Partial decline of storm damage claim (sinking floors and piers) and poor claim handling
Text of the determination
Determination
Case number 957051
Financial firm Insurance Australia Limited
Determination | Case number: 957051 Page 2 of 11
Case number: 957051 16 October 2023
1 Determination overview
1.1 Complaint
The complainant holds a home insurance policy with the financial firm (the insurer). He
lodged a claim for water damage to his home following a storm on 11 March 2022.
The insurer has agreed to cover the mould damage at the property and offered a cash
settlement of $10,870.40. The insurer says all other damage to the property including that to
the floor and piers was not due to the 2022 storm event, rather the damage is related to
maintenance and pre-existing issues.
The insurer says it did not engage an engineer to report on the structural damage to the
property. Therefore, it offers to appoint an engineer to assess and report on this damage. The
complainant is not willing to allow any further inspection of the property. The complainant is
seeking the full policy amount of $526,718, plus compensation for the stress and
inconvenience caused to him due to the insurer‟s claim handling.
1.2 Issues and key findings
Has the insurer correctly assessed the claim?
The insurer has correctly assessed only part of the claim.
Given the insurer‟s de lays and breakdown in the relationship between the parties, it would not
be fair or reasonable on the complainant to allow the insurer to conduct a further assessment
which should have been conducted at an earlier time.
As a result, the panel has sought to bring this matter to finalisation based on the information
that has been exchanged.
However, a t the complainant‟s discretion he has the option to accept the amounts the panel
has determined or to allow the insurer to re-attend for a further assessment.
If the complainant accepts the second option, o n receipt of the engineer‟s report, the insurer
is to review its claim decision and settle any storm related damage.
Is an award of compensation appropriate?
Yes. The insurer did not handle the claim appropriately and this caused an unusual amount of
stress, delay and inconvenience for the complainant.
Why is the outcome fair?
The outcome is fair because it is consistent with the information exchanged.
1.3 Determination
The determination is partially in favour of the complainant.
The insurer and the complainant are to cooperate to comply with this determination.
Determination | Case number: 957051 Page 3 of 11
2 Reasons for determination
2.1 Has the insurer correctly assessed the claim?
The insurer has correctly assessed only part of the claim.
The insurer denied the damage to the floor and piers saying it is related to maintenance and
pre-existing issues. It offered a cash settlement for mould related damage, but the
complainant rejected it. The insurer says it is not yet confirmed if the cause of structural
damage to the property is the March 2022 storm. It says an engineer‟s assessment is
required to confirm the cause of structural damage.
Complainant must establish a valid claim under the policy
The complainant is required to show on the balance of probabilities (that it is more likely than
not) he suffered a loss caused by a risk covered by the policy. This is known as a valid, claim.
The complainant holds a home insurance policy issued by the insurer. Subject to its terms
and conditions, the policy covers loss and damage caused by the listed events detailed in the
insurer‟s product disclosure statement (PDS). One of those listed events is „Storm‟ .
Once the complainant establishes a valid claim, the insurer is liable for the loss unless it
shows an exclusion or limiting condition applies. The insurer has the onus of proving on the
balance of probabilities the application of the exclusion or condition.
When there are multiple potential causes of a loss, it is necessary to determine the proximate
cause. Proximate cause is the dominant, efficient or operative cause of a loss. It is not
required to be last in time or the sole cause. It is a question of fact that depends on the
circumstances of each case. It requires a common-sense evaluation of the evidence.
Complainant says the storm caused the damage
On 26 March 2022, the complainant notified the insurer that the insured property had
sustained water damage during a storm on 11 March 2022.
The complainant says due to the heavy rains, water went through and under his house
resulting in subsidence of the house footings and sinking of the house. He says the hardwood
floors had movement, separation and mould.
The complainant says the entire damage to his property is because of the March 2022
storms. He says there were no maintenance issues which would have contributed to the
damage. He relies on his engineer, JL, who says the structural damage to his property is
because of the storm event. He says JL‟s report includes a detailed scope of works and
c osting to repair the damage. The complainant also submitted a restoration report from „S‟ ,
which confirmed the presence of mould and other storm related damage.
The complainant says the insurer has already conducted multiple inspections to assess the
damag e, therefore, he is not willing to allow access to any of the insurer‟s experts to reassess
the damage at his property. He wants the insurer to review its claim decision based on the
available evidence and provide an outcome.
Complainan t’s engineer JL
JL attended the property on 22 July 2022 and reported that:
Determination | Case number: 957051 Page 4 of 11
the flood and storm waters has caused water damage to the internal and external finishes
of the property. The property has also suffered minor structural damage
repair and reinstatement are required to the brickwork, subfloor framing/posts, roofing,
windows, floor finishes, painting, plumbing and electrical services
mould is apparent and visible throughout the property
it is likely that the house contains asbestos and the removal of any asbestos is required.
However, the exact extent of asbestos is unknown, and a qualified hygienist will need to be
engaged to understand the extent
a structural engineer‟s inspection of the property shows several issues that require
rectification which have been caused by the severe weather event. This includes
underpinning the footings and assessment of the brick piers by removing floor lining and
repairs to the structural crack in a brick wall
The insurer says there are no details about the cause of the structural damag e in JL‟s report.
It says that JL‟s report only provides a scope of work for the d amage identified by the builder.
The insurer considers its builder ‟s (Y) report provides a better analysis of damage.
Insurer says the cause of structural damage is not yet confirmed
The insurer appointed a builder (R), who attended the insured property on 31 May 2022 and
reported that there was no claim related damage at the property. R stated that the internal
floor has sloped away and dropped before the storm. R detailed a mouldy smell at the
property coming from water under the house as there is no drainage for water to exit. R noted
no mould in the interior of the house. R concluded that the damage at the property appeared
to be pre-existing.
The insurer denied the claim on 16 June 2022. The complainant disagrees with R‟s report
and requested a review of the claim decision.
The insurer appointed builder, Y, to assess and report on the damage to the floor and piers at
the property. Y reviewed the reports from R and a cleaning and restoration specialist (S). Y
inspected the property on 12 July 2022 and reported that:
a large amount of water ponding was observed outside, under, in the sub-floor and around
the home
bricks were used previously to support the bottom plates or bearers of the walls indicating
that sinking of the floors is not new. Fibro cement of the villa board sheeting was used to
areas as packers between the piers and bottom plate or bearer due to past/pre-existing
sinking of the piers
in the kitchen and dining rooms there was no evidence of recent dropping of walls or floors
with cracking, separation or dislodgment of tiles, timber trims or moulding or any other
building material that would indicate floor dropping/sinking from a single recent insured
event
partial renovations were done since the home was sold in June 2018 with building
materials that have been cut in, cut to or fitted to suit the sunken floors
there were water marks to the soil under the home around the kitchen area which is most
likely from the recent rain and storms. However, these soil marks are not related to the
sinking of the floors by removing soil at mass causing the piers to sink suddenly from a
recent event. These marks would occur in any large rain event, due to the block sloping
from front to back with most of the water directed under the home from the immediate
water path at the front of the property
Determination | Case number: 957051 Page 5 of 11
the internal walls to some rooms showed signs of mould growth. There is nothing to
confirm about when this mould has appeared. The report from S states that there was
mould present recently after the storm. However, Y noted that the subfloor space is still
ponding large amounts of water which is not escaping as well as the home being locked up
due to the insured not living there which is only contributing and accelerating additional
mould growth inside the home
sinking floors to the home in the kitchen and dining room is not related to a single insured
event (storm) and it has occurred previously and most likely is still slowly occurring over
time
the mould growth to the internal parts of the home is not related to the storm event,
however, it is being accelerated due to water still present under the home and being
locked up.
Based upon Y‟s report the insurer decided that the mould has occurred because of the storm
water. The insurer engaged builder, R to prepare a mould remediation scope of works and
make safe. R subsequently appointed a restorer, RS, who attended the property on 17
August 2022 and who completed a make safe and took moisture readings. RS identified
mould growth on the walls and skirting boards of the house entrance, bedroom two, bedroom
three, lounge room, dining room and on the vanity unit in the bathroom.
R reattended on 12 October 2022, and concluded that there was mould at the property, but all
the walls were dry. R reported that:
the mould growth is from atmospheric transference from a combination of the continual
water that is laying under the house and the house being locked up most of the time.
There is no evidence that the house has been flooded inside as all walls were dry, but
mould continues to grow
as the surrounding yard is extremely water logged, water had trouble escaping from this
area. In R‟s first inspection, t he insured was advised that he needs to install drainage
system as a maintenance issue. No maintenance had been carried out to rectify the water
issues at the time of the second inspection. While the water has flowed under the house, it
did not enter the house. With several major rain storms since the first one there has been
no chance for the subfloor area to dry out
the engineer has noted that the mould growth to the internal parts of the house is not
related to the storm event, however, it is being accelerated due to water still present under
the home and being locked up. As the mould is from atmospheric transference and not
from direct contact with flood waters this would not be covered
The insurer, based on Y‟ s report, decided on 16 November 2022, to not cover the sinking
floor as it was not because of the storm event. The complaint does not accept this decision.
On 16 December 2022, the insurer, due to the conflicting reports appointed RIC an indoor
environmental professional (IEP) to report on the cause of the mould. RIC attended the
property on 30 December 2022 and reported:
there was mould on the contents and building surfaces, predominately on the lower
sections of timber wall panels through the property. Mould damage is consistent with
periods of high indoor humidity (>65%RH), likely further exacerbated by moisture migration
from the subfloor space into the interior of the property
the subfloor space was inundated with floodwater. To confirm this, RIC recommended the
removal of skirting boards along the bottom of affected wall panelling. If mould growth is
evident beyond the skirting board, then it is likely that moisture has migrated from the
Determination | Case number: 957051 Page 6 of 11
subfloor space. If there is mould behind the skirting board, it is likely that the mould inside
the house is solely consistent with high indoor humidity
there was no evidence of water ingress into the property
The insurer has requested further inspections
On 19 January 2023, the insurer reviewed RIC‟s report and decided not to cover further
mould remediation. The complainant again disputed t he insurer‟s decision . The complainant
also complained that a qualified engineer never inspected the damage to his property and the
insurer ‟s decision was made without such an inspection.
In March 2023, the insurer confirmed that RIC‟s report was inadequate as RIC had not
removed the skirting boards along the bottom of affected wall panelling to establish the cause
of the mould damage. The insurer therefore recommended an engineer assess the structural
damage to the property to confirm if it was because of the storm event. The insurer also
proposed for an IEP to remove the skirtings to confirm the cause of the mould.
The complainant has not allowed access for the insurer‟s engineer and IEP to re-inspect his
property. He says there were multiple inspections done previously and the insurer has failed
to engage qualified experts to assess the damage. He says the insurer should decide on the
claim based on the available evidence and the engineering report submitted by him detailing
the damage.
The insurer apologises for the delays in assessing the claim. It agrees that there have been
multiple inspections to assess damage at the property, however, it says that it is still not
confirmed if the mould is related to the March 2022 storms. It says a reattendance is required
to assess the structural damage at the property and to get an updated scope of works and a
quote.
The insurer has confirmed that it will pay for the complainant‟s temporary accommodation
until a decision is made on the AFCA complaint. The complainant has advised that temporary
accommodation is not required at this stage as he has moved into his property. However, he
says that it may be required later when the repairs are conducted. The complainant confirms
the receipt of the temporary accommodation payment from the insurer until 31 May 2023.
Having reviewed all the exchanged information, the panel is satisfied that the insurer‟s claim‟s
handling has been inadequate, and the insurer should have organised the necessary
assessments at a much earlier time.
The panel is sym pathetic to the complainant‟s position that he does not want the insurer‟s
representatives to reattend and AFCA should decide based upon the information exchanged.
That said, the panel is conscious of the fact that further information would be preferable to
decide this matter.
However, noting the complainant‟s request, the panel is satisfied that it would be fair to
determine two options for the complainant.
At the complainant‟s discretion he may choose to accept the outcome of this determination,
detailed below, which is based on the information available (option one).
Alternatively, the complainant may choose to allow the insurer to engage the appropriate
experts to attend for further assessment (option two).
If the complainant chooses option one, the insurer is to make a cash settlement payment of
$84,700, to the complainant within 14 days of the complainant accepting this determination.
Determination | Case number: 957051 Page 7 of 11
If the complainant chooses option two, the parties are to work together and within 14 days of
the acceptance of this determination by the complainant, the insurer is to commence the
further assessment process.
The details of option one
Sinking floors and piers
The panel is satisfied that the available evidence confirms that the floors have been sinking
for some time, and there is no evidence that the floors sank after a single insured event.
There is evidence to suggest past repairs with packing / propping up of piers and bottom
plates / bearers, which indicates an old and likely ongoing problem with the building‟s
foundation .
The Insurer is not liable to fix the sinking floors or piers.
Additional repair costs
The exchanged reports set out a number of event-related repairs that need to take place on
the property. The panel accepts that the insurer is liable for the cost of stripping out and
repairing event related damage to the walls and floors in the home, mostly because of mould
damage. A detailed SOW has been provided for these works. The panel is satisfied that with
removal the costs associated with propping/bracing the subfloor, then the remaining costs are
approximately $50,000.
The insurer is responsible for this amount, together with an uplift of 20% for contingencies,
making a total of $60,000.
Drainage upgrades
The panel is satisfied that the Complainant is responsible for installing upgrades to the
drainage on the property. This was communicated to him at several points and has been
noted in multiple reports. The property clearly needs better drainage since every photo
supplied over the 12-month dispute show mud and pooling water around the house. The
evidence is clear that these upgrades should take place before other repairs to the home, or
mould will continue to be a problem.
The Insurer is not liable to install additional drainage.
Mould remediation
The panel notes that all the specialist reports, with the exception of R say that there is visible
mould in the property and that it was caused by the insured event.
The panel is not satisfied that the reports from R are persuasive as there are inaccuracies
and a lack of detail.
The final mould assessment by RIC in December 2022 still says there is visible mould
throughout the property, and concludes the mould was “ likely further exacerbated by moisture
migration from the subfl oor space into the interior of the property” because “ the subfloor
space was reportedly inundated with floodwater .” RIC recommends a test to confirm this
assessment (removing the skirting boards) but this test is never completed by anyone.
On balance the panel is satisfied that the evidence confirms that mould in the house is event-
related and the insurer should pay for proper remediation.
The panel is also satisfied that had the insurer taken the steps recommended by S in May
2022, the mould damage would not still be an issue, but there is no evidence that drying
Determination | Case number: 957051 Page 8 of 11
equipment or removal of affected contents was ever undertaken. At this stage the only mould
remediation seems to have been done by the Complainant himself using store-bought
disinfectants.
In May 2022, S estimated mould remediation to cost $18,000. In August R estimated mould
remediation to cost about $10,000. Since the panel has significant doubts regarding R ‟s
assessments and since the S estimate was closer in time to the insured event, the panel
believes that the S assessment is more reliable.
As this estimate is now 18 months old, the panel accepts it would be fair to add a 25% uplift
to the $18,000, making a total of $22,500.
Temporary accommodation
A reasonable amount should also be included for temporary accommodation if the
Complainant needs to move out while the repairs are taking place. Average rent in the area
being $550 per week. One month would be $2200.
The details of option two
If the complainant accepts this determination and chooses option two, he must allow the
insurer‟s representatives reasonable access to the property, at a time convenient to all
parties, to undertake their assessments.
The inspections are to be conducted by a qualified structural engineer and an IEP.
Within 14 days of receipt of reports from the representatives, the insurer is to determine its
obligations to the complainant under the terms and conditions of the policy.
If the insurer seeks to cash settle the complainant it must be done based on a complete
scope of works and an actionable quotation, together with a 20% uplift for contingencies.
The insurer must provide any required temporary accommodation to the complainant at least
until these inspections are completed and a final review of the claim decision is made.
2.2 Is an award of compensation appropriate?
Yes. The insurer did not handle the claim appropriately and this caused an unusual amount of
stress, delay and inconvenience for the complainant.
AFCA Rules allow for an award of non-financial loss
Under our Rules, AFCA can award up to $5,400 compensation for non-financial loss. This
must relate to poor claims handling or other actions of the insurer which cause an unusual
degree of stress, delay, or inconvenience.
We expect complainants to be moderately robust, and we will not award compensation for the
ordinary degree of inconvenience involved in making a claim.
Insurer’s management of the claim was poor in the circumstances
In this instance and considering AFCA‟s approa ch to compensation, the panel accepts the
insurer‟s overall management of the claim was poor and has caused the complainant to
experience an unreasonable level of stress, anxiety, inconvenience and delays in bringing
this matter to conclusion.
Determination | Case number: 957051 Page 9 of 11
Consideration of non-financial loss under this complaint relates to the period from when the
claim was lodged and the issuing of this determination. The panel is satisfied there have
occurred various failings in the insurer‟s management of the claim, especially relating to
arranging inspections by qualified experts and reviewing their reports which significantly
contributed to delays in bringing this claim to conclusion. This includes multiple overturns of
claim decision and reattendance of experts to the property to report on the cause of mould
damage which is still not confirmed.
The insurer acknowledges the claim delays and says the claim was lodged at a time when the
overall insurance industry was dealing with many claims resulting from catastrophic events.
The insurer accepted its claim handling fell short of an acceptable standard and did apologize
to the complainant. It offered the complainant an ex-gratia payment of $2,000 for the
inconvenience caused. The complainant rejected this offer.
The panel acknowledges the complainant‟s lack of flexibility to provide access for the
reattendance of the insurer‟ s representatives. However, the panel is of the view that the
insurer should have arranged for an inspection from a structural engineer in the earlier stages
of the claim and would have decided on the claim accordingly. The panel agrees that the
insurer should have managed the claim in a more efficient manner.
Insurer is to pay the complainant $3,500 in non-financial loss
Given the above, and other concerns detailed in this determination, the panel is satisfied it is
fair that the insurer be required to pay the complainant non-financial loss in line with the
AFCA Rules. The insurer‟s management of the claim and conduct have caused the
complainant to experience undue levels of stress, inconvenience and delays. Within 14 days
of receiving notice of the complainant‟s acceptance of this determination, the insure r is to pay
the complainant $3,500 in non-financial loss.
The insurer is to pay the non-financial loss compensation to the complainant within 14 days of
the complainant accepting either option one or option two.
2.3 Why is the outcome fair?
The outcome is fair as it is consistent with the information exchanged.
Determination | Case number: 957051 Page 10 of 11
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all the information the parties have provided.
While the parties have raised several issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
A panel determined this matter
Due to the nature of this complaint, we referred it to a panel for determination. The panel
includes:
an ombudsman
a member with significant experience in consumer and small business advocacy
a member with extensive experience in the insurance industry.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.
Determination | Case number: 957051 Page 11 of 11
3.2 Relevant policy wording
General exclusions for all covers and benefits
The exclusions set out in this section apply to all covers and benefits under your
policy.
What we don't cover
Loss, damage, injury or death arising from:
- rust, corrosion, gradual deterioration, depreciation, wear or tear
- atmospheric conditions or extreme temperature
- mould unless arising from loss or damage covered by a listed event
Your responsibilities
Co-operate
You must:
[ … ] giving us reasonable ac cess to your home for a repairer or other specialist
we choose so they can assess any damage to your home and contents.
Inspections and quotes
If we ask you, you must:
- let us, and our representatives inspect your home or contents at a reasonable
time, and
- allow us to obtain quotations from any repairer or supplier