An SMSF owning a tenanted commercial building claimed for storm water damage from the February 2022 Queensland weather event, and the insurer denied it as flood damage. AFCA found in favour of the insurer.

On balance the initial inundation was a mix of rainwater run-off and creek flood water, which meets the policy definition of flood, and flood cover was not elected.

Issues

Subjects and remedies

broker or intermediaryhome or building damagenatural disastersmsfno remedy

Related

All QBE determinations · Find similar determinations

Text of the determination

Determination Case number 961433 Financial firm QBE Insurance (Australia) Limited Determination | Case number: 961433 Page 2 of 6 Case number: 961433 26 October 2023 1 Determination overview 1.1 Complaint The complainant, a self-managed superannuation fund, owns a tenanted commercial building insured under a business pack policy with the financial firm (insurer). On 28 March 2022, the complainant lodged a claim through its broker, with the insurer for storm water damage to the insured building following a severe weather event in late February 2022. After obtaining a hydrologist report the insurer denied the claim and says the loss was caused by flood which is excluded under the policy. The complainant says the continual rain overwhelmed the local drainage system causing the storm water runoff to inundate the property prior to the flood. The complainant seeks cover for the damage caused by the initial inundation. 1.2 Issues and key findings Is the insurer entitled to deny the claim? Yes. The insurer has shown the inundation of the building was caused by flood and excluded from cover under the policy terms and conditions. Why is the outcome fair? The panel acknowledges the challenging circumstances faced by the complainant because of the catastrophic claim event. On balance, the insurer has shown the inundation was caused by flood, which is specifically excluded under the insurance policy. In the circumstances, it would be unfair to require the insurer to cover this damage. 1.3 Determination This determination is in favour of the insurer. The insurer is entitled to rely on the terms and conditions of the policy to refuse payment of the claim. Determination | Case number: 961433 Page 3 of 6 2 Reasons for determination The complainant is represented by its broker. Reference in this determination to the complainant includes reference to the submissions by the broker. 2.1 Is the insurer entitled to deny the claim? Yes. The panel is satisfied that the inundation was caused by flood and excluded under the policy terms and conditions. Policy covers loss or damage subject to terms and conditions The complainant is required to show, on the balance of probabilities (that it is more likely than not), the claimed loss is covered by the insurance policy. Once the complainant proves the existence of a claimable loss, the insurer is liable for the loss unless it shows an exclusion or limiting condition applies. The policy covers loss or damage to the insured property which occurs during the period of insurance. On page 17 of the product disclosure statement (PDS), the policy says: Provided the 'Business property' cover section is shown in the Policy Schedule as taken, we will cover you up to the sum insured for loss or damage to your property insured at the premises which occurs during the period of insurance. There is no dispute the property suffered damage within the period of insurance. The onus is therefore on the insurer to establish a limitation or exclusion applies. The terms and conditions are provided in the of the PDS. On pages 23 - 24 of the PDS, the policy exclusions are noted, this includes flood unless the optional cover for flood is elected. The policy defines flood as: The covering of normally dry land by water that has escaped or been released from the normal confines of any of the following: a) a lake (whether or not it has been altered or modified): b) a river (whether or not it has been altered or modified): c) a creek (whether or not it has been altered or modified): d) another natural watercourse (whether or not it has been altered or modified): e) a reservoir f) a canal g) a dam It is not in dispute that the complainant’s policy does not include the optional cover for flood. Complainant says damage caused by a rain bomb There is no dispute that during February 2022, Queensland communities were affected by repeated and catastrophic weather events. The level of devastation has been well documented. The complainant says the property was affected by intensive rainfall between 21 February and 27 February 2022 and described as a rain bomb by the Insurance Council of Australia. Determination | Case number: 961433 Page 4 of 6 The parties agree the property is within the flood plains of the E Creek and the property was inundated by flood waters at some point during the weather event which lasted several days. It is the complainant’s argument that the initial inundation was due to storm water runoff prior to the arrival of any floodwaters. The tenants had vacated the property prior to the initial inundation of the property sometime on 27 February 2022. The complainant says the nearby E Creek remained at or above mean levels for several days and affected the drainage network. Due to this, the storm water runoff did not drain away from low lying areas where the property is located. The complainant says the initial inundation was likely caused by rain water as the street drains were unable to cope with the volume of water. The complainant also says the fence was found leaning towards the creek (side) following the event. The panel accepts this is not necessarily an indication of the direction or source of the water inundation. The complainant says the hydrologist report lacks details and does not consider the direction of water and specific circumstances. The panel agrees. The report could have provided more detail as to the initial inundation. It could have provided more information as to how the storm water systems are ‘expected to have a response time of about 1 hour’. Insurer says inundation was caused by flood The insurer engaged a hydrologist (P) to assess the nature and the extent of damage. P reports the following:  Floor level of subject property at 1.83m AHD, which is a low point in the street  The street level at the property is 1.7m AHD  Inundated to approx. 2.8 metres above floor level  The property is about 70 metres north of E Creek  The property is protected from E Creek by a berm/levee/footpath at 2.0mAHD (E Creek becomes B Creek as it continues)  B Hills alert is 300m from the property (on B Creek); E Creek reached an elevation of 2m AHD at about 00:00 on 26 February 2022 resulting in inundation of the property (fig 13)  Rainfall (to 9.00am) on 24, 25 & 26 February was 13mm, 54mm & 272mm respectively  Rainfall (to 9.00am) for 27 & 28 February was 268 and 344 respectively  Peak rainfall at thee 3 local gauges occurred between 20.31 on 27 February and 8.42 on 28 February  The property is within the extents of the river, creek and storm tide inundation events  N Street slopes upwards to the east and west of the property  Flooding of E Creek is the cause of peak inundation at the property.  P concludes that E Creek would have overtopped the berm adjacent the property sometime after 00.00 on 26 February 2022. Based on P’s findings, the insurer is of the opinion flood water inundated the property and it is entitled to deny the claim as ‘flood’ is specifically excluded. The insurer has established inundation was most likely due to flood In the panel’s view, E Creek most likely broke its banks prior to the initial inundation of the property. This is because:  t he data available shows water level at E C reek reached an elevation of 2m AHD at about 00:00 on 26 February 2022. This is the same level as the foot path a nd berm in front of the complainant’s property . Determination | Case number: 961433 Page 5 of 6  water likely escaped E Creek and flowed towards the property from 0.00 on 26 February 2026.  one of the photographs (from the complainant) shows water levels on N street on 26 February 2022 at 12.42pm. This photograph confirms the subject property was already inundated.  If it is accepted the photograph was taken at midday on 26 February 2022, this is consistent with P’s findings and consistent with E Creek breaking its bank around 0.00 on 26 February 2022.  The property is 70 metres north of the creek. Most likely any rainwater collected at site would have mixed with flood water and contributed to cause the inundation.  When floodwater is mixed with water from other sources (such as rainwater run-off) it is established law this is considered floodwater.  The property floor level is approximately 1 metre above street level  The upwards slope of N Street makes it likely there would be some storm water runoff pooling. On balance it is unlikely this would have collected to over a metre above street level to enter the property prior to E Creek breaking its bank. The panel acknowledges t he complainant’s view that the property was initially impacted by rainwater collecting in and around site (without mixing with floodwater from E creek). However, based on the available information, the panel is not satisfied storm water runoff by itself was capable of causing the inundation. Most likely, the initial inundation was caused by a combination of rainwater run-off around the property and flood water from the nearby creek. The inundation meets the policy definition of flood. Insurer is entitled to deny the claim The panel is satisfied that most likely the initial inundation and peak inundation was caused by flood. The policy excludes flood damage unless the optional cover for flood is elected. Given the complainant’s policy does not include this optional cover, the insurer is entitled to deny the claim. 2.2 Why is the outcome fair? The panel acknowledges the impact to the complainant and the surrounding communities because of the weather events in early February 2022. However, the insurer has shown it can rely on the policy exclusion ‘flood’ to deny the claim. Determination | Case number: 961433 Page 6 of 6 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all the information the parties have provided. While the parties have raised several issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. A panel determined this matter Due to the nature of this complaint, we referred it to a panel for determination. The panel includes:  an ombudsman  a member with significant experience in consumer and small business advocacy  a member with extensive experience in the insurance industry. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.