Defective storm-damage roof repairs and resulting mould; rectification and compensation
Summary
Complainants' roof was replaced by the insurer's contractor after hail damage, but repairs were defective and mould developed. AFCA found for the complainants, requiring a scope of works, cash settlement of the quote plus 20%, temporary accommodation and $2,500 compensation.
The lifetime guarantee on repairs applied, expert evidence showed faulty workmanship causing mould and ceiling damage, and the insurer did not establish any exclusion.
Issues
- Repairs or contractors primary · upheld“The complainants have established workmanship issues with the roof repairs completed by the insurer and this has resulted in mould infestation.”
- Claim denial secondary · upheld“Insurer declined to rectify ceiling damage and mould; AFCA not persuaded the rust and mould exclusion applies.”
- Poor claim handling secondary · upheld“Delays and errors made by the insurer caused the complainants an unusual degree of stress and inconvenience.”
- Delay secondary · upheld“Alerted to mould in October 2022, insurer did not assess the mould damage until 5 April 2023.”
- Product terms interpretation secondary · upheld“Unfair to apply the 12-month temporary accommodation limit where faulty repairs make home unfit to live in.”
Subjects and remedies
health or medicalhome or building damagenatural disasterpay claimpay non financial lossrepair or rectify
Related
Text of the determination
Determination
Case number 960215
Financial firm RACQ Insurance Limited
Determination | Case number: 960215 Page 1 of 13
Case number: 960215 7 May 2024
1 Determination overview
1.1 Complaint
The complainants hold a home and contents insurance policy with the financial firm (insurer).
The roof of their home sustained hail damage caused by a storm in October 2020. The
insurer accepted the claim and arranged repairs including installation of a new roof.
The complainants raised concerns about the quality of the roof replacement repairs and
mould subsequently appearing on the roof sheeting and in the roof cavity.
To resolve the dispute, the complainants want the insurer to pay the cost of replacing the roof
and rectifying issues arising from the previous roof repairs including mould remediation.
1.2 Issues and key findings
Is the insurer required to pay for rectification works?
Yes. The complainants have established workmanship issues with the roof repairs completed
by the insurer and this has resulted in mould infestation. The insurer is to pay the cost of
replacing the roof, repairing the plaster ceiling and completing mould remediation.
How is the insurer to settle the dispute?
The insurer is to obtain a scope of works and actionable quote(s) for the roof replacement,
plaster repairs and mould remediation, then cash settle the complainants with a 20% uplift.
Is the complainant entitled to compensation?
Yes. The insurer’s claims handling caused the complainants an unusual degree of physical
inconvenience and stress. The insurer must pay non-financial loss compensation of $2,500.
Why is the outcome fair?
The outcome is fair because the insurer has not met its obligations under the policy. The roof
repairs were defective and have caused further damage to the property. It is fair for the
insurer to cash settle the cost to rectify these issues and pay $2,500 compensation.
1.3 Determination
This determination is in favour of the complainants.
Within 21 days of acceptance of this determination, the insurer is to:
appoint a building expert and hygienist to prepare a scope of works which includes:
> replacing the roof and anticon blanket on the house
> replacing the roof on the patio with an appropriate material
> remediating the mould damage in the ceiling cavity
> repairing the internal plasterboard ceiling and water damage around chimney
Determination | Case number: 960215 Page 2 of 13
pay the complainant $2,500 compensation for non-financial loss
Within 21 days of receiving the scope of works, the insurer is to:
obtain an actionable quote (or quotes) to complete the works with an estimated timeframe
pay the complainant the amount quoted plus 20% for contingencies
settle temporary accommodation in accordance with the terms of the policy
Determination | Case number: 960215 Page 3 of 13
2 Reasons for determination
2.1 Is the insurer required to pay for rectification works?
Yes. The complainants have established workmanship issues with the roof repairs completed
by the insurer and this has resulted in mould infestation. The insurer is to pay the cost of
replacing the roof, repairing the plaster ceiling and completing mould remediation.
Complainant bears the onus of establishing a claimable loss
It is accepted insurance law that an insured has the initial onus to prove on the balance of
probabilities (that is, more likely than not) that the loss or damage claimed falls within the
terms of the policy. If a claimable loss is established, the insurer must accept the claim,
unless it can establish the application of a relevant exclusion.
There is no dispute the complainant was provided with the Product Disclosure Statement and
Certificate of Insurance. The policy covers several insured events including storm (page 26).
There is no dispute the complainants made a valid claim for storm damage to the property in
October 2020. The insurer accepted the claim and arranged for JL to undertake repairs. The
complainant says these repairs were defective and this has caused further damage.
Policy provides a lifetime guarantee on repairs
Th e complainants’ policy includes a lifetime guarantee on repairs. Page 39 of the PDS says:
Lifetime guarantee on repairs
We guarantee the quality of repairs we authorised for your home or contents when you
made a claim with us if they were completed by a repairer authorised by us. This means
we’ll pay the cost to fix any faulty workmanship while you own your home or contents.
Yes – While you or your family own your home or contents, we pay the cost to fix any
faulty workmanship resulting from repairs authorised by us.
No – The repairs to your home or contents fail because of:
Wear, tear and gradual deterioration
Movement of your home
…
No – The general exclusions shown on pages 61-63
This is an additional benefit provided by the policy. To receive this benefit, the complainants
must show that the repairs authorised by the insurer were faulty.
The complainants say the roof screws were over tightened, there are missing rivets and the
chimney flue is incorrectly installed. They say the roof and patio leaks when it rains and this
did not happen prior to the storm. Further, they say the ceiling has been affected and there is
water damage and mould inside the ceiling cavity and on the exterior roof sheeting.
The insurer acknowledges there were some quality issues with previous repairs but says that
it arranged for JL to complete the necessary rectification works. The insurer says the popped
screws to the ceilings and the mildew build-up on the roof are not event-related items or items
for rectification. It says further that the rust and mildew on the roof can be cleaned.
Determination | Case number: 960215 Page 4 of 13
The complainants do not agree the insurer has rectified all of the damage arising from the
previous roof repairs. They want the insurer to pay the cost of replacing the roof and anticon
blanket, repairing the internal plaster and completing mould remediation.
Insurer’s expert evidence
The insurer engaged the services of a builder (BR) and a building consultant (CD) to attend to
the property in mid-2022 and report on any works requiring rectification.
BR reported that overall the roof has been completed to a high standard considering the pitch
and capping works. However, minor defects were present which required attention including
issues with the screws and spacings, plus water ingress and scratches affecting the patio. BR
also reported wear and tear issues with the ceiling and cornices unrelated to the claim.
CD inspected the property and reported on the alleged defects. CD reported that some items
had been fixed or required no works. However, CD identified multiple outstanding issues
including rusted roof sheets, mould on the roof, poor installation of flashings and cappings
and an incorrect fireplace flue. CD also identified damage and debris caused by the insurer’s
contractors and noted minor internal cracking, which may have been contributed to by the
roof replacement although he considered it more likely related to footing movement.
BR reattended the property and prepared a further report in January 2023. This report
concludes that that the big items have been addressed but minor defects are still present. BR
opined that mildew build up on roof and other areas is related to atmospheric conditions.
In April 2023, the insurer appointed FR to report on mould concerns. FR inspected the roof
cavity and reported that the roof/roof space has several issues. Visual mould can be seen on
the wood trusses and the backing of insultation and daylight is coming through in some areas.
Approximately 25% of the roof space is affected by mould.
In May 2023, the insurer appointed another building consultant (RB) and a mould expert (RI)
to inspect the property and report on the complainant’s concerns.
RB reported that internal cracking was consistent with wear and tear and building movement,
but it is possible these issues could have been exaggerated by the roof replacement. There
was no sign of water ingress in the accessible roof cavities and the fungal growth to the roof
sheets is concentrated around the solar vents and ridge flashings, which is common due to
warm/moist air escaping the roof cavity. RB identified several issues with the patio including
impact damage to the gable sheeting and water ingress due to a defective box gutter.
RI identified water damage and mould inside the ceiling cavity and on the exterior of the roof,
including water damaged sections of anticon blanket and suspected hidden mould growth
between the sarking and anticon blanket. RI reported that the damages in the ceiling cavity
were consistent with a wetting event of unknown origins. RI recommended liaising with a
competent roofing contractor to rectify any excess moisture in the roof structure.
Complainants ’ expert evidence
The complainants engaged their own roofing expert, CR. CR inspected the property in July
2023 and prepared a report which identifies numerous issues (summarised in 3.2 below).
Significantly, CR reported that the anticon blanket has mould on it which is a sign it was damp
before installation and there is visible mould on the roof sheets which amounts to a defect if it
appeared within 12 months of installation. There are also defects with the screws, fixings and
spacings of the roof and the eaves overhang exceeds manufacturers specifications.
Determination | Case number: 960215 Page 5 of 13
CR concluded that the roof and anticon need to be replaced to eliminate the mould issue and
the roof also needs to be replaced as it does not meet the manufacturer’s specifications.
CR also identified problems with the patio roof, overhang and flashings which are allowing
water ingress. CR recommended replacing the custom orb roof and Trimdek sheets.
Complainants’ submissions
The complainants and the insurer have made various submissions to AFCA. While this
determination does not refer to them all, I have taken each submission into account.
The complainants relevantly say:
The mould in the roof cavity occurred because the anticon blanket was installed wet. They
saw the original roofer attempt to dry out the anticon blanket by unrolling it in the carport.
The roof screws have been fastened too tight to the battens, which has caused the rubber
washers to fail creating a potential source of water ingress.
The property did not leak before the roof replacement by JL.
Defects with the roof are causing water ingress into the roof cavity and this has caused the
plaster ceiling to pop and fail. The chimney is also leaking and rusty.
There has been excessive use of silicon to rectify construction errors and faulty installation
around capping areas, which is unsightly and does not constitute quality fit and finish.
They were aware the patio roof has only a 1 degree pitch, but expected that an appropriate
roofing material would be used. The Trimdek installed is not suitable.
The CD report contains conflicting evidence regarding the cause of the internal cracking.
CD acknowledge the roof replacement may have caused internal cracking, then deny this
saying it is more likely the minor damage is from footing movement. However, CD has not
identified any issues with the footings and the damage is to the ceiling not the walls.
The faulty repairs have considerably impacted the value of the property.
Complainant has established roof repairs require rectification
Having considered the available information, I am satisfied on the balance of probabilities that
the roof repairs completed by JL were faulty and require rectification. This is because:
BR and CR both state that roof screws have been overtightened and fixing spacings
exceed maximum of 40mm.
CD and CR confirmed mould on roof sheets and incorrectly sized fireplace flue
CD reported rust stains caused by swarf (fine pieces of metal debris) left on the roof
BR identified a foot traffic dent to the gabled roof on the patio area and that the patio
aprons required a cover flashing. RB confirmed impact damage this this area.
CD stated poor installation of flashings and cappings and that materials from roof repairs
were in the gutters and over the lawns.
FR identified several areas allowing large amounts of daylight coming through the roof.
RI reported that water damage to the sarking may be consistent with it being installed wet.
CR state the anticon blanket has mould on it which is a sign it was damp before installation
CR identified repairs not meeting required standard and/or manufacturers specifications.
The insurer has sent multiple experts to assess the alleged defects, but very little information
has been provided regarding the rectification works it says have been completed.
The insurer says it arranged for JL to attend the property and rectify all issues identified in the
BR report. However, the second BR report states that there are still minor defects present.
T he insurer’s response to AFCA also indicates that there are outstanding rectification works
including cleaning the entire roof to remove rust stains, removing building debris from the
Determination | Case number: 960215 Page 6 of 13
gutters and possibly installing a new security camera. These works do not appear to have
been completed.
The insurer also does not appear to have completed any works to address the mould issue
despite the evidence from its own experts (FR and RI) confirming the presence of mould and
other serious issues with the roof/roof space. This is confirmed by CR.
All experts found defects with the roof, mould in the roof cavity and damage to the patio. CR
has provided the most recent expert report, having inspected the property in mid-2023. CR
identified many of the same defects as the other experts, but CR recommended the roof and
anticon blanket be replaced to resolve these issues. CR also identified defects with the patio
roof and RB reported the box gutter is undersized. On balance, I accept that rectification
works are required to both the roof and the patio.
Overall, I am satisfied that the insurer has not satisfactorily repaired the damage arising from
the original storm event. It follows that the insurer is liable to rectify the defective repairs and
any resultant damage in accordance with the policy terms and common law.
Insurer has not established policy exclusions apply
The insurer has declined to rectify the ceiling damage and mould/mildew on the roof sheets
on the basis that these items were not caused by the storm or defective repairs. The insurer
also relies on the following policy exclusions:
Loss not linked to event:
Loss to your home or contents which can’t be linked to an identifiable event
…
Rust and mould
Rust, corrosion, rot, mould or gradual deterioration caused by light, air, the climate
(which includes wind, rain, or sand) or the passage of time.
Internal plaster damage
The expert material confirms the plasterboard ceiling has separated from the truss and there
are cracked cornices throughout the home. There are also minor cracks in the walls.
BR reported the ceiling damage is due to wear and tear and there is evidence of pre-existing
repairs in the ensuite. CD and RB reported the internal cracking may have been caused by
the roof replacement, but it was more likely caused by footing related building movement.
The complainants have not provided any expert evidence on the plaster damage but say they
have owned the property for 16 years and there were no previous issues with the ceiling.
They acknowledge completing minor repair in the ensuite but deny any other ‘patching’ and
attribute the ceiling dropping to moisture in the roof cavity.
Based on the available information, I am not satisfied the complainants have established the
wall cracks arose from an insured event or defective repairs. I acknowledge that footing
movement can cause internal cracking. However, the insurer’s experts have not explained the
cause of the ceiling dropping. Given the timing and nature of the damage, I consider it more
likely that the ceiling damage occurred due to the roof replacement by JL.
In addition, multiple experts confirm the presence of mould in the roof space and on the
anticon blanket due to a wetting event or damp installation. No other explanation has been
provided for this damage and I am satisfied on the balance of probabilities that the mould in
Determination | Case number: 960215 Page 7 of 13
the roof cavity was attributable to faulty workmanship by JL. The presence of mould and
moisture in the roof cavity has also likely impacted the plaster ceiling.
I consider it fair in the circumstances for the insurer to repair the plaster ceiling.
External roof damage
The insurer accepts the rust stains on the roof need rectification, but says the mould and
mildew was caused atmospheric conditions and warm/moist air escaping the roof cavity. I
acknowledge these factors may have contributed to fungal growth on the roof. However, it is
reasonable to expect that a newly installed roof will not become mouldy in less than 12
months. I accept CR’s evidence that this contravenes QBCC Standards.
I am not persuaded the insurer has established that the rust and mould exclusion applies.
AFCA’s usual approach is that exclusions of this nature do not apply where the proximate
cause of the damage was an insured event. It would also be unfair for the insurer to rely on
this exclusion where the damage occurred due to faulty repairs by its contractors. The insurer
appears to accept this because it has agreed to cover the rust damage.
Replacing the roof sheets will resolve both issues and avoid the need for any cleaning.
2.2 How is the insurer to settle the dispute?
The insurer is to obtain a scope of works and actionable quote(s) for the roof replacement,
plaster repairs and mould remediation, then cash settle the complainants with a 20% uplift.
Insurer to pay for rectification and remediation works
The complainants want the insurer to cash settle the cost of rectification works based on CR’s
report. They also want the insurer to pay for mould remediation and plaster repairs, including
replacing the ceiling in the master bedroom and carport.
As outlined above, I am satisfied there are defects with the roof which have likely led to mould
in the roof cavity and damage to the plaster ceiling. I accept the findings of CR that the roof
and anticon blanket need to be replaced and the patio requires rectification.
Given the insurer has already attempted to rectify the roof defects and failed to complete all
items adequately, I consider it fair for the insurer to cash settle the cost of completing the
works recommended by CR and repairing the plaster ceiling. An independent building expert
should be engaged to prepare a scope of works to complete these items and advise on the
method for repairing the plaster ceiling (including whether any areas require replacement).
I am also satisfied the insurer is responsible for remediating the mould issue. A hygienist
should be engaged to report on the extent of the mould issue and prepare a scope of works
for remediation of the building (and contents if required).
Any cash settlement must be sufficient to enable to complainants to complete the necessary
works. The insurer is to obtain an actionable quote (or quotes) and pay the amount quoted
plus an uplift of 20% to account for contingencies, loss of the guarantee and transfer of risk.
Insurer to pay reasonable temporary accommodation costs
The policy covers temporary accommodation. Page 44 provides as follows.
Temporary accommodation
Determination | Case number: 960215 Page 8 of 13
If we agree to pay your claim for an insured event and you need to move out of your
home because the event makes your home unfit to live in, then we pay or reimburse
you for) your
Reasonable short term accommodation costs for up to 14 days from when the
insured event happened
Ongoing accommodation costs while your home is being rebuilt or repaired for
up to 12 months from when the insured event happened until your home is fit to
live in.
The nature of the rectification and remediation works suggest temporary accommodation may
be required. Although not explicitly stated in the policy, I consider it fair for the insurer to pay
for temporary accommodation where the home is unfit to live in due to faulty repairs following
an insured event, including while rectification works are performed. It would be unfair to apply
the 12-month limit in these circumstances.
The complainants’ entitlement to temporary accommodation costs will need to be calculated
once the time frames to repair the home are known.
2.3 Is the complainant entitled to compensation?
Yes. The insurer’s claims handling caused the complainants an unusual degree of physi cal
inconvenience and stress. The insurer must pay non-financial loss compensation of $2,500.
AFCA can award compensation for non-financial loss
Under AFCA’s rul es, we may award compensation for non-financial loss where a complainant
has suffered an unusual degree of physical inconvenience, time taken to resolve the situation
or interference with their expectation of enjoyment or peace of mind.
However, AFCA adopts a conservative approach and expects complainants to be moderately
robust, bear the normal degree of inconvenience experienced when a problem occurs, and
take reasonable steps to minimise the inconvenience suffered.
Insurer is to pay compensation for non-financial loss
The complainants first contacted the insurer with concerns regarding the faulty repairs and
resultant damage on 8 March 2022. In a later call to the insurer on 31 March 2022, the male
complainant informed the insurer that he had suffered a heart attack.
The insurer arranged for several experts to investigate the complainants’ concerns. It is not in
dispute that the roof repairs by JL had defects that required rectification, but the insurer failed
to complete all necessary rectification works.
The complainant alerted the insurer to issues with mould in October 2022 and the insurer did
not assess the mould damage until 5 April 2023. I consider this unsatisfactory given the
known health effects of mould and its propensity to spread. Further, despite the insurer’s own
experts identifying mould at the property, the insurer has done nothing to remediate it.
Overall, I accept there were delays and errors made by the insurer that caused the
complainants an usual degree of stress and inconvenience. I consider it fair for the insurer to
pay the complainant $2,500 compensation for non-financial loss.
Determination | Case number: 960215 Page 9 of 13
2.4 Why is the outcome fair?
The outcome is fair because the insurer has not met its obligations under the policy. The roof
repairs were defective and have caused further damage to the property. It is fair for the
insurer to cash settle the cost to rectify these issues and pay $2,500 compensation.
Determination | Case number: 960215 Page 10 of 13
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.
Determination | Case number: 960215 Page 11 of 13
3.2 Summary of expert evidence
Record Key points
Insurer’s Builder 1 ( BR )
Builder’s Report
8/04/2022
wear and tear repairs (not relevant to claimed damage) – In our opinion
the popped fixings, failing tape joints and cracked cornice adhesive is a
result of wear and tear. This is found consistent throughout the home
with no more gaps applied to failing co rnice adhesive in the en suit
which would be prior to the event
over tighten roof screws across the roof - approx 100 missing rivets to
the ridge capping laps, exceeding 40mm maximum spacings
one foot traffic dent to the gabled roof on the patio area
the p atio aprons require a cover flashing to go over the top to shield the
top of the apron as water is getting in and behind the aprons in wet
weather conditions
the insured is not happy about the visual scratches to the underside of
the patio trim deck sheet s. Attempt to clean off or replacement may be
required.
overall the roof has been completed to a high standard considering the
pitch and capping works. However, minor defects were present which
requires attention.
Insurer’s Building Consultant
(CD )
Causation Report
11/08/2022
Roof sheets are secured in a straight line through valley gutter – no
further works required.
Roof sheets are visibly rusting – minor stains can be cleaned – builder to
clean entire roof
Fibre cement sheet to rear of Gable end of patio roof has been damaged
by contractor – sheet needs to be replaced.
Contractor dropped and damaged the Security camera – builder to
discuss with contractor.
Mould on roof sheets – no rectification required.
Fireplace flue is wrong size – builder to ensure the flue is installed as
per the standards required.
Various cracks to plasterboard throughout residence – noted a number
of areas where cracking has occurred previously and been patched.
While re - roofing such a structure can sometimes release tens ion in the
roof framing and cause it to relax, potentially contributing to cracks
opening up, it is difficult to say where this is the case due to the location
and type of cracking present. The damage is very minor. More likely the
damage is as a result o f footing sy stem related building movement.
Footing system appears to be performing reasonably well and damage
is minor. Cosmetic rectifications can be undertaken – no works required.
Poor installation of flashings and cappings – recommend that builder
rep lace all cut flashings.
Materials from roof repairs like screws rivets and washers are in the
gutters and over the lawn. Builder to attend site and clean all debris.
Insurer’s Expert ( B R)
Reattendance Report
24/01/2023
T he following needs to be rectified :
> over tighten roof screws across the roof - approx 100
> one foot traffic dent to the gabled roof on the patio area
> Insured not happy about scratches under patio trim dek sheets. Attempt
to clean off or replacement may be required. T wo sheets wit h scratches
to metal - not a warranty issue - aesthetic only.
Drypan to valley isn’t ideal and hasn’t been folded neatly however isn’t
easily visible. We do not believe this should be rectified.
Mildew build up on roof, r ear patio rafters, fascia and downpipes. We
believe this is related to atmospheric conditions
Owner claimed the anticon was put on and got wet, whilst not ideal this
does not explain why the issue is present on all elevations. Anticon is
also designed to get wet by definition.
Determination | Case number: 960215 Page 12 of 13
Record Key points
COM not happy with flashings installed under patio to hide cut sheets –
i n our opinion a flashing is the best solution to cover the cut sheet.
Sheets at tops of valleys - this is a common issue and not a defect.
Overall the roof has been completed to a high standard
considering the pitch and capping works. However, minor
defects were still present with the big items have been
addressed [sic] .
Insurer’s Expert (FR)
Mould Remediator
13/04/2023
Several problems with the roof/roof space.
Visual mould can be seen on some areas of the wood trusses against
insulation backing onto colorbond roof.
Some areas of the backing of the insulation are showing signs of
moisture and mould.
Several areas throughout roof space consist of large amounts of daylight
coming through.
Mould is not consistent throughout the entire roof space, mould is
present in some areas (approx. 25% of roof space).
Insurer’s Expert ( RI )
Mould Assessment Report
11/05/2023
Water damaged, and mould affected materials were identi fied inside the
ceiling cavity, as well as on the exterior of the roof sheeting. The
damages identified in the ceiling cavity are consistent with some type of
wetting event affecting the roof ing materials. It is unknown where the
water is coming into the celling cavity.
It was not ed that the roof was replaced. The source of water damage to
the sarking and a small section of plasterboard below is unconfirmed,
but it may be consistent with reportedly wet sarking that was installed.
Water damaged – sections o f antico n blanket inside the ceiling cavity,
sections of timber framework inside the ceiling cavity, sections of the
exterior roof sheeting, section of exterior roofing structure in patio.
Suspected hidden mould growth – between water affected sections of
sarking and anticon blanket.
Liaise with competent roofing contractor to rectify an y e xcess moisture
in the roofing structure
Insurer’s Builder 2 (RB)
Causation Report
1 2 /0 5 /2023
Internal - Multiple areas of separation where observed between truss
chord a nd ceiling lining. Failure consistent with general wear and tear /
age. A numbe r of minor wall lining cracks w ere observed with these
being consistent with differential building movement. It is possible these
issues could have been exaggerated by the roof replacement.
External - Damage to the Gable FC sheeting installed to the pitched
Patio area is consistent with impact.
Roof cavity - No sign of water ingress was observed throughout either of
the accessible roof cavities.
House roof - The fungal growth to the roof sheets is concentrated
around the solar powered vents and ridge flashings. This is a common
occurrence due to the warmer / moist air escaping the roof cavity
creates an ideal climate for Fungus to form / grow.
Patio roof - Water entry to the rear of the pitched section is consistent
with no overflow consideration to the box gutter which has been created.
The box gutter is undersized with no sump installed to the downpipe
connection / no overview device to the atmosphere. Should excessive
rainfall o ccur the gutter will overflow under the roof sheets causing the
drip marks noted to the fascia below.
Complainant’s Expert ( CR )
Roof Specialist
14 /0 7 /2023
Anticon insul ation blanket has mould on it - sign it was damp before
installation.
Mould on roof sheets. QBCC standards & Tolerances Guide Section 7.3
states that within the first 12 months from completion any staining of roof
cladding is defective if visible from normal viewing position.
Determination | Case number: 960215 Page 13 of 13
Record Key points
Fixing spacings on the flashing joints exceed max of 40mm as per SA
HB 39.2012
Eaves overhang unstiffened exceeds the minimum of manufacturers
installation specifications.
Ends of the valleys into the gutter are not turned down into the gutter as
per SA HB 392015.
Roof screws have been installed too tight causing the rubber washer to
fail.
Roof screws are missing in some sections and screw patte r n does not
meet manufacturers installation specification.
Recommended action - the roof and anticon need to be replaced to
eliminate the mould issue. Roof n eeds to be replaced as it does not
meet the manufacturer’s installation specifications.
Patio Report / Condition
Trimdek section roof is under the required 2 degrees for Trimdeck to be
suitable.
Overhang of the custom orb roof is less that the minimum of 50mm.
Up stand of the apron flashings under both sides the custom orb section
has been cut too low exposing the timber frame work and allowing water
ingress behind.
Fixing spacings exceed maximum of 40mm as per SA HB 39.2015.
Recommended Action
Replace Tri mdek sheets with Kliplok suitable for 1 - degree pitch.
Replace custom orb section ensuring overhang is minimum of 50mm.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.