Home / QBE / Determination 958022

Determination 958022

Claim declined on basis of flood exclusion; complainant says damage was from stormwater runoff

FirmQBE
Decided2024-05-06
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant
Amount awarded—
Non-financial loss$1,000
Amount claimed—
SourceAFCA PDF

Summary

A business's contents and stock claim after February 2022 severe weather was declined by the insurer under the flood exclusion. AFCA found the initial inundation was stormwater runoff, required the insurer to accept the claim based on 150mm inundation, contribute to expert costs up to $10,000, and pay $1,000 non-financial loss.

The insurer did not show the flood exclusion applied, because stormwater prevented from draining into a full creek is not water escaped from the creek and the initial inundation preceded mixing with floodwater.

Issues

Subjects and remedies

broker or intermediarybusiness interruptionnatural disastersmall businesspay claimpay compensationpay non financial loss

Related

All QBE determinations · Find similar determinations

Text of the determination

Determination Case number 958022 Financial firm QBE Insurance (Australia) Limited Determination | Case number: 958022 Page 1 of 8 Case number: 958022 30 April 2024 1 Determination overview 1.1 Complaint The complainant holds a business insurance policy with the financial firm (insurer). On 7 March 2022, the complainant (through their broker) lodged a claim for damage to insured contents, stock and other goods at the business premises following a severe weather event in late February 2022. The insurer assessed the claim and denied cover, saying the damage was caused by flood, which is excluded under the policy. The complainant does not accept the insurer’s decision. They say the damage was caused by stormwater runoff and so the claim should be covered. References in this determination to ‘the complainant’ include the complainant and their broker/representative, as the context allows. 1.2 Issues and key findings Is the insurer entitled to deny the claim? No. The insurer is not entitled to deny the claim. This is because the available evidence indicates it is more likely than not the initial inundation of the premises was from stormwater runoff which could not enter the creek through the drainage network due to the amount of water already in the creek. That does not constitute floodwater for the purposes of the policy. To be clear, the initial inundation occurred, on balance, before the point at which the stormwater runoff which entered the premises had mixed with floodwater (even though there was likely to have been mixing later in time and lower in location). Why is the outcome fair? The complainant has shown a claimable loss for physical damage to insured contents and other insured goods due to initial inundation by stormwater runoff. The insurer has not established the flood exclusion applies to that loss/damage. It is therefore fair that the insurer covers the claim based on a 150mm inundation level. It is also fair in the circumstances that the insurer contributes to the complainant’s expert (KM’s) report fees and pays compensation for non-financial loss, as set out in detail in section 2.1 below. 1.3 Determination This determination is in favour of the complainant. The insurer is required to accept the claim under the policy terms and cover damage caused by inundation to 150mm in height. The parties are required to work together in finalising the matter. The insurer is also required to contribute to the complainant’s professional costs in pursuing the complaint (to a maximum of $10,000 given the special circumstances, and subject to provision of evidence of costs incurred) and pay compensation of $1,000 for non-financial loss. Determination | Case number: 958022 Page 2 of 8 2 Reasons for determination 2.1 Is the insurer entitled to deny the claim? Complainant needs to establish a valid claim The complainant holds the initial onus to establish a ‘ valid ’ claim. That is, they need to show, on balance, the loss suffered falls within the scope of cover under the policy. The policy covers physical loss of or damage to insured property which occurs during the period of insu rance. There is no dispute the complainant’s propert y (including contents and stock) was damaged during severe weather events. However, cover is subject to conditions, limitations and exclusions (one of which is ‘flood’) . The insurer says the damage was from flood. In order to be covered for loss or damag e from ‘flood’, the complainant needed to have taken out the optional extra flood cover. The certificate of insurance (COI) shows they did not take out flood cover. Insurer says the damage was caused by flood In seeking to deny the claim, the onus is on the insurer to show, on balance, the flood exclusion applies to the circumstances of the loss. While the complainant does not dispute a flood event took place, they submit the claimed damage was from inundation by stormwater runoff prior to the property being affected by any floodwaters. The insurer’s denial of liability is based on the report of its hydrologist WR, who concluded: local stormwater runoff alone, without the influence of [B Creek] flooding , would not have been sufficient to inundate [the complainant’s] property above floor level. This is because stormwater accumulating in the topographical depression surrounding the property could overflow to [B Creek] at a level below [the complainant’s] property floor level. (Emphasis added) The policy defines ‘flood’ as: The covering of normally dry land by water that has escaped or been released from the normal confines of any of the following: a lake (whether or not it has been altered or modified); a river (whether or not it has been altered or modified); a creek (whether or not it has been altered or modified); another natural watercourse (whether or not it has been altered or modified); … Determination | Case number: 958022 Page 3 of 8 Complainant’s expert says damage caused by stormwater runoff The complainant’s expert , consulting engineer KM, provided a hydrology report as well as commentary in response to the insurer’s expert’s findings , noting amongst other points, the following:  extreme rainfall occurred from Saturday 26 to Sunday evening 27 February 2022  due to the size of the 26.6ha local catchment above the premises, and overwhelmed stormwater drainage, water began flowing overland in the early hours of Sunday 27 th  there are two (1050mm and 1220mm) Council stormwater pipes that cross Cr Road either side of the property, draining the whole of the catchment above. The two pipes discharge into a 1.5m high x 2.05m wide stormwater main running along and beneath Co Street to outfall at B Creek. The invert of this large drain is at RL 0mAHD opposite the property and at normal high tide level of 1m AHD both pipes have standing tidal water  the floor level of the complainant’s premises is 2.45m AHD and the street level outside is approximately 2.0m AHD  from 6:00 to 9:00 on Sunday, overland flow passed to the west of the property and water almost reached the shop floor level at 2.45m AHD before it subsided a low of 2.15m AHD  the complainant’s premises were inundated by stormwater runoff from approximately 13:00 – 14:00 on Sunday due to an intense burst of rain ( 42mm in half an hour, 68mm in the hour )  at the time, the creek was in a low tidal cycle  at 15:18 the rain had eased and despite a rising tide the water level eased back to below the floor level of the premises  from 16:00 the water level in the creek began to rapidly rise as the intense storm experienced at 13:00 worked its way down the creek from the upper catchment and together with the high tide the river breached its banks at about 18:00 forcing water eastwards into Co Street flowing down to the oval then exiting the area via I Stre et to the south, mixing with clean storm water from the local catchment  throughout the event the water in Cr Road (where the complainant’s property is located) remained largely clean from the steady rainfall in the catchment continually keeping the water from the creek isolated to flowing along Co Street  water levels peaked in B Creek opposite Cr Road at 3.32m AHD at roughly 20:45 on Sunday 27 th (from a combination of high tide, flooding and local stormwater flows)  local rainfall eased at 21:30  it was only after the rain eased at 21:30 that flow from the creek began to enter Cr Road. KM’s report included the complainant’s images of the street and property at various points during the day, and certain contents items (including one photo taken at 13:38 on 27 February), depicting clear uncontaminated water, and no mud staining or discoloration. Other photographs provided by the complainant include one taken at 8:56 on 27 February showing rainwater at the external door level of the premises; and another taken at 9:49 showing clear stormwater running down the hill towards the premises and pooling in the street outside the building. In the latter photo, the premises are seen to be situated in a topographic depression at the bottom of the hill, with no water pooled at the far end of the street below (nearer the creek) where the road rises up again. In support of their claim, the complainant has also provided several eyewitness accounts of events at and near the premises on 27 February, which refer to the intense rainfall and stormwater runoff ‘streaming’ and ‘cascading’ down Cr Road throughout that day (becoming ‘catastrophic’ at about midday) , and note the pooling of water at the lower end of the street (beyond the premises and nearer the creek), with the stormwater drains unable to cope despite it being low tide. There was also an observation that the depth of water at the lower Determination | Case number: 958022 Page 4 of 8 section of the street rose and fell according to the varying rain intensity, and that water entered and exited the premises twice between 14:00 and 15:30. KM concluded the initial inundation of the premises shortly after 13:00 on Sunday was ‘ the result of (clean) local stormwater from an intense half hour storm which was unable to enter the stormwater system because of a high tailwater at the outfall end of the storm pipe ’ . I accept that stormwater runoff generally occurs contemporaneously with the peak intensity of rainfall. The evidence indicates the initial water entry to the premises coincided with the period of heaviest rainfall. Insurer’s expert concluded inundation was floodwater mixed with stormwater The insurer ’s hydrologist WR noted:  ground levels in the car park immediately in front of the subject property are about 2.4 m AHD. Subject property floor levels are estimated be about 2.5 m AHD  based on an estimated floor level of 2.5 m AHD and inundation to a maximum depth of about 0.8 m above floor level, the peak water level at the subject property during the event was about 3.3 m AHD  the peak hourly rainfall intensity of 61 mm/hr occurred in the hour to 14:00 hours on 27 February  peak B Creek levels at the subject property would have occurred between about 20:40 hours on 27 February and 08:00 hours on 28 February.  water accumulating in the topographical depression surrounding the subject property is drained to B Creek via the underground stormwater pipe network. The lowest elevation at which surface water within the topographical depression can drain overland to B Creek is approximately 2.0 m AHD, via I Street to the south  water levels within the topographical depression would be affected by stormwater inflows, which respond relatively quickly to rainfall, and B Creek water levels at the outlet of the stormwater pipe system that drains the topographical depression  if B Creek water levels in the vicinity of the subject property were higher than stormwater levels in the topographical depression, then floodwater would flow backwards through the pipe system from B Creek into the topographical depression and mix with any stormwater that was prevented from draining by the high creek water levels  once B Creek water levels exceeded about 2.0 m AHD (early morning of 27 February), flood water from B Creek would begin to overtop S Road and flow into the topographical depression via I Street. The water level in the depression would be controlled by the water level in the creek. Therefore, stormwater runoff from local catchments reporting to the subject site would not be able to drain freely to the creek  the peak rainfall intensity (61 mm/hr) occurred between 13:00 and 14:00 hours on 27 February. The initial above floor level inundation of the subject property occurred shortly after between 14:00 and 15:00 hours  B Creek water levels would have reached the floor level of the subject property at about 15:00 hours, which is similar to the time of initial inundation above floor level  between 13:00 and 14:00 hours, when the peak rainfall intensity was occurring, it is possible that the water levels in the topographical depression were slightly higher than in the creek as stormwater accumulating in the depression rose at a faster level than B Creek  there are no backflow prevention devices installed on the Cr Road stormwater pipe network, so from a level of about 1.9 m AHD (the estimated ground level at the stormwater inlet pits), water from B Creek would be able to backflow to Cr Street [sic] and surcharge from the stormwater inlet pits on Cr Road Determination | Case number: 958022 Page 5 of 8  consequently, any water ponding in Cr Road between about 04:00 hours on 27 February and about 14:00 hours on 28 February would have been a combination of local catchment stormwater (while it was raining) and water escaping (surcharging) from B Creek. WR concluded that: Local stormwater runoff alone, without the influence of creek flooding, would not have been sufficient to inundate the subject property above floor level, because stormwater accumulating in the topographical depression surrounding the property could overflow to [B Creek] at a level below the property floor level. However, WR also noted that rising creek levels on the morning of 27 February would have ‘prevented the free drainage of stormwater from the topographical depression’ around the property. On that basis, while acknowledging the ‘significant volume of stormwater’ from the heavy rainfall burst between 13:00 and 14:00, WR said that was mixed with floodwater that had flowed overland and backflowed through the stormwater pipe system, which meant the peak inundation of the property was from floodwater overflowing from B Creek. WR noted the premises were above both the level of adjacent Cr Road and the level at which water from B Creek would have started surcharging; and as well that the above floor level inundation had occurred several hours after the time at which the surcharging would have started. Given there was no backflow prevention device installed at the outlet of the stormwater pipe network to B Creek, WR believed KM’s analysis did not adequately consider the potential backflow of water from the creek to Cr Road via the stormwater network prior to the occurrence of the ‘intense local catchment storm’. WR also disputed KM’s assertions that the water which entered the property was freshwater and not floodwater, as it was clear rather than dirty. WR said there was no basis on which to conclude clear water observed during an event must always be stormwater runoff, nor muddy water must always be floodwater, as opposed to a mix of the two. On balance, stormwater runoff inundated premises before floodwater The complainant maintains that while stormwater runoff patterns on the day of inundation may have been influenced by water levels in B Creek preventing or hindering excessive rainwater draining away, that does not constitute flood for the purposes of the policy. It is a long-held AFCA view that water which cannot enter the creek through drains and other infrastructure due to the amount of water already in the creek, is not water which has escaped or been released from the creek (such that it represents floodwater). WR refers to ‘the influence of creek flooding’ (my emphasis) on the inundation of the property. However, a consideration of that ‘influence’ involves a consideration of the timing, location and mechanism of the inundation – and that includes acknowledging the difference between high water levels in the creek preventing stormwater runoff from entering it in the first place, and water escaping from the creek and mixing with stormwater. WR believed KM did not adequately consider the potential backflow of water from the creek via the stormwater network prior to the occurrence of the ‘intense local catchment storm’. However, I am not satisfied WR adequately considered or acknowledged the ongoing and Determination | Case number: 958022 Page 6 of 8 cumulative impact of sustained stormwater runoff from a significant catchment area on the capacity of the drainage system and the creek itself. WR’s conclusion was that the inundation could not have been from stormwater runoff alone, ‘because stormwater accumulating in the topographical depression surrounding the property could overflow to [B Creek] at a level below the property floor level ’ . However any effective overflow would have been impeded/prevented if the drainage system and the creek was already at capacity – which was, on balance, the case when the property was initially inundated (and which is the point at which WR acknowledged it was ‘possible’ that water levels in the topographical depression surrounding the property were ‘slightly higher’ than in the creek). There has been a robust and detailed exchange of views between the respective experts. That includes KM’s rebuttal of WR’s references to suggest backflow and surcharge of water from B Creek. KM considers WR’s use of the term ‘surcharge’ is misleading. In simple terms, KM states that stormwater flowing down from the significant local catchment was at a higher level than that in the creek and so on ‘basic hydraulic principle’ would displace any creek flow. KM points out that the hydraulic grade in the storm pipe would have been higher at Cr Road, forcing the storm flow down the pipe toward the creek, and that any backflow or surcharging would have been of stormwater from the catchment. I acknowledge that at some point there would have been a mixing of floodwater escaping from the creek with stormwater runoff. However, I am not persuaded this happened until after the complainant’s premises were first inundated (both in terms of the timing and the point of physical mixing). The initial inundation of the property occurred during the period of peak rainfall, and the water levels at the property are reported to have fluctuated in response to the varying rainfall intensity. The property sits in a topographical depression in a significant catchment area, serviced by nearby stormwater pipes which were clearly overwhelmed. That, coupled with the progressively higher water levels in the creek, meant the stormwater runoff was effectively prevented from dispersing and entering the creek and that is what inundated the premises. That does not represent floodwater. The complainant makes the point that there were two distinct inundations of the premises: the initial one at about 14:00 on 27 February and another later that evening. They submit that even if there was floodwater involved in the peak inundation (which was sometime during the night and after 18:00), the insured contents would already have been damaged from the earlier inundation by stormwater runoff. The available evidence is not sufficient to identify the precise level reached within the premises by the initial inundation. In the circumstances, I consider it reasonable for the claim to be accepted on the basis that the initial stormwater inundation was to the level of 150mm within the premises. Insurer is not entitled to decline the claim The complainant has shown a claimable loss for physical damage to insured contents and other goods (which includes antique furniture) due to initial inundation by stormwater runoff. The insurer has not established the flood exclusion applies to that loss/damage. In the circumstances, and in the absence of specific evidence as to the level reached by the initial stormwater inundation, I consider it reasonable to require the insurer to cover the claim based on a 150mm inundation level. The parties are required to work together in finalising the claim. Determination | Case number: 958022 Page 7 of 8 Other compensation is also payable Professional costs The AFCA Rules (applicable at the time this complaint was lodged) provide that an insurer may be required to contribute up to $5,000 towards the legal or other professional costs incurred by the complainant in the course of the complaint. However, the Rules go on to provide that if ‘special circumstances’ apply, AFCA may require the insurer to contribute more than $5,000 to these costs. I am satisfied the report and input of the complainant’s expert, KM, assisted in the resolution of this complaint. I am also satisfied that the costs associated with hydrology reports in particular can be significant. Subject to the complainant providing evidence of the reasonable costs incurred in engaging KM, the insurer is required to contribute to those costs, up to a maximum of $10,000. Non-financial loss The Rules also provide that in limited circumstances, an insurer may be required to pay compensation for non-financial loss. That includes where the complainant has experienced an unusual degree of upset and inconvenience be cause of the insurer’s handling of the claim. I acknowledge the increased demand on the resources of the insurer and other parties in the period following the severe February 2022 weather events. However, it was not until 5 months after the claim was lodg ed that the insurer’s hydrologist report was provided, and then a further 3 months before the insurer declined the claim (in October 2022). During that protracted period, the complainant says they were under significant financial as well as emotional pressure. In the particular circumstances, it is fair that the insurer pays $1,000 compensation for non-financial loss. 2.2 Why is the outcome fair? The policy definition of flood includes damage caused by water escaping or released from the confines of a creek. It is also the case that runoff which mixes with floodwater is regarded as flood. However, in this claim, it was not, on balance, flood which inundated the property – it was instead stormwater runoff which had been prevented from entering the creek through drains and other infrastructure due to the amount of water already in the creek. It would not be fair for the insurer to decline the claim when it has not been shown that the flood exclusion applies. In the circumstances, it is fair that the insurer contributes to the complainant’s expert reports/professional costs, since they assisted in resolution of the complaint. It is also fair that the insurer pays compensation for non-financial loss, given the time taken for it to make its claim decision, and the significant inconvenience and concern experienced by the complainant in the meantime. Determination | Case number: 958022 Page 8 of 8 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all the information the parties have provided. While the parties have raised several issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.