Denial of storm damage claim for subfloor pier collapse and cracking to investment property, plus loss of rent, legal costs and non-financial loss
Text of the determination
Determination
Case number 957366
Financial firm QBE Insurance (Australia) Limited
Determination | Case number: 957366 Page 1 of 7
Case number: 957366 4 March 2024
1 Determination overview
1.1 Complaint
The complainant holds landlord insurance with the financial firm (insurer). She lodged a claim
for movement and cracking damage to her investment property, following a storm in
November 2021. She said rainfall run-off had caused the collapse of several subfloor piers.
The insurer denied the claim. It says the damage was not caused by the storm. Rather, the
damage was from causes excluded under the policy terms, including long term earth
movement and gradual deterioration.
The complainant disagrees with the insurer’s decision and is diss atisfied with its claim
handling. She wants the insurer to pay for repair of the damage claimed as well as for loss of
rent (LOR). She also seeks reimbursement of legal fees and non-financial loss compensation.
In this complaint, the complainant is represented by lawyers BR. During the claim, she was
also represented by her son, JW. The complainant, JW and BR are referred to in this
determination as ‘the complainant’, unless context requires otherwise.
1.2 Issues and key findings
Is the insurer entitled to deny the claim?
Yes. On balance, the complainant has not established a claimable loss under the policy. Also,
it is more likely than not the damage is from excluded causes. This means the insurer is not
required to attend to repairs or pay for LOR.
Is the insurer required to reimburse legal fees?
No. I am not satisfied the insurer’s claim handling meant it was necessary for the complainant
to engage BR. Further, their involvement has not assisted her to obtain a better outcome.
Is non-financial loss compensation payable?
No. While the complainant has experienced stress and inconvenience, I am not satisfied that
the insurer unreasonably delayed or otherwise mishandled the claim.
Why is the outcome fair?
As the complainant has not established a claimable loss under the policy terms, it would be
unfair to require the insurer to cover the claim. In those circumstances, and as the insurer
handled the claim reasonably overall, it would also be unfair to require the insurer to
reimburse legal costs or pay non-financial loss compensation.
1.3 Determination
This determination is in favour of the insurer.
The insurer is entitled to deny the claim. It is not required to take any further action.
Determination | Case number: 957366 Page 2 of 7
2 Reasons for determination
2.1 Is the insurer entitled to deny the claim?
Yes. On balance, the complainant has not established a claimable loss under the policy. Also,
it is more likely than not the damage is from excluded causes. This means the insurer is not
required to attend to repairs or pay for LOR.
Complainant must show a claimable loss under the policy
The complainant is required to show, on the balance of probabilities (that it is more likely than
not), that she suffered a claimable loss under the policy. This means she must show the loss
was caused by a risk for which she is insured.
Subject to the terms and conditions set out in the product disclosure statement (PDS), the
complainant’s policy covers damage to her investment residential property (home) caused by
a listed insured event. Those event s include ‘Storm’.
The PDS defines ‘event’ as ‘each occurrence, loss or damage which entitles you to make a
claim under this Policy’.
On 25 January 2022, the complainant notified the insurer that several of the home’s sub-floor
brick piers had fallen or displaced due to rainfall run-off during a recent storm. The damage to
the piers had resulted in cracking within the home.
Once the complainant proves the existence of a claimable loss, the insurer is liable for the
loss unless it shows an exclusion or limiting condition applies. The insurer has the onus of
proving on the balance of probabilities the application of the exclusion or condition.
Parties’ experts disagree on causation
The insurer relies on a report dated 25 February 2022 by engineer DW. After inspecting the
home on 9 February 2022, DW informed the insurer that:
the block had a moderate fall from the north-east to the south-west
the internal cracking was aged in appearance, rather than sharp and clean as would be
expected of newly formed cracks
there were previous patch repairs, indicating cracking had been an issue in the past
it was likely the home was founded on moderately to highly reactive clay soils
the width of the cracks ranged from less than 1mm to about 3mm
cracking in that range would generally be considered consistent with ‘normal and expected
building movements’ for a moderately reactive clay site
the home’s north wall towards the north-eastern corner was retaining 300 to 500mm of soil
there was no obvious evidence of water drainage systems on the higher adjacent
properties to the north and to the east
during rain/storm events, surface and subsurface water would typically follow the fall
towards the home’s north -eastern corner and enter the subfloor area
sections of the subfloor surface soil were very damp, and a channel had formed due to
frequent surface/subsurface water flows
five brick piers had moved/displaced. They were generally near the channel. Packing had
previously been inserted between some of the piers and the floor bearer above
the pier movement was likely due to water flows into the subfloor during seasonal rains,
which had created abnormal moisture conditions. The channel suggests this had been an
ongoing issue and was not related to any specific event
Determination | Case number: 957366 Page 3 of 7
‘In conclusion the movement of the brick piers obs erved in the subfloor area and the likely
resultant internal cracking in the dwelling (in part) is likely to be related to the poor site
drainage observed and not any specific event’.
The complainant engaged engineer LE. After inspecting the home, LE provided a report
dated 28 March 2022 in which it said:
the home’s subfloor support system had been subjected to high flow flooding from the
backyard, which was not a regular occurrence
the footings appeared to have been damaged by water that had ponded in t he backyard
and then escaped into the subfloor
the strip footing to the rear wall had been undermined and would require underpinning
the water ingress had caused the foundation material to erode, rotate and dislodge
the floor support structure required rectification to prevent further deflection
a builder had installed temporary props to prevent additional displacement
there was a ‘no go zone’ currently in place within the home and the subfloor
the damage was isolated to the footings in the vicinity of the overland flow path generated
by the floodwaters. The remainder of the subfloor was in good condition.
LE provided additional comments in an email dated 31 May 2023. It said:
if water regularly infiltrated the subfloor, there would be a high moisture content
atmosphere
instead, the subfloor was generally dry, with no overwhelming moisture smell, no rusting of
stored metal items, and the areas not affected by the water ingress were dry and dusty
as at December 2021, the home was too dangerous to be occupied - the floor system was
not adequately supported due to the pier undermining, and could collapse if loaded
the internal cracking, or at least some of it, was due to the pier movement
while there was minor packing to piers, that was to be expected because when brick piers
are constructed and first loaded they settle somewhat.
Due to the differing views of DW and LE, the parties discussed engaging a third engineer to
prepare a causation report. However, that did not occur due to disagreement on the engineer
to be used and costings.
Insurer says it is entitled to deny the claim
The insurer says DW’s report is more thorough and persuasive than LE’s report.
Based on DW’s findings, the insurer says the complainant has not established a claimable
loss under the storm insured event. Instead, the damage claimed is excluded because the
PDS states on page 15 that the policy does not cover damage caused by:
wear, tear or gradual deterioration
inherent defects, structural defects, faulty workmanship or design
settling, shrinkage or expansion in foundations
erosion, subsidence or earth movement (unless caused by an insured event).
The insurer notes that the PDS contains an insured event for earth movement. However, that
event only applies if the movement is directly the result of and occurs within 72 hours of
(relevantly) a storm. The insurer says the earth movement insured event does not apply.
In addition, the insurer points out that the LOR coverage under the policy is only triggered if
the home is rendered unliveable by an accepted claim event. It says that in the
circumstances, the complainant is not entitled to LOR.
Determination | Case number: 957366 Page 4 of 7
Complainant says the claim should be accepted
The complainant maintains that the claim should be accepted by the insurer.
She says that at some time prior to 11 November 2021, her tenant verbally informed her
managing agent that there was water running under the home, and a pier had fallen over.
After LE and a builder inspected the home and identified safety concerns, the managing
agent sent a notice to vacate dated 11 November 2021 to the tenant.
The complainant has provided two photos taken in December 2019 (2019 photos), and says
they show there were no subfloor surface channels then. She says that the storm event was
the first occasion when water had flowed through the subfloor area. She refers to LE’s
statement that such water flow was not a regular occurrence.
While she concedes that some of the internal cracking may have been due to normal building
movement, and repairs may have previously been undertaken, the complainant does not
agree that was the cause of all the cracking.
The complainant also notes that she has owned the home for over 30 years and does not
recall any packing being installed or other pier repair work prior to the storm.
Insurer is entitled to deny the claim
In general insurance claim, the term ‘proximate cause’ is used to describe whether an event
is the cause of the loss or damage. The proximate cause of a loss is the dominant, effective
or operative cause. It does not have to be the first, the last or the only cause.
Based on the exchanged information, I am not satisfied the complainant has established the
proximate cause of the damage claimed was a storm. Rather, it is more likely than not the
damage is from excluded causes. This is because:
a careful comparison of the 2019 photos and images in the reports of DK and LE shows:
> the location of water ingress identified by LE (a hole under the strip footing) was already
present in 2019
> the channel and the main area of erosion identified by LE and DK were present in 2019
> the location of water ingress identified by LE is slightly downhill from the channel, which
suggests that water flows from other entry points must also have contributed to the
channel’s cre ation
DK’s report contains more analysis, scientific data, images and mapping than LE’s report. I
find DK’s report more persuasive
the complainant has not identified the date of the storm event said to have caused the
damage, has not provided any rainfall data for November 2021, and has not adequately
explained how a single rainfall event would have created a channel of such size
I am not satisfied the level of dampness observed by DK on 9 February 2022 is consistent
with having been caused by a one-off storm event, three months earlier in November 2021
the complainant concedes there was cracking and repairs prior to November 2021. This
supports a finding that the home was affected by long term ground movement
LE has not provided any moisture testing results to show the subfloor air had a low
moisture content.
The complainant has not established a claimable loss under the policy. On balance, the
damage was due to causes excluded under the policy terms. This means the insurer is not
required to attend to repairs or pay for LOR.
Determination | Case number: 957366 Page 5 of 7
2.2 Is insurer required to reimburse legal fees?
No. I am not satisfied the insurer’s claim handling meant it was necessary for the complainant
to engage BR. Further, their involvement has not assisted her to obtain a better outcome.
AFCA may require insurer to contribute to a complainant’s professional costs
The AFCA Rules enable AFCA to require an insurer to contribute to the professional costs
incurred by the complainant. These costs are, however, usually capped at a total of $5,000,
unless special circumstances apply.
When considering whether to require an insurer to make a costs contribution, AFCA
considers matters such as the complexity of the complaint and whether the particular
complainant needed to incur costs to understand or establish their claim.
Insurer is not required to reimburse legal fees
The complainant says that due to the insurer’s delays and claim mismanagement, she was
forced to engage BR to represent her. She specifically refers to a two-month delay in the
provision of DK’s report and the insurer’s alleged reneging of an agreement to obtain a third
e ngineer’s report.
The complainant says that special circumstances apply, such that the insurer should
contribute more than $5,000 to her legal costs. BR has provided redacted invoices, totalling
more than $9,400.
However, the insurer did not unreasonably delay providing DK’s report. It received the report,
dated 25 February 2022, on 29 March 2022. The insurer sent the report to the complainant on
8 April 2022.
Based on the exchanged information, I cannot be satisfied that the discussions between the
parties about engaging a third engineer amounted to a binding agreement. Further, there was
nothing preventing the complainant from obtaining her own additional expert reports.
I am therefore not satisfied that it was necessary for the complainant to engage BR. Further,
BR has not assisted the complainant in establishing the claim should be accepted.
I also note that the redacted invoices provided by BR do not enable an assessment of the
relationship between the work undertaken and the claim/complaint.
Accordingly, the insurer is not required to reimburse the complainant’s legal fees.
2.3 Is non-financial loss compensation payable?
No. While the complainant has experienced stress and inconvenience, I am not satisfied that
the insurer unreasonably delayed or otherwise mishandled the claim.
AFCA can award compensation for poor claim handling
Under the AFCA Rules, we may award compensation (capped at $5,400) for non-financial
loss where a complainant has suffered an unusual degree or extent of physical
inconvenience, time taken to resolve the situation or interference with their expectation of
enjoyment or peace of mind.
Determination | Case number: 957366 Page 6 of 7
Insurer is not required to pay non-financial loss compensation
The complainant is an elderly woman who was recently diagnosed with a serious health
condition. She says the insurer’s incorrect coverage decision, delays and claim
mismanagement have caused her significant stress, anxiety and inconvenience.
The insurer says it has handled the claim in a reasonable and timely manner.
I acknowledge that the complainant has found the claim and subsequent complaint process
stressful and inconvenient.
I accept that there have been delays. Some of these have been the result of the parties’
discussions about obtaining a third engineer’s report. Others have involved the insurer
awaiting contact from JW or BR. It is also apparent that the insurer took steps to keep the
complainant informed. To the extent there were delays in that regard, they were minor.
Overall, based on the exchanged information, I am not satisfied that the insurer unreasonably
delayed or otherwise mishandled the claim. As outlined above, I consider that the insurer’s
coverage decision was correct.
In the circumstances, the insurer is not required to pay the complainant non-financial loss
compensation.
2.4 Why is the outcome fair?
As the complainant has not established a claimable loss under the policy terms, it would be
unfair to require the insurer to cover the claim. In those circumstances, and as the insurer
handled the claim reasonably overall, it would also be unfair to require the insurer to
reimburse legal costs or pay non-financial loss compensation.
Determination | Case number: 957366 Page 7 of 7
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. I have reviewed and considered
all the information the parties have provided.
While the parties have raised several issues in their submissions, I have restricted this
determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.