Home / IAG / Determination 960519
Determination 960519
Cash settlement amount for water damage claim, loss of rent and non-financial loss
Summary
The complainant's landlord insurance water damage claim was offered a cash settlement of about $39,111, which she said was inadequate. AFCA required a cash settlement based on builder UB's quote plus a 20% uplift and $2,000 compensation, but rejected loss of rent.
A cash settlement must be based on a reasonable, actionable quote for all claim-related repairs plus a contingency uplift, and the loss of rent policy terms were not met, while the insurer's delay warranted compensation.
Issues
- Claim amount dispute primary · upheld“The insurer's offer is based on a quote that did not allow for all claim related repairs and was not actionable by a retail customer.”
- Delay secondary · upheld“The insurer has unreasonably delayed progression of the claim. This has caused the complainant stress and inconvenience.”
- Product terms interpretation secondary · not upheld“The policy requirements for payment of LOR have not been met; no rent was paid and home was not unable to be lived in.”
Subjects and remedies
home or building damagepay claimpay non financial loss
Related
Text of the determination
Determination
Case number 960519
Financial firm Insurance Australia Limited
Determination | Case number: 960519 Page 2 of 7
Case number: 960519 26 October 2023
1 Determination overview
1.1 Complaint
The complainant holds landlord insurance with the financial firm (insurer), covering her
investment property against accidental damage. On 29 March 2021, she lodged a claim for
water damage to various rooms.
The insurer partially accepted the claim but said some of the damage was due to deteriorated
shower base waterproofing. The policy excludes gradual wear, tear and deterioration. In late
December 2021, the insurer offered to cash settle the claim for $20,877.81. By December
2022, the offer had increased to $32,913.25 including a 10% contingencies uplift.
The complainant sa ys the insurer’s offer is manifestly inadequate. She wants the insurer to
cash settle the claim based on a quote for more than $75,000 from builder UB, and to include
a 50% uplift. She also seeks loss of rent (LOR) and compensation for stress experienced.
1.2 Issues and key findings
Is the insurer required to pay a higher cash settlement?
Yes. The insurer’s offer is based on a quote that did not allow for all claim related repairs and
was not actionable by a retail customer such as the complainant. The insurer is to cash settle
the claim based on UB’s latest quote , which is actionable, plus a 20% uplift.
Is the complainant entitled to LOR?
No. NC, the complainant’s son, was living i n the home rent free when the accidental damage
occurred and continues to do so. The policy terms for payment of LOR have not been met.
Is non-financial loss compensation payable?
Yes. The insurer has unreasonably delayed progression of the claim. This has caused the
complainant stress and inconvenience. The insurer is to pay her $2,000 in compensation.
Why is the outcome fair?
It is fair that the cash settlement is based on UB’s quote as it is actionable by a retail
customer and more likely reflects the claim related repairs required. It would not be fair for the
insurer to pay LOR when the policy terms have not been met, but the insurer’s delays mean it
is fair that it compensates the complainant for stress and inconvenience experienced.
1.3 Determination
This determination is in favour of the complainant. Within 14 days of receiving written notice
the complainant accepts this determination, the insurer is to pay her:
$91,082.05 for repairs ($75,901.71 as quoted by UB on 22 June 2023, plus 20%), and
$2,000 in non-financial loss compensation.
Determination | Case number: 960519 Page 3 of 7
2 Reasons for determination
The complainant is represented by NC. In this determination, the complainant and NC are
referred to as ‘the complainant’, unless context requires otherwise.
2.1 Is the insurer required to pay a higher cash settlement?
Yes. The insurer’s offer is based on a quote that did not allow for all claim related repairs and
was not actionable by a retail customer such as the complainant. The insurer is to cash settle
the c laim based on UB’s latest quote, which is actionable, plus a 20% uplift.
Insurer has made cash settlement offers
On 5 November 2021, the insurer’s builder JL provided an assessment report to the insurer.
JL stated that the first floor bathroom’s shower ba se waterproofing membrane had failed. As
a result, water had soaked through and damaged the ceilings and walls of the ground floor
bathroom (bathroom two) and laundry.
JL’s report included a SOW for claim related repairs (excluding the shower base) and a quote
totalling $21,477.81. In late December 2021, the insurer offered the complainant a
$20,877.81 cash settlement ($21,477.81 less the $600 excess).
After the complainant raised concerns about JL’s SOW, the insu rer appointed building
consultant QT. QT inspected the home on 2 and 28 February 2022, and provided a SOW
dated 4 March 2022. The SOW set out work in addition to that JL included in its SOW.
QT also noted that additional work could be required, but this could not be ascertained until
the laundry wall linings were removed.
On 8 December 2022, JL provided a quote based on QT’s SOW. It estimated the work would
cost $30,466.59. On 20 December 2022, the insurer offered the complainant $32,913.25,
being JL’s updated quote amount plus a 10% contingencies uplift, less the excess.
The complainant remained dissatisfied. On 2 June 2023, QT provided a report in which it
agreed with the complainant that the following items should be added to the SOW:
replace the bath
waterproofing of the bathroom outside the shower area
p ainting of bathroom two’s walls
remove and replace the cornice to the ceiling junction of the laundry and bathroom two
remove and replace architraves to laundry side of timber door.
On the same day, the insurer increased its cash settlement offer to $34,416.57. The insurer
did not make any specific allowance for the additional work QT accepted was required.
Rather, it increased the contingencies allowance from 10% to 15%.
On 13 June 2023, JL provided a quote allowing for the further work QT said should be
included in its SOW. It quoted $34,945.41. The following day, the insurer offered $39,110.69
as a cash settlement, based on JL’s new quote plus 15% less the excess.
QT provided another report to the insurer on 24 July 2023. After considering the
complainant’s further submissions and UB’s quote dated 22 June 2023. QT agreed that the
following additional items should be added to the SOW:
remove and replace bathroom sub-floor
remove and replace florescent light and vent in bathroom two
Determination | Case number: 960519 Page 4 of 7
remove and replace laundry waterproofing membrane
remove and replace bathroom two waterproofing membrane
remove and replace laundry floor tiles
remove and replace bathroom two wall and floor tiles
remove and replace rumpus room floor tiles
remove and replace wall lining to shower/laundry wall
remove and replace bathroom toilet
remove and replace timber trims associated with doors
remove, store and reinstall laundry cabinets.
QT also said the amounts UB had quoted for the abovementioned works were fair and
reasonable.
The only damage QT did not agree should be included in its SOW was:
marks on stair landing wall adjacent to laundry – the complainant says the insurer’s
restorer damaged the wall when removing mould before QT attended the home. QT says
wear and tear as located in a high traffic area
white chalky residue on hallway floorboards outside bathroom – the complainant says this
is efflorescent staining and requires sanding and sealing to rectify. As it forms part of an
open plan area, the entire area will need to b e sanded and sealed to return it to ‘as new’
condition (as the policy permits). QT says there is no evidence of water damage to the
floorboards, they do not require sanding and sealing, and the residue can be cleaned off.
The insurer has not provided any c omments on QT’s latest report, submitted a q uote from JL
allowing for the further items QT agreed should be added to its SOW, or increased the
$39,110.69 cash settlement offer it made on 14 June 2023.
Complainan t says the insurer’s latest offer is insufficient
The complainant obtained SOWs/quotes from UB. The latest of these is dated 22 June 2023,
with the estimated cost of repairs being $75,901.71.
The complainant says the insurer’s $39,110.69 cash settlement is insufficient because:
UB’s quote i s more than double that of JL dated 13 June 2023, on which the insurer based
its offer
UB is prepared to undertake the work, unlike JL
After JL provided its quote, QT added a substantial number of additional items to its SOW
QT accepts that the amounts UB quoted for those items were fair and reasonable
QT’s SOW still does not encompass the required repairs
The reliability of QT’s SOW remains questionable given that it has already twice conceded
substantial further works should be included.
The complainant wants the insurer to pay a cash settlement based on UB’s quote dated 22
June 2023. She says that as there is a very real prospect that concealed damage will become
apparent once repairs begin, a 50% contingencies uplift should apply. This means the
amount she seeks is $113,852.57.
Insurer is to pay a higher cash settlement
A cash settlement must be based on a reasonable quote for claim related repairs, actionable
by a retail customer. An uplift is then to be applied to the quoted amount to allow for
contingencies and the loss of the lifetime guarantee that applies to insurer approved repairs.
Determination | Case number: 960519 Page 5 of 7
In making its $39,110.69 cash settlement offer, the insurer relied on JL’s quote dated 13 June
2023. JL’s quote was based on QT’s SOW dated 2 June 2023. However, in its report dated
24 July 2023, QT accepted that numerous additional substantial repairs should be added to
its SOW.
This means that the insurer’s cash settlement offer is not based on a reasonable quote for (all
the) claim related repairs. Further, as JL is not prepared to attend to the work and has
excluded items a retail customer would be required to pay (such as removal of contents to
facilitate the work), its quote is not actionable.
I am satisfied that it is reasonable to require the insurer to cash settle the claim based on
UB’s SOW/quote dated 13 June 2023. UB’s SOW allows for the remainin g disputed items. I
consider it reasonable to accept as being claim related. I note UB inspected the home more
recently than QT and I find the complainant’s submission s on those items persuasive.
I accept that UB’s quote is actionable.
From comments made by QT and UB, it appears that there is a reasonable prospect that
further damage requiring repairs will be identified once works commence. I am satisfied that a
15% contingencies uplift is therefore insufficient. On the other hand, 50% is excessive. I
consider 20% to represent a reasonable uplift.
2.2 Is the complainant entitled to LOR?
No. NC was living in the home rent free when the accidental damage occurred and continues
to do so. The policy terms for payment of LOR have not been met.
Policy covers LOR in specified circumstances
The complainant’s policy includes as an additional benefit LOR cover. LOR is payable when:
the home is unable to be lived in after accidental damage or loss has occurred, or
the home is unable to be leased/rented when the property is used for short term rental
(less than three months), after accidental damage or loss has occurred.
‘Unable to be lived in’ is defined in the policy to mean when the home is ‘not fit to live in due
to the buildings not being connected to electricity or gas, or hot and cold running water, or [is
not] safe to live in’.
The insurer pays an amount equal to the ‘rent’ up to the time the home is repaired.
‘Rent’ is defined in the policy to mean ‘the amount of money paid, or payable, by the tenant to
rent your property’.
Complainant seeks LOR
NC moved into the home in March 2021, shortly before the claimed damage was discovered.
On 24 April 2021, his partner (now wife) moved in along with their newborn children.
NC acknowledges that there is no formal tenancy agreement in place between him and the
complainant. Further, he has never paid rent, but instead covers utility bills.
He accepts these matters present challenges in terms of meeting the policy requirements for
LOR. Nevertheless, he requests consideration be given to paying the complainant LOR at
$1,000/week from the date the claim was lodged.
Determination | Case number: 960519 Page 6 of 7
Complainant is not entitled to LOR
The policy requirements for payment of LOR have not been met because:
the complainant and then he and his family have continued to reside at the home since the
accidental damage occurred, and the definition of ‘unable to be lived in’ has not been met
the home was not being used as a short term rental when the accidental damage occurred
as the complainant and then he and his family have at all times been living at the home
without paying rent, so there has been no LOR.
As the policy requirements have not been met, it would be unreasonable to expect the insurer
to pay LOR.
2.3 Is non-financial loss compensation payable?
Yes. The insurer has unreasonably delayed progression of the claim. This has caused the
complainant stress and inconvenience. The insurer is to pay her $2,000 in compensation.
AFCA can award compensation for poor claim handling
Under paragraph D.3 of the AFCA Rules, we may award compensation for non-financial loss
(capped at $5,400 per claim) where the insurer’s actions have caused a complainant an
unusual amount of:
physical inconvenience
time taken to resolve the situation
interference with the complainant’s expectation of enjoyment or peace of mind.
Insurer has caused stress and inconvenience
NC says the insurer has handled the claim poorly and has caused unacceptable delays. He
submits this has resulted in significant levels of stress and inconvenience. He refers to the
difficulties he and his family have experienced while living in the damaged home.
The insurer accepts that it has unreasonably delayed the claim’s progression. It has offered
the complainant $1,500 in non-financial loss compensation.
It is readily apparent that this claim has taken too long. The insurer is responsible for most
(but not all) of the delay. I accept that the delay has presented challenges for NC and his
family. However, NC is not the complainant and I am unable to award him compensation.
No specific commentary has been provided on the impact the insurer’s delay has had on the
complainant. However, I am satisfied that delay would have caused her stress and
inconvenience. I consider it reasonable that the insurer pays her $2,000 as compensation.
2.4 Why is the outcome fair?
It is fair that the cash settlement is based on UB’s quote as it is actionable by a retail
customer and more likely reflects the claim related repairs required. It would not be fair for the
insurer to pay LOR when the policy terms have not been met, but the insurer’s delays mean it
is fair that it compensates the complainant for stress and inconvenience experienced.
Determination | Case number: 960519 Page 7 of 7
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. I have reviewed and considered
all the information the parties have provided.
While the parties have raised several issues in their submissions, I have restricted this
determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.