Home / IAG / Determination 962440

Determination 962440

Dispute over cash settlement amount for accepted tenant damage claim

FirmIAG
Decided2023-12-20
ProductGeneral Insurance · Landlord
OutcomeFor the complainant in part
Amount awarded$81,737
Non-financial loss$2,000
Amount claimed$167,000
SourceAFCA PDF

Summary

The insurer accepted a landlord tenant-damage claim but offered $78,958.12 cash settlement, while the complainant sought $167,000. AFCA found the AR quote reasonable but required a 25% contingency uplift (total $81,737.20) plus $2,000 non-financial loss, or alternatively a further inspection with 15% uplift.

The insurer was entitled to cash settle based on a reasonable actionable quote for claim-related repairs, but the contingency uplift needed to rise to 25% because the quote was not actionable and works may vary.

Issues

Subjects and remedies

home or building damagepay claimpay non financial loss

Related

All IAG determinations · Find similar determinations

Text of the determination

Determination Case number 962440 Financial firm Insurance Manufacturers of Australia Pty Ltd Determination | Case number: 962440 Page 1 of 9 Case number: 962440 13 December 2023 1 Determination overview 1.1 Complaint The complainant holds a landlord ‟ s policy with the financial firm (the insurer). The property sustained damage which was found after the tenant vacated in December 2022. The insurer accepted the tenant damage claim however a dispute has arisen over the amount of settlement. The complainant says that the offer of settlement from the insurer is not sufficient to complete the repairs and he wants his quote accepted and paid in the amount of $167,000. The insurer says that they have accepted the tenant damage. However, the insurer says that some of the damage is also a result of poor hygiene and lack of maintenance which are excluded under the terms of the policy. The insurer has requested to reattend the property to reassess the damage, however the complainant has denied this request. The insurer has offered $78,958.12 to settle the claim which includes 20% contingencies for the cash settlement. The insurer has also offered the complainant $2,000 non-financial loss compensation. The insurer says that the offer is a fair and reasonable settlement of the claim. 1.2 Issues and key findings Does the in surer’s offer of settlement represent the reasonable cost of repairs ? No. While the insurer‟s quote from AR likely represents the reasonable cost of repair, it is to increase the cash settlement with a 25% uplift for contingencies and the transfer of risk. Alternatively, should the complainant elect, the insurer is to appoint an engineer to prepare a scope of works and obtain an actionable quote for a cash settlement with a 15% uplift for contingencies and the transfer of risk. Is the complainant entitled to compensation for non-financial loss? Yes. The insurer has offered non-financial loss compensation of $2,000 in acknowledgement of the claims experience and complaint. I consider that it is fair in the circumstances that the insurer pays the complainant this sum as offered The complainant has not disputed the offer. Why is the outcome fair? The outcome is fair because the exchanged material established the insurer is entitled to cash settle the claim but increase the uplift. The complainant has been given the option of accepting the cash settlement or alternatively, giving the insurer an opportunity to re-assess the damage and prepare a new quote. It is also fair that the insurer pay compensation as offered. 1.3 Determination This determination is substantially in favour of the complainant. Within 21 days of the determination being accepted, the insurer is to: Determination | Case number: 962440 Page 2 of 9  cash settle the claim based on AR‟s quote plus a 25% contingency in the amount of $81,737.20  pay the complainant $2,000 compensation for non-financial loss However, should the complainant elect to allow the insurer to undertake a further inspection, the insurer is to:  within 14 days of being notified of the complainant‟s election, provide the complainant with three options of an engineer or building consultant who has not previously been involved with the claim to provide a SOW in respect of the tenant damage;  within 14 days of receiving notification from the complainant of his preferred engineer or building consultant, the insurer is to engage them to prepare the SOW in respect of the tenant damage;  within 14 days of receipt of the engineer or building consultant‟s SOW, the insurer is to obtain an actionable quote based on the SOW provided by the engineer or building consultant;  within 14 days of receiving the actionable quote from the builder, the insurer is to cash settle the complainant with an additional 15% for contingencies. Determination | Case number: 962440 Page 3 of 9 2 Reasons for determination 2.1 Does the insurer’s offer of settlement represent the reasonable cost of repairs? No. While the insurer‟s quote from AR likely represents the reasonable cost of repair, it is to increase the cash settlement with a 25% uplift for contingencies and the transfer of risk. Alternatively, should the complainant elect, the insurer is to appoint an engineer to prepare a scope of works and obtain an actionable quote for a cash settlement with a 15% uplift for contingencies and the transfer of risk. Onus on complainant to establish claimable loss The complainant is required to show, on the balance of probabilities (that it is more likely than not), that he suffered a claimable loss under the policy. This means he must show the loss was caused by a risk for which he is insured. Once the complainant proves the existence of a claimable loss, the insurer is liable for the loss unless it shows an exclusion or limiting condition applies. The insurer has the onus of proving on the balance of probabilities the application of the exclusion or condition. Th e complainant holds a landlord‟s insurance policy that provides cover for listed insured events. Cover for damage by tenants is included. The complainant says that following the tenant‟s eviction for rental arrears, he found that the property had been damaged. Such damage included paint being splattered on walls and graffiti. He lodged a claim with the insurer on 14 December 2022. I am satisfied that the complainant has established that the loss and damage is of a type covered by the policy, being tenant damage. However, the coverage remains subject to the terms, exclusions and conditions of the policy. The relevant terms of the Product Disclosure Statement (PDS) are outlined in section 3.2 of this determination. Insurer has offered to cash settle The policy provides the insurer with a discretion as to whether to repair or cash settle the claim. Such discretion must be exercised fairly, reasonably and consistent with utmost good faith. A cash settlement must be based on a reasonable quote for claim related repairs, actionable by a retail customer. An uplift is then to be applied to the quoted amount to allow for contingencies and the loss of the lifetime guarantee that generally applies to insurer approved repairs. The insurer has obtained a quote from AR for repairs to the tenant damage. The quote is for $65,389.76. The insurer says that as the building is not well- maintained AR can‟t warrant the works and have offered a cash settlement. The insurer has offered an additional 20% contingency. That is, the offer is $78,958.12. The insurer says that its offer is fair and reasonable because the quote from AR covers the claim related repairs. Comp lainant’s quotes are excessive The complainant does not dispute the cash settlement. However, the complainant says that the insurer‟s offer is not sufficient to undertake the repairs. The complainant has obtained two Determination | Case number: 962440 Page 4 of 9 quotes- one from UT in the amount of $167,660 and another from HC in the amount of $200,756. The complainant is seeking settlement based on UT‟s quote. In UT‟ s opinion, the quote from AR is impracticable. However, UT‟s quote includes several items without substantial information to show they are necessary and related to the claimed event. For example, UT‟s quote includes costs to:  demolish and remove all cabinetry in kitchen  benchtop in kitchen  kitchen appliances including an oven and rangehood  new benchtop in the laundry  replacement of toilet  replacement of fittings in bathroom including bath and shower base  repairs of plaster walls  asbestos allowance for other areas of the house  sand and polish other areas of the house  paint other areas of the house  site set up with amenities and security cameras Given this, I am not satisfied that UT‟s quote is a fair estimate of the complainant‟s loss. The complainant has provided additional quotes for electrical and plumbing works. He says that these also support that the insurer‟s quote from AR is manifestly low. However, while the costs are greater than AR‟s, I am not satisfied that this establishes that the insurer‟s quote is inadequate. The complainant has also provided an invoice for the removal of “damaged goods” from the property in the amount of $3,500. However, the removal of tenant‟s possessions from the property is not covered under the terms of the policy. Is the insurer’s quote from AR reasonable ? The insurer has acknowledged in its claims notes that the quote from AR does contain some “catch all” which may not be sufficient. However, despite requests by the insurer, the complainant has refused access to the i nsurer‟s builders for obtaining a second quote. The complainant says that he would be agreeable to the insurer‟s builder returning only when they provide a line by line comment in response to his quote from UT. He says that the insurer is required to undertake this as part of their due diligence. The insurer sought to re- assess the property after receipt of the complainant‟s quotes which were considerably higher than AR‟s. I am satisfied that this was not an unreasonable request, particularly noting that many of the tenant‟s belon gings remained when AR attended. Further, the insurer has acknowledged that AR‟s quote is not actionable. The complainant is obligated under the terms of the policy to allow the insurer to obtain quotes. See section 3.2 of the determination for the relevant policy terms. When AR attended the property to quote for repairs, it provided a report together with several coloured photographs. Using these photographs, together with the quotes from AR and UT, I have considered whether AR has omitted to include tenant damage as identified by UT and the complainant. The photographs show several kitchen doors that have been removed. AR‟s quote allows for the replacement of these doors. UT‟s quote provides for the replacement of all kitchen cabinetry. I am not satisfied that it is necessary to replace all the kitchen cabinetry because of Determination | Case number: 962440 Page 5 of 9 tenant damage. I also note that the quote from HC allowed only for the cabinetry doors to be replaced. The complainant has provided a photograph of the kitchen benchtop and says that it is damaged and should be replaced. UT‟s quote allows for the costs of a new benchtop. The photograph depicts tiles as the benchtop. The quote from AR allows for the supply and installation of 3m2 of bench tiles. I am satisfied that this is sufficient. I am not satisfied that a new benchtop is required in the laundry given that the cupboard doors only need replacing. UT‟s quotes have allowed for some additional GPOs and light switches which the complainant says were damaged by the tenant. The complainant has provided a photograph of a light switch with paint on it in the bathroom which he says is omitted from AR‟s quote . AR has allowed for two GPOs. The complainant has not provided any other evidence in support of the other GPO or light switches being damaged. The complainant says that the plaster wall is cracked and that UT‟s allowance for repair of plaster walls is justified. However, the complainant has not provided ingoing condition reports to establish the condition of the property at the commencement of the tenancy agreement. I am therefore not satisfied that it represents tenant damage. The complainant also claims for asbestos removal in the laundry and kitchen. However, AR has allowed for the laundry to be tiled over. The complainant has not provided evidence to support that the wall is damaged and that the asbestos is required to be removed. In relation to the kitchen, there is no information to show the wall has been damaged by the tenant. UT has also allowed for the removal of a bath tub, toilet in the bathroom, and replacement of shower base. However, I am not satisfied based on the photographs that these items are damaged and require replacement. UT has also allowed for the replacement and painting of a new toilet door. In the photographs it appears that the door is absent but again the complainant has not provided information to support that it was there at the commencement of the tenancy. U T‟s quote has also allowed for the sanding and polishing of floorboards throughout and for the painting of the entire house. Page 64 of the PDS provides that the insurer will pay for repairs to the damaged areas only and not for matching. UT has not provided an explanation of how many of these items have been damaged by the tenant. Damage is limited under the terms of the policy as being the loss or damage caused by a tenant or their guest. I accept that AR‟s quote more likely reflects the scope of works re lated to the claim and can be used as the basis of settlement. While the complainant says that the insurer‟s quote has underquoted, in the absence of an opportunity of providing another, it is fair in the circumstances that AR‟s quote is used as the basis of the settlement. However, as discussed below, an increased contingency should be allowed. Insurer should increase contingency The insurer has allowed a 20% contingency because it is unable to authorise the works. This should be increased to 25% because of the following:  the extent and nature of the works will likely require some variations;  AR‟s quote is not actionable, and  rates and costs may have increased. Determination | Case number: 962440 Page 6 of 9 This increase in contingency will be sufficient to cover the additional items identified including an additional GPO and door if required. Alternatively, complainant can elect for insurer to inspect and quote Alternatively, the complainant can elect for the insurer to undertake a further inspection as it has requested. If the complainant elects for the insurer to re-attend, the insurer is to:  within 14 days of being notified of the complainant‟s election, provide the complainant with three options of an engineer or building consultant who has not previously been involved with the claim to provide a SOW in respect of the tenant damage;  within 14 days of receiving notification from the complainant of his preferred engineer or building consultant, the insurer is to engage them to prepare the SOW in respect of the tenant damage;  within 14 days of re ceipt of the engineer or building consultant‟s SOW, the insurer is to obtain an actionable quote based on the SOW provided by the engineer or building consultant;  within 14 days of receiving the actionable quote from the builder, the insurer is to cash settle the complainant with an additional 15% for contingencies. 2.2 Is non-financial loss compensation payable? Yes. The insurer has offered non-financial loss compensation of $2,000 in acknowledgement of the claims experience and complaint. I consider that it is fair in the circumstances that the insurer pays the complainant this sum as offered. The complainant has not disputed the offer. 2.3 Why is the outcome fair? The outcome is fair because the exchanged material established the insurer is entitled to cash settle the claim but increase the uplift. The complainant has been given the option of accepting the cash settlement or alternatively, giving the insurer an opportunity to re-assess the damage and prepare a new quote. It is also fair that the insurer pay compensation as offered. Determination | Case number: 962440 Page 7 of 9 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided. While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established. Determination | Case number: 962440 Page 8 of 9 3.2 Relevant policy provisions Product Disclosure Statement Page Policy terms Page 24 Damage by tenants If loss or damage is caused by a tenant or their guest. Covered  any damage , caused by a tenant or their guest or a p et kept at the site, including: - vandalism or malicious act - intentional or deliberate damage - contamination caus ed by the manufacture, storage, or distribution of illegal drugs Less 4 times the weekly rent amount that is shown on your written rental agreement. Not covered  loss or damage caus ed by a tenant or their guest or a pet kept at the site if we previously paid a claim under the same tenancy for: - rent default - theft or attempted theft by a tenant or a guest, or - damage by tenant. Conditions  you must have a written rental agreement that states the: - term of the rental period, and - amount of rent and bond your tenant needs to pay. Page 53 Inspections and quote s If we ask you, you must:  let us, and our representatives inspect your rental property or contents at a reasonable time; and  allow us to obtain quotations from any repairer or supplier. Page 59 How we settle your buildings claim We will choose to settle your claim for loss or damage to your rental property and any „other benefits‟ in one of the following ways. Our choice will have regard to the circumstances of your claim and consider any preference you may have. … How we calculate the am ount if we choose to pay you If your building is repairable, in some circumstanc es we will choose to settle your claim by deciding to pay you. We will pay you the reasonable costs of what it would cost us provided that cost is available to or actionable by you. What are some examples of when we do this? …  if not all the damage to your building is covered by this policy - you Determination | Case number: 962440 Page 9 of 9 can find examples of these under „Not covered‟ or „General exclusions and your res ponsibilities‟ in this policy  your building may have had some damage that existed prior to the event you are claiming for  … Page 64 How we settle certain things Matching materials Under Buildings Insurance  we only repair the damaged part(s) of your rental property. We don‟t pay for materials to match the undamaged parts of your rental property to create a uniform appearance. Page 65 Carpet, vinyl, tiles or floorboards Under Buildings Insurance and Contents Insurance  we only repair or replace the carpet, vinyl, tiles or floorboards in the part of your rental property that was damaged  we don‟t pay for any adjoining rooms, or your entire rental property

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.