Home / Suncorp Group / Determination 963298

Determination 963298

Insurer declined storm damage claim for tennis court, retaining wall and related structures relying on exclusions; AFCA found partly liable and awarded non-financial loss for delay

FirmSuncorp Group
Decided2023-11-30
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded—
Non-financial loss$1,500
Amount claimed$209,848
SourceAFCA PDF

Summary

Homeowners' storm damage claim for a tennis court area was declined by the insurer on exclusion grounds. AFCA found the insurer could decline the retaining wall, tennis court and concrete path but must cash settle the light poles, brick edging and unconnected fencing, reimburse the expert report and make safe costs with interest, and pay $1,500 for non-financial loss.

Policy exclusions for retaining walls, tennis courts, hydrostatic seepage and storm cracking to paths applied, but the insurer did not show exclusions applied to the light poles, brick edging and unconnected fencing, and its delays warranted compensation.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimpay compensationpay interestpay non financial loss

Related

All Suncorp Group determinations · Find similar determinations

Text of the determination

Determination Case number 963298 Financial firm AAI Limited Determination | Case number: 963298 Page 2 of 14 Case number: 963298 28 November 2023 1 Determination overview 1.1 Complaint The complainants hold a home and contents insurance policy with the financial firm (insurer). They lodged a claim after their property was damaged in significant rain events in February and March 2022. The insurer declined the claim on the basis the damage was from excluded factors, including gradual deterioration and wear and tear. It also says there is no cover, in any case, for retaining walls and tennis courts damaged by storm. The complainants do not agree. They want the insurer to accept the claim and settle it based on their quote(s) plus an allowance for contingencies. They also claim compensation for non- financial loss because, they say, the insurer unreasonably delayed assessing the claim. 1.2 Issues and key findings Has the insurer correctly assessed the claim? No. The insurer is entitled to decline cover for the retaining wall, tennis court and concrete path based on policy exclusions. However, the insurer is liable for the four light poles and the brick border edging, since the available evidence shows, on balance, those were damaged by the storm and the insurer has not shown exclusions apply. The insurer is also liable for that portion of the tennis court fencing not connected to/damaged specifically by the failure of the retaining wall. As well, the in surer is required to reimburse the complainants the cost of NS’s expert report fee, and additional necessary make safe they undertook (plus statutory interest), subject to them providing evidence of the costs incurred. Is compensation for non-financial loss warranted? Yes. The available information shows an unreasonable delay in the claim process and issues with claims handling which caused the complainants significant upset and inconvenience. Compensation of $1,500 for non-financial loss is warranted in the circumstances. Why is the outcome fair? The outcome is fair because the available evidence shows the insurer is only entitled to decline part of the claim under the terms of the policy. It is also fair that the complainants be compensated for the cost of their expert’s report and for non-financial loss. 1.3 Determination This determination is partially in favour of the complainants. The insurer is required to pay the complainants for their expert report fee, make safe, $1,500 as compensation for non-financial loss, and cash settle the damage claim for the brick border edging, lights , and portion of the tennis court fencing as set out in section 2.1 below. It is not required to take any other action. Determination | Case number: 963298 Page 2 of 14 2 Reasons for determination 2.1 Has the insurer correctly assessed the claim? Complainants say they did not receive updated product disclosure statement The complainants say it became apparent during the course of the claim, that the version of the product disclosure statement (PDS) to which they had been referring and on which they were relying, was not the current nor the correct one. They say they received an email on 30 June 2021 offering renewal of the policy, but it was not clear that the new version PDS (dated 3 November 2020) was actually attached to that email. On that basis, they believed the previous version (dated 7 April 2016) still applied. In the covering email from the insurer to the complainants offering renewal, it reads: A new Product Disclosure Statement applies to your policy from renewal with new and changed benefits, features, options, terms, conditions and exclusions. Please read your renewal documents carefully. Later in that email, there is a list of ‘Attachments you may receive with this email’ (my emphasis added), which includes ‘Product Disclosure Statement’ and ‘Supplementary PDS’. However, there is no evidence that the new PDS was actually attached to the email, or otherwise provided to the complainants before renewal occurred. The insurer has not specifically responded to the complainants’ concern about the applicable version of the PDS, and whether or not the correct version was actually provided at renewal. Under section 35 of the Insurance Contracts Act 1984 (Cth) (the Act), the insurer is obliged to clearly inform the insured of the relevant provisions of insurance cover before the contract is entered into. Section 35 of the Act applies to claims made under a ‘prescribed contract’ when the event giving rise to the claim is a ‘prescribed event’ in relation to the contract. A ‘prescribed contract’ (Regulation 9) includes a contract that provides insurance cover in respect of the destruction of or damage to a home building, where the insured is a natural person. A ‘prescribed event’ (Regulation 10) includes damage caused by or resulting from specific listed events, including ‘storm, tempest, flood…’. I am satisfied the compla inant’s claim was in respect of a prescribed event under a prescribed contract. That means the insurer was required to have provided the complainants (before they entered into the new contract of insurance at renewal) with the full and correct terms and conditions of cover that applied to that new period of cover. If an insurer cannot show it clearly informed the complainant of the applicable policy provisions, the claim will ordinarily be reviewed based on the ‘Standard Cover’ provisions under the Insurance Contracts Regulations 2017. Relevant to this complaint, Regulation 11 specifically excludes cover for damage from ‘wear and tear, rust and corrosion’ , as well as damage to ‘a freestanding or retaining wall…or to a gate or fence, as a result of a storm or tempest’. Determination | Case number: 963298 Page 3 of 14 As set out below, however, both the old and new policies do provide cover for fences. For that reason, I consider it fair that cover applies in this particular case. Provisions of ‘old’ PDS and ‘new’ PDS are broadly consistent ‘Old’ PDS The old PDS (dated 7 April 2016) covers the insured home for ‘accidental loss or damage at the insured address caused by an incident during the period of insurance. Accidental loss or damage is loss or damage from an incident you did not intend or expect t o happen.’ The ‘home’ covered under the policy is stated as including:  garages, carports, outbuildings, outdoor walls, gates, fences and any structural improvements on land;  decks, pergolas, pagodas, verandas and balconies, fixed water tanks, fixed swimming pools and spas, granny flats, sheds, tennis courts;  garden borders, sealed pathways and paved or concreted floor areas;  retaining walls which are located within the boundaries of the insured address;  any permanently fixed outdoor items, such as solar panels, satellite dish, play equipment, clothes lines, animal housing and outdoor lights. Under that PDS , an ’ insured incident ’ means ‘an incident not excluded by this policy’. An ‘incident’ is ‘a single event, accident or occurrence which you did not intend or expect to happen ’. The PDS lists examples of insured incidents, including ‘storm’. ‘Storm’ is defined as ‘a storm, cyclone or severe atmospheric disturbance. It can be accompanied by strong winds, rain, lightning, hail, snow or dust’. Cover under the policy is subject to general exclusions, including:  defect, structural fault or design fault (that the insured knew about or should reasonably have known about)  loss or damage caused by wear, tear, rust, fading, rising damp, mould, mildew, corrosion, rot...  water seeping or running through the earth (hydrostatic water seepage)  water seeping or running against or through retaining walls and forcing them to move or crack  wear, tear, gradual deterioration. There is also a specific exclusion under ‘storm or flood’ for:  resultant cracking to paths, driveways, any outdoor surfaces, but we will cover them if they are washed away by the flood  loss or damage: –– to retaining walls, sea walls, garden borders or free standing outdoor walls; –– to a sporting surface or court ‘New’ PDS The new PDS (dated 3 November 2020) covers ‘ specific insured events like storm, flood, fire (including bushfire), escape of liquid and impact’. ‘Storm’ is defined as ‘a single weather event being, a cyclone or severe atmospheric disturban ce. It can be accompanied by strong winds, rain, lightning, hail, snow or dust’. Determination | Case number: 963298 Page 4 of 14 Relevant to this claim, cover for the ‘home’ under the new PDS (as in the old PDS) also extends to tennis courts, garden borders, sealed pathways, fences and retaining walls and permanently fixed outdoor lights. Again however, as under the old PDS, the new PDS contains general exclusions for damage caused by, connected with or arising from:  seepage of water ‘through the earth (hydrostatic water seepage)’ and ‘against or through retaining walls’  wear, tear and gradual deterioration  defects, faults, workmanship. As well, under the insured event of ‘storm’, and broadly consistent with the old PDS, the new PDS specifically excludes:  loss or damage to retaining walls, … garden borders and free standing outdoor walls;  resultant cracking to sealed paths, sealed roads and sealed driveways, but we will cover them if they are washed away by the storm;  loss or damage to a sporting surface or court including a tennis court, squash court or multi-court surface;  loss or damage to gates, fences or wall fences that would be considered by a reasonable person to be in an obvious state of disrepair before the loss or damage occurred. Complainants not prejudiced by differences between policy versions Having considered the relevant provisions of both the old and the new PDS, and the application of section 35 and the Regulations of the Act, I do not consider the complainants have been prejudiced by their original reliance on the terms of the old PDS, nor by the basis on which the insurer has sought to decline cover. The complainants do say, in any case, that they would not have changed their position to remain covered by the insurer had they received the correct and updated PDS at renewal, since they are satisfied the policy does provide cover appropriate to their needs. Complainants reported a range of damaged areas The complainants have said that in the early morning of 8 March 2022 (during the peak of the extreme multi-day rainfall event that affected south-eastern Queensland and eastern New South Wales from 22 February to 9 March 2022), their property suffered the following damage to:  -the tennis court  -the retaining wall bordering the tennis court and pool area  -the concrete pathway at the western end of the tennis court  -the brick edging bordering the southern and eastern sides of the tennis court  -the tennis court perimeter fencing  -the tennis court lights. They are claiming $209,848 (net of the $1,000 policy excess) for the damage to their property, plus any price increases since their May 2022 quote. That amount also includes their claim for reimbursement of $1,650 for their expert (NS) engineer’s report. Onus on complainants to establish a ‘valid’ claim The onus is on the complainants to show they have a ‘valid’ claim to which the policy responds. That is, they need to show, on balance, that the damage being claimed was caused by one of the insured incidents or events. That in cludes the insured event of ‘storm’. Determination | Case number: 963298 Page 5 of 14 Having considered all the available information (including data from the Bureau of Meteorology), I am satisfied the event giving rise to the claim was a ‘storm’ for the purposes of the policy – under the definition in either the old or the new PDS. That is because the event in question was a series of rain events over an approximately two week period from a single source. While the new PDS states that an ‘event’ or ‘incident’ is ‘ a single event, accident or occurrence which you did not intend or expect to happen that is covered by your policy ’, it also provides that a ‘ series of incidents attributable to one source of originating cause is deemed to be the one incident ’ . I do not accept the distinction the complainants have attempted to make between what they say was not a ‘storm’ but was instead ‘a single, albeit protracted, abnormal extreme rain event’. Having regard to the policy definitions, and the ordinary and usual understanding of the word, I am satisfied there was a storm event which caused damage to the complainants’ property. I am satisfied the complainants have a valid claim for storm damage. To be clear, if the event causing the damage was not a ‘storm’, then the complainants would not have established a valid claim and so the insurer would not be liable for any damage on that basis. That means the onus now shifts to the insurer to show, on balance, that exclusions apply or that it is otherwise entitled to decline the claim. Evidence indicates several likely contributing factors to the damage The insurer’s builder JL attended the property on 23 May 2022 and reported: the damages [sic] sustained to the residence are as a result of a large torrential storm and wind driven rain. The heavy rain/stormwater has flowed underneath the tennis court, subsequently damaging the structural support. Additionally, the tennis court's retaining wall has collapsed due to hydrostatic pressure of the soil. The footpaths adjacent to the tennis court have also cracked and bowed. The insurer subsequently engaged engineers SE to further assess the damage and comment on the proximate cause. The proximate cause is the dominant, operative or effective cause of damage. It is not necessarily the first, the last or the sole cause. Retaining wall and tennis court With regard to the causes of damage to the retaining wall and tennis court, SE ’s 14 December 2022 report states:  a general inspection of the collapsed section of retaining wall showed that the collapse had affected approximately 15 linear metres of wall.  the timber retaining wall of the tennis court should have been designed and detailed in such a way that it was able to adequately resist its expected design loads, which include the loads from liquid pressures such as from heavy rains.  from this, whilst the rain event around the time of collapse may have been an infrequent event, we would expect a well designed, constructed, and maintained retaining wall to be able to resist the loads from such an event. As such, in our opinion, the proximate cause of the failure is not the rain event but rather other factors.  considering that the retaining wall was constructed approximately 32 years ago and was observed to have a significant level of rotting, in our opinion the timber retaining wall has reached the end of its design life and is no longer expected to perform adequately. Determination | Case number: 963298 Page 6 of 14  from this, in our opinion, the proximate cause of the failure of the retaining wall is not the reported rain event, but rather age-related deterioration. SE’s supplementary report also addressed, as follows, concerns from the complainants that the rotting timber found in the retaining wall was due to the delays in the property being assessed:  significant rotting of timber, as was encountered on site, is an age-related phenomenon and does not occur over a period of months, but rather years. As such, the suggestion that the post has failed due to other reasons, and then has experienced significant rotting over a period of seven months is not plausible.  rotting of timber is rarely a visible problem and can go unnoticed for years. All things being equal, the rate of rotting is generally increased for timbers at or slightly below the surface of the ground due to the prolonged contacted with moist soils. In this case, it is not unexpected that the base of the timber uprights has rotted when compared to the timbers more exposed to the wind and sun.  we note that the timber elements have reached the minimum design life of approximately 30 years, and as such, their degradation and failure is not unexpected. NS disagreed that the cause of the damage to the retaining wall (and in turn to the tennis court) was gradual deterioration of the timbers, noting that ‘ significant rotting was only observed in the newly unearthed snapped post at the end of the collapsed section of retaining wall ’ . The alternative cause of the retaining wall collapse according to the NS was ‘ increased active soil pressure due to higher static water pressure and decreased passive soil resistance due to soil erosion arising from the extreme multi- day rainfall event’. I am satisfied NS’ explanation of the effect of increased pressure in the soil from the extreme rainfall event represents hydrostatic water seepage for the purposes of the policy. However, as noted above, the policy specifically excludes cover for any loss or damage caused by, connected with or arising from ‘seepage of water’ (hydrostatic water seepage through the earth, or water seeping against or through retaining walls). That means the insurer would be entitled to decline cover for the retaining wall and tennis court on that basis alone. Having regard to all the available evidence, I also consider it is more likely than not that the retaining wall was compromised to some degree by gradual deterioration and wear and tear (which is also excluded from cover under the policy), although I do not consider the evidence establishes that was the sole or dominant cause of the damage. The tennis court was in turn damaged as a result of the failure of the retaining wall. That means the combined effect of the excluded factors of seepage of water (hydrostatic pressure) and gradual deterioration have contributed to the damage to the tennis court as well. Those exclusions would apply, whether or not any construction issues identified represent inherent defects or faulty design or workmanship (which, to be clear, I am not satisfied has been established). The complainants do not accept that the proximate cause of the damage to the tennis court and retaining wall was gradual deterioration or seepage of water (or a combination of those factors). However, as already noted, with regard to ‘storm’, the policy has a blanket exclusion for loss or damage to retaining walls and tennis courts. Determination | Case number: 963298 Page 7 of 14 That means that cover for the retaining wall and tennis court is excluded, regardless of whether the proximate cause of that damage was gradual deterioration, seepage of water, the storm itself or a combination of those factors. The insurer is not liable for the damaged retaining wall or tennis court. Concrete path Having attended the property on 14 October 2022, SE reported on 14 December 2022:  an inspection of the site to the west of the tennis court showed perimeter concrete paving that was cracked, uneven, and had a large void beneath the base of the paving.  the cracking and rotation of the western concrete paving is the result of a combination of the progressive failure of the western timber retaining walls, and differential movement of the foundation material beneath the paving slabs due to the seasonal changes in soil moisture levels.  the damage (cracking and scouring) that has occurred to the western concrete paving is not the result of the once-off storm event, but rather a combination of poor construction techniques (such as the drainage outlet onto the ground surface), progressive failure of the western retaining wall, and normal ground movements. SE later provided a supplementary report dated 13 February 2023 in response to concerns expressed by the complainants. In it, SE commented:  had the site drainage been constructed such that concentrated water could not discharge against the edge of the concrete paving/path, then the observed void beneath the concrete paving/path would not have occurred.  we expect that this drainage system is the same age as the overall structure, and in our opinion 30 years of heavy rains, as highlighted by the insured to cause outflow, would be sufficient to cause the observed scouring over this long period of time.  had the claimed storm event caused the observed scouring, we expect that a similar level of scouring would be observed along the entire length of concrete paving/path. Instead, the soils above the point of discharge are in good condition with no signs of scouring. SE ’s reports identify an inadequate drainage system and subsequent movement of the retaining wall as the main causes of the damage, while acknowledging that the storm event (including the increased outflow of water) will have also contributed. The complainants engaged NS to conduct a further review of the property on 24 February 2023. In their report dated 2 March 2023, NS agreed that the concrete path on the western side of the tennis court showed significant cracks in the top section and said ‘t he cracks were very likely to be a combined result of scouring, undermining of the base soil underneath the path and leaning of the retaining wall behind ’ . NS was of the view, however, that ‘ after tracing the source of water from the two pipes discharging alongside the concrete path, it is very unlikely these would have any significant impact over time on the scouring, nor has it caused any undermining to the base soil underneath the path ’ . Having considered all the available evidence, I accept there were likely several contributing factors to the damage to the concrete path, all of which are subject to policy exclusions: construction (drainage issues) and progressive wear and tear and deterioration (including of the retaining wall generally, given the evidence of rotation and movement). Determination | Case number: 963298 Page 8 of 14 Further, I am satisfied, on balance, the proximate cause of damage (that is, the dominant, operative and effective cause) was storm. Cracking to paths is specifically excluded from cover when caused by storm. That means the insurer is not liable for the concrete paths. Brick border edging With regard to the brick border edging (on the opposite side of the tennis court to the damaged retaining wall), NS noted: The southern side and eastern end of the tennis court have a single-course brick border edging laid onto the ground on a bed of mortar, which is designed to protect and preserve the edges of the tennis court base. The full length of brick edging showed significant signs of displacement in the levelling and alignment. NS concluded the displacement along the full length of the brick border was ‘ likely caused by scouring due to relentless heavy rain and rapidly draining water, which would be a result of the extreme multi-day rainfall event as mentioned above ’ . SE does not specifically refer to the brick border edging in their reports, nor does the insurer address the brick border edging or rely on exclusions in respect of that particular area of damage. I note that under both the old and the new policies, there is an exclusion for damage to ‘garden borders’ under the insured event of storm. However, I am not persuaded, on the available evidence, that the brick border edging in this case represents a garden border, given its location and apparent purpose (as explained by NS). I am satisfied, on balance, the damage to the brick border edging was caused by the sustained storm event. That means the insurer is liable for the cost of repair of that component of the damaged property. Lights The evidence indicates the four light poles at various locations around the perimeter of the tennis court were affected to some degree. NS stated the shifting of footings at the southern end of the tennis court was ’very likely caused by scouring and undermining of soil’ due to the heavy rainfall and draining water, and that then caused the light poles in that location to lean. NS notes the top of the footings of those two light poles were now sitting approximately 30mm higher than the top of the abutting brick border edging; the electrical cabling conduits connecting into the footings supporting those poles were now also exposed to air. NS said the leaning of light poles on the northern side of the court was ‘ also very likely caused by the movement of soil surrounding the footings ’ . With regard to the north-western pole (impacted by the damaged retaining wall), NS noted ‘ the failure of the retaining wall has further released soil surrounding the front side of its footing worsening its situation ’. While the insurer says its engineer’s findings show that damage to the light poles was caused by wear, tear and deterioration, it is not clear that SE specifically addressed the condition of the light poles. I am not satisfied, on the available evidence, that the light poles had been suffering any pre-existing damage. Determination | Case number: 963298 Page 9 of 14 Instead, I am satisfied that the damage to the light poles was, on balance, from the severe storm events which affected the surrounding supporting soil and infrastructure. The insurer is liable for the damage to the four light poles. To be clear, even though the light pole in the north-western corner was more significantly impacted by the retaining wall failure, it is only the damage to the retaining wall which is excluded from cover for damage caused by storm. The affected light pole should still be covered because it is more likely than not, irrespective of the wall failure, that light pole would have suffered damage in any case (as did the other 3). Fencing NS reported that:  the tennis court perimeter fencing is constructed of chain mesh attached to metal posts  the posts supporting the fencing on the northern side and part of the western end of the tennis court are fixed to the retaining wall  the remaining sections of fencing are fixed to free-standing posts concreted directly into the ground. Larger diameter posts are used for each of the four corners  approximately 1/6th of the total tennis court perimeter fencing, being the north-western section that was physically attached to the collapsed section of retaining wall, has collapsed  the damage to the rest of the fencing not actually attached to the retaining wall is unrelated to the collapse of the retaining wall – the shifting of footings in multiple locations far apart across the site was very likely caused by undermining and scouring of soil by the heavy rain  the concrete footings for the two main posts at the south-eastern and south-western corners of the fencing showed significant signs of shifting. The electrical conduits connected to the footings of these posts have been separated from the posts, whilst both the conduits and the cabling were exposed to air. NS said repair works need to be carried out to rectify the footings, as well as repair and realignment of the fencing. SE also inspected the end of the collapsed retaining wall which showed where the metal post for the fence had been connected into the sleepers of the retaining wall. SE considered the fencing should therefore be declined, because the damage was caused by the retaining wall collapse, which was itself excluded. In denying cov er for the fencing, the insurer’s assessor also said that damage ‘appears to be due to long-term age- related deterioration’. SE reported that the complainants said they had carried out repair of corroded steel fence posts by installing new steel posts inside the older, corroded ones. NS also observed ‘ sleeving that has been undertaken to maintain the structural integrity of any posts exhibiting signs of rust at their base ’ . However, just because there were signs of previous repairs, does not in itself establish the condition of the fenceposts at the time of the storm was deteriorated or that any such deterioration was the sole or a contributory cause of the damage. In the circumstances, I am not persuaded the insurer has established that it is entitled to decline cover for all the tennis court fencing on the basis of deterioration. However, I do consider the insurer is entitled to decline cover for that portion of the fencing which was physically connected to and damaged by the failure of the retaining wall. To be Determination | Case number: 963298 Page 10 of 14 clear, that includes sections of the fencing along other sections of the northern/western sides of the retaining wall where (even though the wall had not totally collapsed at those points) the evidence shows movement/leaning of the wall from vertical. That is because those areas were also, on balance, affected by seepage of water against the retaining wall. The insurer is liable for the remainder of the damaged fencing. Insurer is not entitled to decline all components of the claim Based on all the available evidence, I am not satisfied it would be fair for the insurer to avoid liability for all the claimed damage. The insurer is liable for the four light poles and the brick border edging, since the available evidence shows, on balance, those were damaged by the storm and the insurer has not shown exclusions apply. The insurer is also liable for that portion of the tennis court fencing not connected to/damaged specifically by the failure of the retaining wall. Cash settlement to be based on actionable quotes The parties are to work together to obtain new quotes for those individual areas of damage, and to agree and finalise a cash settlement as soon as reasonably practicable. Any cash settlement needs to be based on current quotes actionable by the complainants as retail customers. The settlement should also include an uplift of 10% to allow for contingencies and the transfer of risk to the complainants. Fair that other costs be reimbursed Under our Rules, AFCA may require an insurer to contribute to the professional costs incurred by a complainant in the course of a complaint. I am satisfied that NS’s expert report assisted in a fair resolution of this complaint. The insurer is required to reimburse the complainants the cost of that report, subject to the provision of evidence of costs incurred. As set out below, the complainants have also said they incurred additional costs in attending to recommended and necessary additional make safe work for which the insurer should have taken responsibility (including in relation to the light poles). Subject to the complainants provided evidence of the reasonable costs incurred, the insurer is required to reimburse those expenses. The insurer is required to add statutory interest to these reimbursed costs, calculated from the respective dates the complainants incurred them to the date of settlement. 2.2 Is compensation for non-financial loss warranted? Yes. The insurer’s delays have caused the complainants an unusual degree of inconvenience and time taken to resolve the situation. Compensation of $1,500 for non-financial loss is fair. AFCA can award compensation for non-financial loss Under our Rules, AFCA can award up to $5,400 compensation for non-financial loss. This must relate to poor claims handling or other actions of the insurer which cause an unusual degree of stress, delay, or inconvenience. Determination | Case number: 963298 Page 11 of 14 AFCA takes a conservative approach to compensation for non-financial loss. We expect complainants to be moderately robust, and we will not award compensation for the ordinary degree of inconvenience involved in making a claim. Complainants experienced avoidable concern and inconvenience Make safe N’s make safe report from their attendance on 9 March 2022 records: During our attendance to make the property safe we undertook the following works: - To restrict access we taped off the area of concern to make safe - Installed some temporary props beneath the slab to support it and prevent further collapse. However, NS reported that two of the three temporary timber props were not engaged properly to the slab. They observed as well that ‘the temporary timber posts were supported by another cantilevered timber sleepers bearing into the side soil ’ . NS concluded that the temporary make-safe measure was not sufficient and recommended immediate re-design and installation of professional temporary propping. The complainants say the make safe carried out by the insurer was inadequate to protect against personal injury or further property damage. They are also concerned the insurer failed to take any additional action when urgent safety risks were confirmed by engineer SE in their 14 December 2022 report and they advised that the initial make safe work was inadequate. SE had noted, in their report, ‘ the collapse of the retained soils beneath the tennis court rest area has resulted in a loss of support of the steel awning structure, and the risk of collapse of the awning and/or light pole ’ . The complainants say they have had to attend to additional make safe work themselves. That includes action to mitigate the risk of the leaning light poles falling. On the available evidence, it is not clear that the insurer responded appropriately, or at all, to those safety concerns pending finalisation of investigations into the claim. Delays The complainants say it took the insurer almost five months from when the claim was lodged to appoint an engineer, then another two and a half months before that engineer inspected the damage, then a further two months before the engineer’s report was completed and provided. The complainants lodged the claim with the insurer on 8 March 2022. However, an engineer did not attend to inspect the property until October 2022. While a make safe was conducted and a builder attended in April 2022, I consider the delay of six months between the builder ’ s and engineer’s attendances was unreasonable and caused the complainants additional avoidable upset and inconvenience at an already difficult time. Determination | Case number: 963298 Page 12 of 14 Compensation is warranted in the circumstances I am satisfied, on the evidence, that the insurer’s handling of the claim has caused the complainants an unusual and significant degree of upset and inconvenience. The y have had protracted uncertainty about the extent of cover (if any), including lack of clarity about the applicable PDS. In the meantime, there has also been the concern about substantial unremediated structural and safety issues on their property. In the circumstances, I am satisfied an award of $1,500 compensation for non-financial loss is fair and appropriate. I note the insurer has already refunded the policy excess of $1,000, which is fair. 2.3 Why is the outcome fair? The outcome is fair in all the circumstances because the insurer has not established it was entitled to decline all aspects of the claim. It is, however, fair for the insurer to address the effect on the complainants of its claim handling by paying compensation for non-financial loss. Determination | Case number: 963298 Page 13 of 14 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided. While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.