timber posts are cracked and rotten. The report also relevantly says:  the timber sleeper retaining wall at the west side leaning forward; timber post is cracked  the timber sleeper retaining wall at the north-east side leaning towards east; timber posts were rotten & cracked  the timber sleeper retaining wall at north boundary leaning forwards; timber sleepers & columns were rotten & cracked  the timber sleeper retaining wall north-east side leaning towards east Timber posts were rotten & cracked From the photographs, I am satisfied the photographs show visible wear, tear and deterioration which are not consistent with a single event and are more likely than not to have pre-existed the insured event of the storm. The posts were therefore not in a position to have stood up to To this extent, I am satisfied the failure of the retaining walls and fence was caused by gradual deterioration – an excluded cause – and the insurer was also entitled to deny this aspect of the claim on this basis. The ‘earth movement’ was caused by the storm However, Company P relevantly said: Determination | Case number: 963362 Page 6 of 9 Uneven pavement around swimming. Soil below the pervious concrete pavement expanded and swelled due to increasing of moisture content, which resulted uneven surface. Leaning retaining wall in Item 3 also contributed. Inadequate surface drainage sighted. This appears to be the sole piece of analysis on which the insurer‟s position is based. I note there was no explanation provided of the cause of the increasing moisture content – it would appear more likely than not this is able to be attributed to the storm. The proximate cause of damage is the operative or dominant cause of a loss. It is not required to be the first, last or sole cause of damage. It is what had the most significant impact in bringing about the claimed loss. It requires a common-sense evaluation of the evidence. If it is more likely than not the increasing moisture content was caused by the storm, the storm is therefore the proximate cause of the lifting of the concrete pavers, not „settling, shrinkage or any movement of ea rth‟ whic h could be reasonably excluded. This aspect of the claim should therefore be accepted. 2.3 Has the insurer complied with its claim handling obligations? Yes. The insurer has complied with its claim handling obligations under the General Insurance Code of Practice (the Code). The insurer has obligations under the Code The insurer is a signatory to the Code of Practice. The Code relevantly requires:  a progress update to be given at least every 20 business days (clause 70) and  a claims decision to be made within 4 months of the claim being made (clause 77). The complainant says the service was poor The complainant says he:  was not satisfied with the communication from the insurer during its claim investigation  had to make most of the calls to the insurer to receive an update and  is not satisfied with the time taken to review his claim. He seeks compensation for the time and stress incurred as a result. AFCA may award non-financial loss compensation AFCA may award, in certain circumstances, non-financial loss compensation up to a particular limit. For this complaint, the limit is $5,400. However, AFCA will only award compensation for non-financial loss where there has been an unusual amount of physical inconvenience, time taken to resolve a situation, or interference with the complainant‟s expectation of enjoyment or peace of mind. In assessing whether to award compensation, AFCA expects the complainant to be moderately robust, bear the normal degree of inconvenience experienced when a problem occurs, and take reasonable steps to minimise the inconvenience suffered. Determination | Case number: 963362 Page 7 of 9 The insurer met its service standard requirements The complainant was proactive in contacting the insurer about the progress of his claim. As a result, according to the Claim File Notes, the contact and progress updates to the complainant were more frequent than every 20 business days. Accordingly, I am satisfied, regardless of who initiated the telephone conversations, the insurer has met its service obligations under clause 70 of the Code. Further, the complainant lodged his claim on 28 January 2022 and received the claim decision on 29 March 2022, within the 4-month timeframe required by clause 77. On this basis, despite the complainant challenging that claim decision subsequently, I am satisfied the insurer has met its service obligations to him and no award of non-financial loss is appropriate. 2.4 Why is the outcome fair? While the complainant has a claimable loss, the insurer has established a reasonable basis for it to have concluded that relevant exclusions applied to parts of the claim. The complainant has provided insufficient evidence to contest the position taken by the insurer, and therefore the insurer is entitled to take the decision it did under the terms of the insurance contract the parties both agreed to. The exception to this is in respect of the concrete pavers. Determination | Case number: 963362 Page 8 of 9 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided. While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established. 3.2 Relevant Policy Terms Incident cover provided under specific conditions [..] Storm, flood, rainwater or wind We will cover your buildings or contents for loss or damage as a result of storm, flood, rainwater or wind. We will not cover loss or damage as a result of flood within 14 days (336 hours) of the start date of this policy, unless: […] . We will not cover: • swimming pool covers, including: Determination | Case number: 963362 Page 9 of 9 – solar covers and plastic liners. • water entering your buildings: – through an opening made for any building, renovation or repair work – because of a structural defect, faulty design or faulty workmanship when your buildings were constructed. • free -standing fences made of corrugated fibrous material that do not have a supporting frame, if: – they have not been installed and constructed according to the manufacturer‟s specifications, and – such installation or construction caused or contributed to the loss or damage. • free -standing gates, fences or walls that are made of timber and are more than 15 years old • […] Exclusions To Your Cover Any cover we provide is subject to the following exclusions. Accidental Damage cover, additional cover and Strata Title Mortgagee Protection exclusions We will not cover any loss or damage as a result of, or caused by: • settling, shrinkage or any movement of earth • erosion, rust, corrosion, gr adual deterioration, depreciation, wear or tear • […] a defect in an item, structural defects, or faulty workmanship or design • […] water entering your buildings: – […] – because of a structural defect, faulty design or faulty workmanship when your buildings were constructed.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.