Decline of storm damage claim for foundation and footing damage, internal damage and drainage costs

FirmOpen Insurance Pty Ltd
Decided2023-12-14
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The complainant claimed for storm damage to foundations, internal damage and drainage costs after March 2022 storms; the insurer declined. AFCA found the footing damage covered and ordered engineer-designed repairs or cash settlement plus report fees, but rejected internal damage, drainage and non-financial loss.

On the balance of probabilities the March 2022 storm compromised the footings, which are part of the defined home, while internal damage was long-term and drainage works were improvements not covered.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimpay compensationreassess claim

Related

All Open Insurance Pty Ltd determinations · Find similar determinations

Text of the determination

Determination Case number 957515 Financial firm Open Insurance Pty Ltd Determination | Case number: 957515 Page 1 of 9 Case number: 957515 13 December 2023 1 Determination overview 1.1 Complaint On 16 March 2022 the complainant lodged a claim on his home and contents insurance policy for structural damage to his property following a severe storm event. The insurer says there is no damage but that the sandstone beneath the footing has eroded away. The sandstone is not defined as part of the home. Further the internal damage is not due to a single event but most likely due to foundation movement and maintenance issues. The complainant disputes the insurer’s decision and says the insurer has breached its duty of utmost good faith. The complainant also says the insurer’s claims handling caused him a great level of stress and inconvenience. 1.2 Issues and key findings Is the insurer liable for the foundation repairs? Yes. Most likely the structural integrity of the foundations was affected by the March 2022 event. The insurer must settle the claim as set out in section 2.1 of this determination. Is the insurer liable for the internal damage? No. Most likely the internal damage was long term and did not arise from the storm event. Is the insurer liable for the installation of the drainage? No. The policy does not cover structural improvements. Is the insurer liable for report fees? Yes. The insurer must meet the reasonable cost of the report fees from DA and FS. Has the insurer mishandled the claim? No. The insurer has handled the claim fairly and consistently with utmost good faith. Why is the outcome fair? This outcome is fair as most likely the structural integrity of the brick piers and concrete footings have been compromised. It is fair in these circumstances that the insurer covers the cost of the required repairs in accordance with the terms of the policy. 1.3 Determination This determination is in favour of the complainant. Within 21 days of the notification of the complainant accepting this determination the insurer is to:  appoint a geotechnical or structural engineer to provide designs for the stabilisation of the footings. Determination | Case number: 957515 Page 2 of 9  once the report is obtained and scope of works provided the insurer is to obtain an actionable quote to complete the required works.  the insurer can then elect to either complete the works or cash settle the claim. If the claim is cash settled the insurer is to include a 15% uplift on the quoted amount to cover potential contingencies.  pay the reasonable cost of the report fees from DA and FS subject to the complainant providing the relevant invoices or receipts The insurer is otherwise entitled to deny the balance of the complainants claim in accordance with the terms of the policy. Determination | Case number: 957515 Page 3 of 9 2 Reasons for determination 2.1 Is the insurer liable for the foundation repairs? Yes. I am satisfied that most likely the structural integrity of the foundations has been affected by the floodwaters from March 2022 and should settle the claim as set out in this determination. Complainant has onus to prove claim falls within terms of policy It is established insurance law that an insured has the initial onus to prove on the balance of probabilities (that is more likely than not) that the loss or damage claimed falls within the terms of the policy. Once established the onus shifts to the insurer to show that, on the balance of probabilities, it is entitled to decline the claim. The complainant’s comprehensive home and contents policy provides cover for a series of listed events including storm, rainwater and flood as well as accidental damage cover. The policy defines an event as a single occurrence that results in loss or damage. Circumstances of claim The complainant lives in New South Wales (NSW). On 16 March 2022, the complainant lodged a claim with the insurer for stormwater damage to his property which happened two weeks earlier. There was a severe storm event in March 2021 (12 months prior to the subject event). The complainant says the water from that event did not cause any scouring or erosion. Following that event, the complainant installed a water sprinkler system on the roof and added a new drain along the front of the property to prevent water flowing under the property. In March 2022, 625 mm of rain fell which resulted in water flowing through the property. The Bureau of Meteorology (BOM) data confirms the area received over 430mm of rain in the first nine days of March. The property slopes from south to north. The complainant says stormwater flowed under the home scouring out the sandstone beneath the footings on the south-west corner of the property. There is no dispute that there was heavy rain during the period or that water flowed through the property during the event. The complainant says the scouring of the sandstone has damaged the foundations and footings. As this was caused by stormwater runoff the complainant says it should be covered under the terms of the policy. Following the 2022 storm event, the complainant installed a larger strip drain along the front of the property the prevent further damage. The insurer says that while there is scouring, the scouring has happened over a period of time, and not from a single event in 2022. Further, it says there was no actual damage to the compl ainant’s home or to the footings . To the extent that there is scouring of the soil (sandstone), soil is not included in the policy definition of home. The complainant says the policy definition of a home is not meant to be exhaustive or complete. He says the definition does not include all the standard components of a home. Determination | Case number: 957515 Page 4 of 9 The complainant says the soil and the foundations directly beneath the house support the load bearing structures including footings, piers, piles and slab and any damage to the foundations should be considered as damage to the house itself. Further, he says footings cannot function without the foundation they are anchored into and if the foundations or the footings are damaged, then it is reasonable to infer that the home has been damaged. Engineers confirm structural integrity likely to be impacted It is not in dispute a large portion of rock and soil has eroded below the western masonry piers and concrete footings, partially exposing the underside of the foundations. BBS were appointed by the insurer’s loss adjuster and attended the property on 28 March 2022. BBS noted large amounts of ground in the subfloor area had been excavated to facilitate the construction of the laundry and exposing most of the concrete footing supporting the external brickwork of the dwelling. BBS considered a suitably qualified professional was required to comment on the condition of the area and recommend any necessary repairs. BBS considered maintenance would include but not limited to the construction of a compliant retaining wall to secure the cut sandstone foundation and the installation of adequate drainage. The insurer engaged the services of an engineer (CD) to inspect the property and assess damage to the building footings. CD attended the property on 6 May 2022 and noticed water was seeping from the exposed rock face in the south-western subfloor space. CD noticed a strip drain around the subfloor was filled with deposits of silt and soil. CD concluded the erosion has been happening over a period of time and significant weather events of March 2021 and March 2022 have likely increased the rate of erosion of soils underneath the foundations. CD also stated the significant slope of the property and long- term saturation has resulted in the erosion of the rocks and soil below the south-western foundations at the property. CD found no immediate concerns regarding the structural integrity of the building but considered ongoing erosion may result in the loss of material below the foundation and subsequent cracks. CD recommended that a Geotech/Structural Engineer be appointed to provide designs on the stabilisation of the foundations. The insurer’s builder JLG attended the site on 5 August 2022. JLG identified soil erosion underneath the footings. JLG considered the footings may not be structurally sound or at risk of losing structural integrity. JLG recommended a structural engineer be appointed. The complainant appointed an engineer (FS) to assess the damage to the structural components of the property. FS attended on 5 September 2022. FS considered that the structural component of the dwelling has been affected by the recent flood water mainly, to the sub-floor area and rear balcony of the dwelling. FS considered the dwelling is structurally habitable but, the issues are required to be addressed. FS concluded that due to continuous run-off water and high flow of flood water, soil is scoured in the sub-floor area, causing slightly movement in the foundation. Further due to the flood impact and inclined terrain, subsidence/movement to natural ground soil has occurred causing the cracks in plasterboards, ceiling and separation gap between wall and ceiling. Determination | Case number: 957515 Page 5 of 9 The complainant also appointed another expert (DA) to inspect the footings. DA observed stormwater undermining the footings and said the washout beneath the footings should be backfilled with concrete to prevent the collapse of the foundations I note CD considered the soil/rock face below the subject foundations will likely be strengthened or retained by way of installing a cast in-situ retaining wall reinforced with screw piles. CD recommended all voids created by the eroded soil be filled with the concrete to ensure the existing pier footings have full bearing capacity on the underlying material. Footing/Foundation impacted by storm/flood While I accept there was likely scouring of the sandstone prior to the March 2022 event , I am persuaded by the complainants reports that the event in March 2022 caused significant scouring. I do not accept the insurers argument that there is no evidence that shows the footings have suffered any damage. The evidence shows that the footings have been exposed and undermined. The reports from BBS, JLG, FS and CD support this. The recommendation from CD is that the footings and foundations be backfilled. I accept based on the available information that most likely the structural integrity of the foundations and brick pier footings has been impacted. Insurer liable to cover costs to repair structural damage I agree the intention of the policy is not to cover the land on which the property has been built. The intention is to cover damage to the home caused by either accidental damage or an insured event. Home is defined as a: “ fully enclosed building with walls and a roof, used primarily for domestic purposes and that can be locked up. It includes any fixtures or home improvements at the site, secured outbuildings (such as your garage) and other domestic structural improvements on your site that comply with local government or other statutory requirements. It does not cover a new home being buil t”’ I accept that the brick pier and concrete pad footings are part of the building as defined. Damage to the structural integrity of the brick piers and concrete pad footings would be damage within the terms of the policy. The exact extent of that damage is not clear. In the circumstances I consider it fair that the insurer appoints a geotechnical or structural engineer to provide designs for the stabilisation of the footings. Once the report is obtained and scope of works provided the insurer is to obtain an actionable quote to complete the required works. The insurer can then elect to either complete the works or cash settle the claim. If the claim is cash settled the insurer is to include a 15% uplift on the quoted amount to cover potential contingencies. 2.2 Is the insurer liable for the internal damage? No. Most likely the internal damage including mould was long term and did not arise from the storm event. Internal damage is not due to a single storm event The complainant says the property also suffered internal damage after the storm event as well. FS reported the lower rear balcony plasterboard and ceiling had cracks. Determination | Case number: 957515 Page 6 of 9 FS identified a separation gap between wall and ceiling in the living area. FS concluded this damage is due to a combination of the insured event, inclined terrain and movement at the property. CD undertook an internal inspection in January 2023. It noticed water stains, mould growth and softened fibre cement sheet near the balcony. The soffit in the balcony had relatively high moisture at the time of inspection. It noticed a step crack above the sliding door in the balcony. The internal ceilings and lining around the sliding door was soft and there was mould present. The floorboards adjacent to the sliding door were uneven and loose and detected a high moisture reading. CD attributed all the above damage to the following:  mould growth is due to absence of weep holes along the façade resulting in water getting trapped within the cavity wall  absence of drainage weep holes and storm moulds along the sliding door  constant exposure of the timber flooring to moisture  mould and water stains in the balcony due to lack of waterproofing above the balcony  step crack due to minor foundation movement or dilapidated building. Based on the available information, I am satisfied the internal damage is not due to a single event. I am satisfied this damage most likely occurred over a period of time. In reaching this view, I consider:  CD’s report is more thorough and conclusive than FS  CD’s reasoning is more plausible and logical  damage to the plasterboard appear old and weathered  signs of previous sealant repair between the balcony wall and floor junction prove there has been moisture issues in the past. Accordingly, the insurer is not required to accept the internal damage. 2.3 Is the insurer liable for the installation of the drainage? No. The policy does not cover structural improvements. Insurer not liable for installation of new drainage The complainant is claiming for the cost he incurred in installing new drainage at the property to mitigate any further damage. I am not satisfied the insurer is required to pay for such works as I consider those works as improvement to the property as they were undertaken to prevent any future damage. The policy does not provide any coverage for such improvements. 2.4 Is the insurer liable for report fees? Yes. Subject to the provision of the invoices the insurer must meet the reasonable cost of the report fees from DA and FS. AFCA can require insurer contribute to professional fees incurred Under AFCA rule D.5 AFCA can determine an insurer contribute up to $5,000 in professional costs reasonably incurred by a complainant in the course of a complaint. Determination | Case number: 957515 Page 7 of 9 The complainant incurred report fees in obtaining an engineering report from FS and building report from DA. Both reports have been relied upon in reaching this determination. In my view both were necessarily obtained to address the issues raised by the insurer. In the circumstances I consider it fair that the insurer pays the complainant the reasonable costs of the reports from FS and DA subject to the complainant providing the relevant receipts or invoices. 2.5 Has the insurer mishandled the claim? No. The insurer has handled the claim fairly and consistently with utmost good faith. AFCA can award non-financial loss in certain circumstances The complainant seeks non-financial loss for stress and inconvenience due to the way the insurer handled the claim. AFCA will only award compensation for non-financial loss where there has been an unusual amount of physical inconvenience, time taken to resolve a situation, or interference with the complainant’s expectation of enjoyment or peace of mind. Compensation is capped at an award of $5,400. In assessing whether to award compensation, we expect complainants to be moderately robust, bear the normal degree of inconvenience experienced when a problem occurs, and take reasonable steps to minimise the inconvenience suffered. Where a complainant has contributed to their loss arising from the financial firm’s conduct, the level of compensation may be reduced accordingly. Claims handling was reasonable The complainant says the insurer breached its duty to act in good faith. The complainant has raised the following issues in relation to the claims handling:  the insurer’s appeal process was unfair, lacked impartiality and was biased  after disputing the initial claims decision, the insurer changed its reasoning to decline the claim  the claim was not handled in a fair, honest and timely manner. Further, the complainant says the insurer’s handling of the cl aim caused him significant stress and anxiety. The insurer has provided a timeline of events. The claim notes show the builder and the engineer were appointed in a timely manner. After the complainant disputed the outcome, the internal disputes team at the insurer provided its review in a timely manner. Further, I do not consider the insurer acted in bad faith. It is well established that the principles of utmost good faith include acting with commercial standards of decency and fairness. While I accept it is not ideal for the insurer to change its reasoning of declining the claim, that is the nature of the disputes process. I do not consider the insurer changing the reasoning to decline the claim means it breached its duty to act in utmost good faith. The role of the disputes handling team is to review the decisions in an independent, impartial and robust manner. If the disputes team identifies an error in the claims decision/handling, I consider it is reasonable for the disputes handler to change its claims decision or the reasoning. If the disputes team are unable to provides its independent review, I consider that would make the dispute process redundant. Determination | Case number: 957515 Page 8 of 9 I accept the claim would have caused stress and inconvenience to the complainant. However even though I disagree with the insurers decision, I consider the overall handling of the claim was reasonable in the circumstances. Accordingly, I am satisfied the insurer is not required to pay any compensation. 2.6 Why is the outcome fair? This outcome is fair as the available information indicates it is most likely that the structural integrity of the brick piers and concrete footings have been compromised. It is fair in these circumstances that the insurer covers the cost of the required repairs in accordance with the terms of the policy. Determination | Case number: 957515 Page 9 of 9 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all the information the parties have provided. While the parties have raised several issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.