Home / IAG / Determination 957051

Determination 957051

Partial decline of storm damage claim (sinking floors and piers) and poor claim handling

FirmIAG
Decided2023-11-07
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded$84,700
Non-financial loss$3,500
Amount claimed$526,718
SourceAFCA PDF

Summary

The complainant claimed for storm and flood damage to his home; the insurer offered only a mould cash settlement and denied floor and pier damage. AFCA found the sinking floors were pre-existing but the mould and related damage were storm-related, ordering $84,700 cash settlement (or reassessment at the complainant's option) plus $3,500 non-financial loss.

The complainant must show a covered loss; evidence showed the floors were sinking before the storm, but mould and related damage were storm-caused, and the insurer's poor claim handling warranted compensation.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimpay non financial lossreassess claim

Related

All IAG determinations · Find similar determinations

Text of the determination

Determination Case number 957051 Financial firm Insurance Australia Limited Determination | Case number: 957051 Page 2 of 11 Case number: 957051 16 October 2023 1 Determination overview 1.1 Complaint The complainant holds a home insurance policy with the financial firm (the insurer). He lodged a claim for water damage to his home following a storm on 11 March 2022. The insurer has agreed to cover the mould damage at the property and offered a cash settlement of $10,870.40. The insurer says all other damage to the property including that to the floor and piers was not due to the 2022 storm event, rather the damage is related to maintenance and pre-existing issues. The insurer says it did not engage an engineer to report on the structural damage to the property. Therefore, it offers to appoint an engineer to assess and report on this damage. The complainant is not willing to allow any further inspection of the property. The complainant is seeking the full policy amount of $526,718, plus compensation for the stress and inconvenience caused to him due to the insurer‟s claim handling. 1.2 Issues and key findings Has the insurer correctly assessed the claim? The insurer has correctly assessed only part of the claim. Given the insurer‟s de lays and breakdown in the relationship between the parties, it would not be fair or reasonable on the complainant to allow the insurer to conduct a further assessment which should have been conducted at an earlier time. As a result, the panel has sought to bring this matter to finalisation based on the information that has been exchanged. However, a t the complainant‟s discretion he has the option to accept the amounts the panel has determined or to allow the insurer to re-attend for a further assessment. If the complainant accepts the second option, o n receipt of the engineer‟s report, the insurer is to review its claim decision and settle any storm related damage. Is an award of compensation appropriate? Yes. The insurer did not handle the claim appropriately and this caused an unusual amount of stress, delay and inconvenience for the complainant. Why is the outcome fair? The outcome is fair because it is consistent with the information exchanged. 1.3 Determination The determination is partially in favour of the complainant. The insurer and the complainant are to cooperate to comply with this determination. Determination | Case number: 957051 Page 3 of 11 2 Reasons for determination 2.1 Has the insurer correctly assessed the claim? The insurer has correctly assessed only part of the claim. The insurer denied the damage to the floor and piers saying it is related to maintenance and pre-existing issues. It offered a cash settlement for mould related damage, but the complainant rejected it. The insurer says it is not yet confirmed if the cause of structural damage to the property is the March 2022 storm. It says an engineer‟s assessment is required to confirm the cause of structural damage. Complainant must establish a valid claim under the policy The complainant is required to show on the balance of probabilities (that it is more likely than not) he suffered a loss caused by a risk covered by the policy. This is known as a valid, claim. The complainant holds a home insurance policy issued by the insurer. Subject to its terms and conditions, the policy covers loss and damage caused by the listed events detailed in the insurer‟s product disclosure statement (PDS). One of those listed events is „Storm‟ . Once the complainant establishes a valid claim, the insurer is liable for the loss unless it shows an exclusion or limiting condition applies. The insurer has the onus of proving on the balance of probabilities the application of the exclusion or condition. When there are multiple potential causes of a loss, it is necessary to determine the proximate cause. Proximate cause is the dominant, efficient or operative cause of a loss. It is not required to be last in time or the sole cause. It is a question of fact that depends on the circumstances of each case. It requires a common-sense evaluation of the evidence. Complainant says the storm caused the damage On 26 March 2022, the complainant notified the insurer that the insured property had sustained water damage during a storm on 11 March 2022. The complainant says due to the heavy rains, water went through and under his house resulting in subsidence of the house footings and sinking of the house. He says the hardwood floors had movement, separation and mould. The complainant says the entire damage to his property is because of the March 2022 storms. He says there were no maintenance issues which would have contributed to the damage. He relies on his engineer, JL, who says the structural damage to his property is because of the storm event. He says JL‟s report includes a detailed scope of works and c osting to repair the damage. The complainant also submitted a restoration report from „S‟ , which confirmed the presence of mould and other storm related damage. The complainant says the insurer has already conducted multiple inspections to assess the damag e, therefore, he is not willing to allow access to any of the insurer‟s experts to reassess the damage at his property. He wants the insurer to review its claim decision based on the available evidence and provide an outcome. Complainan t’s engineer JL JL attended the property on 22 July 2022 and reported that: Determination | Case number: 957051 Page 4 of 11  the flood and storm waters has caused water damage to the internal and external finishes of the property. The property has also suffered minor structural damage  repair and reinstatement are required to the brickwork, subfloor framing/posts, roofing, windows, floor finishes, painting, plumbing and electrical services  mould is apparent and visible throughout the property  it is likely that the house contains asbestos and the removal of any asbestos is required.  However, the exact extent of asbestos is unknown, and a qualified hygienist will need to be engaged to understand the extent  a structural engineer‟s inspection of the property shows several issues that require rectification which have been caused by the severe weather event. This includes underpinning the footings and assessment of the brick piers by removing floor lining and repairs to the structural crack in a brick wall The insurer says there are no details about the cause of the structural damag e in JL‟s report. It says that JL‟s report only provides a scope of work for the d amage identified by the builder. The insurer considers its builder ‟s (Y) report provides a better analysis of damage. Insurer says the cause of structural damage is not yet confirmed The insurer appointed a builder (R), who attended the insured property on 31 May 2022 and reported that there was no claim related damage at the property. R stated that the internal floor has sloped away and dropped before the storm. R detailed a mouldy smell at the property coming from water under the house as there is no drainage for water to exit. R noted no mould in the interior of the house. R concluded that the damage at the property appeared to be pre-existing. The insurer denied the claim on 16 June 2022. The complainant disagrees with R‟s report and requested a review of the claim decision. The insurer appointed builder, Y, to assess and report on the damage to the floor and piers at the property. Y reviewed the reports from R and a cleaning and restoration specialist (S). Y inspected the property on 12 July 2022 and reported that:  a large amount of water ponding was observed outside, under, in the sub-floor and around the home  bricks were used previously to support the bottom plates or bearers of the walls indicating that sinking of the floors is not new. Fibro cement of the villa board sheeting was used to areas as packers between the piers and bottom plate or bearer due to past/pre-existing sinking of the piers  in the kitchen and dining rooms there was no evidence of recent dropping of walls or floors with cracking, separation or dislodgment of tiles, timber trims or moulding or any other building material that would indicate floor dropping/sinking from a single recent insured event  partial renovations were done since the home was sold in June 2018 with building materials that have been cut in, cut to or fitted to suit the sunken floors  there were water marks to the soil under the home around the kitchen area which is most likely from the recent rain and storms. However, these soil marks are not related to the sinking of the floors by removing soil at mass causing the piers to sink suddenly from a recent event. These marks would occur in any large rain event, due to the block sloping from front to back with most of the water directed under the home from the immediate water path at the front of the property Determination | Case number: 957051 Page 5 of 11  the internal walls to some rooms showed signs of mould growth. There is nothing to confirm about when this mould has appeared. The report from S states that there was mould present recently after the storm. However, Y noted that the subfloor space is still ponding large amounts of water which is not escaping as well as the home being locked up due to the insured not living there which is only contributing and accelerating additional mould growth inside the home  sinking floors to the home in the kitchen and dining room is not related to a single insured event (storm) and it has occurred previously and most likely is still slowly occurring over time  the mould growth to the internal parts of the home is not related to the storm event, however, it is being accelerated due to water still present under the home and being locked up. Based upon Y‟s report the insurer decided that the mould has occurred because of the storm water. The insurer engaged builder, R to prepare a mould remediation scope of works and make safe. R subsequently appointed a restorer, RS, who attended the property on 17 August 2022 and who completed a make safe and took moisture readings. RS identified mould growth on the walls and skirting boards of the house entrance, bedroom two, bedroom three, lounge room, dining room and on the vanity unit in the bathroom. R reattended on 12 October 2022, and concluded that there was mould at the property, but all the walls were dry. R reported that:  the mould growth is from atmospheric transference from a combination of the continual water that is laying under the house and the house being locked up most of the time. There is no evidence that the house has been flooded inside as all walls were dry, but mould continues to grow  as the surrounding yard is extremely water logged, water had trouble escaping from this area. In R‟s first inspection, t he insured was advised that he needs to install drainage system as a maintenance issue. No maintenance had been carried out to rectify the water issues at the time of the second inspection. While the water has flowed under the house, it did not enter the house. With several major rain storms since the first one there has been no chance for the subfloor area to dry out  the engineer has noted that the mould growth to the internal parts of the house is not related to the storm event, however, it is being accelerated due to water still present under the home and being locked up. As the mould is from atmospheric transference and not from direct contact with flood waters this would not be covered The insurer, based on Y‟ s report, decided on 16 November 2022, to not cover the sinking floor as it was not because of the storm event. The complaint does not accept this decision. On 16 December 2022, the insurer, due to the conflicting reports appointed RIC an indoor environmental professional (IEP) to report on the cause of the mould. RIC attended the property on 30 December 2022 and reported:  there was mould on the contents and building surfaces, predominately on the lower sections of timber wall panels through the property. Mould damage is consistent with periods of high indoor humidity (>65%RH), likely further exacerbated by moisture migration from the subfloor space into the interior of the property  the subfloor space was inundated with floodwater. To confirm this, RIC recommended the removal of skirting boards along the bottom of affected wall panelling. If mould growth is evident beyond the skirting board, then it is likely that moisture has migrated from the Determination | Case number: 957051 Page 6 of 11 subfloor space. If there is mould behind the skirting board, it is likely that the mould inside the house is solely consistent with high indoor humidity  there was no evidence of water ingress into the property The insurer has requested further inspections On 19 January 2023, the insurer reviewed RIC‟s report and decided not to cover further mould remediation. The complainant again disputed t he insurer‟s decision . The complainant also complained that a qualified engineer never inspected the damage to his property and the insurer ‟s decision was made without such an inspection. In March 2023, the insurer confirmed that RIC‟s report was inadequate as RIC had not removed the skirting boards along the bottom of affected wall panelling to establish the cause of the mould damage. The insurer therefore recommended an engineer assess the structural damage to the property to confirm if it was because of the storm event. The insurer also proposed for an IEP to remove the skirtings to confirm the cause of the mould. The complainant has not allowed access for the insurer‟s engineer and IEP to re-inspect his property. He says there were multiple inspections done previously and the insurer has failed to engage qualified experts to assess the damage. He says the insurer should decide on the claim based on the available evidence and the engineering report submitted by him detailing the damage. The insurer apologises for the delays in assessing the claim. It agrees that there have been multiple inspections to assess damage at the property, however, it says that it is still not confirmed if the mould is related to the March 2022 storms. It says a reattendance is required to assess the structural damage at the property and to get an updated scope of works and a quote. The insurer has confirmed that it will pay for the complainant‟s temporary accommodation until a decision is made on the AFCA complaint. The complainant has advised that temporary accommodation is not required at this stage as he has moved into his property. However, he says that it may be required later when the repairs are conducted. The complainant confirms the receipt of the temporary accommodation payment from the insurer until 31 May 2023. Having reviewed all the exchanged information, the panel is satisfied that the insurer‟s claim‟s handling has been inadequate, and the insurer should have organised the necessary assessments at a much earlier time. The panel is sym pathetic to the complainant‟s position that he does not want the insurer‟s representatives to reattend and AFCA should decide based upon the information exchanged. That said, the panel is conscious of the fact that further information would be preferable to decide this matter. However, noting the complainant‟s request, the panel is satisfied that it would be fair to determine two options for the complainant. At the complainant‟s discretion he may choose to accept the outcome of this determination, detailed below, which is based on the information available (option one). Alternatively, the complainant may choose to allow the insurer to engage the appropriate experts to attend for further assessment (option two). If the complainant chooses option one, the insurer is to make a cash settlement payment of $84,700, to the complainant within 14 days of the complainant accepting this determination. Determination | Case number: 957051 Page 7 of 11 If the complainant chooses option two, the parties are to work together and within 14 days of the acceptance of this determination by the complainant, the insurer is to commence the further assessment process. The details of option one Sinking floors and piers The panel is satisfied that the available evidence confirms that the floors have been sinking for some time, and there is no evidence that the floors sank after a single insured event. There is evidence to suggest past repairs with packing / propping up of piers and bottom plates / bearers, which indicates an old and likely ongoing problem with the building‟s foundation . The Insurer is not liable to fix the sinking floors or piers. Additional repair costs The exchanged reports set out a number of event-related repairs that need to take place on the property. The panel accepts that the insurer is liable for the cost of stripping out and repairing event related damage to the walls and floors in the home, mostly because of mould damage. A detailed SOW has been provided for these works. The panel is satisfied that with removal the costs associated with propping/bracing the subfloor, then the remaining costs are approximately $50,000. The insurer is responsible for this amount, together with an uplift of 20% for contingencies, making a total of $60,000. Drainage upgrades The panel is satisfied that the Complainant is responsible for installing upgrades to the drainage on the property. This was communicated to him at several points and has been noted in multiple reports. The property clearly needs better drainage since every photo supplied over the 12-month dispute show mud and pooling water around the house. The evidence is clear that these upgrades should take place before other repairs to the home, or mould will continue to be a problem. The Insurer is not liable to install additional drainage. Mould remediation The panel notes that all the specialist reports, with the exception of R say that there is visible mould in the property and that it was caused by the insured event. The panel is not satisfied that the reports from R are persuasive as there are inaccuracies and a lack of detail. The final mould assessment by RIC in December 2022 still says there is visible mould throughout the property, and concludes the mould was “ likely further exacerbated by moisture migration from the subfl oor space into the interior of the property” because “ the subfloor space was reportedly inundated with floodwater .” RIC recommends a test to confirm this assessment (removing the skirting boards) but this test is never completed by anyone. On balance the panel is satisfied that the evidence confirms that mould in the house is event- related and the insurer should pay for proper remediation. The panel is also satisfied that had the insurer taken the steps recommended by S in May 2022, the mould damage would not still be an issue, but there is no evidence that drying Determination | Case number: 957051 Page 8 of 11 equipment or removal of affected contents was ever undertaken. At this stage the only mould remediation seems to have been done by the Complainant himself using store-bought disinfectants. In May 2022, S estimated mould remediation to cost $18,000. In August R estimated mould remediation to cost about $10,000. Since the panel has significant doubts regarding R ‟s assessments and since the S estimate was closer in time to the insured event, the panel believes that the S assessment is more reliable. As this estimate is now 18 months old, the panel accepts it would be fair to add a 25% uplift to the $18,000, making a total of $22,500. Temporary accommodation A reasonable amount should also be included for temporary accommodation if the Complainant needs to move out while the repairs are taking place. Average rent in the area being $550 per week. One month would be $2200. The details of option two If the complainant accepts this determination and chooses option two, he must allow the insurer‟s representatives reasonable access to the property, at a time convenient to all parties, to undertake their assessments. The inspections are to be conducted by a qualified structural engineer and an IEP. Within 14 days of receipt of reports from the representatives, the insurer is to determine its obligations to the complainant under the terms and conditions of the policy. If the insurer seeks to cash settle the complainant it must be done based on a complete scope of works and an actionable quotation, together with a 20% uplift for contingencies. The insurer must provide any required temporary accommodation to the complainant at least until these inspections are completed and a final review of the claim decision is made. 2.2 Is an award of compensation appropriate? Yes. The insurer did not handle the claim appropriately and this caused an unusual amount of stress, delay and inconvenience for the complainant. AFCA Rules allow for an award of non-financial loss Under our Rules, AFCA can award up to $5,400 compensation for non-financial loss. This must relate to poor claims handling or other actions of the insurer which cause an unusual degree of stress, delay, or inconvenience. We expect complainants to be moderately robust, and we will not award compensation for the ordinary degree of inconvenience involved in making a claim. Insurer’s management of the claim was poor in the circumstances In this instance and considering AFCA‟s approa ch to compensation, the panel accepts the insurer‟s overall management of the claim was poor and has caused the complainant to experience an unreasonable level of stress, anxiety, inconvenience and delays in bringing this matter to conclusion. Determination | Case number: 957051 Page 9 of 11 Consideration of non-financial loss under this complaint relates to the period from when the claim was lodged and the issuing of this determination. The panel is satisfied there have occurred various failings in the insurer‟s management of the claim, especially relating to arranging inspections by qualified experts and reviewing their reports which significantly contributed to delays in bringing this claim to conclusion. This includes multiple overturns of claim decision and reattendance of experts to the property to report on the cause of mould damage which is still not confirmed. The insurer acknowledges the claim delays and says the claim was lodged at a time when the overall insurance industry was dealing with many claims resulting from catastrophic events. The insurer accepted its claim handling fell short of an acceptable standard and did apologize to the complainant. It offered the complainant an ex-gratia payment of $2,000 for the inconvenience caused. The complainant rejected this offer. The panel acknowledges the complainant‟s lack of flexibility to provide access for the reattendance of the insurer‟ s representatives. However, the panel is of the view that the insurer should have arranged for an inspection from a structural engineer in the earlier stages of the claim and would have decided on the claim accordingly. The panel agrees that the insurer should have managed the claim in a more efficient manner. Insurer is to pay the complainant $3,500 in non-financial loss Given the above, and other concerns detailed in this determination, the panel is satisfied it is fair that the insurer be required to pay the complainant non-financial loss in line with the AFCA Rules. The insurer‟s management of the claim and conduct have caused the complainant to experience undue levels of stress, inconvenience and delays. Within 14 days of receiving notice of the complainant‟s acceptance of this determination, the insure r is to pay the complainant $3,500 in non-financial loss. The insurer is to pay the non-financial loss compensation to the complainant within 14 days of the complainant accepting either option one or option two. 2.3 Why is the outcome fair? The outcome is fair as it is consistent with the information exchanged. Determination | Case number: 957051 Page 10 of 11 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all the information the parties have provided. While the parties have raised several issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. A panel determined this matter Due to the nature of this complaint, we referred it to a panel for determination. The panel includes:  an ombudsman  a member with significant experience in consumer and small business advocacy  a member with extensive experience in the insurance industry. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established. Determination | Case number: 957051 Page 11 of 11 3.2 Relevant policy wording General exclusions for all covers and benefits The exclusions set out in this section apply to all covers and benefits under your policy. What we don't cover Loss, damage, injury or death arising from: - rust, corrosion, gradual deterioration, depreciation, wear or tear - atmospheric conditions or extreme temperature - mould unless arising from loss or damage covered by a listed event Your responsibilities Co-operate You must: [ … ] giving us reasonable ac cess to your home for a repairer or other specialist we choose so they can assess any damage to your home and contents. Inspections and quotes If we ask you, you must: - let us, and our representatives inspect your home or contents at a reasonable time, and - allow us to obtain quotations from any repairer or supplier

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.