Home / QBE / Determination 960956

Determination 960956

Scope of works and cash settlement amount for storm damage building and carpet repairs

FirmQBE
Decided2023-12-12
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded$8,145
Non-financial loss$2,000
Amount claimed—
SourceAFCA PDF

Summary

Complainants disputed the scope and cash settlement for storm damage repairs to their home. AFCA rejected the claim for the tiled wet areas and waterproofing, but required an additional carpet payment, a new quote for the SB scope of works cash settled with a 20% uplift, and $2,000 compensation.

Complainants must prove claimable damage; no evidence of resultant damage to wet areas, but the insurer failed to properly assess the damage and scope for other items, so settlement is increased.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimpay non financial lossreassess claim

Related

All QBE determinations · Find similar determinations

Text of the determination

Determination Case number 960956 Financial firm QBE Insurance (Australia) Limited Determination | Case number: 960956 Page 1 of 8 Case number: 960956 11 December 2023 1 Determination overview 1.1 Complaint The complainants hold a home and contents insurance policy with the financial firm (insurer). On 26 October 2022, they lodged a claim for damage to the property which they say was due to a storm. The insurer has accepted the claim. The complainants have requested a cash settlement for the building repairs, which the insurer has paid in relation to certain items (covered items). However, the complainant says there are various items that have not been included in the scope of works (disputed items). They have lodged various complaints with the insurer but have not received a substantive response. The complainants seek a cash settlement for the disputed items, an increase in the settlement for covered items and compensation for its claims experience. The contents claim (excluding the carpet) has been resolved and is not part of this complaint. 1.2 Issues and key findings Should the insurer increase the cash settlement? Yes. The insurer should obtain an actionable quote for the SB scope of works. It should then cash settle the complainants with a 20% uplift for contingencies and the loss of a lifetime guarantee on repairs. This is consistent with the uplift paid by the insurer on the previous building repairs. It should also pay an additional $8,145.17 for the carpet replacement cost. Are the complainants entitled to compensation? Yes. The insurer is required to pay the complainants $2,000 in compensation. Why is the outcome fair? The complainants have established a claimable loss under the policy. However, the insurer has failed to property assess the resultant damage. It is fair in the circumstances that the insurer increases its cash settlement and pay compensation to the complainants. 1.3 Determination This determination is in favour of the complainant. Within 14 days of being advised of the complainants ’ acceptance of the determination, the insurer is required to:  pay the complainants $8,145.17 for the carpet replacement cost;  pay the complainant’s $2,000 in non -financial loss compensation;  engage a builder to provide an actionable quote for the SB scope of works; and  within 14 days of receiving the quote, cash settle the complainants for the value of the quote plus a 20% uplift Determination | Case number: 960956 Page 2 of 8 2 Reasons for determination 2.1 Should the insurer increase the cash settlement? Yes. The insurer should obtain an actionable quote for the SB scope of works. It should then cash settle the complainants with a 20% uplift for contingencies and the loss of a lifetime guarantee on repairs. This is consistent with the uplift paid by the insurer on the previous building repairs. It should also pay an additional $8,145.17 for the carpet replacement cost. Insurer says claim is covered and has cash settled some building repairs The insurer accepts that the claim is covered. On 13 February 2023, it cash settled the following items:  $10,880.05 ($11,380.05 less $500 excess) for certain building repairs;  $31,320.89 for contents (including the pool pump); and  $132.52 for electricity usage. A 20% uplift for contingencies was later paid for the building repair items, being $2,176.01. Onus on complainants to establish a claimable loss The complainants are required to show, on the balance of probabilities (that it is more likely than not), that there is a claimable loss under the policy. This means the complainants must prove the loss or damage was caused by a risk that is covered under the policy. Once the complainants prove there is a claimable loss, the insurer is liable for the loss unless it shows an exclusion or limiting condition applies. The insurer has the onus of proving, on the balance of probabilities, that the exclusion or condition applies. Policy sets out how insurer will deal with undamaged parts of the home The insurer’s policy consists of the policy schedule and product disclosure statement (PDS). It is not in dispute the insurer provided the policy documents to the complainant. Page 80 of the PDS states in relation to internal walls: We’ll pay to repair or replace the damaged wall(s). We won’t pay to replace the wall covering, for example wallpaper or paint on any adjoining walls or in any adjoining rooms, hallways or stairwells. Page 87 of the PDS states in relation to carpets: We’ll pay to repair or replace up to an existing change or join in the carpet or an archway, doorway or similar opening, whichever is closest to the damage… We won’t pay to replace any undamaged carpet in any other adjoining rooms, hallways or stairwells. Parties disagree on the extent of covered items and cover for disputed items The complainants say that, in addition to the covered items, two bathrooms, the laundry room, study and entry (tiled areas) were also damaged by the storm. They also say, various aspects of the covered items have not been included. The complainants submit that: Determination | Case number: 960956 Page 3 of 8  due to the amount of water and surface runoff water, there was approximately 75mm of water sitting above the finished floor level for 2-3 hours;  this led to water and moisture coming in through the windows, cracks, brick weep holes and timber frame;  this also affected the tiled areas with water and moisture getting into the cabinetry and under the tiles. The biggest issue is water under the waterproofing membrane, which cannot be dried out, therefore leaving moisture in the concrete slab;  the tiled areas were not properly treated and have not been repaired since the storm in October 2022. They need to be pulled up to be properly rectified;  various aspects of the scope of works needs to be broadened. For example, it needs to include further works in the master bedroom, self-contained unit (unit), the main living room, the garage/multi-purpose room. Externally, it says the replacement of square timber moulding and painting of the full length of eave should also be included in the scope of works. The complainants also say adequate allowances have not been made for skip bins, rubbish removal and professional cleaning; and  the insurer approved the carpet payment before quotes had been obtained. The quote is for $17,000 and payment was made of $10,554.83. Therefore, the carpet settlement needs to be increased. The complainants have obtained a report from building consultant, PR. It says:  following a site inspection, that water has penetrated inside the building cavity through the window sill and weep holes;  it is highly likely it has soaked into the frame and wall lining from the back side;  the waterproofing done in the wet areas covers positive hydrostatic pressure (if water penetrates through the grout or the other cracks/joints and sits on top of membrane with intent to drain towards the drain) not the negative hydrostatic pressure when water comes from back of the membrane;  i f the affected area isn’t treated immediately after the event , there is a great possibility that the frame and the wall lining will be damaged and it will cause failure of the membrane, mould, cracking grout and peeling off of the tiles together with the membrane from the walls; and  to rectify the damage, there needs to be access created to the affected areas to confirm the damage and then create a proposed scope of works. The insurer refers to the reports of its assessor, SA, builder, JL, and building consultant, SB. The experts say that:  the damage was consistent with the insured event but was extremely minor in nature. The damage was focused along the southern side of the dwelling;  moisture checks were carried out using a pinless moisture meter. Measurements with this type of meter do not give a full assessment of moisture presence but do indicate in which areas moisture may be located. The readings are based on a scale of 1- 1000. The pinless moisture content readings showed a marginally raised moisture content of the tiled floor through the bathroom and laundry (200-250) and readings through the other dry tiled areas of 160-190. No raised moisture content readings were observed to any wall surfaces in the bathroom or laundry;  slightly raised surface moisture content of the slab was recorded internally adjacent to the southern wall of Bedroom 2 and slight efflorescence was visible to the top surface of the concrete slab;  external surface water drainage is inadequate. Considering the site conditions, an engineer designed drainage system ought to be implemented to prevent future water ingress; Determination | Case number: 960956 Page 4 of 8  while it is likely the concrete slab beneath the waterproof membranes of the wet areas has been subject to increased moisture content during the insured event, there is no evidence of any resultant damage to the tiled areas, including the bathroom and laundry. Therefore, an invasive investigation of these areas is not recommended;  raised moisture readings and moisture damage would be evident to t he walls if significantly raised moisture levels remained in the slab. Given this was not observed and the slab was dry where exposed, there is no evidence of excessive moisture content to the concrete slab;  the damage to the garage/multi-purpose room and unit at the western end of the dwelling was more severe than the damage throughout the main dwelling, although it was still relatively minor in nature, and it was consistent with the insured event;  a scope of works for visible resultant damage has been prepared. This includes defects and maintenance items which are related to the insured event; however, it is not intended to be an exhaustive list of defects and maintenance items for the property; and  due to the lack of resultant damage in the bathroom, an invasive investigation of the wet area waterproof membranes is not recommended. The insurer further says:  it disagrees with the complainant that when the drying and restoration works were being conducted, the restorer should have undertaken drying of the bathroom as well. The complainants allege that as a result, the waterproofing in the bathroom has been compromised and the bathroom and ensuite should be fully renovated. The insurer disagrees;  at most, restorers will mop or wipe the flooring of tiled areas. Further restoration works are not usually carried out to wet areas;  a bathroom is waterproofed to withstand water on the floors. Therefore, if there is damage following minor water inundation, then this indicates an issue with the waterproofing itself. That is, the waterproofing membrane is compromised and cannot withstand water on the bathroom floor. In such instances it is not for the insurer to undertake maintenance works as a result of the waterproofing failure. Rather, that is the responsibility of the home owner;  it is also unusual that a wet area such as a bathroom would have hydrostatic pressure just from an accumulation of storm water on the floor; and  no expert for the insurer or complainants can comment further on the waterproofing without actually breaking the tiles. The insurer is not prepared to do so as there is no evidence of damage and any damage (if it exists) is due to a failed waterproof membrane and so would not be covered under the policy. On balance, insurer is not required to cover disputed items I have carefully reviewed all the exchanged information. There is no evidence to suggest there is any visible resultant damage to the tiled areas. That is, there are no dislodged or drummy tiles, no cracking of grout joints, no mould or other resultant damage. I acknowledge the report from SB and its comments in relation to moisture. I also acknowledge the complainants ’ submission regarding the waterproofing membrane being compromised, the slab and the frame. Their expert, PR, also says ‘if the affected area isn’t treated immediately after the event, there is a great possibility that the frame and the wall lining will be damaged and it will cause failure of the membrane, mould, cracking grout and peeling off of the tiles together with the mem brane from the walls’. However, there is no evidence of such damage. There has also been no evidence provided of negative hydrostatic pressure. In the circumstances, I am more persuaded by the evidence of SB. I accept that there is no evidence of excessive moisture content of the concrete slab and that, given the Determination | Case number: 960956 Page 5 of 8 absence of resultant damage in the tiled areas, an invasive investigation of the wet area waterproof membrane is not required. Further, it is not enough to say that it is highly likely that there is damage. The onus is on the complainants in the first instance to establish a claimable loss. That is, that there is, in fact, damage. There is no doubt that the insured event occurred. However, the complainants have not established, on balance, that the insured event caused damage to the disputed items including the waterproof membrane, the slab and the frame. Therefore, the insurer is not required to cover for these items. Accordingly, the insurer is not required to demolish and reconstruct the tiled wet areas. Insurer is required to extend scope of works for certain items only Based on the exchanged information, it appears that, to date, the insurer has paid:  $11,380.05 (less $500 excess plus a 20% uplift) for building repairs. However, there is no breakdown available as to which specific building items this sum relates to; and  $10,554.83 for replacement carpet. The insurer has not provided a copy of the carpet quote from CF. However, I understand from the exchanged information that the quote is approximately $17,000. Therefore, I consider the insurer should have to pay the complainants an extra $6,445.17 for carpet replacement ($17,000 less $10,554.83). I also consider it is fair that a 10% uplift ($1,700) should be applied to the carpet quote for contingencies and the loss of a lifetime guarantee on repairs. Therefore, the additional cash settlement required for the carpet replacement is $8,145.17. In addition, the complainants say the scope of works needs to be broadened as follows:  all skirtings in carpeted areas need to be painted since the carpet is being replaced;  the living room adjoins the master bedroom and the same carpet continues with no termination. Therefore, the carpet in the living room also needs to be replaced;  the skirting boards in the garage/multipurpose room have been heavily damaged;  in the unit: > the ceiling in the living room should be painted as the kitchen/meals is connected to the living room and the insurer is painting that section of the ceiling; > the damage in the kitchen and living room has got worse with more visible damaged plaster, cornice and cabinetry bulkhead; > the skirtings in the kitchen, living room and bedroom 1 are damaged and need to be replaced and painted; > a larger area of ceiling in Bedroom 1 needs to be replaced;  externally, the square timber moulding needs to be replaced and the full length of eave painted; and  further allowance should be made for skip bins, rubbish removal and professional cleaning. I refer to page 80 of the PDS and the approach set out in relation to internal walls. Therefore, I do not consider that all skirtings in the carpeted areas need to be painted. As set out in the builder’s scope of works, and based on the policy terms and conditions, only those skirtings which are being replaced are required to be painted. The new skirtings will be painted to match the existing skirting boards. Page 87 of the PDS deals specifically with carpets. It expressly states that the insurer will only replace carpets up to an existing ‘archway, doorway or similar opening’ . Therefore, the insurer is only required to replace the carpet in the master bedroom up to the doorway. It is Determination | Case number: 960956 Page 6 of 8 not required to replace the carpet in any adjoining hallway or adjoining room. Accordingly, the insurer is not required to replace the carpet in the living room. In relation to the unit:  a two square metre section of ceiling in the kitchen is being replaced and a one square metre section in the bedroom. There is also an allowance to replace the cornice in these rooms. These measurements were most recently confirmed by SB in June 2023. In the circumstances, I consider them to be persuasive. This is particularly so in circumstances where the complainants have not provided any alternate calculations of the area they say should be replaced. Therefore, I do not consider the insurer is required to replace a larger area of ceiling or cornice;  the insurer has also made an allowance to replace skirting boards and kickboards in the unit. There is also no evidence provided that these allowances are inadequate or the extent to which they should be increased. Therefore, I do not consider the insurer is required to replace a larger section of the skirting or kick boards; and  the complainants say that the living area is part of the same room and that the living area ceiling should also be painted. The policy says that a ‘combined lounge/dining room will be considered as one room if the opening between them is more than 82cm wide (this is a common width of a doorway)’. I am satisfied the openin g between the kitchen/meals area and the living area in the unit is more than 82cm wide. Therefore, in accordance with the terms of the policy, this should all be considered one room. Accordingly, the insurer is also required to paint the ceiling in the living area. The insurer’s scope of works from SB includes a painting allowance for 30 square metres. I am satisfied that this is reasonable in the circumstances. The complainants also say the skirting boards in the garage/multipurpose room need to be replaced. SB’s quote makes an allowance of 7.3 linear metres for this purpose. In the absence of any evidence to the contrary, I am satisfied that SB’s quote is reasonable. Externally, the complainant seeks that the timber mouldings be replaced. However, there is no evidence provided that the moulding has been damaged. I otherwise note that the insurer’s scope of works includes an allowance to paint the eave. Therefore, I do not consider it necessary to increase the external scope of works. The complainants ’ additional allowance for skip bins, rubbish removal and professional cleaning is not substantiated. I therefore do not consider this needs to be included in the scope of works. Insurer is required to take further steps to cash settle certain items In February 2023, the insurer cash settled the complainants for $10,880.05 for building repairs. In June 2023, the insurer obtained a further scope of works from SB which includes a number of additional items. I am satisfied that the insurer should obtain an actionable quote based on the SB scope of works. The insurer should then cash settle the complainants for the value of the SB quote with a 20% uplift (as it has done in relation to the other building repairs). The insurer is otherwise required to pay an additional $8,145.17 for the replacement carpet. 2.2 Are the complainants entitled to compensation? Yes. The insurer is required to pay the complainants $2,000 in compensation. Determination | Case number: 960956 Page 7 of 8 AFCA can award compensation for poor claim handling Under our Rules, AFCA can award up to $5,400 compensation for non-financial loss. This must relate to poor claims handling or other actions of the insurer which causes an unusual degree or extent of physical inconvenience, delay or interference with a person’s expectation of enjoyment and/or peace of mind. We expect complainants to be moderately robust, and we will not award compensation for the ordinary degree of inconvenience involved in making a claim. Complainants are entitled to non-financial loss compensation I accept the complainants say the claims process has caused a high level of stress and anxiety, with the insurer showing minimal duty of care in relation to their claim. I acknowledge the complainants’ concerns and dissatisfaction that the insurer has not assessed the cla im properly and communicated effectively with them. The complainants say the initial scope of works missed a number of items. Based on my determination, I consider this is correct. I also consider a number of additional items have been identified by SB, which are set out in its scope of works. Therefore, I consider the insurer has failed to properly assess the extent of resultant damage at the property. However, several aspects of the complainants’ claim has not been substantiated. The pursuit of these ite ms likely contributed to the complainants’ stress and inconvenience. I also accept the claimed event itself would have resulted in stress and inconvenience. The insurer is not responsible to pay compensation for these factors. In the circumstances, I consider the insurer should pay the complainants $2,000 in non- financial loss compensation. 2.3 Why is the outcome fair? The complainants have established a claimable loss under the policy. However, the insurer has failed to property assess the resultant damage. It is fair in the circumstances that the insurer increases its cash settlement and pay compensation to the complainants. Determination | Case number: 960956 Page 8 of 8 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided. While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.