Home / Suncorp Group / Determination 961209
Determination 961209
Settlement of hailstorm damage claim: scope and cost of repairs, cash settlement, and non-economic loss
Summary
After a hailstorm, the insurer's cash settlement was based on an outdated builder scope and quote, which the complainant disputed. AFCA required an updated DW quote to be cash settled with a 10% uplift, $500 for the floor and $1,000 non-economic loss, rejecting the other claimed items.
The DW scope of works accurately reflects covered damage, other items were excluded as wear and tear, but the quote was out of date and the insurer's delay and poor communication warranted compensation.
Issues
- Claim amount dispute primary · upheld
“The Scope of Works provided by DW is out of date; insurer to obtain updated quote and cash settle with 10 per cent uplift.”
- Claim denial secondary · not upheld
“insurer is entitled to deny the claim in relation to each of the other matters raised, other than the internal flooring damage”
- Delay secondary · upheld
“appropriate that the insurer pay $1,000 non-economic compensation, due to the delays and the lack of adequate communication”
- Poor communication secondary · upheld
“The insurer does acknowledge that the communication with the complainant in relation to this was insufficient.”
Subjects and remedies
home or building damagenatural disasterthird party authoritypay claimpay compensationpay non financial loss
Text of the determination
Determination
Case number 961209
Financial firm AAI Limited
Determination | Case number: 961209 Page 1 of 6
Case number: 961209 28 September 2023
1 Determination overview
1.1 Complaint
The complainant holds a Building and Contents policy with the financial firm (the insurer). The
complainant lodged a claim on 20 January 2020 following a hailstorm at the premises. The
insurer made a cash settlement based on the first builder (AB) quote. But subsequently, a
further quote was arranged by the insurer with a second builder, (DW). The complainant does
not accept the DW quote. The complainant has requested that the insurer update the DW
quote to reflect 2023 costs.
In response, the insurer has offered to uplift the quote as a cash settlement. The complainant
is represented by a friend and any reference to the representative is a reference to the
complainant unless otherwise noted.
1.2 Issues and key findings
How should the claim be settled?
On the information provided to me, on balance, I am satisfied as follows:
The Scope of Works provided by DW dated 6 November 2020 provides an accurate
assessment of the damage to the property, subject to issues with the bore pump and
watering system.
Nothing has been provided by the complainant that shows there is further damage to the
property, which is not excluded under the terms and conditions of the policy.
The Scope of Works provided by DW is out of date and therefore no longer valid.
DW should update the quotation based upon the Scope of Works (SOW) of 6 November
2020 to reflect current costs.
Due to the breakdown in the relationship between the insurer and the complainant, this is
an appropriate matter to cash settle.
I accept that there was damage to the bore and irrigation system however I am satisfied it
is dealt with in DW’s SOW as the complainant has provided several quotations without
sufficient explanation to establish the cost of repairs.
The insurer accepts the floor suffered damage.
The insurer is to obtain an up to date quotation from DW to reflect the current costs. The
insurer is to obtain this update within 21 days of acceptance of this determination. The insurer
is to pay an uplift of 10 per cent on the quotation, as part of the cash settlement, to cover
contingencies and loss of guarantee. The insurer is to pay the amount within 14 days of
receipt of the updated quotation.
The insurer is to pay $500 for the damage to the floor.
Is the complainant entitled to non-economic compensation?
The conduct of this matter has been difficult due to the fact that it took until February 2021 for
a full assessment of the property to be completed. Subsequently, the insurer decided to make
a cash settlement payment in this matter. The insurer does acknowledge that the
communication with the complainant in relation to this was insufficient.
Determination | Case number: 961209 Page 2 of 6
I also note that there have been difficulties in the communication between the complainant
and the insurer which, to some extent, are not the insurer's fault.
In the circumstances it is appropriate that the insurer pay the sum of $1,000, non-economic
compensation, due to the delays and the lack of adequate communication.
Why is the outcome fair?
The complainant has been given the opportunity to review the information provided by the
insurer. Whilst I accept there has been a breakdown in the communication between the
parties, I consider this an appropriate matter for cash settlement. The quotation based upon
the Scope of Works provided by DW is no longer up to date. It is appropriate that this
quotation be updated and that this matter is cash settled.
The complainant has already received non-economic compensation in this matter. It would be
unfair to require the insurer to compensate the complainant further.
1.3 Determination
This determination is substantially in favour of the insurer.
The insurer, upon acceptance of this determination is to:
Arrange an up to date quotation based upon the scope of works provided by DW dated
6.11.2020. The updated quotation is to be provided within 28 days of acceptance of this
determination.
The insurer is to pay as a cash settlement the amount of this quotation, together with a 10
per cent uplift to cover contingencies and loss of guarantee.
$500 for floor repairs
The insurer is to pay $1,000 non-economic compensation.
Determination | Case number: 961209 Page 3 of 6
2 Reasons for determination
The complainant held a Home Building Contents policy and, following a hailstorm, lodged
their damage claim on 20 January 2020.
The assessment of the property took a long time and unfortunately the insurer was forced to
remove DW and appoint AB to assess the property. AB was unable to gain full access to the
property and provided a Scope of Works and quotation based upon that.
There is a more substantial 'Scope of Works' provided by DW dated 6 November 2020.
Subsequently, the insurer attempted to cash settle the matter, including offering an uplift. The
complainant has rejected the offer and the dispute was the subject of a recommendation. This
recommendation has been rejected by the complainant and the matter has been referred for
determination.
2.1 How should this matter be settled?
Product Disclosure Statement (PDS)
The insurer has referred to the provisions of the PDS as follows:
StormWe do not cover
………….
loss or damage to retaining walls, sea walls, garden borders and free-standing
outdoor walls;
resultant cracking to paths, driveways, any outdoor surfaces, but we will cover
them if they are washed away by the storm;
Page 40
What we do not cover - general exclusions (cont’d)
You are not covered under any section of your policy for damage, loss, cost or
legal liability that is caused by, arises from or involves:
Wear, tear and gradual deterioration
wear, tear, rust, fading, rising damp, mould, mildew, corrosion, rot, action of light,
atmospheric or climatic conditions or gradual deterioration such as, but not limited
to:
tiles and their adhesive or grouting breaking down;
weathering of roof tiles or roof ridge capping;
Determination | Case number: 961209 Page 4 of 6
gradual weathering and breakdown of bricks, mortar or concrete.
Pages 45 to 46
How we settle building claims
If we agree to pay a claim for loss, theft or damage to the building, we will
decide if we will:
repair damage to the building;
………….
pay you what it would cost us to repair or rebuild the building
…….
If we repair (or pay you what it would cost us to repair), we will at our option do so
on a `new for old’ basis or repair to a similar condition to what the building was in
before the loss or damage occurred
…..
Quotations and Scope of Works
The ability for a full assessment of this property to be carried out was, to some extent,
restricted by COVID.
Ultimately, the insurer obtained two quotations and Scope of Works from DW and AB.
Unfortunately, AB's Scope of Works was restricted by the fact that he was unable to enter the
property.
In view of this, I accept that the most accurate Scope of Works is that by DW.
There are also disputes that have arisen in relation to the following items:
brick pavers, driveway, retaining wall
internal flooring
mould
roof gutters
timber
DW obtained reports from other specialists to assist in making the assessment and the scope
of works. I am satisfied that DW’s scope of works is an accurate assessment of the damage
that the insurer is responsible to rectify.
The complainant has not provided any information that I am convinced disputes the matters
raised by the insurer.
I am satisfied that the insurer is entitled to deny the claim in relation to each of the other
matters raised by the complainant, other than the internal flooring damage from the broken
glass.
Determination | Case number: 961209 Page 5 of 6
Nothing has been provided by the complainant in support of these items claimed that
convinces me they are covered by the policy.
I am satisfied that each of the items' condition is due to wear and tear and age. I am satisfied
that the mould was adequately dealt with by the insurer.
In relation to the internal flooring, I note that the insurer accepts that the floor requires a light
sand and repolish, but it is not possible to warrant these repairs.
I am satisfied that the Scope of Works provided by DW is the most appropriate in relation to
this matter. However, I am also satisfied that they 'may not reflect the current cost of
undertaking this work'. In the circumstances, the insurer is to arrange for DW to reassess the
quote, taking into account current costs and using the Scope of Work previously provided.
If DW is unable to provide the quotation, the insurer is to obtain an actionable quote from a
suitable builder using the Scope of Works provided by DW.
I accept that the flooring cannot be repaired and warranted. I consider an allowance of $500
would be appropriate.
Insurer to cash settle
The insurer is to cash settle the quotation obtained above, together with an uplift of 10 per
cent to cover contingencies and loss of guarantee.
The insurer is to pay $500, without uplift, towards the damage to the floor.
The quotation for the repairs is to be obtained within 28 days from the date this determination
is accepted, and the cash settlement plus other sums as set out herein is to be paid within 14
days of the receipt of the new quotation.
Is the complainant entitled to non-economic loss?
I have dealt with this already and I am satisfied that the insurer, in most instances, has
undertaken an appropriate approach to this matter. I acknowledge that it has been particularly
difficult due to the time at which the damage occurred, however I am satisfied that it is
appropriate that the insurer pay the sum of $1,000.
Determination | Case number: 961209 Page 6 of 6
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.