Home / Hollard / Determination 960720

Determination 960720

Cash settlement amount for storm and flood damage to cladding, decline of garage claim, temporary accommodation and delay

FirmHollard
Decided2024-01-25
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant
Amount awarded$367,598
Non-financial loss$2,500
Amount claimed—
SourceAFCA PDF

Summary

The insurer cash settled a storm and flood claim at a low desktop quote and declined the garage for prejudice after demolition. AFCA found for the complainant, ordering higher settlements for cladding and garage, demolition costs with interest, four weeks accommodation and $2,500 non-financial loss.

The insurer's desktop quote did not fairly represent the loss, and under section 54 of the Insurance Contracts Act it did not show prejudice from the garage demolition.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimpay interestpay non financial loss

Related

All Hollard determinations · Find similar determinations

Text of the determination

Determination Case number 960720 Financial firm Hollard Insurance Partners Limited Determination | Case number: 960720 Page 2 of 13 Case number: 960720 25 January 2024 1 Determination overview 1.1 Complaint The complainant holds a home building insurance policy underwritten by the financial firm (insurer). On 30 March 2022 the complainant lodged a claim for storm and flood damage to the residential building and garage. The insurer partially accepted the claim and has offered $64,427.42 for the home’s external cladding and $14,276.90 for the internal repairs. Additionally, the insurer has offered four weeks of temporary accommodation. The insurer declined the claim for damage to the garage. The complainant says the insurer’s offer will not cover cladding repair costs and seeks an additional temporary accommodation amount. The complainant also seeks cover for the garage. The internal repair costs are agreed. 1.2 Issues and key findings Is the cash settlement for external cladding appropriate? No. The insurer’s quotation stated it was not a final quote and further did not include additional items recommended by its own expert. Is the insurer entitled to decline the garage outbuilding? No. The complainant has established the garage was damaged by an insured event and the insurer has not established the complainant caused it prejudice which entitles it to refuse the claim. Is the offer of temporary accommodation adequate? Yes. The insurer’s offer is adequate ba sed on the exchanged information and additional amounts may be permitted if required. Is the complainant entitled to non-financial loss? Yes. The insured is entitled to non-financial loss compensation as a result of substantial delays in the claims handli ng and interference with the complainant’s expectation of enjoyment or peace of mind. Why is the outcome fair? The outcome is fair as it is based on the evidence, policy terms and relevant law. Determination | Case number: 960720 Page 3 of 13 1.3 Determination This determination is in favour of the complainant. Within 21 days from the complainant’s acceptance of this determination the insurer shall pay the following amounts less any excess or settlement amounts already paid for the items listed below:  $167,947.82 for repairs to the external cladding and an additional 15% contingency for unexpected repairs and for the transfer of risk  $193,600 to re-build the garage and an additional 15% contingency to account for the transfer of risk  $6,050 for demolition costs incurred for garage together with interest pursuant to section 57 of the Insurance Contracts Act 1984 from 30 March 2023 to the date of payment.  Four weeks temporary accommodation  $2,500 non-financial loss compensation. Determination | Case number: 960720 Page 4 of 13 2 Reasons for determination 2.1 Is the cash settlement for external cladding appropriate? No. The insurer’s quotation stated it was not a final quote and further did not include additional items recommended by its own expert. The parties agree the insurer is liable for the external cladding The parties agree that the external cladding to the dwelling was damaged by an event covered by the policy of insurance. There is no dispute that the insurer must settle this portion of the claim. The dispute arises as to the amount to be paid under a cash settlement. The policy provides terms for cash settlement The policy provides the following terms and conditions for settlement of a claim: Building, Contents and Portable Contents claims If we pay your claim we will, in consultation with you: • repa ir your damaged property where it is practicable and economical to do so; • replace your lost or damaged property where it is not practicable and/or economical to repair it; or • pay you the value that fairly represents your loss, in the form of cash or a pre- paid store card*, up to the relevant sum insured stated on your current Certificate of Insurance. The amount we will pay will be reduced by any applicable excess and/or outstanding premium. The insurer has elected to cash settle the claim. Accordingly, the insurer is to pay the value that fairly represents the loss in the form of cash up to the relevant sum insured listed on the Certificate of Insurance. Each party has provided quotations for the cladding work The insurer’s quotation for cladding work The insurer has provided a quotation from a builder, CS, in the sum of $64,427.42. The quotation has a notation that indicates it may not be a final quote: This desktop quote is based on the scope of works and photos provided, and final price is subject to an onsite assessment. The material indicates that the quotation was based on the report from the insurer’s engineering expert, SB, who was requested to provide a scope of works. SB confirmed the cladding was fixed over the original cladding which appeared to be asbestos sheeting with timber battens. The cladding was bulging in numerous locations around the perimeter of the building and the timber batten(s) was noted to be warped. SB originally considered the cladding could be re-used. SB noted that if the material underneath is confirmed to be asbestos then it should be removed and replaced. Determination | Case number: 960720 Page 5 of 13 A later report from SB agrees with statements from the complainant that additional inclusions to SB’s original scope of works should be made such as:  ensuring the house remains weathertight and lockable during works  establish site inclusive of site shed, tools, storage shed and amenities block where required  allow to protect all existing surfaces internally and externally to prevent damage as a result of the work  allow for suitable site supervision of trade contractors as well as off-site project and contract management as required  allow for final clean prior to handover  if power is not available, then allow for temporary power boards and/or stands as required in work areas to comply with statutory requirements  supply and install sediment control to protect waste runoff if and where required.  supply and install temporary fencing, hoarding panels and or suitable temporary walls and barricades to facilitate the work  SB acknowledged the cladding was in good condition with minimal warping at the time of inspection, however the cladding may now have permanently taken on the new warped shape. Given this, all permanently deformed cladding should be replaced to match existing  typically, no sarking or insulation batts would be present to buildings of this age and construction and therefore would not be required to return the building back to its pre-loss condition. However, this can be confirmed after sheeting is removed  if ACM sheeting extends past eaves, the removal and setting aside for re-use of eave soffits will be required  safely disconnect and reconnect relevant utilities  spot removal of timber decking for re-use as required  removal and reinstatement of side fencing as required  the builder needs to consider the method and staging of the works to ensure the dwelling remains watertight and lockable  the builder should verify the quantity of each building component in submitting their quotation. The quantities in SB’s report were for guid ance only and the tendering builder should familiarise themselves with the site. The i nsurer’s internal assessor disagreed with the SB scope of works responding to the complainant’s comme nts. The internal assessor went on to say: I strongly disagree with [SB] re-attending to date they have made numerous mistakes in their original SOW, If a proper roof report was completed we would have found the damage internally and to behind the cladding was from water ingress due to the very poor condition of the roof. Even whilst on site there was a build-up of debris. Considering insureds disputes are for the scope I am happy to attend with [CS] and alter the scope as required after the reinspection, [SB] have failed to impress on this job and I don’t feel giving them a re -attendance has any merit. The commentary by the internal assessor suggests there were mistakes in the original scope of works on which the insurer’s building repairs quotation from CS was based. Whilst the assessor stated CS had measured up onsite, the quotation on which the cash settlement is based clearly states it is a desktop quote. A desktop quote is undertaken without a physic al Determination | Case number: 960720 Page 6 of 13 inspection of the item being quoted. SB had physically assessed the damage and suggested additional items should be included in the scope of works and/or quotation for those works. CS has not provided an updated quotation on the cladding which:  confirmed a final price after a physical inspection  i ncluded SB’s additional scope of works items or  confirmed CS would perform the work for the same price if engaged by the complainant. The quotation relied on by the insurer is therefore not a final quote and appears to be missing items required to fairly represent the value of the repair work required. The complainant’s quotation The complainant provided a quotation dated 1 March 2023 from builder CT in the sum of $167,947.82. The quotation does not itemise the cost of each item but gives a trade cost together with b uilder’s margin and GST. In addition, the complainant has provided a quotation from builder SG dated 28 July 2023 in the total sum of $370,821. The quotation from SG however combines the cladding and garage replacement costs. The amount for the cladding repairs is $212,292 with 50% of preliminaries and building margin added. I consider the CT quotation the most economical and reliable of the two quotations and prefer this quote. The CT quotation provides for many of the same works as CS but includes the removal of the cladding, asbestos cladding, eaves, timber battens and contaminated gold insulation batts from external walls. There is further an allowance for asbestos cleaning to the timber frames , air monitoring and engagement of a hygienist. The quote allows for replacement of those materials together with new window frames and architraves. The quotation also allows for sarking to be applied to the external wall system. As noted above, SB agreed that some of the cladding may have warped – however the insurer did not agree and maintains that the cladding could be re-used. The evidence on this point is varied at best and it would appear that the builder, CT, is more aligned with SB’s current position. Given this, I consider the evidence supports replacement of the cladding is required. Similarly, the window frames are unlikely to be able to be re-used given the original assessor report dated 18 April 2022 which confirmed the rainwater had damaged a timber window which was swollen, split and sagging. The insurer has disputed the allowance for insulation batts and sarking due to doubts the walls contained these materials pre-damage. However, there was uncertainty regarding the accuracy of this statement with a notation it could be included if those items were found to be present. There was no comment or submissions addressing the mandatory nature of insulation in external walls or the requirements for sarking to the walls to the home. There are no express inclusions or exclusions relating to repairs or building works which meet current building codes and standards. However, the policy allows a cash settlement which fairly represents the loss. In considering this, the loss is what it would cost the complainant to repair or rebuild the damage building or portion of the building damaged by the claimed event. The market cost of this repair or rebuild to complete those repairs or the rebuild to a workmanlike standard is what fairly represents the loss. Determination | Case number: 960720 Page 7 of 13 The complainant’s CT quotation should be used for a cash settlement For reasons noted above, the complainant’s quotation from CT should be used as a basis for cash settlement as it fairly represents the fair value of repair costs required to the home building. However, to allow for contingencies which may arise during the repairs, the age of the quotation and transfer of risk of completing the repairs to the complainant, an addition uplift of 15% should be added. 2.2 Is the insurer entitled to decline the garage outbuilding? No. The complainant has established the garage was damaged by an insured event and the insurer has not established the complainant caused it prejudice which entitles it to refuse the claim. The complaint must establish the loss was caused by flood or storm There is no dispute that the policy provides cover for damage caused by flood or storm. The complainant has the onus of establishing he suffered a loss from an event covered by the policy. If a claimable loss is established, the insurer then has the onus of establishing the application of any exclusion or condition it relies on to deny or reduce its liability. For both the complainant and the insurer, the onus of proof is the balance of probabilities (that is, it is more likely than not). The complainant has established the garage was damaged by flood or storm The complainant arranged for his own assessment of the garage with a building consultant JL. JL attended the property on 10 June 2024 and determined the garage panels were broken due to the amount of water running down the driveway. JL further recommended the demolition of the garage due to damaged ACM (asbestos) sheeting used in the construction of the walls and eaves. The insurer was critical of the JL report as the complainant was previously employed at JL. The complainant arranged for an assessment t hrough the NSW Government’s resiliency program and had ceased employment by the time the physical inspection and report occurred. There is no evidence the complainant was involved in or knew the author of the JL report which could have created a conflict any more than the insurer does in relying on its own internal assessment reports and opinions. The insurer ’s expert, SB, could not comment on the garage or cause of loss in its original report as the garage had been demolished. However, the insurer generated an internal assessment report after a site inspection on 24 February 2023 (over a year after the original loss) relating to the garage. An inundation level of 30cm was recorded to the garage which the assessor acknowledged can exert pressure on structures potentially causing damage. If the garage had pre-existing weakness, then it may have been more susceptible to the force of the water. The assessor queries if 30cm is an exaggeration given the existing floor shows no signs of water ingress as there are no floor stains and nor do existing cabinets/materials appear impacted. The assessor references ‘wood rot’ and long -term damage in the photographs from JL which are unrelated to the storm/flood event. However, there is no evidence these issues caused the loss. JL is the only expert to have physically inspected the garage within a 5 to 6 month period of the claimed event. More importantly, JL was the only expert to inspect the pre-demolition Determination | Case number: 960720 Page 8 of 13 state of the garage to establish a clear cause of loss and provide repair recommendations. For these reasons, I prefer and accept the evidence of JL. It follows that I accept the garage was damaged by the covered event of flood and storm and that the garage had to be demolished due to ACM sheeting. The insurer has denied the claim on basis of prejudice The insurer considers that the complainant’s actions in demolishing the garage have prejudiced it to the extent of the entire claim. The insurer relies on the f ollowing policy terms to reduce the claim to nil: What you must not do You must not without our agreement: • make any admissions to anyone about any incident covered by this policy; or • settle or attempt to settle any claim that: – you may have against someone else that relates to an incident covered by this policy; or – someone else may have against you and in respect of which this policy requires us to indemnify you; or • authorise any repairs or arrange for the replacement of any item of your building, contents and/or portable contents unless you are taking reasonable steps to prevent any further loss or damage. If you do any of the above, we may reduce the amount we pay you in the event of a claim, potentially to nil. In response, the complainant notes that the insurer did have an opportunity to inspect the property and that he relied on expert opinion the property needed to be demolished. Further, he relies on section 54 of the Insurance Contracts Act 1984 (Act). The insurer has not established the complainant caused it prejudice The insurer has relied on a term of the policy rather than an exclusion. The policy term suggests that if the complainant must not authorise repairs or arrange for the replacement of any item of the building unless taking reasonable steps to prevent further loss or damage. Section 54 of the Act provides that an insurer may not simply refuse to pay a claim because of a post contractual act or omission of an insured or some other party. However, under Section 54(2) if the act could reasonably be regarded as capable of causing or contributing to the loss, the insurer can refuse to pay the claim. Section 54(1) of the Act is remedial in nature. It allows the insurer to reduce its liability for a claim based on the extent to which the insured’s acts or omissions have prejudiced its interests. The objects of the section include striking a fair balance between the interest of an insurer and an insured regarding a contractual term designed to protect the insurer from an increase in risk during the period of cover. The complainant says that on the date of the first assessment by the insurer he informed the assessor the garage was damaged. The assessor did not have time to complete the assessment. It is unknown whether the insurer’s assessor informed the insurer of the need to assess this outbuilding. The complainant contacted the insurer on 20 May 2022 to request the insurer re-attend to assess the damage to the garage. The insurer indicated the complainant should attempt to Determination | Case number: 960720 Page 9 of 13 re-arrange an assessment directly with CS. The complainant says he attempted to contact CS with no success. The insurer says CS does not keep call recordings to authenticate said attempts were made and acknowledges it should have requested CS to assess the garage, rather than requesting the complainant to contact CS. The insurer did not arrange for any other expert to attend the property to assess the garage prior to removal of the asbestos sheeting from the garage on 6 August 2022. The complainant arranged for an assessment of the garage by JL, which is a well-known company which provides reports routinely to insurers on cause of loss and repairs. The insurer further received a copy of JL’s expert report which contained photographs of the damaged garage. The complainant had a garage with exposed asbestos on his property which presented a risk to safety and could have led to additional repair costs if additional deterioration led to ground contamination. The complainant took reasonable steps to prevent the ongoing risk by acting in accordance with JL’s recommendations. The complainant’s actions did not cause or contribute to the loss and based on JL’s report the garage needed to be demolished. I consider that section 54 of the ICA applies to assist the complainant because the insurer has not satisfactorily shown its interests have been prejudiced. The CT quotation should be relied on for cash settlement The following quotations have been received in relation to the garage:  Quotation from CT in the sum of $193,600 provided by the complainant  Quotation from SG in the sum of $370,821 provided by the complainant  Quotation from CS in the sum of $108,768.42 provided by the insurer. I note that the quotations of CT and CS are within $84,831.58 of each other. However, the SG quotation combines the cladding and garage repairs together. If the sole cost of the garage together with the 50% of the preliminaries, provisional sums, GST and margins were added, the cost would be approximately $158,529. However, if all of the preliminaries, provisional sums, GST and margins were added it would $222,833. It is unclear whether a 50% proportion of the preliminaries, provisional sums, GST and margins is a fair representation of the costs applicable to the garage or not. This is particularly as the older quote from CT is more than the amount of $158,529 calculated with a 50% application of certain costs under the SG quotation. I consider there is more certainty in the CT quotation. I note that the CS quotation was only valid for thirty days, and it is not clear if it is still valid or would have increased. A further issue arises as to whether this is an insurance quotation. The insurer has access to industry and bulk rates, and as such is able to obtain quotations from panel builders such as CS at a different rate to what the complainant could access. The insurer has not confirmed whether CS would be willing to perform the work for the quoted price if engaged by the complainant directly. Whether a complainant can action the quotation pro vided by the insurer’s panel builder CS directly outside the claim for the same amount is important in determining a cash settlement value which fairly represents the value of the loss and the cost to repair it. Determination | Case number: 960720 Page 10 of 13 The validity of the quotation from CT is not restricted to a thirty-day period. However, I note the quotation is nearly a year old and that inflation has impacted the building industry. The quotation also records that a variation will be required if ground contamination is found. The quotation from CT allows for additional items to the CS quotation which likely accounts for some of the variation to the pricing. In particular, the garage slab is to be removed and replaced. Further, the builder has allowed for 12 augured piers around the slab. I note there are some comments by SB about the potential to re-use the garage slab but as a building permit is required to replace the structure, certification of the concrete slab by a structural engineer is likely required for re-use. There is no discussion from SB as to whether the garage slab would meet current National Construction Code requirements or the likelihood of an engineer signing off on the slab. This is of particular concern given the soil is reactive clay and currently foundation slabs are engineered to adapt to the foundation soil and the load applied to those foundations. Additional items included in CT’s quotation are items such as re -flooring to the slab (tiles and vinyl flooring) and cabinetry. The insurer has criticised the inclusion of some of these items with the suggestion the cabinetry was not damaged. However, the flooring and cabinetry were exposed to the elements over a long period of time due to delays in resolving this claim. I would accept that if the flooring or any cabinetry had been inundated to a depth of 30cms that it was damaged in the original claimed event. Further, that those items would also have been damaged from lack of timely rectification and exposure to the elements. I am not satisfied that the CS quotation contains all relevant items for the repair of the garage and/or is an actionable market value quote for the complainant. Given this, I prefer the CT invoice as a basis for settlement with 15% uplift to represent all contingencies. Additional Amount for demolition The policy provides cover for demolition and debris removal costs under building cover. The complainant has expended costs for demolition of the garage and removal of asbestos debris. As I have found the garage is an item to be settled by the insurer and that demolition was a recommendation of JL, the insurer should also reimburse the complainant the cost of the demolition invoice in the sum of $6,050. I note the insurer has raised concerns with the cost of $6,050. The invoice was provided as the cost of demolition, which includes the structural demolition as well as the cost of removing asbestos safely from the property. Given the structure contained laundry and toilet fixtures, the structure likely required plumbing and electrical works too prior to demolition. The insurer has not provided any alternative market rate quotations to demonstrate the cost claimed is excessive. Given this, I accept the quotation of $6,050 is fair in the circumstances. If this amount has not been paid to date, then interest pursuant to section 57 of the ICA will apply from 30 March 2023 being the date of the IDR letter until date of payment of this amount. 2.3 Is the offer of temporary accommodation adequate? Yes. The insurer’s offer is adequate based on the exchanged information and additional amounts may be permitted if required. The evidence does not support a higher temporary accommodation amount The quotations provided do not indicate the timeframes for the works and/or the timeframes during which the main dwelling of the home will be unliveable. Determination | Case number: 960720 Page 11 of 13 I acknowledge the complainant says the repairs require 12 weeks however there no supporting documentation or information to demonstrate the time required for the repairs. Temporary accommodation will be required I accept that the removal of asbestos, need to clean the timber frames, filter the air and the general exposure of the internal aspect of the home during repairs will require some temporary accommodation. This is particularly because there is an infant and an adult with respiratory issues who reside at the home. The insurer’s offer is satisfactory and subject to variation In the absence of any contrary evidence, I find the following offer from the insurer is appropriate:  an initial four weeks  to review additional temporary accommodation during the repairs and extension as appropriate. The insurer is able to allow additional amounts for temporary accommodation in accordance with policy terms if the complainant produces evidence that the home is not able to be lived in during repairs or a portion of those repairs required as a result of this claim. If a dispute later arises for any additional temporary accommodation amount which cannot be agreed to then the complainant may bring the dispute to AFCA. As such, I am satisfied the insurer’s resolution is appropriate and fair and reasonable. 2.4 Is the complainant entitled to non-financial loss? Yes. The insured is entitled to non-financial loss compensation as a result of substantial delays in the claims handling and interference with the complainant ’ s expectation of enjoyment or peace of mind. AFCA can award compensation for poor claim handling Under paragraph D.3.3 of the AFCA Rules, we may award compensation for non-financial loss (capped at $5,400), where the insurer’s actions have caused an unusual amount of:  physical inconvenience  time taken to resolve the claim  interference with the complainant’s expectation of enjoyment or peace of mind. Insurer’s claim handling caused stress and inconvenience The insurer failed to assess the complainant’s garage, requiring the compla inant to obtain his own assessment report. The insurer also failed to assess the cladding and its scope of works accurately and as a result a significant delay occurred in the resolution of this claim. The complainant says the insurer’s conduct has had a significant impact on himself and his young family. The complainant indicated that the delay meant the property was still in a damaged state following the birth of his child, which created stress and meant he could not have others at his home. I accept that this interfered with his expectation of enjoyment of the property and peace of mind. Determination | Case number: 960720 Page 12 of 13 The insurer has previously offered $1,000 for delays to the claim in its Internal Dispute Resolution (IDR) response dated 30 March 2023. It is not clear if this offer is still open. Having reviewed the available information, I am satisfied $2,500 compensation is warranted on the basis of delays, time taken to resolve the claim and interference with the complainant ’ s peace of mind and expectation of enjoyment of the property. 2.5 Why is the outcome fair? The outcome is fair as it is based on the evidence, policy terms and relevant law. Determination | Case number: 960720 Page 13 of 13 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided. While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.