Home / Hollard / Determination 961484

Determination 961484

Claim declined for fence damage and earthquake damage; loss of rent dispute and claim handling delays

FirmHollard
Decided2023-12-08
ProductGeneral Insurance · Landlord
OutcomeFor the complainant in part
Amount awarded—
Non-financial loss$4,500
Amount claimed—
SourceAFCA PDF

Summary

The landlord's claims for fence damage by tenants and for earthquake damage were declined, and further loss of rent was refused as already paid beyond the limit. AFCA required the insurer to pay $4,500 for non-financial loss due to claim handling delays.

The complainant did not establish the damage was caused by an insured event (wear and tear and ground movement were excluded), but avoidable delays in claim handling warranted non-financial loss compensation.

Issues

Subjects and remedies

home or building damagenatural disasterpay non financial loss

Related

All Hollard determinations · Find similar determinations

Text of the determination

Determination Case number 961484 Financial firm Hollard Insurance Partners Limited Determination | Case number: 961484 Page 1 of 6 Case number: 961484 18 October 2023 1 Determination overview 1.1 Complaint The complainant held a home insurance policy with the financial firm (insurer) for his investment property. On 7 December 2020, the complainant lodged a claim for malicious damage by his tenants. He also submits that the insurer’s negligence and delay in p roviding a resolution on the claim has led to further loss of rent on the property. The insurer accepted and paid the claim in part. However it says the damage to the fence was not covered as it was from gradual deterioration, which is excluded under the policy. The insurer also says the loss of rent it has paid already exceeds the policy limit. The complainant subsequently lodged another damage claim to the property. He says that damage was from an earthquake on 22 September 2021. The insurer declined that claim on the basis the damage was not caused by the earthquake, but was from ground movement. The complainant wants the insurer to accept the claimed damage and pay further loss of rent. He also seeks compensation for non-financial loss for stress and inconvenience suffered. 1.2 Issues and key findings Is the insurer liable for the claimed damage? The insurer is not liable for the fence because the complainant has not established the damage was caused maliciously by the tenants. Instead, the evidence shows, on balance, the state of the fence was because of gradual deterioration, which is excluded from cover. The insurer is also not liable for the damage claimed to be from the earthquake, since the evidence does not establish that (or any other insured event) was the cause. Is further loss of rent payable? No further loss of rent is payable. The insurer acknowledged it was responsible for some delays, and has already compensated the complainant for loss of rent beyond the policy limit. Is compensation for non-financial loss warranted? Yes. The insurer’s handling of the claim caused significant inconvenience and upset to the complainant. It is required to pay $4,500 compensation. Why is the outcome fair? It would not be fair to require the insurer to cover claims for damage which has not been shown to fall within the scope of cover under the policy. It is, however, fair that it pays compensation for the serious impact of its claim handling on the complainant. 1.3 Determination This determination is substantially in favour of the insurer. It must pay compensation of $4,500. It is not required to take any other action. Determination | Case number: 961484 Page 2 of 6 2 Reasons for determination 2.1 Is the insurer liable for the claimed damage? 2.1.1 The fence damage The complainant has not established that the tenants caused malicious damage to the fence. Instead, the evidence shows the state of the fence was because of gradual deterioration, which is excluded from cover. Complainant needs to show, on balance, damage from an insured event The complainant has the onus of establishing, on balance (that it is more likely than not) that the damage being claimed falls within the scope of cover under the policy – in other words, that he has a ‘valid’ claim. If he can establish a valid claim, then the onus shifts to the insurer, in declining cover, to show that exclusions apply or that it is otherwise entitled to do so. The policy only covers the listed insured events. One of those is ‘malicious damage or theft by tenants’. With regard to the fence, the complainant has said it was in good condition before the tenants ran an oversized caravan into the driveway and damaged the fence in the process. He has provided photos which he says were taken before and then after the damage. The complainant says the damage to the fence by the tenants was malicious. The policy specifically defines ‘malicious act’ as an ‘act done with the intention of causing loss or damage, or with reckless disregard for the consequences’. That means it is not sufficient for the complainant simply to say (or show) that the tenants damaged the fence, he needs to show it is more likely than not that they damaged the fence intentionally or without caring whether or not their actions caused damage. Damage which they may have caused by accident or negligence or otherwise is not ‘malicious’ for the purposes of the policy. Insurer ’s experts say damage to fence is from deterioration The insurer’s experts (builder AB and loss adjuster S) reported tha t the fence damage was the result of deterioration, and that it was in that state before any damage by the tenant. The policy specifically excludes cover for loss or damage caused directly or indirectly by ‘wear and tear and lack of maintenance, including rust, corrosion and deterioration…’. Insurer is not liable for the fence Based on the available evidence, I am not satisfied the complainant has established, on balance, that the damage to the fence was caused maliciously by his tenants. If – as the complainant says – the tenants ran into the fence when manoeuvring a large caravan into the driveway, then any damage caused at the time is more likely than not to be an accident. I am not satisfied the complainant has established a valid claim for malicious damage by tenants. The available evidence indicates the fence was, in any case, suffering from some wear and tear/deterioration which was likely age-related. That is excluded under the policy. That means the insurer is not liable for the fence damage. Determination | Case number: 961484 Page 3 of 6 2.1.2 The earthquake claim Based on available information, the proximate cause of claimed damage to the property was not earthquake (or any other insured event). Complainant must establish a valid claim As in the case of the fence above, the onus is on the complainant to establish, on balance, the earthquake caused the additional damage being claimed. ‘Earthquake’ is one of the insured events covered under the policy. While acknowledging there were previous cracks in the house, the complainant has said he noticed cracks in new areas of the property after the September 2021 earthquake event. In surer’s experts say that the damage was not caused by the earthquake Builder AJG inspected the property and identified cracking in various areas of the home (including in walls, cornices, skirting boards, shower recess). AJG noted there were a number of possible contributory causes, including the age of the building, poor design or workmanship, vibration (including from earthquake), general ground movement. They recommended an engineer be appointed. Engineer IL provided a detailed report, including a consideration of the location and severity of the earthquake by reference to the complainant’s property and the construction type, overall condition and age of the property (about 50 years). IL noted cracking in the external brickwork, and some signs of previous repairs. Cracks and previous repairs were also sighted inside the house. IL noted, for example, that the nature and direction of certain (diagonal) cracks was not consistent with an earthquake. They were, instead, consistent with differential ground movement of the structure. IL acknowledged some horizontal cracking but noted that was isolated to one area of the house. IL said that if the damage had been from lateral shaking during an earthquake, then it would have been spread throughout. With regard to damage in the shower, IL noted that was localised, with the dislodged tiles consistent with the incorrect installation of the attached shower seat, and the mould and evidence of water ingress into the tile backing board indicating long-term issues unrelated to the earthquake. IL concluded that the damage sighted was not from the earthquake event, but was from differential movement, and (in the case of the shower) poor installation and long-term deterioration. Insurer is entitled to deny the earthquake claim I am not satisfied, on the available evidence, that the complainant has established the damage being claimed was caused by the earthquake or any other insured event. Instead, I consider it is, on balance, from differential movement and/or other pre-existing long- term issues and deterioration. The policy specifically excludes cover for damage arising from the vibration, settling, shrinking or expanding of earth or any building, foundation, wall (except in the case of Earthquake). Determination | Case number: 961484 Page 4 of 6 2.2 Is further loss of rent payable? No. The insurer has acknowledged responsibility for some delays, and has appropriately paid the complainant for loss of rent beyond the policy limit. Loss of rent payment has exceeded the policy limit The complainant submits he has suffered an extended period of lost rental income because of the insurer’s ‘ negligence ’ and the delays it has caused in dealing with his claims. In addition to what has already been paid, he believes he should be covered for a further period from February 2022 until March 2023. The policy allows for loss of rent payments if the property becomes ‘unliveable’, for up to a maximum period of 50 weeks. Due to the delays which the insurer has acknowledged, the complainant has already been paid $37,596.10, which represents loss of rent for a period of 79 weeks and 5 days. The complainant has not provided additional information to support his position regarding increased loss of rent, despite being invited to do so. On the evidence that is available, I am not satisfied the insurer should be required to make any further payments. 2.3 Is compensation for non-financial loss warranted? Yes. The evidence shows – and the insurer has acknowledged – there have been significant delays in finalising the complainant’s claims, due to the insurer’s handling of the matter. Compensation for non-financial loss is warranted in the circumstances. Compensation for non-financial loss payable in limited circumstances Under our Rules, AFCA can award compensation for non-financial loss in limited circumstances, and up to a maximum of $5,400 per claim. When considering whether such an award is warranted, we expect complainants to be moderately robust in dealing with a claim and to bear the ordinary and normal degree of inconvenience associated with that. Insurer caused complainant unusual upset and inconvenience The evidence shows that over the lengthy period from when the first claim was lodged, there have been a number of delays. Some were unavoidable (such as Covid lockdowns, breaks for the New Year periods) but others were not. Some also were because of issues the complainant himself was dealing with. However, I am satisfied the insurer’s handling of the claims has involved avoidable delays, which have caused the complainant a significant degree of inconvenience. I also acknowledge the complainant was particularly upset by references to personal family matters. As well, he says he was told his claim was accepted, but then that changed (although it is not clear that he was materially prejudiced by any such communications). The insurer has acknowledged the delays and made an initial offer of compensation. Having considered all the available evidence, I am satisfied that compensation of $4,500 is fair in this case. Determination | Case number: 961484 Page 5 of 6 2.4 Why is the outcome fair? It would not be fair to require the insurer to cover claims for damage which has not been shown to fall within the scope of cover under the policy. It would also be unfair to require it to pay more for loss of rent than it has already paid, when the payments already exceed the policy limit and take account of the additional delays caused by the insurer’s handling of the claim. Even though the insurer was not liable for the additional damage claimed, its claim handling (including delays) caused significant avoidable upset and inconvenience to the complainant. For that reason it is fair that compensation for non-financial loss be paid. Determination | Case number: 961484 Page 6 of 6 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided. While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.