Insurer refused to accept mould damage as part of a storm claim and wanted a further expert assessment; also claim handling, delay and defective repairs

FirmRACQ
Decided2024-02-05
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant
Amount awarded—
Non-financial loss$4,500
Amount claimed—
SourceAFCA PDF

Summary

The insurer accepted a storm claim but refused to cover mould without a further expert assessment. AFCA found the mould was caused by the storm and defective repairs, required the insurer to cover it plus temporary accommodation and contents storage, and awarded $4,500 for non-financial loss.

On balance the evidence showed no mould before the storm and that the storm combined with the insurer's defective repairs caused it, so the insurer was liable and no further assessment was needed.

Issues

Subjects and remedies

home or building damagenatural disastertheft or burglarypay claimpay non financial lossreassess claimrepair or rectify

Related

All RACQ determinations · Find similar determinations

Text of the determination

Determination Case number 957873 Financial firm RACQ Insurance Limited Determination | Case number: 957873 Page 1 of 8 Case number: 957873 2 February 2024 1 Determination overview 1.1 Complaint The complainant holds a home and contents insurance policy with the financial firm (insurer). He lodged a claim on 12 December 2022 after the property suffered storm damage. The insurer accepted the claim and attended to repairs. However the insurer does not agree that the mould can be attributed to the storm event. It wants to appoint a restoration expert to assess the mould to determine its cause. The complainant says there was no mould prior to the storm and an expert has already found the cause was the storm and poor subsequent repairs. He also wants temporary accommodation and contents removal/storage covered. As well, the complainant says the insurer mishandled the claim and caused avoidable delays. 1.2 Issues and key findings Is the insurer liable for the mould damage? Yes. This is because the available evidence establishes, on balance, there was no mould in the property prior to the storm event, and water ingress was occurring for a total of 10 months until the insurer’s defective repairs after the event were rectified. It is not necessary for a further assessment to be carried out to determine the cause of the mould. The insurer is required to accept and cover the mould damage under the claim. The parties will need to work together to allow for a new detailed scope of works and quote to be obtained, to facilitate prompt mould remediation/settlement. Given the mould remediation works, the insurer must also cover other relevant policy benefits (including temporary accommodation, and removal/storage of contents until the home is fit and ready to be occupied again). Is compensation for non-financial loss warranted? Yes. This is because the insurer failed to consider and appropriately respond to the available expert evidence or address the complainant ’s concerns , including about the behaviour of its contractors. It also caused lengthy delays. The insurer must pay the complainant $4,500 compensation for the significant upset and inconvenience caused by its handling of the claim. Why is the outcome fair? The outcome is fair because the available evidence shows, on balance, the mould was caused by a combination of the initial storm event and the defective roof repairs completed by the insurer. It is necessary and appropriate that the parties cooperate to allow a comprehensive scope of work/quotes to be promptly prepared and actioned. 1.3 Determination This determination is in favour of the complainant. The parties must work together to establish the scope of works and settlement amount/method for the mould damage, which the insurer is required to cover in accordance with the policy terms, and otherwise as set out below. It is also liable for applicable policy benefits, including temporary accommodation and contents storage/removal. As well, the insurer must pay $4,500 non-financial loss compensation. Determination | Case number: 957873 Page 2 of 8 2 Reasons for determination 2.1 Is the insurer liable for the mould damage? M ould was caused by combination of storm event and defective repairs The complainant says an additional mould assessment is not required to determine the proximate cause of that damage. This is because, he says, the available expert evidence substantiates his position the mould was caused by the initial storm event and subsequent defective repairs. The complainant refers to various expert reports in support of his position:  ITP (builder) report 23 December 2022  C&C (assessor) report 19 January 2023  CR (restorer) report 24 January 2023  ELS (occupational hygienist) mould assessment report 7 July 2023  BRA (builder) report on the insurer’s completed repairs 13 July 2023. The ITP report was completed eight days after the initial storm event and it noted there was no mould present in the property at the time. The C&C report noted the presence of mould within the property, and that was treated during its inspection (approximately five weeks after the initial event). The C&C report also highlights that water ingress via the roof was ongoing despite two earlier make safe attempts by ITP on 6 January 2023 and 17 January 2023. The insurer agreed to allow the complainant to choose his own mould specialist to assess the extent and cause of the mould. The complainant engaged ELS to conduct the assessment, and the insurer has since reimbursed the complainant for that cost. The ELS report of July 2023 confirms significant mould presence throughout the building and contents. It says the increased moisture in the ceiling was likely caused by the initial event, leading to mould growth throughout the ceiling. The ELS report also highlights lack of ventilation in the laundry and bathroom as potential cause of elevated moisture levels within these areas. However, I am satisfied the storm event would have exacerbated pre-existing mould growth (if any) which might have been caused by the inadequate ventilation. In any case, the evidence shows ITP did not identify any such mould during its initial assessment. The BRA report identified several defects with the roof repairs completed by the insurer ’ s contractor ITP, including:  roof sheets not turned down into gutters  wall cladding replaced with flat zinc sheet metal with no capillary breaks  flashings not undersealed or rivetted at sufficient intervals  no rivets around skylight dry pans  incorrectly installed wall apron  exposed anti condensation material under eave  incomplete gable flashing. BRA identified the ‘overall standard of repairs’ as ‘fair’. The insurer has not disputed the BRA findings and I understand the issues have since been rectified by the insurer. To be clear, if Determination | Case number: 957873 Page 3 of 8 those rectification works have not been fully and satisfactorily completed, then the insurer must attend to that as a priority. I am satisfied the defective repairs more likely than not allowed on-going water ingress from the time they were completed on 3 March 2023. This is because the BRA report includes photographs showing the poorly installed and unsealed flashing allowing water to pool underneath it and likely enter the property. It also includes photographs showing the other defects, which will likely have allowed further water ingress contributing to excess moisture within the property. The insurer is liable for the quality of workmanship and repairs undertaken by its appointed repairers. That includes for the remediation work carried out on the original defective repairs, and for any further work it carries out. I am satisfied the proximate cause of the mould was a combination of the initial storm event and the defective repairs. This is because the evidence shows there was no mould prior to the storm event and water ingress has likely been occurring over a 10-month period since the event and up until defective repairs were attended to. That means the insurer is liable for the mould damage broadly as outlined in the ELS report, but subject to the preparation of a new and detailed assessment, scope and quote (as addressed below). I note the home sum insured is $350,000 and the contents sum insured is $40,000 (as that appears on the September 2022 certificate of insurance). Additional repair/rectification work and now the mould remediation is required as a result of the inadequacy of the insurer’s initial repairs. On that basis, it would not be fair to limit the insurer’s liability to those respective sums insured, should the cost to properly finalise all repairs/rectification and remediation arising from this claim exceed those amounts. No requirement for further mould assessment to establish liability The insurer does not dispute the presence of mould. However, it says there is insufficient evidence to show it was caused by the initial event. The insurer says its request to appoint another expert to determine whether the mould can be attributed to the event is reasonable. The insurer disputes the opinion provided by its initial contractor ITP regarding no mould being present during their first inspection. The insurer says ITP is a builder and does not have any qualifications to be able to identify mould, and ITP’s opinion alone does not establish the mould was event-related. I do not accept the insure r’s position on that point. This is because identifying the presence of mould is a key component of the assessment process (particularly in relation to water ingress situations) and forms part of the habitability check list on the report. I am satisfied it is reasonable to expect a builder engaged for the purpose of an assessment in these circumstances would have the necessary knowledge and experience to at least identify the presence of mould. I note the insurer has not provided a response explaining why it does not believe the mould can be attributed to the defective repairs. I am satisfied, based on the available evidence, there was no mould prior to the event. (This is further supported by the initial ITP report which includes several internal photographs of the property with no evidence of mould present.) Determination | Case number: 957873 Page 4 of 8 I am therefore also satisfied, on balance, the proximate cause of the mould was a combination of the storm event and the defective repairs. On that basis, I do not consider it necessary to conduct any further assessment to determine the cause of the mould. New scope of works and cost for mould remediation to be established The ELS report does not include a complete itemised scope of works for mould remediation, nor does it include a quote for the required works. However it does set out recommendations for remediation work to be carried out to the building and contents by an appropriately trained and experienced mould remediation professional, with the requirement for certification of the work once completed. The recommendations include, for example, that all ceiling structures throughout the property be removed and the ceiling structure fully decontaminated. I also note the work will require removal of contents to allow for decontamination, and then storage while the building work is undertaken. It is therefore appropriate to obtain a new detailed scope of works and quote for the recommended work. To be clear, in the event the mould and damage has spread since the date of ELS’ inspection (which I consider likely), then any such further damage not previously identified is also required to be covered by the insurer. The complainant will need to allow reasonable access to the property for the purposes of the necessary inspection. However, given the difficulties of the complainant’s dealings with the insurer to date (and his justified concerns about the quality and reliability of some of the insure r’s trades/experts), I consider it fair and appropriate that the complainant has the right to either choose the relevant (appropriately qualified) specialists to prepare the scope of work and quote(s), or to approve any specialists suggested by the insurer. Alternatively, the complainant might agree that each party submit scopes/quotes from their chosen experts to provide a reasonable basis for comparison and assist in reaching a fair settlement. (If the complainant chooses his own specialist, then the insurer remains responsible for the related costs.) The insurer is liable for the work/costs identified in the new scope and quote obtained. If cash settling for the mould damage, the insurer is required to do so based on the new agreed scope of works and by reference to at least one quote for that scope which is actionable by the complainant as a retail customer. The cash settlement is to include an uplift of 10% on the quoted amount, to allow for contingencies and the transfer of risk to the complainant. Temporary accommodation to be provided until home fit to be lived in again ELS noted that, at the time of their report, the: total airborne mould concentrations are not at a level where ELS would generally recommend that occupants are excluded from the s pace. However, a ‘safe level’ of mould exposure has not been defined and varies considerably with mould species and the individual exposed. It is recommended that occupants experiencing predisposing health conditions be excluded from the southwest corner and adjacent areas until remediation is successfully undertaken. Determination | Case number: 957873 Page 5 of 8 Given the months which have now passed since that report, I consider there is the possibility that mould levels may have increased, making it unsafe or at least inadvisable for the complainant and his family to remain in occupation until the mould situation is remedied. The policy provides that the insurer will cover the costs of temporary accommodation (up to 10% of the home sum insured) ‘after an insured event happens that makes your home u nfit to live in’. That includes: ongoing accommodation costs, while your home is being rebuilt or repaired for up to 12 months from when the insured event happened until your home is fit to live in. I am satisfied, based on the currently available evidence, it would be unreasonable and likely unsafe for the complainant to be required to remain in the home until such time as the full mould remediation has been completed and certified and the complainant is able to re-occupy the house. The insurer is liable for the ongoing costs of temporary accommodation for that period. To be clear, because the mould was, on balance, caused or at least exacerbated by the insurer’s inadequate repairs in the first place, then it would be unfair to strictly impose the policy limit as to the period or cost of temporary accommodation cover (or of the contents cover below). Contents removal/storage to be provided The policy also provides that the insurer will cover the costs to store contents if the complainant needs to move out of the home because an insured event makes it unfit to live in. The costs include removal and storage of contents until the home is fit to live in and return of the contents from storage to the home. The insurer is liable for these costs until the home is re-occupied by the complainant after the full mould remediation is completed. 2.2 Is compensation for non-financial loss warranted? Insurer did not handle the claim appropriately overall The complainant says the insurer mishandled the claim, caused significant delays and failed to consider the negative claims experience which he suffered. I accept the insurer was entitled to assess the claimed damage to determine whether it was event-related. However, I am satisfied that was established on the available evidence, and the insurer should reasonably have accepted liability for it. I do not accept there was a need for any further assessments in relation to liability. The delays experienced as a result could have been avoided. In addition, it is relevant to note that several employees of the contractor initially appointed have since been convicted of theft of property from the complainant ’ s home during the repair process. The insurer does not dispute the theft occurred and a second theft claim has been lodged. Whilst the merits of the theft portion of the claim are not the subject of this complaint, I am satisfied the experience created an understandable and significant level of concern and distrust on the complainant ’s part in relation to the insurer and its contractors. Determination | Case number: 957873 Page 6 of 8 The complainant’s upset has then also been exacerbated by the repairs completed by the insurer ’ s contractor being inadequate and causing further damage. That is in a situation when the complainant should have been able to rely on the insurer and its contractors to act professionally and reliably in dealing with a valid claim. As well, the complainant has expressed dissatisfaction about the insurer’s lack of responsiveness to certain other matters he has raised, including a request for privacy information, and incorrectly amended details on renewal documents. Compensation may be awarded in certain circumstances Under the AFCA Rules, we may award compensation (capped at $5,400) for non-financial loss where a complainant has suffered an unusual degree or extent of physical inconvenience, time taken to resolve the situation or interference with their expectation of enjoyment or peace of mind. We take a conservative approach to compensation for non-financial loss. It is not awarded when a person suffers the normal degree of inconvenience to be expected when a claim needs to be lodged. Non-financial loss compensation is warranted in this case Having regard to the insurer’s actions throughout the claim process (including the delays caused and the further damage), I am satisfied it is fair that the insurer pays compensation $4,500 for non-financial loss. 2.3 Why is the outcome fair? The available information establishes, on balance, the mould was a result of the insured event and subsequent inadequate repairs. The insurer is responsible for the quality of repairs and workmanship of its appointed repairers. It would not be fair for the insurer to decline liability. Nor, given the already available evidence, is it necessary or fair to further delay finalisation of the matter by conducting an additional assessment in relation to liability. It is, however, fair that the parties work together to establish a comprehensive scope of works and actionable quote for the mould-related damage, to ensure a fair settlement for the complainant. Determination | Case number: 957873 Page 7 of 8 3 Supporting information 3.1 The AFCA process AFCA’s approach is b ased on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided. While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established. 3.2 Relevant expert report extracts Record Key points Complainant’s expert ELS Report 07 - 07 - 2023 7.0 Asse ssment The result of the visual inspection and sampling confirm that an elevated mould ecology is pres ent within the living quarters of the property. It is likely that the initial water ingress event has caused elevated moisture levels wit hin the timber ceiling linin gs, allowing microbial growth to proliferate throughout the ceiling structure. It is recommended that all ceilings throughout the property are removed and the ceiling structure fully decontaminated. Determination | Case number: 957873 Page 8 of 8 Record Key points In addition, mould growth was confirmed to be present t o many contents and building materials throughout. Some internal areas were found to lack sufficient ventilation (laundry, central bathroom), which will cause elevated water vapour to affect these rooms via occupant activity. Although the lack of ventilati on and occupant activity is likely to be a factor for the mould growth within these internal areas, the mould growt h that will have proliferated as a result of the initial ingress will have exacerbated any internal mould growth. It is recommended that all cont ents throughout are inspected for mould growth and remediated as appropriat e.