Home / Allianz Australia / Determination 960775

Determination 960775

Decline of storm damage claim to home; claims handling and non-financial loss

FirmAllianz Australia
Decided2023-11-24
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded—
Non-financial loss$4,000
Amount claimed—
SourceAFCA PDF

Summary

Complainants claimed for storm damage to their home's floor; the insurer declined it, citing long-term drainage problems. AFCA upheld the decline but found the claim was poorly handled and ordered $4,000 non-financial loss compensation.

Damage was caused by long-term poor drainage, not a covered storm, and was not 'unforeseen' for accidental damage cover since the complainants were told of drainage issues in 2018; poor claim handling warranted compensation.

Issues

Subjects and remedies

home or building damagenatural disasterpay non financial loss

Related

All Allianz Australia determinations · Find similar determinations

Text of the determination

Determination Case number 960775 Financial firm Allianz Australia Insurance Limited Determination | Case number: 960775 Page 1 of 7 Case number: 960775 7 November 2023 1 Determination overview 1.1 Complaint The complainants hold a home building and contents insurance policy underwritten by the financial firm (insurer). They lodged a claim for storm damage to their home. The insurer declined the claim. It says that the complainants have not shown the loss was caused by an event it covers. Rather, the insurer says multiple excluded factors, including inadequate ventilation and drainage, caused the damage. It says the policy does not respond to the loss. The complainants dispute the insurer’s decision . They also raised concerns with how the claim was handled and seek compensation for non-financial loss. 1.2 Issues and key findings Is the loss covered by the policy? No. The complainants had ongoing drainage problems at the home for several years. This meant water pooled in the subfloor and could not drain away. This water caused damage to the building over time. The loss is similar to the circumstances of a previous claim from 2018, meaning the events in 2022 were not unforeseen. Is an award for compensation appropriate? Yes. The insurer was slow to address relevant concerns, did not address the damage properly and generally failed to handle the matter as it should have. The delays and issues encountered greatly distressed the complainants. The insurer must pay them $4,000 compensation for non-financial loss. Why is the outcome fair? The exchanged material shows the loss was caused by poor drainage at the property. This permitted water to pool in the subfloor and cause damage. As the complainants were informed of this issue in 2018 and undertook no apparent rectification of it, the loss was not unforeseen. It is therefore not covered by the policy. Given the insurer’s handling of the matter was poor, it is fair that it pays $4,000 compensation for non-financial loss. 1.3 Determination This determination is mostly in favour of the insurer. The insurer is not required to cover the claimed damage to the home. The insurer is required to pay compensation for non-financial loss of $4,000. Determination | Case number: 960775 Page 2 of 7 2 Reasons for determination 2.1 Is the claim covered by the policy? No. The complainants had ongoing drainage problems at the home for several years. This meant water pooled in the subfloor and could not drain away. This water caused damage to the building over time. The loss is similar to the circumstances of a previous claim from 2018, meaning the events in 2022 were not unforeseen. Complainants have previously sought cover for similar damage at the home The insured home was constructed in or about 1992. It is a brick veneer construction. The partially flooded subfloor area is supported by bearer joists, with a prominent bricked-in exterior. The complainants say the subfloor area was inundated due to ongoing severe rain. This led to the collapse of their flooring. They have resided at the insured home for about eight years. They lodged the claim on 16 August 2022 and say a series of storms damaged their property including the floor joists. This, in turn, caused the floor and part of the walls to collapse. A previous floorboard damage claim was lodged with the insurer in 2018. This also involved consideration of water ingress into the subfloor. The insurer denied that claim. For the 2022 claim, the insurer provided the copies of documents it reviewed as part of the 2018 claim. The insurer noted in its denial letter for the 2018 claim: The building consultant found the damage sustained to your property is a result of lack of drainage allowing the water seep in and remain under the property over a period of time. Whilst unhappy with the outcome, the complainants never challenged the outcome of the 2018 claim. The consideration for this determination is limited to the 2022 claim only. Onus on complainants to establish claimable loss for 2022 event The complainants have the onus of establishing they suffered a loss from an event covered by the policy. If a claimable loss is established, the insurer then has the onus of establishing the application of any exclusion or condition it relies on to deny or reduce its liability. For both the complainants and the insurer, the onus of proof is the balance of probabilities (that is, it is more likely than not). If the complainants can establish they suffered a claimable loss, the onus shifts to the insurer to show, on balance:  it is entitled to rely on an exclusion under the policy, or  it is otherwise entitled to decline the claim. Insurer covers listed events and accidental damage subject to exclusions The terms of the policy include the policy schedule and the Product Disclosure Statement (PDS). There is no dispute the insurer sent these documents to the complainants. Determination | Case number: 960775 Page 3 of 7 The policy covers damage caused by one of the listed events. Amongst these events is cover for ‘storm, cycl one, rainwater or run-off and flood’. ‘Storm’ is defin ed in the PDS as: Violent wind (including cyclones and tornadoes), thunderstorms or hail which may be accompanied by rainwater or snow. ‘Rainwater’ is defined as: Rain falling naturally from the sky onto the buildings and/or ground. ‘Run - off’ is defined as : Rainwater that has collected on or has flowed across normally dry ground or has overflowed from swimming pools or spas, provided such rainwater is not combined with flood waters. The complainants also selected an option to cover ‘Accidental damage’. This is defined as: damage caused by sudden, unforeseen and unintended events. The accidental damage cover includes ‘any accidental damage or loss’ to buildings. All cover provided by the policy is subject to terms, conditions and exclusions. Builder found water damage caused due to poor construction of home The insurer arranged for experts to review the damage at the home. Builder JL attended on 25 August 2022. It addressed make safe works and noted the complainants found the floor was sinking after a storm. JL found the floor had sunk more than 130mm. There was ‘excessive moisture damage’ to the lounge and dining room floors and the floor wall junction in the main bedroom. JL concluded the dama ge was a ‘direct result’ of: a building defect being non adequate clearance under the subfloor area of [the] home … Non adequate subfloor drainage. Additional floor damage was noted in the entry and the children’s bedrooms. JL found there was significant mud, mould and pooling water in the subfloor area under the home. In a later email to the insurer, JL acknowledged there was significant rainfall but says the extent of deterioration observed ‘takes years’ and was not due to the claimed event. JL noted the landscaping was built to a height which covers the subfloor, preventing adequate air flow. JL considers the construction of the home does not comply with the National Construction Code 2019 (NCC), citing surface water drainage requirements under part 3.1.3.3. I am satisfied this has no bearing on the loss as the building was constructed in or about 1992. Determination | Case number: 960775 Page 4 of 7 Engineer says issues with the property permitted ingress into subfloor The insurer initially denied the claim based on the findings by JL. After the complainants rejected this outcome, the insurer arranged for an engineer (SW) to visit the home. SW attended on 25 May 2023 and found:  rainfall data from Canberra Airport (36km from the property) showed local rainfall from 2020-2022 was significantly higher than in previous years  the cause of water ingress into the subfloor was: > the property sloping to the external wall, allowing water to accumulate at the brickwork > the external ground level on the eastern side sitting level with the internal floor covering ant caps, the damp proof course and the subfloor vents > there was inadequate provision for subsoil drainage to drain out water in the subfloor > no external surface drainage system to divert run-off rainwater from the subfloor  the subfloor ventilation was not in accordance with the NCC (3.4.2 and 3,4.3a)  the construction also contravenes Australian Standard (AS) 4773.2 2015, which outlines requirements for damp proofing a subfloor  subterranean water has been pooling behind the eastern wall of the dining and study, permeating through to the subfloor over time  this is a long-term issue and ‘un related to any single storm or any other insurable event ’  the sloping topography, the concrete paving being higher than the damp course, and inadequate external drainage all led to water entering the subfloor during a period of elevated rainfall and run-off  rising damp from continuous ingress and rotting of the timber trusses is due to a combination of inherent design and construction faults. As with the findings of JL, I am satisfied the NCC and AS provisions cited are not relevant. As the home was constructed well before these provisions came into effect, they are not applicable to the claim. Complainants say subfloor ventilation is adequate A photo from 7 October 2022 shows extensive water inundation under the home. The complainants say this was from a ‘severe storm and flood event’. They maintain the cause of the loss was the ‘extreme weather’ and cite the public commentary around the extrem e nature of local storm and flooding events in 2022. Whilst the insurer considers the home was constructed without adequate ventilation, the complainants disagree. They note there are 42 23cm vents around the perimeter of the home, two blowers and two 95cm vents to allow adequate sub-floor ventilation. They say in their discussions with SW, the expert acknowledged the drainage and subfloor ventilation was likely effective for the first 20 or so years. They say SW acknowledged the ‘extenuating circumstances’ of the 2022 storms ‘might have led to the collapse of the floor’. The complainants also say the subfloor varies between 700mm and 900mm clearance, which is more than is required. They have ‘optimal active east -west ventilation, sufficient passive air ven ts and ample ground clearance’. There is also 69.4m of agricultural pipe surrounding the rear perimeter. They challenge many of the conclusions drawn by the insurer’s experts. The complainants say the rainfall station cited by SW is too far from their home to be relevant. The closest station is at Hall, which is only about 13.5km from their home. They note the rainfall for corresponding periods was far greater at Hall than in Canberra. Determination | Case number: 960775 Page 5 of 7 The complainants were invited to obtain an expert report to support their position. They elected not to do this. Complainants are unable to show the damage is caused by a claimable loss I accept the intrusion of water into the subfloor of the home caused damage. I further accept this was caused by a series of storms and rainwater run-off events in 2022. However, there is no particular storm or series of storm events which accounts for the level of water inundation under the home. Rather, I consider this build-up of water in the subfloor occurred over time due to the unusual characteristics of the home, including the poor drainage. I am not satisfied the damage was caused by the insured event of ‘ storm, cyclone, rainwater or run- off and flood’. Noting the policy also covers accidental damage, I considered this provision also. This cover requires that damage is caused by ‘sudden, unforeseen and unintended events’ . Even if I accept there was a sudden and unintended event, I do not accept it was unforeseen. It is clear from the exchanged material that the insurer informed the complainants that there was a drainage issue at the property in 2018. It was one of the reasons it denied the previous claim. The complainants were informed that water was flowing under the home and staying there. There is no persuasive evidence they rectified the issue. Given this, I am not satisfied the complainant can show the loss is covered by the policy. I acknowledge they did not intend nor want the loss to occur, however they were made aware of a drainage issue which was causing damage. This damage continued and worsened over time. I am satisfied they have not established the policy responds to this damage. This means I accept the insurer is entitled to deny the claim. It is therefore not necessary to consider the policy exclusions. 2.2 Is an award for compensation appropriate? Yes. The insurer was slow to address relevant concerns, did not address the damage properly and generally failed to handle the matter as it should have. The delays and issues encountered greatly distressed the complainants. The insurer must pay them $4,000 compensation for non-financial loss. AFCA can award compensation for non-financial loss Under our Rules, AFCA can award up to $5,400 compensation for non-financial loss. This must relate to poor claims handling or other actions of the insurer which cause an unusual degree of stress, delay, or inconvenience. We expect complainants to be moderately robust, and we will not award compensation for the ordinary degree of inconvenience involved in making a claim. Insurer to pay compensation of $4,000 for non-financial loss The complainants say the management of this claim has taken an enormous health and emotional toll on them. They say the insurer gave no regard for these issues. They also maintain the insu rer’s investigation of the loss was poor and (at best) superficial. I accept the insurer’s handling of the matter was poor. It initially denied the claim c iting apparent building defects but did not obtain an engineer’s opinion. When it later obtained thi s, Determination | Case number: 960775 Page 6 of 7 the engineer cited NCC building regulations and Australian Standards that were not applicable. The insurer also failed to recognise this. These issues considerably delayed the claim and failed to properly address why the insurer did not agree to cover the damage. In denying the claim, the insurer cited numerous exclusions which are not relevant to the loss. These were not considered as I am satisfied the loss was not ‘unforeseen’, however the insurer gave no analysis of this issue either. The matter was poorly handled and I accept this has a significant effect on the complainants. The insurer acknowledged the claim was poorly handled and offered to pay non-financial loss compensation of $3,000. I am satisfied a more substantial compensatory award is required. Based on the submissions made by the parties, I consider it fair that the insurer pays the complainants $4,000 compensation for non-financial loss. 2.3 Why is the outcome fair? The exchanged material shows the loss was caused by poor drainage at the property. This permitted water to pool in the subfloor and cause damage. As the complainants were informed of this issue in 2018 and undertook no apparent rectification of it, the loss was not unforeseen. It is therefore not covered by the policy. Given the in surer’s handling of the matter was poor, it is fair that it pays $4,000 compensation for non-financial loss. Determination | Case number: 960775 Page 7 of 7 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided. While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.