Home / Open Insurance Pty Ltd / Determination 957515
Determination 957515
Decline of storm damage claim for foundation and footing damage, internal damage and drainage costs
Summary
The complainant claimed for storm damage to foundations, internal damage and drainage costs after March 2022 storms; the insurer declined. AFCA found the footing damage covered and ordered engineer-designed repairs or cash settlement plus report fees, but rejected internal damage, drainage and non-financial loss.
On the balance of probabilities the March 2022 storm compromised the footings, which are part of the defined home, while internal damage was long-term and drainage works were improvements not covered.
Issues
- Claim denial primary · upheld
“Most likely the structural integrity of the foundations was affected by the March 2022 event. The insurer must settle the claim.”
- Poor claim handling secondary · not upheld
“The insurer has handled the claim fairly and consistently with utmost good faith.”
- Inadequate claim investigation secondary · not upheld
“Internal damage most likely occurred over a period of time; CD's report more thorough than FS.”
- Product terms interpretation secondary · upheld
“I accept that the brick pier and concrete pad footings are part of the building as defined.”
Subjects and remedies
home or building damagenatural disasterpay claimpay compensationreassess claim
Text of the determination
Determination
Case number 957515
Financial firm Open Insurance Pty Ltd
Determination | Case number: 957515 Page 1 of 9
Case number: 957515 13 December 2023
1 Determination overview
1.1 Complaint
On 16 March 2022 the complainant lodged a claim on his home and contents insurance
policy for structural damage to his property following a severe storm event.
The insurer says there is no damage but that the sandstone beneath the footing has eroded
away. The sandstone is not defined as part of the home. Further the internal damage is not
due to a single event but most likely due to foundation movement and maintenance issues.
The complainant disputes the insurer’s decision and says the insurer has breached its duty of
utmost good faith. The complainant also says the insurer’s claims handling caused him a
great level of stress and inconvenience.
1.2 Issues and key findings
Is the insurer liable for the foundation repairs?
Yes. Most likely the structural integrity of the foundations was affected by the March 2022
event. The insurer must settle the claim as set out in section 2.1 of this determination.
Is the insurer liable for the internal damage?
No. Most likely the internal damage was long term and did not arise from the storm event.
Is the insurer liable for the installation of the drainage?
No. The policy does not cover structural improvements.
Is the insurer liable for report fees?
Yes. The insurer must meet the reasonable cost of the report fees from DA and FS.
Has the insurer mishandled the claim?
No. The insurer has handled the claim fairly and consistently with utmost good faith.
Why is the outcome fair?
This outcome is fair as most likely the structural integrity of the brick piers and concrete
footings have been compromised. It is fair in these circumstances that the insurer covers the
cost of the required repairs in accordance with the terms of the policy.
1.3 Determination
This determination is in favour of the complainant. Within 21 days of the notification of the
complainant accepting this determination the insurer is to:
appoint a geotechnical or structural engineer to provide designs for the stabilisation of the
footings.
Determination | Case number: 957515 Page 2 of 9
once the report is obtained and scope of works provided the insurer is to obtain an
actionable quote to complete the required works.
the insurer can then elect to either complete the works or cash settle the claim. If the claim
is cash settled the insurer is to include a 15% uplift on the quoted amount to cover
potential contingencies.
pay the reasonable cost of the report fees from DA and FS subject to the complainant
providing the relevant invoices or receipts
The insurer is otherwise entitled to deny the balance of the complainants claim in accordance
with the terms of the policy.
Determination | Case number: 957515 Page 3 of 9
2 Reasons for determination
2.1 Is the insurer liable for the foundation repairs?
Yes. I am satisfied that most likely the structural integrity of the foundations has been affected
by the floodwaters from March 2022 and should settle the claim as set out in this
determination.
Complainant has onus to prove claim falls within terms of policy
It is established insurance law that an insured has the initial onus to prove on the balance of
probabilities (that is more likely than not) that the loss or damage claimed falls within the
terms of the policy.
Once established the onus shifts to the insurer to show that, on the balance of probabilities, it
is entitled to decline the claim.
The complainant’s comprehensive home and contents policy provides cover for a series of
listed events including storm, rainwater and flood as well as accidental damage cover.
The policy defines an event as a single occurrence that results in loss or damage.
Circumstances of claim
The complainant lives in New South Wales (NSW). On 16 March 2022, the complainant
lodged a claim with the insurer for stormwater damage to his property which happened two
weeks earlier.
There was a severe storm event in March 2021 (12 months prior to the subject event). The
complainant says the water from that event did not cause any scouring or erosion. Following
that event, the complainant installed a water sprinkler system on the roof and added a new
drain along the front of the property to prevent water flowing under the property.
In March 2022, 625 mm of rain fell which resulted in water flowing through the property. The
Bureau of Meteorology (BOM) data confirms the area received over 430mm of rain in the first
nine days of March.
The property slopes from south to north. The complainant says stormwater flowed under the
home scouring out the sandstone beneath the footings on the south-west corner of the
property. There is no dispute that there was heavy rain during the period or that water flowed
through the property during the event.
The complainant says the scouring of the sandstone has damaged the foundations and
footings. As this was caused by stormwater runoff the complainant says it should be covered
under the terms of the policy. Following the 2022 storm event, the complainant installed a
larger strip drain along the front of the property the prevent further damage.
The insurer says that while there is scouring, the scouring has happened over a period of
time, and not from a single event in 2022. Further, it says there was no actual damage to the
compl ainant’s home or to the footings . To the extent that there is scouring of the soil
(sandstone), soil is not included in the policy definition of home.
The complainant says the policy definition of a home is not meant to be exhaustive or
complete. He says the definition does not include all the standard components of a home.
Determination | Case number: 957515 Page 4 of 9
The complainant says the soil and the foundations directly beneath the house support the
load bearing structures including footings, piers, piles and slab and any damage to the
foundations should be considered as damage to the house itself.
Further, he says footings cannot function without the foundation they are anchored into and if
the foundations or the footings are damaged, then it is reasonable to infer that the home has
been damaged.
Engineers confirm structural integrity likely to be impacted
It is not in dispute a large portion of rock and soil has eroded below the western masonry
piers and concrete footings, partially exposing the underside of the foundations.
BBS were appointed by the insurer’s loss adjuster and attended the property on 28 March
2022. BBS noted large amounts of ground in the subfloor area had been excavated to
facilitate the construction of the laundry and exposing most of the concrete footing supporting
the external brickwork of the dwelling. BBS considered a suitably qualified professional was
required to comment on the condition of the area and recommend any necessary repairs.
BBS considered maintenance would include but not limited to the construction of a compliant
retaining wall to secure the cut sandstone foundation and the installation of adequate
drainage.
The insurer engaged the services of an engineer (CD) to inspect the property and assess
damage to the building footings. CD attended the property on 6 May 2022 and noticed water
was seeping from the exposed rock face in the south-western subfloor space. CD noticed a
strip drain around the subfloor was filled with deposits of silt and soil.
CD concluded the erosion has been happening over a period of time and significant weather
events of March 2021 and March 2022 have likely increased the rate of erosion of soils
underneath the foundations. CD also stated the significant slope of the property and long-
term saturation has resulted in the erosion of the rocks and soil below the south-western
foundations at the property.
CD found no immediate concerns regarding the structural integrity of the building but
considered ongoing erosion may result in the loss of material below the foundation and
subsequent cracks. CD recommended that a Geotech/Structural Engineer be appointed to
provide designs on the stabilisation of the foundations.
The insurer’s builder JLG attended the site on 5 August 2022. JLG identified soil erosion
underneath the footings. JLG considered the footings may not be structurally sound or at risk
of losing structural integrity. JLG recommended a structural engineer be appointed.
The complainant appointed an engineer (FS) to assess the damage to the structural
components of the property. FS attended on 5 September 2022. FS considered that the
structural component of the dwelling has been affected by the recent flood water mainly, to
the sub-floor area and rear balcony of the dwelling. FS considered the dwelling is structurally
habitable but, the issues are required to be addressed.
FS concluded that due to continuous run-off water and high flow of flood water, soil is scoured
in the sub-floor area, causing slightly movement in the foundation. Further due to the flood
impact and inclined terrain, subsidence/movement to natural ground soil has occurred
causing the cracks in plasterboards, ceiling and separation gap between wall and ceiling.
Determination | Case number: 957515 Page 5 of 9
The complainant also appointed another expert (DA) to inspect the footings. DA observed
stormwater undermining the footings and said the washout beneath the footings should be
backfilled with concrete to prevent the collapse of the foundations
I note CD considered the soil/rock face below the subject foundations will likely be
strengthened or retained by way of installing a cast in-situ retaining wall reinforced with screw
piles. CD recommended all voids created by the eroded soil be filled with the concrete to
ensure the existing pier footings have full bearing capacity on the underlying material.
Footing/Foundation impacted by storm/flood
While I accept there was likely scouring of the sandstone prior to the March 2022 event , I am
persuaded by the complainants reports that the event in March 2022 caused significant
scouring.
I do not accept the insurers argument that there is no evidence that shows the footings have
suffered any damage. The evidence shows that the footings have been exposed and
undermined. The reports from BBS, JLG, FS and CD support this. The recommendation from
CD is that the footings and foundations be backfilled.
I accept based on the available information that most likely the structural integrity of the
foundations and brick pier footings has been impacted.
Insurer liable to cover costs to repair structural damage
I agree the intention of the policy is not to cover the land on which the property has been built.
The intention is to cover damage to the home caused by either accidental damage or an
insured event. Home is defined as a:
“ fully enclosed building with walls and a roof, used primarily for domestic purposes and that
can be locked up. It includes any fixtures or home improvements at the site, secured
outbuildings (such as your garage) and other domestic structural improvements on your site
that comply with local government or other statutory requirements. It does not cover a new
home being buil t”’
I accept that the brick pier and concrete pad footings are part of the building as defined.
Damage to the structural integrity of the brick piers and concrete pad footings would be
damage within the terms of the policy. The exact extent of that damage is not clear.
In the circumstances I consider it fair that the insurer appoints a geotechnical or structural
engineer to provide designs for the stabilisation of the footings. Once the report is obtained
and scope of works provided the insurer is to obtain an actionable quote to complete the
required works. The insurer can then elect to either complete the works or cash settle the
claim. If the claim is cash settled the insurer is to include a 15% uplift on the quoted amount
to cover potential contingencies.
2.2 Is the insurer liable for the internal damage?
No. Most likely the internal damage including mould was long term and did not arise from the
storm event.
Internal damage is not due to a single storm event
The complainant says the property also suffered internal damage after the storm event as
well. FS reported the lower rear balcony plasterboard and ceiling had cracks.
Determination | Case number: 957515 Page 6 of 9
FS identified a separation gap between wall and ceiling in the living area. FS concluded this
damage is due to a combination of the insured event, inclined terrain and movement at the
property.
CD undertook an internal inspection in January 2023. It noticed water stains, mould growth
and softened fibre cement sheet near the balcony. The soffit in the balcony had relatively high
moisture at the time of inspection.
It noticed a step crack above the sliding door in the balcony. The internal ceilings and lining
around the sliding door was soft and there was mould present.
The floorboards adjacent to the sliding door were uneven and loose and detected a high
moisture reading.
CD attributed all the above damage to the following:
mould growth is due to absence of weep holes along the façade resulting in water getting
trapped within the cavity wall
absence of drainage weep holes and storm moulds along the sliding door
constant exposure of the timber flooring to moisture
mould and water stains in the balcony due to lack of waterproofing above the balcony
step crack due to minor foundation movement or dilapidated building.
Based on the available information, I am satisfied the internal damage is not due to a single
event. I am satisfied this damage most likely occurred over a period of time. In reaching this
view, I consider:
CD’s report is more thorough and conclusive than FS
CD’s reasoning is more plausible and logical
damage to the plasterboard appear old and weathered
signs of previous sealant repair between the balcony wall and floor junction prove there
has been moisture issues in the past.
Accordingly, the insurer is not required to accept the internal damage.
2.3 Is the insurer liable for the installation of the drainage?
No. The policy does not cover structural improvements.
Insurer not liable for installation of new drainage
The complainant is claiming for the cost he incurred in installing new drainage at the property
to mitigate any further damage.
I am not satisfied the insurer is required to pay for such works as I consider those works as
improvement to the property as they were undertaken to prevent any future damage. The
policy does not provide any coverage for such improvements.
2.4 Is the insurer liable for report fees?
Yes. Subject to the provision of the invoices the insurer must meet the reasonable cost of the
report fees from DA and FS.
AFCA can require insurer contribute to professional fees incurred
Under AFCA rule D.5 AFCA can determine an insurer contribute up to $5,000 in professional
costs reasonably incurred by a complainant in the course of a complaint.
Determination | Case number: 957515 Page 7 of 9
The complainant incurred report fees in obtaining an engineering report from FS and building
report from DA. Both reports have been relied upon in reaching this determination. In my view
both were necessarily obtained to address the issues raised by the insurer.
In the circumstances I consider it fair that the insurer pays the complainant the reasonable
costs of the reports from FS and DA subject to the complainant providing the relevant receipts
or invoices.
2.5 Has the insurer mishandled the claim?
No. The insurer has handled the claim fairly and consistently with utmost good faith.
AFCA can award non-financial loss in certain circumstances
The complainant seeks non-financial loss for stress and inconvenience due to the way the
insurer handled the claim.
AFCA will only award compensation for non-financial loss where there has been an unusual
amount of physical inconvenience, time taken to resolve a situation, or interference with the
complainant’s expectation of enjoyment or peace of mind. Compensation is capped at an
award of $5,400.
In assessing whether to award compensation, we expect complainants to be moderately
robust, bear the normal degree of inconvenience experienced when a problem occurs, and
take reasonable steps to minimise the inconvenience suffered. Where a complainant has
contributed to their loss arising from the financial firm’s conduct, the level of compensation
may be reduced accordingly.
Claims handling was reasonable
The complainant says the insurer breached its duty to act in good faith. The complainant has
raised the following issues in relation to the claims handling:
the insurer’s appeal process was unfair, lacked impartiality and was biased
after disputing the initial claims decision, the insurer changed its reasoning to decline the
claim
the claim was not handled in a fair, honest and timely manner.
Further, the complainant says the insurer’s handling of the cl aim caused him significant stress
and anxiety.
The insurer has provided a timeline of events. The claim notes show the builder and the
engineer were appointed in a timely manner. After the complainant disputed the outcome, the
internal disputes team at the insurer provided its review in a timely manner.
Further, I do not consider the insurer acted in bad faith. It is well established that the
principles of utmost good faith include acting with commercial standards of decency and
fairness. While I accept it is not ideal for the insurer to change its reasoning of declining the
claim, that is the nature of the disputes process. I do not consider the insurer changing the
reasoning to decline the claim means it breached its duty to act in utmost good faith.
The role of the disputes handling team is to review the decisions in an independent, impartial
and robust manner. If the disputes team identifies an error in the claims decision/handling, I
consider it is reasonable for the disputes handler to change its claims decision or the
reasoning. If the disputes team are unable to provides its independent review, I consider that
would make the dispute process redundant.
Determination | Case number: 957515 Page 8 of 9
I accept the claim would have caused stress and inconvenience to the complainant. However
even though I disagree with the insurers decision, I consider the overall handling of the claim
was reasonable in the circumstances. Accordingly, I am satisfied the insurer is not required to
pay any compensation.
2.6 Why is the outcome fair?
This outcome is fair as the available information indicates it is most likely that the structural
integrity of the brick piers and concrete footings have been compromised. It is fair in these
circumstances that the insurer covers the cost of the required repairs in accordance with the
terms of the policy.
Determination | Case number: 957515 Page 9 of 9
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all the information the parties have provided.
While the parties have raised several issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.