Insurer refused to accept mould damage as part of a storm claim and wanted a further expert assessment; also claim handling, delay and defective repairs
Text of the determination
Determination
Case number 957873
Financial firm RACQ Insurance Limited
Determination | Case number: 957873 Page 1 of 8
Case number: 957873 2 February 2024
1 Determination overview
1.1 Complaint
The complainant holds a home and contents insurance policy with the financial firm (insurer).
He lodged a claim on 12 December 2022 after the property suffered storm damage.
The insurer accepted the claim and attended to repairs. However the insurer does not agree
that the mould can be attributed to the storm event. It wants to appoint a restoration expert to
assess the mould to determine its cause. The complainant says there was no mould prior to
the storm and an expert has already found the cause was the storm and poor subsequent
repairs. He also wants temporary accommodation and contents removal/storage covered. As
well, the complainant says the insurer mishandled the claim and caused avoidable delays.
1.2 Issues and key findings
Is the insurer liable for the mould damage?
Yes. This is because the available evidence establishes, on balance, there was no mould in
the property prior to the storm event, and water ingress was occurring for a total of 10 months
until the insurer’s defective repairs after the event were rectified. It is not necessary for a
further assessment to be carried out to determine the cause of the mould. The insurer is
required to accept and cover the mould damage under the claim. The parties will need to
work together to allow for a new detailed scope of works and quote to be obtained, to
facilitate prompt mould remediation/settlement. Given the mould remediation works, the
insurer must also cover other relevant policy benefits (including temporary accommodation,
and removal/storage of contents until the home is fit and ready to be occupied again).
Is compensation for non-financial loss warranted?
Yes. This is because the insurer failed to consider and appropriately respond to the available
expert evidence or address the complainant ’s concerns , including about the behaviour of its
contractors. It also caused lengthy delays. The insurer must pay the complainant $4,500
compensation for the significant upset and inconvenience caused by its handling of the claim.
Why is the outcome fair?
The outcome is fair because the available evidence shows, on balance, the mould was
caused by a combination of the initial storm event and the defective roof repairs completed by
the insurer. It is necessary and appropriate that the parties cooperate to allow a
comprehensive scope of work/quotes to be promptly prepared and actioned.
1.3 Determination
This determination is in favour of the complainant. The parties must work together to establish
the scope of works and settlement amount/method for the mould damage, which the insurer
is required to cover in accordance with the policy terms, and otherwise as set out below. It is
also liable for applicable policy benefits, including temporary accommodation and contents
storage/removal. As well, the insurer must pay $4,500 non-financial loss compensation.
Determination | Case number: 957873 Page 2 of 8
2 Reasons for determination
2.1 Is the insurer liable for the mould damage?
M ould was caused by combination of storm event and defective repairs
The complainant says an additional mould assessment is not required to determine the
proximate cause of that damage. This is because, he says, the available expert evidence
substantiates his position the mould was caused by the initial storm event and subsequent
defective repairs.
The complainant refers to various expert reports in support of his position:
ITP (builder) report 23 December 2022
C&C (assessor) report 19 January 2023
CR (restorer) report 24 January 2023
ELS (occupational hygienist) mould assessment report 7 July 2023
BRA (builder) report on the insurer’s completed repairs 13 July 2023.
The ITP report was completed eight days after the initial storm event and it noted there was
no mould present in the property at the time.
The C&C report noted the presence of mould within the property, and that was treated during
its inspection (approximately five weeks after the initial event).
The C&C report also highlights that water ingress via the roof was ongoing despite two earlier
make safe attempts by ITP on 6 January 2023 and 17 January 2023.
The insurer agreed to allow the complainant to choose his own mould specialist to assess the
extent and cause of the mould. The complainant engaged ELS to conduct the assessment,
and the insurer has since reimbursed the complainant for that cost.
The ELS report of July 2023 confirms significant mould presence throughout the building and
contents. It says the increased moisture in the ceiling was likely caused by the initial event,
leading to mould growth throughout the ceiling.
The ELS report also highlights lack of ventilation in the laundry and bathroom as potential
cause of elevated moisture levels within these areas. However, I am satisfied the storm event
would have exacerbated pre-existing mould growth (if any) which might have been caused by
the inadequate ventilation. In any case, the evidence shows ITP did not identify any such
mould during its initial assessment.
The BRA report identified several defects with the roof repairs completed by the insurer ’ s
contractor ITP, including:
roof sheets not turned down into gutters
wall cladding replaced with flat zinc sheet metal with no capillary breaks
flashings not undersealed or rivetted at sufficient intervals
no rivets around skylight dry pans
incorrectly installed wall apron
exposed anti condensation material under eave
incomplete gable flashing.
BRA identified the ‘overall standard of repairs’ as ‘fair’. The insurer has not disputed the BRA
findings and I understand the issues have since been rectified by the insurer. To be clear, if
Determination | Case number: 957873 Page 3 of 8
those rectification works have not been fully and satisfactorily completed, then the insurer
must attend to that as a priority.
I am satisfied the defective repairs more likely than not allowed on-going water ingress from
the time they were completed on 3 March 2023. This is because the BRA report includes
photographs showing the poorly installed and unsealed flashing allowing water to pool
underneath it and likely enter the property. It also includes photographs showing the other
defects, which will likely have allowed further water ingress contributing to excess moisture
within the property.
The insurer is liable for the quality of workmanship and repairs undertaken by its appointed
repairers. That includes for the remediation work carried out on the original defective repairs,
and for any further work it carries out.
I am satisfied the proximate cause of the mould was a combination of the initial storm event
and the defective repairs. This is because the evidence shows there was no mould prior to
the storm event and water ingress has likely been occurring over a 10-month period since the
event and up until defective repairs were attended to.
That means the insurer is liable for the mould damage broadly as outlined in the ELS report,
but subject to the preparation of a new and detailed assessment, scope and quote (as
addressed below).
I note the home sum insured is $350,000 and the contents sum insured is $40,000 (as that
appears on the September 2022 certificate of insurance). Additional repair/rectification work
and now the mould remediation is required as a result of the inadequacy of the insurer’s initial
repairs. On that basis, it would not be fair to limit the insurer’s liability to those respective
sums insured, should the cost to properly finalise all repairs/rectification and remediation
arising from this claim exceed those amounts.
No requirement for further mould assessment to establish liability
The insurer does not dispute the presence of mould. However, it says there is insufficient
evidence to show it was caused by the initial event. The insurer says its request to appoint
another expert to determine whether the mould can be attributed to the event is reasonable.
The insurer disputes the opinion provided by its initial contractor ITP regarding no mould
being present during their first inspection. The insurer says ITP is a builder and does not have
any qualifications to be able to identify mould, and ITP’s opinion alone does not establish the
mould was event-related. I do not accept the insure r’s position on that point. This is because
identifying the presence of mould is a key component of the assessment process (particularly
in relation to water ingress situations) and forms part of the habitability check list on the
report.
I am satisfied it is reasonable to expect a builder engaged for the purpose of an assessment
in these circumstances would have the necessary knowledge and experience to at least
identify the presence of mould.
I note the insurer has not provided a response explaining why it does not believe the mould
can be attributed to the defective repairs.
I am satisfied, based on the available evidence, there was no mould prior to the event. (This
is further supported by the initial ITP report which includes several internal photographs of the
property with no evidence of mould present.)
Determination | Case number: 957873 Page 4 of 8
I am therefore also satisfied, on balance, the proximate cause of the mould was a
combination of the storm event and the defective repairs. On that basis, I do not consider it
necessary to conduct any further assessment to determine the cause of the mould.
New scope of works and cost for mould remediation to be established
The ELS report does not include a complete itemised scope of works for mould remediation,
nor does it include a quote for the required works. However it does set out recommendations
for remediation work to be carried out to the building and contents by an appropriately trained
and experienced mould remediation professional, with the requirement for certification of the
work once completed. The recommendations include, for example, that all ceiling structures
throughout the property be removed and the ceiling structure fully decontaminated.
I also note the work will require removal of contents to allow for decontamination, and then
storage while the building work is undertaken.
It is therefore appropriate to obtain a new detailed scope of works and quote for the
recommended work. To be clear, in the event the mould and damage has spread since the
date of ELS’ inspection (which I consider likely), then any such further damage not previously
identified is also required to be covered by the insurer.
The complainant will need to allow reasonable access to the property for the purposes of the
necessary inspection. However, given the difficulties of the complainant’s dealings with the
insurer to date (and his justified concerns about the quality and reliability of some of the
insure r’s trades/experts), I consider it fair and appropriate that the complainant has the right
to either choose the relevant (appropriately qualified) specialists to prepare the scope of work
and quote(s), or to approve any specialists suggested by the insurer. Alternatively, the
complainant might agree that each party submit scopes/quotes from their chosen experts to
provide a reasonable basis for comparison and assist in reaching a fair settlement. (If the
complainant chooses his own specialist, then the insurer remains responsible for the related
costs.)
The insurer is liable for the work/costs identified in the new scope and quote obtained.
If cash settling for the mould damage, the insurer is required to do so based on the new
agreed scope of works and by reference to at least one quote for that scope which is
actionable by the complainant as a retail customer. The cash settlement is to include an uplift
of 10% on the quoted amount, to allow for contingencies and the transfer of risk to the
complainant.
Temporary accommodation to be provided until home fit to be lived in again
ELS noted that, at the time of their report, the:
total airborne mould concentrations are not at a level where ELS would generally
recommend that occupants are excluded from the s pace. However, a ‘safe level’
of mould exposure has not been defined and varies considerably with mould
species and the individual exposed. It is recommended that occupants
experiencing predisposing health conditions be excluded from the southwest
corner and adjacent areas until remediation is successfully undertaken.
Determination | Case number: 957873 Page 5 of 8
Given the months which have now passed since that report, I consider there is the possibility
that mould levels may have increased, making it unsafe or at least inadvisable for the
complainant and his family to remain in occupation until the mould situation is remedied.
The policy provides that the insurer will cover the costs of temporary accommodation (up to
10% of the home sum insured) ‘after an insured event happens that makes your home u nfit to
live in’. That includes:
ongoing accommodation costs, while your home is being rebuilt or repaired for up
to 12 months from when the insured event happened until your home is fit to live
in.
I am satisfied, based on the currently available evidence, it would be unreasonable and likely
unsafe for the complainant to be required to remain in the home until such time as the full
mould remediation has been completed and certified and the complainant is able to re-occupy
the house. The insurer is liable for the ongoing costs of temporary accommodation for that
period.
To be clear, because the mould was, on balance, caused or at least exacerbated by the
insurer’s inadequate repairs in the first place, then it would be unfair to strictly impose the
policy limit as to the period or cost of temporary accommodation cover (or of the contents
cover below).
Contents removal/storage to be provided
The policy also provides that the insurer will cover the costs to store contents if the
complainant needs to move out of the home because an insured event makes it unfit to live
in. The costs include removal and storage of contents until the home is fit to live in and return
of the contents from storage to the home.
The insurer is liable for these costs until the home is re-occupied by the complainant after the
full mould remediation is completed.
2.2 Is compensation for non-financial loss warranted?
Insurer did not handle the claim appropriately overall
The complainant says the insurer mishandled the claim, caused significant delays and failed
to consider the negative claims experience which he suffered.
I accept the insurer was entitled to assess the claimed damage to determine whether it was
event-related. However, I am satisfied that was established on the available evidence, and
the insurer should reasonably have accepted liability for it. I do not accept there was a need
for any further assessments in relation to liability. The delays experienced as a result could
have been avoided.
In addition, it is relevant to note that several employees of the contractor initially appointed
have since been convicted of theft of property from the complainant ’ s home during the repair
process. The insurer does not dispute the theft occurred and a second theft claim has been
lodged. Whilst the merits of the theft portion of the claim are not the subject of this complaint,
I am satisfied the experience created an understandable and significant level of concern and
distrust on the complainant ’s part in relation to the insurer and its contractors.
Determination | Case number: 957873 Page 6 of 8
The complainant’s upset has then also been exacerbated by the repairs completed by the
insurer ’ s contractor being inadequate and causing further damage. That is in a situation when
the complainant should have been able to rely on the insurer and its contractors to act
professionally and reliably in dealing with a valid claim.
As well, the complainant has expressed dissatisfaction about the insurer’s lack of
responsiveness to certain other matters he has raised, including a request for privacy
information, and incorrectly amended details on renewal documents.
Compensation may be awarded in certain circumstances
Under the AFCA Rules, we may award compensation (capped at $5,400) for non-financial
loss where a complainant has suffered an unusual degree or extent of physical
inconvenience, time taken to resolve the situation or interference with their expectation of
enjoyment or peace of mind.
We take a conservative approach to compensation for non-financial loss. It is not awarded
when a person suffers the normal degree of inconvenience to be expected when a claim
needs to be lodged.
Non-financial loss compensation is warranted in this case
Having regard to the insurer’s actions throughout the claim process (including the delays
caused and the further damage), I am satisfied it is fair that the insurer pays compensation
$4,500 for non-financial loss.
2.3 Why is the outcome fair?
The available information establishes, on balance, the mould was a result of the insured
event and subsequent inadequate repairs. The insurer is responsible for the quality of repairs
and workmanship of its appointed repairers. It would not be fair for the insurer to decline
liability. Nor, given the already available evidence, is it necessary or fair to further delay
finalisation of the matter by conducting an additional assessment in relation to liability.
It is, however, fair that the parties work together to establish a comprehensive scope of works
and actionable quote for the mould-related damage, to ensure a fair settlement for the
complainant.
Determination | Case number: 957873 Page 7 of 8
3 Supporting information
3.1 The AFCA process
AFCA’s approach is b ased on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.
3.2 Relevant expert report extracts
Record Key points
Complainant’s expert
ELS Report
07 - 07 - 2023
7.0 Asse ssment
The result of the visual inspection and sampling confirm that an
elevated mould ecology is pres ent within the living quarters of the
property. It is likely that the initial water ingress event has caused
elevated moisture levels wit hin the timber ceiling linin gs, allowing
microbial growth to proliferate throughout the ceiling structure. It is
recommended that all ceilings throughout the property are removed
and the ceiling structure fully decontaminated.
Determination | Case number: 957873 Page 8 of 8
Record Key points
In addition, mould growth was confirmed to be present t o many
contents and building materials throughout. Some internal areas
were found to lack sufficient ventilation (laundry, central bathroom),
which will cause elevated water vapour to affect these rooms via
occupant activity. Although the lack of ventilati on and occupant
activity is likely to be a factor for the mould growth within these
internal areas, the mould growt h that will have proliferated as a
result of the initial ingress will have exacerbated any internal mould
growth. It is recommended that all cont ents throughout are
inspected for mould growth and remediated as appropriat e.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.